marie reed school sit meeting presentation (june 3, 2015)
TRANSCRIPT
MARIE REED ELEMENTARY SCHOOLDISTRICT OF COLUMBIA
DEPARTMENT OF GENERAL SERVICES
SCHOOL IMPROVEMENT TEAM (SIT) MEETING JUNE 3rd, 2015
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OVERVIEWAGENDA
• Purpose & Objectives - this meeting
• Recap - regarding prior meetings
• Upcoming Community Meeting
• Preliminary Concepts
• Pro/Con - preliminary discussion
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
GROWTH OF THE WHOLE CHILD
ELEMENTARY SCHOOLS SHOULD PROMOTE PERSONAL GROWTH AND A SENSE OF IDENTITY WITHIN THESE CONTEXTS
SELF FAMILY COMMUNITY NATION WORLD
APPROACH TO THE DESIGN OF LEARNING ENVIRONMENTS
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
ANC RECOMMENDATIONS
CELEBRATE THE COMMUNITY• Embrace the ideas expressed in the 20 April 2015 Vision Statement
PROVIDE A BETTER SENSE OF CENTER, A TOWN SQUARE• Improve the facility presence and provide improved access for the DCPS,
DPR and DOH and other partnersCONSIDER ALTERNATIVES
• Renovate• Build New• A (hybrid) combination: some renovation and some new construction• Confirm adequate funding and assure quality renewal
DEVELOP A “GREEN” BUILDING• Provide comfort• Assure energy efficiency• Apply best practices in regards to environmental responsibility
PROVIDE CLEAR PHYSICAL DELINEATIONS• Define appropriate entrance locations and boundaries between facilities• Define a place for the Elementary School, the Recreational Facilities and the
Health Facilities and other PartnersHONOR THE HISTORY
• A facility intended to serve as a “civic heart”• Celebrate the re-conceptualization of Adams Morgan as a place that has
embraced a diverse racial, cultural, and socio-economic communityMINIMIZE THE DISRUPTION DURING CONSTRUCTION
• Maintain continuity of programs to the greatest feasible extent• Build quickly
Marie Reed, Dedication Photo, Washington Star, 1978
Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.
A Community Center for Adams Morgan: A Community Center For Adams MorganBy Joann Stevens Washington Post Staff WriterThe Washington Post (1974-Current file); Mar 30, 1978; ProQuest Historical Newspapers: The Washington Postpg. DC1
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
ANC RECOMMENDATIONS
REFRESH AND EXPAND THE RECREATIONAL FACILITIES• Provide for soccer, swimming and gymnasium facilities• Provide playgrounds, tennis and related game courts• Provide needed support facilities – restrooms and lockers
DEVELOP AN EXCELLENT ELEMENTARY SCHOOL FACILITY• Fulfill the DCPS Educational Specifications
PROVIDE PLACE FOR COMMUNITY USE• Support community meetings• Support adult learning• Support performance events
PROVIDE EXPANDED SPACE FOR THE WOMEN INFANTS AND CHILDREN PROGRAM
• Support s provided to over 200 clients each month• Support the synergistic relationship between the WIC and the Community
of Hope •
SUPPORT EXPANDED DEVELOPMENT OF THE EARLY CHILD-HOOD LEARNING CENTER
• Support growth beyond the current 16 child limit.MAINTAIN AND EXPAND THE COMMUNITY OF HOPE HEALTH CENTER
• Provide a facility well designed to accommodate over 13,600 patient visits per year
• Anticipate growthCONSIDER AND ALLOW FOR DEVELOPMENT OF A NEW BRANCH LIBRARY
• Anticipate future funding and development of a new branch library• In the meantime, assure that quiet reading spaces are provided for within
the existing Elementary School and Community Center
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
COMPONENT PARTSPROGRAM
• Community Center
• Marie Reed Elementary School
School Based Partners
• Department of Parks and Recreation Facility
After School CareGymnasium Public Pools
• Community of Hope Health Clinic
Women and Infant Care (WIC) Pro-gram
• Legacy Display Area
• Future Library Program
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
URBAN PLACE AND SUSTAINABLE INFRASTRUCTUREPLACE MAKING
CANAL PARK, WASHINGTON, DC
RAILROAD PARK, BIRMINGHAM, AL NORMAL, IL
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
PUBLIC SPACE COMPARISON
DUPONT CIRCLE CANAL PARK
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
DESIGN OPPORTUNITIES
CAFETERIA & STUDENT COMMONS
A flexible cafeteria space may be designed to function as an additional learning environment when not used for dining. It might also support informal performances during after school activities. Additional performance spaces would help develop communication and self expression skills to align with goals of the Common Core and the DC Scores Poetry programming.
MEDIA CENTER
INTERMEDIATECLUSTER
ART AND SCIENCE STUDIOS
RECORDING STUDIO
A recording studio might support the DC Scores goals to help students develop a deeper understanding of themselves through written expression and performance. Students would learn communications and media skills; they would also have the opportunity to review recordings of their poetry performances to reflect on and refine their craft.
MEDIA PRODUCTION LAB
Digital media labs are versatile learning environments that allow students to create, edit, refine, and communicate ideas and information. Students could enhance communication, creativity, critical thinking, and media literacy skills through a technologically rich digital arts curriculum that would develop 21st century skills. This lab could also support after school programming.
MEDIA PRODUCTION LAB
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
DESIGN OPPORTUNITIES
COMMONS
Commons spaces could support Tools of the Minds theme-based play. After school programming such as chess clubs and one on one tutoring could make use of more intimately scaled environments.
COMMONS
Commons spaces could support small group instruction and after school tutoring and social activities. Ample storage should be provided for after school programs and to secure personal belongings during after school activities. Tackable surfaces and display cases should display student work to promote a sense of ownership and pride.
RESOURCE ROOMS
Thoughtful integration of technology and furnishings will create flexible and adaptable resource rooms. These rooms will support teacher collaboration, small group instruction, and after school tutoring programs.
CLASSROOM CLUSTER - INTERMEDIATE GRADES
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
TRANSFORMATION OF EXISTING BUILDINGCLAIRE T. CARNEY LIBRARY
Claire T. Carney Library, located at the University of Massachusetts Dartmouth, was originally designed by Paul Rudolph between 1962 and 1974. It is of the same era in history as Marie Reed (1971-1977), and of a similar building style. In 2013, the
building underwent a transformative renovation that enhanced the interior environ-ment, increased daylight and visual connection to the exterior, and all at the same
time, maintained the quintessential character of the original building.
EXISTING BUILDING
AFTER RENOVATION
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
CONSIDERED BUT NOT DEVELOPEDPRELIMINARY CONCEPTS
• Both are costly options
• East side of champlain is ill suited for athlectic program
• Does not take adantage of existing building infra-structure
• Phasing issue - where would tenants go while new facility is being built? (upper right image)
District of Columbia Public SchoolsMarie Reed Elementary ModernizationFeasibility Study 10.10.13
p 24
NEW CONSTRUCTION
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
CONSIDERED BUT NOT DEVELOPEDPRELIMINARY CONCEPTS
• East side of champlain is ill suited for athlectic program
• Disruption to residential neighbors during demolition of east wing
• Large hole left by demolition of east wing would need to infilled
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION A - REUSE EXISTING BUILDINGPRELIMINARY CONCEPTS
ORGANIZEDSPORTS
BUILDING ADDITION
ENTRY
EDUCATION
POCKETPARKEARLY
CHILDHOOD
DAYCARE
STRUCTUREDPLAY
EXISTINGBUILDING
xx
x
x
xx
x
x
xx
x
DESIRE LINES
SITE BOUNDARY
SCHOOL ONLY ZONE DURINGDESIGNATED HOURS(DEFENSIBLE SPACE)
COMMUNITY BUFFER
LEGEND
SCALE 1”=100’
0 100 200 FT
x x x
18TH STREET NW
CHAMPLAIN STREET NW
FLOR
IDA
AVE
NW
CALIFORNIA STREET NW
ONTARIO ROAD NW
PUMPSTATION
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
PRECEDENT IMAGES - TRANSITIONSSITE
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
PRELIMINARY CONCEPTSOPTION A - REUSE EXISTING BUILDING
EXISTING DEMO BARREL VAULTS
NEW PROGRAM NEW SKYLIGHTS
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION A - REUSE EXISTING BUILDINGPRELIMINARY CONCEPTS
GROUND FLOOR
POOL
KIDDIE POOL
CLINIC
ME
CH
DAYCARE
GYM
DPR OFFICE
DAYLIGHT
ENTRY
ENTRY
LOC
KE
RS
1ST FLOOR
MECH
SCHOOL ADMIN
PRE-K
PRE-S
PRE-S
PRE-S
PRE-K
PRE-K KG
KGAUDITORIUM
KG
ENTRY
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION A - REUSE EXISTING BUILDINGPRELIMINARY CONCEPTS
2ND FLOOR
SECTION PERSPECTIVE OF 2ND FLOOR COMMONS
SECTION PERSPECTIVE OF GYM
1ST
CAFETERIA
MEDIA
SCIENCE
SKYLIGHTSABOVE
SKYLIGHTSABOVE
1ST
1ST
3RD 3RD
3RD
4TH
4TH
4TH 5TH
5TH
5TH ART
2ND
2ND
2ND
RE
SO
UR
CE
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION B - REUSE EXISTING BUILDING AND BUILD RECREATIONAL ADDITIONPRELIMINARY CONCEPTS
ORGANIZEDSPORTS
BUILDING ADDITION
ENTRY
EDUCATION
POCKETPARKEARLY
CHILDHOOD
DAYCARE
STRUCTUREDPLAY
EXISTINGBUILDING
x xx
x
xx
x
x
xx
xx
DESIRE LINES
SITE BOUNDARY
SCHOOL ONLY ZONE DURINGDESIGNATED HOURS(DEFENSIBLE SPACE)
COMMUNITY BUFFER
LEGEND
SCALE 1”=100’
0 100 200 FT
x x x
18TH STREET NW
CHAMPLAIN STREET NW
FLOR
IDA
AVE
NW
CALIFORNIA STREET NW
ONTARIO ROAD NW
PUMPSTATION
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION B - REUSE EXISTING BUILDING AND BUILD RECREATIONAL ADDITIONPRELIMINARY CONCEPTS
GROUND FLOOR
POOL
CLINIC
DAYCARE
GYM
DPR OFFICE
COMMUNITY MULTI-PURPOSE ROOM
DAYLIGHT
EN
TRY
EN
TRY
ME
CH
ENTRY
LOC
KE
RS
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION B - REUSE EXISTING BUILDING AND BUILD RECREATIONAL ADDITIONPRELIMINARY CONCEPTS
POOL ADDITION
KIDDIE POOL ADDITION
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION C - REUSE EAST WING AND BUILD NEW SCHOOL/REC BUILDINGPRELIMINARY CONCEPTS
ORGANIZEDSPORTS
ENTRY
EDUCATION
POCKETPARK
DAYCARE
PARKING
STRUCTUREDPLAY
NEW BUILDING
EXISTINGBUILDING
DESIRE LINES
SITE BOUNDARY
SCHOOL ONLY ZONE DURINGDESIGNATED HOURS(DEFENSIBLE SPACE)
COMMUNITY BUFFER
LEGEND
SCALE 1”=100’
0 100 200 FT
x x x
18TH STREET NW
CHAMPLAIN STREET NW
FLOR
IDA
AVE
NW
CALIFORNIA STREET NW
ONTARIO ROAD NW
PUMPSTATION
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION C - REUSE EAST WING AND BUILD NEW SCHOOL/REC BUILDINGPRELIMINARY CONCEPTS
POOL
KIDDIE POOL
GYM
MECH
DPR OFFICECOMMUNITY MULTI-PURPOSE ROOM
BLEACHERS OVERLOOKING POOL
DAYLIGHTDAYLIGHT
EN
TRY
LOC
KE
RS
LOC
KE
RS
SH
OW
ER
SHOWER
BASEMENT
GROUND FLOOR
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION C - REUSE EAST WING AND BUILD NEW SCHOOL/REC BUILDINGPRELIMINARY CONCEPTS
3RD FLOOR
2ND FLOOR
COMMONS
CO
MM
ON
S
ATRIUM
ATRIUM
ATRIUM
ART SCIENCE MUSIC
2ND2ND2ND
4TH
1ST
4TH
1ST
4TH
1ST
MEDIA
GREEN ROOF
5TH 3RD5TH 3RD5TH 3RD
RE
SO
UR
CE
RE
SO
UR
CE
TOIL
ET
TOIL
ET
TOIL
ET
TOIL
ET
RE
SO
UR
CE
RE
SO
UR
CE
1ST FLOOR
COMMONS(OPEN TO ABOVE)
LOBBY(OPEN TO ABOVE)
RE
SO
UR
CE
TOIL
ET
TOIL
ET
RE
SO
UR
CE
SCHOOL ADMIN
PRE-KPRE-KPRE-K PRE-SPRE-SPRE-S
CAFETERIA
KGKGKG
EN
TRY
VIEW OF CITY
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION C - REUSE EAST WING AND BUILD NEW SCHOOL/REC BUILDINGPRELIMINARY CONCEPTS
1ST FLOORGROUND FLOOR 2ND FLOOR
PARKING
LOBBYLOBBY LOBBY
CLINICDAYCARE
ENTRY
ENTRY
ENTRY
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
OPTION C - REUSE EAST WING AND BUILD NEW SCHOOL/REC BUILDINGPRELIMINARY CONCEPTS
District of Columbia Public SchoolsMarie Reed Elementary School DRAFT
PRO/CON EVALUATION - INITIAL DISCUSSIONPRELIMINARY EVALUATION & DISCUSSION
• Urban Place-Making:• as a public place• as a recreational center
• Learning Environments:• in compliance with the Educational
Specification• as a 21st Century Educational Facility• as a place for the In School Partners
• Project Economics:• Initial Cost• Life Cycle Cost
• Community Partner Environments:• of the Community of Hope Clinic• of the Daycare Facility• of the Women and Infant Care Facility
• Environmental Stewardship: • in regard to construction impact• in regard to sustainability and regenerative
design
ORGANIZEDSPORTS
BUILDING ADDITION
ENTRY
EDUCATION
POCKETPARKEARLY
CHILDHOOD
DAYCARE
STRUCTUREDPLAY
EXISTINGBUILDING
x xx
x
xx
x
x
xx
xx
DESIRE LINES
SITE BOUNDARY
SCHOOL ONLY ZONE DURINGDESIGNATED HOURS(DEFENSIBLE SPACE)
COMMUNITY BUFFER
LEGEND
SCALE 1”=100’
0 100 200 FT
x x x
18TH STREET NW
CHAMPLAIN STREET NW
FLOR
IDA
AVE
NW
CALIFORNIA STREET NW
ONTARIO ROAD NW
PUMPSTATION