March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY Kris Stryker is currently a Senior Project Manager with Tampa Electric Company (TEC), Energy Supply department heading up the Polk 2 Combined Cycle Expansion Project at their Polk Power Station located near Mulberry. Kris has worked for TEC for 16 years starting as a Mechanical Engineer in the former Independent Power Business (TECO Power Services) in 1999 and worked on design, construction and operation of ten different power plants around the country and internationally. After moving over to the Tampa-based utility company, Kris held various positions including Engineering Manager at both the Bayside and Big Bend stations before taking the position to head up the Polk expansion project. Kris is originally from the Tampa area and graduated from the University of Florida with a degree in Mechanical Engineering.

Upload: others

Post on 20-Oct-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR

PROJECT MANAGER – TAMPA ELECTRIC COMPANY

Kris Stryker is currently a Senior Project Manager with

Tampa Electric Company (TEC), Energy Supply department heading up the Polk 2

Combined Cycle Expansion Project at their Polk Power Station located near Mulberry.

Kris has worked for TEC for 16 years starting as a Mechanical Engineer in the former

Independent Power Business (TECO Power Services) in 1999 and worked on design,

construction and operation of ten different power plants around the country and

internationally.

After moving over to the Tampa-based utility company, Kris held various positions

including Engineering Manager at both the Bayside and Big Bend stations before taking

the position to head up the Polk expansion project.

Kris is originally from the Tampa area and graduated from the University of Florida with

a degree in Mechanical Engineering.

Page 2: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Tampa Electric Overview

Page 3: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

About TECO Energy

Page 4: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

TECO Energy, Inc.

TECO Energy, Inc. (NYSE: TE) – Energy-related holding company – Based in Tampa, Florida – Began in 1895 as Tampa Gas Company and in

1899 as Tampa Electric Company – Member S&P 500 – $2.85 billion in revenues (2013)

Page 5: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

One company, four businesses

Page 6: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Our people

4,625 team members – all four companies 2,500 local to Tampa Bay area

Page 7: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Our values

Safety Integrity Respect and Concern for Others Achievement with a Sense of Urgency Customer Service

Page 8: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Tampa Electric

Page 9: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

About Tampa Electric

Electric utility Started in 1899 2,300 team members Over 699,000 customers

Page 10: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

About Tampa Electric

Electric generation: – 4,742 MW winter peak

2,000 square miles in West Central Florida, – Hillsborough and parts of

Polk, Pasco and Pinellas counties 6,400 miles of distribution

and 1,300 miles of transmission lines

Page 11: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Big Bend Power Station

Page 12: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Big Bend Power Station

Four coal-fired units with a combined output of almost 1,700 megawatts

One aero-derivative unit serves as a peaking unit making the combined output from Big Bend Power Station 1,800 megawatts

Meets strict environmental regulations through the use of flue gas desulfurization systems or “scrubbers”, which remove sulfur dioxide produced when coal is burned

$300 million selective catalytic reduction (SCR) project from 2007-10, to control nitrogen oxides (NOx).

Page 13: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

H.L. Culbreath Bayside Power Station

Page 14: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

H.L. Culbreath Bayside Power Station

Provides over 1,800 megawatts of natural gas-fueled electric energy

Integrates seven combustion turbines, seven heat recovery steam generators and two steam turbines

In-service since May 2003 with Unit One and January 2004 with Unit Two

Four aero-derivative peaking units providing over 240 megawatts

Natural gas has reduced the nitrogen oxides and sulfur dioxide emissions by approximately 99 percent to date

Page 15: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Polk Power Station

Page 16: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Polk Power Station

State-of-the-art, integrated coal gasification combined-cycle (IGCC), clean-coal technology

260-megawatt IGCC facility began commercial operation in the fall of 1996

Among the nation’s cleanest, most efficient and most economical power generation units

10 million net generation hours from synfuel, “world leader”

Page 17: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

IGCC success factors

Uses low-cost feedstocks to create environmentally friendly, reliable power – Polk 1 is Tampa Electric’s lowest-cost

incremental unit – Polk 1 is Tampa Electric’s first unit to

be dispatched

Page 18: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

IGCC environmental profile

Named cleanest coal-fired power plant in North America

Significantly lower emissions levels for SO2, NOx, particulate matter

Beneficial reuse of byproducts and lower H2O requirements

Minimal solid waste results from the process

Page 19: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

IGCC facility

Page 20: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Polk 2 Combined Cycle Expansion

Conversion of four existing peaking units to a modern and efficient combined cycle unit.

Approximately a $700M investment. Capacity increase of approximately 500 MW. Efficiency improvement of the existing units

by 37 percent. NOx emissions reduction of 86 percent.

Page 21: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Equipment Deliveries to Port Manatee

HRSG Modules and Steam Drums – Manufactured in Korea by Vogt Power Intl

Steam Turbine Generator – Manufactured in Poland & Switzerland by Alstom

Condenser Tube Bundles – Manufactured in Tulsa, OK by SPX Heat Transfer

Page 22: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Project Benefits from Port Manatee

Economical storage options to reduce laydown needs at the project site.

Heavy haul to project site to allow “just-in-time” deliveries and reduce double handling of large heavy components.

Close proximity to project site with mostly rural roads to transit.

Page 23: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Generator Leaving Factory

Page 24: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

HSRG Module Lift

Page 25: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Page 26: March 19, 2015 AGENDA ITEM 3.: PRESENTATION – KRIS … · AGENDA ITEM 3.: PRESENTATION – KRIS STRYKER, SENIOR PROJECT MANAGER – TAMPA ELECTRIC COMPANY . Kris Stryker is currently

LIFE RUNS ON ENERGY®

Questions?