MARCH 2019 PROJECT AQUA
STACKBO, GÄVLE, SWEDEN OVERALL GEOTECHNICAL INVESTIGATION
SOIL INVESTIGATION REPORT (SIR)
MARCH 2019 PROJECT AQUA
STACKBO, GÄVLE, SWEDEN OVERALL GEOTECHNICAL INVESTIGATION
SOIL INVESTIGATION REPORT (SIR)
ADRESS COWI AB
Södra Förstadsgatan 26
211 43 Malmö
Sverige
TEL 010 850 10 00
FAX 010 850 10 10
WWW cowi.se
PROJECT NO. DOKUMENT NO.
A070065 A070065-03-04-SIR-STACKBO-003
VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED
3.0 19.03.2019 SOIL INVESTIGATION REPORT SICO JEHA
STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
5
CONTENT
1 Generally 7
2 Object 7
3 Purpose 8
4 Project basis 8
4.1 Previous surveys 8
4.2 Basis for the investigation 8
5 Governing documents 8
6 Geotechnical category 10
7 Existing conditions 10
7.1 Topography and surface conditions 10
7.2 Existing constructions 11
8 Positioning 11
9 Geotechnical surveys 12
9.1 Generally 12
9.2 Field investigation in Area 1 12
9.3 Field investigation in Area 2 13
9.4 Calibration and certification 13
10 Geotechnical laboratory testing 14
10.1 Laboratory testing in Area 1 14
6 STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
10.2 Laboratory testing in Area 2 14
11 Hydrogeological surveys 15
12 Valuation of examination 15
APPENDIX
Appendix 1 Soil laboratory protocol
Appendix 2 Sieving protocol
DRAWINGS
Plan Drawing A070065-STACKBO-G01, scale 1:3000 (A1)
Boreholes Drawing A070065-STACKBO-G02, scale 1:100 (A1)
Boreholes Drawing A070065-STACKBO-G03, scale 1:100 (A1)
Boreholes Drawing A070065-STACKBO-G04, scale 1:100 (A1)
STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
7
1 Generally MS is considering acquiring a site north of Stockholm in the municipality of
Gävle. The area is called Stackbo and is planned for construction of Data halls.
COWI AB have been asked to conduct the Due Diligence for MS. In order to get
some information about the geotechnical conditions COWI have performed an
overall geotechnical survey on the site.
2 Object The site is located in the municipality of Gävle, approximately 15 km south west
of central Gävle and approximately 170 km north of Stockholm. For location, see
Figure 1.
Figure 1. Location of site Stackbo.
8 STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
3 Purpose The main purpose of the investigation was to create an overview of the soil
layers, the groundwater conditions and the technical properties of the soil.
Furthermore, the purpose was to identify possible adverse geotechnical issues
and recommendations for additional site investigation.
The following report presents the results of the geotechnical field and laboratory
investigations, carried out in the form of drawings and appendices.
Description of the geotechnical conditions is reported in a separate document,
entitled “Geotechnical interpretation report (GIR), Overall geotechnical
investigation, Project Aqua, Stackbo, Gävle, Sweden”, project no A070065 and
date of issue 19.03.2019.
4 Project basis
4.1 Previous surveys No geotechnical investigation has, what is known, previously been conducted in
the area.
4.2 Basis for the investigation As the basis for planning, conducting and reporting of geotechnical field
investigation, the following basis has been used:
› Geological maps from Swedish Geological Survey (SGU)
› Digital substrate with existing wires and cables
› Digital basic map obtained by the municipally of Gävle
5 Governing documents This report connects to SS-EN 1997-1 and associated national annex and TK Geo
13 (The Swedish Transport Administration's technical requirements for
geotechnical constructions).
For more information regarding governing documents for specific field and
laboratory investigations, see Table 1-Table 3.
STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
9
Table 1. Planning and presenting
Method Governing documents
Field planning SS-EN 1997-2
Field performance SGF Rapport 1:2013 Geoteknisk fälthandbok samt
SS-EN-ISO 22475-1
System of notations SGF/BGS beteckningssystem 2001:2
Table 2. Field investigation
Method Governing documents
Weight sounding (Vim) SIS-CEN ISO/TS 22476-10:2005
Ram sounding (HfA) SS-EN ISO 22476-2:2005 with addon
SS-EN ISO 22476:A1 2011
Percussion sounding with
registration (Slb)
SGF Rapport 1:2013, Geoteknisk Fälthandbok
Soil/rock probing (Jb) SGF Rapport 4:2012
Disturbed soil sampling Auger
drilling (Skr)
SGF Rapport 1:2013, Geoteknisk Fälthandbok
Hydrogeological measurements SS-EN ISO 22475-1:2006
Table 3. Laboratory test
Method Governing documents
Soil classification BTR T21:1982
Natural water content SS 027116, edition 3
Liquid limit SS 027120, edition 2
Ignition loss SS 027105
Sieving SSEN 933-1:2012
10 STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
6 Geotechnical category The surveys are conducted in accordance with the requirements for applying
Geotechnical Category 2 (GK2).
7 Existing conditions
7.1 Topography and surface conditions The site consists of undeveloped, forested land. The investigation area is divided
into two smaller areas; Area 1 and Area 2. For orientation, see Figure 2.
There are no known buildings on the site. Some gravel roads are crossing the
site, for example the road “Kabelvägen” and the road “Farfarsvägen”. The creek
“Valsjöbäcken” crosses the western part of the site from south to north.
Figure 2. Map of Stackbo site. The larger black boundary roughly corresponds to the site
limit. The red boundary lines represent the investigated areas.
Kabelvägen
Farfarsvägen
Area 1
Area 2
STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
11
The topography within the investigated areas is generally flat. The investigation
areas are shown as red boundary lines in Figure 2. Ground levels at the location
of conducted boreholes in Area 1 range from about +65 to +68 in west to about
+70 to +74 in east. In the southern part, Area 2, the ground levels vary between
+68 and +76.
The forest is dominated by pine and spruce. The site consists of a larger wetland
area in the eastern part of the site and there is a lot of large block and stones in
the surface. Figure 3 shows photos from the area.
Figure 3. Photos from the site.
7.2 Existing constructions There is a power line crossing the site from southeast to northwest. The power
line separates the two investigation areas.
8 Positioning Measurements in Area 1 have been performed by Metria AB and in Area 2 by
Orbicon AB. The measurements are reported in the coordinate system SWEREF
99 16 30 and in the height system RH 2000.
12 STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
9 Geotechnical surveys
9.1 Generally Geotechnical surveys have been performed on two different occasions.
The field investigation in Area 1 was conducted in September 2018. The field
work was carried out by Ronny Kratz and Robert Halvarsson, COWI AB. The
results were reported in a Soil Interpretation Report (SIR), document no
A070065-03-04-SIR-STACKBO-002 with a date of issue 23.11.2018.
The field investigation in Area 2 was conducted in January 2019. The field work
was carried out by Magnus Kippel under the direction of Joakim Wallgren at
Orbicon AB.
The field investigations were carried out with a geotechnical site investigation
rig. Sampling and handling of soil sample was performed in accordance with
Swedish standards for the respective investigation method.
9.2 Field investigation in Area 1 The geotechnical surveys in Area 1 were carried out in 11 boreholes, named
18CW301-18CW303, 18CW303B and 18CW304-18CW310. The location of the
investigation points was planned by future construction and availability for the
drilling rig due to thick forest and vegetation.
Table 4 below shows which field investigation have been conducted with each
method.
Table 4. Geotechnical field investigations in Area 1.
Investigation method Number Remark
Weight sounding (Vim) 10 pcs The soundings have stopped at a depth of
between 0.3 m and 2.2 m below ground level.
Percussion sounding with
registration (Slb) 8 pcs
The soundings have stopped at a depth of
between 0.5 and 3.6 m below ground level.
Soil/rock probing (Jb2) 2 pcs
The depth of rock was found at about 5.2 m and
about 10.1 m below ground level. The probing in
borehole 18CW308 has not been made to a depth
of a minimum 3 m in the rock due to the capacity
of the air compressor and lack of water.
Disturbed soil sampling
Auger drilling (Skr) 7 pcs
Disturbed soil sampling and soil description in the
field have been conducted to a depth of between
0.9 m and 2.2 m below ground level.
STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
13
The results of the surveys are presented on plan and section drawings, see
appendix.
9.3 Field investigation in Area 2 The geotechnical surveys in Area 1 were carried out in 11 boreholes, named
CW3201-CW3211. The location of the investigation points was planned by future
construction and availability for the drilling rig due to thick forest and
vegetation.
Table 5 below shows which field investigation have been conducted with each
method.
Table 5. Geotechnical field investigations in Area 2.
Investigation method Number Remark
Weight sounding (Vim) 11 pcs The soundings have stopped at a depth of
between 0.7 m and 1.4 m below ground level.
Ram sounding (HfA) 4 pcs The soundings have stopped at a depth of
between 0.8 m and 1.8 m below ground level.
Soil/rock probing (Jb2) 11 pcs
The depth to solid rock was found between 1.5 m
and 7.5 m below ground level. The probing in
borehole CW3203, CW3209 and CW3210 has not
been made to a depth of a minimum 3 m in the
rock due to the capacity of the air compressor
and lack of water.
Disturbed soil sampling
Auger drilling (Skr) 11 pcs
Disturbed soil sampling and soil description in the
field have been conducted to a depth of between
1.1 m and 3.0 m below ground level.
The results of the surveys are presented on plan and section drawings, see
appendix.
9.4 Calibration and certification Calibration of the geotechnical site investigation rig is saved by COWI and can
be sent to the customer upon request.
No abnormities were noted during the field surveys.
14 STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
10 Geotechnical laboratory testing
10.1 Laboratory testing in Area 1 Geotechnical laboratory tests have been carried out at MRM, a Civil and
Geotechnical Laboratory in Stockholm, in October 2018.
Table 5 below shows which laboratory analysis there have been conducted in
Area 1.
Table 5. Geotechnical laboratory analysis in Area 1.
Laboratory analysis stage 1 Number
Soil description 15 pcs
Natural water content 3 pcs
Ignition loss 3 pcs
Particle size distribution of soil by sieving 2 pcs
For laboratory protocol, see appendix no 1 and no 2.
10.2 Laboratory testing in Area 2 Geotechnical laboratory tests have been carried out at MRM, a Civil and
Geotechnical Laboratory in Stockholm, in February 2019.
Table 6 below shows which laboratory analysis there have been conducted in
Area 2.
Table 6. Geotechnical laboratory analysis in Area 2.
Laboratory analysis stage 2 Number
Soil description 20 pcs
Particle size distribution of soil by sieving 2 pcs
For laboratory protocol, see appendix no 1 and no 2.
STACKBO, GÄVLE, SWEDEN
SIR
http://projects.cowiportal.com/psc/A070065/Documents/03 Project documents/04_Geotechnical/Dokument/Stackbo/Kompletterande undersökning/A070065-03-04-SIR-STACKBO-003.docx
15
11 Hydrogeological surveys A free groundwater table was observed in 2 open boreholes when conducting the
field investigation in Area 1. The groundwater levels are recorded on boreholes
drawing, see appendix.
12 Valuation of examination Due to the weather conditions when conducting the field investigation in Area 2,
with approximately 0,1 m of snow on the ground, the soil classification in the
upper soil layers was difficult to determine. The top layer of humus was
estimated to be about 0,1 m.
During conducting the ram soundings in Area 2 an error with the ram
registration was observed. The ram registration (HfA) in borehole CW3204 was
counted twice. This has been solved by adjusting the raw data files afterwards.
Otherwise the investigations have been performed by the current standards.
Aqua Stackbo - SIR Appendix no 1, page 1/4
Aqua Stackbo - SIR Appendix no 1, page 2/4
Aqua Stackbo - SIR Appendix no 1, page 3/4
Aqua Stackbo - SIR Appendix no 1, page 4/4
Aqua Stackbo - SIR Appendix no 2, page 1/4
Aqua Stackbo - SIR Appendix no 2, page 2/4
Aqua Stackbo - SIR Appendix no 2, page 3/4
Aqua Stackbo - SIR Appendix no 2, page 4/4
GEOTECHNICAL INVESTIGATION
LAYOUT / PLAN BOREHOLES
1:3000 (A1) A070065-STACKBO-G01
A070065 SICO JEHA
2019-03-19 --
AQUASTACKBO, GÄVLE, SWEDEN
COWI ABSÖDRA FÖRSTADSGATAN 26211 43 MALMÖ
010-850 10 00
www.cowi.se
GEOTECHNICAL INVESTIGATION
BOREHOLES 18CW301-18CW310
1:100 (A1) A070065-STACKBO-G02
A070065 SICO JEHA
2019-03-19 --
AQUASTACKBO, GÄVLE, SWEDEN
COWI ABSÖDRA FÖRSTADSGATAN 26211 43 MALMÖ
010-850 10 00
www.cowi.se
GEOTECHNICAL INVESTIGATION
BOREHOLES CW3201-CW3206
1:100 (A1) A070065-STACKBO-G03
A070065 SICO JEHA
2019-03-19 --
AQUASTACKBO, GÄVLE, SWEDEN
COWI ABSÖDRA FÖRSTADSGATAN 26211 43 MALMÖ
010-850 10 00
www.cowi.se
GEOTECHNICAL INVESTIGATION
BOREHOLES CW3207-CW3211
1:100 (A1) A070065-STACKBO-G04
A070065 SICO JEHA
2019-03-19 --
AQUASTACKBO, GÄVLE, SWEDEN
COWI ABSÖDRA FÖRSTADSGATAN 26211 43 MALMÖ
010-850 10 00
www.cowi.se