MARCH 16, 2020 CC MINUTES A regular meeting of the City Council of the City of Fort Calhoun, Nebraska, was held in open and public session at 7:00, on Monday, March 16, 2020 at the Fort Calhoun Council Chambers, in Fort Calhoun, Nebraska. Notice of the meeting was given in advance thereof by publication, said form of notice being a designated method for giving notice, an affidavit of publication being attached to these minutes. Advance notice of this meeting was also given to the Mayor and all Council Members. Availability of the agenda was Mayor Robinson publicly stated to all in attendance that a current copy of the Nebraska Open Meetings Act was available for review and indicated the location of such copy in the room where the meeting was being held. In accordance with Section 84-1412 sub section eight (8) of the Reissue Revised State Statutes of the State of Nebraska 1943, as amended, one copy of all reproducible written material to be discussed is available to the public at this meeting for examination and copying. Mayor Robinson stated persons wishing to address the Governing Body on an agenda item shall wait to be identified by the Presiding Officer; then, after stating their name and address for the record, may proceed to speak. No person, other than the Council and the person having the floor will be permitted to enter any discussion without the permission of the Presiding Officer. Remarks shall be limited to five minutes unless extended or limited and repetitive or cumulative remarks may be limited or excluded by the Presiding Officer. Please note that the meeting minutes are not approved until the next regular City Council meeting. On roll call, the following Council Members answered present: Lori Lammers, Bob Prieksat, and Nick Schuler. With a quorum present, Mayor Robinson presided, and the clerk recorded the proceedings. Mayor Robinson led those present in the Pledge of Allegiance. Member Prieksat made a motion seconded by member Lammers to approve the consent agenda, as presented. With members Schuler, Lammers, and Prieksat voting “Aye”, motion carried. (The consent agenda included: February 19, 2020 City Council minutes, March 2, 2020 Special City Council minutes, February 2020 Treasures Report, March 9, 2020 Planning Commission minutes, February 6, 2020 City Council minutes, Maintenance Report, February 2020 Washington County Sheriff’s Statistics) Member Prieksat made a motion seconded by member Schuler to approve the following bills: OPPD, 2719.39, utl; MUD, 286.24, utl; Papio M-R NRD, 4910.95, water; Abe’s Trash, 110.70, ser; Access Systems, 334.56, ser; Access Systems Leasing, 187.44, sup; Aflac, 567.96, ben; Am. Broadband, 571.61, utl; Berger, Elliott, & Pritchard, 1000.00, audit; Bomgaars, 90.87, sup; Brians Tree Service, 220.00, ser; Cappel Auto Supply, 290.90, sup; Chase, 6958.75, bond; City of Blair, 6834.08, ser; Conoco Fleet, 185.19, ser; Corban Helmandollar, 226.20, reimb; Deb Sutherland, 18.99, reimb; EFTPS, 2315.88, payroll tax; Enterprise Media, 245.28, ser; Home Depot Credit Services, 241.66, sup; iHeartMedia, 2755.00, ser; JDS Services, 70.00, ser; JDW Midwest, 962.01, ser; JEO Consulting, 44773.73, ser; Johnson Controls, 481.00, ser; Katie Knight, 57.55, reimb; NE Public Health Env Lab, 15.00, test; NE Dept of Rev, 451.88, tax; NE Sales Tax, 3152.49, tax; One Call Concepts, 61.62, ser; Postmaster, 143.15, ser; Talbot Law, 1557.50, ser; The American Funds Group, 803.42, IRA; Thiele Geotech, 12517.00, ser; Two Rivers Bank, 12517.00, pymt; United Healthcare, 8422.09, ins; Verizon, 130.23, exp; VISA(Two Rivers), 2349.78, sup; Washington County Sheriff, 5692.30, ser; with members Lammers, Prieksat, and Schuler voting “Aye”, motion carried. It was noted that there was an error in the February 19, 2020 City Council minutes. Member Schuler made a motion to amend the minutes. Member Prieksat seconded the motion. With members Prieksat, Schuler, and Lammers voting “Aye”, motion carried. The public hearing relating to ADOPTING AND INCORPORATING BY REFERENCE A REVISED ZONING ORDINANCE AND SUBDIVISION REGULATIONS FOR THE CITY OF FORT CALHOUN, NEBRASKA opened at 7:05 p.m. With no written or public comments, the public hearing closed at 7:05 p.m. Jim McNally with Municipal Code Services presented the final draft of the revised Fort Calhoun Municipal Code. Updates to the book are free for a year.

Upload: others

Post on 20-Mar-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

MARCH 16, 2020 CC MINUTES

A regular meeting of the City Council of the City of Fort Calhoun, Nebraska, was held in open and public session at 7:00, on Monday, March 16, 2020 at the Fort Calhoun Council Chambers, in Fort Calhoun, Nebraska.

Notice of the meeting was given in advance thereof by publication, said form of notice being a designated method for giving notice, an affidavit of publication being attached to these minutes.

Advance notice of this meeting was also given to the Mayor and all Council Members. Availability of the agenda was Mayor Robinson publicly stated to all in attendance that a current copy of the Nebraska Open Meetings Act was available for review and indicated the location of such copy in the room where the meeting was being held.

In accordance with Section 84-1412 sub section eight (8) of the Reissue Revised State Statutes of the State of Nebraska 1943, as amended, one copy of all reproducible written material to be discussed is available to the public at this meeting for examination and copying.

Mayor Robinson stated persons wishing to address the Governing Body on an agenda item shall wait to be identified by the Presiding Officer; then, after stating their name and address for the record, may proceed to speak. No person, other than the Council and the person having the floor will be permitted to enter any discussion without the permission of the Presiding Officer. Remarks shall be limited to five minutes unless extended or limited and repetitive or cumulative remarks may be limited or excluded by the Presiding Officer.

Please note that the meeting minutes are not approved until the next regular City Council meeting.

On roll call, the following Council Members answered present: Lori Lammers, Bob Prieksat, and Nick Schuler. With a quorum present, Mayor Robinson presided, and the clerk recorded the proceedings.

Mayor Robinson led those present in the Pledge of Allegiance.

Member Prieksat made a motion seconded by member Lammers to approve the consent agenda, as presented. With members Schuler, Lammers, and Prieksat voting “Aye”, motion carried.

(The consent agenda included: February 19, 2020 City Council minutes, March 2, 2020 Special City Council minutes, February 2020 Treasures Report, March 9, 2020 Planning Commission minutes, February 6, 2020 City Council minutes, Maintenance Report, February 2020 Washington County Sheriff’s Statistics)

Member Prieksat made a motion seconded by member Schuler to approve the following bills: OPPD, 2719.39, utl; MUD, 286.24, utl; Papio M-R NRD, 4910.95, water; Abe’s Trash, 110.70, ser; Access Systems, 334.56, ser; Access Systems Leasing, 187.44, sup; Aflac, 567.96, ben; Am. Broadband, 571.61, utl; Berger, Elliott, & Pritchard, 1000.00, audit; Bomgaars, 90.87, sup; Brians Tree Service, 220.00, ser; Cappel Auto Supply, 290.90, sup; Chase, 6958.75, bond; City of Blair, 6834.08, ser; Conoco Fleet, 185.19, ser; Corban Helmandollar, 226.20, reimb; Deb Sutherland, 18.99, reimb; EFTPS, 2315.88, payroll tax; Enterprise Media, 245.28, ser; Home Depot Credit Services, 241.66, sup; iHeartMedia, 2755.00, ser; JDS Services, 70.00, ser; JDW Midwest, 962.01, ser; JEO Consulting, 44773.73, ser; Johnson Controls, 481.00, ser; Katie Knight, 57.55, reimb; NE Public Health Env Lab, 15.00, test; NE Dept of Rev, 451.88, tax; NE Sales Tax, 3152.49, tax; One Call Concepts, 61.62, ser; Postmaster, 143.15, ser; Talbot Law, 1557.50, ser; The American Funds Group, 803.42, IRA; Thiele Geotech, 12517.00, ser; Two Rivers Bank, 12517.00, pymt; United Healthcare, 8422.09, ins; Verizon, 130.23, exp; VISA(Two Rivers), 2349.78, sup; Washington County Sheriff, 5692.30, ser; with members Lammers, Prieksat, and Schuler voting “Aye”, motion carried. It was noted that there was an error in the February 19, 2020 City Council minutes. Member Schuler made a motion to amend the minutes. Member Prieksat seconded the motion. With members Prieksat, Schuler, and Lammers voting “Aye”, motion carried.

The public hearing relating to ADOPTING AND INCORPORATING BY REFERENCE A REVISED ZONING ORDINANCE AND SUBDIVISION REGULATIONS FOR THE CITY OF FORT CALHOUN, NEBRASKA opened at 7:05 p.m. With no written or public comments, the public hearing closed at 7:05 p.m.

Jim McNally with Municipal Code Services presented the final draft of the revised Fort Calhoun Municipal Code. Updates

to the book are free for a year.

Member Prieksat made a motion to not take action on the Parking Lot License Agreement (Northern Hills Ventures

Redevelopment Project). Council explained that there were issues with the cost and waiving of certain fees. Member Lammers seconded the motion. With members Schuler, Lammers, and Prieksat voting “Aye”, motion carried.

Member Schuler made a motion seconded by member Lammers to approve the plans and specifications for the 2020 Adams Street Corridor Park Improvements Phase 2 and 3 Project and authorize JEO Consulting Group to work with the clerk to establish a bid date and advertise for the same. City Engineer, Lucas Billesbach, explained that project is split up into group A & B. Group A is the infrastructure associated with underground work and group B is the splash pad, shade shelter, and landscaping. Total project cost estimated at $675,000 (originally started at $550,000). The increase is due to most of the infrastructure that was not anticipated. The contract is laid out to bid group A & group B at the same time. Group A would be awarded and under construction this summer and group B would not be awarded until the end of July and start date would be in September. With members Prieksat, Schuler, and Lammers voting “Aye”, motion carried.

Member Prieksat made a motion seconded by member Schuler to award a construction contract to Western Engineering in the amount of $305,991.67 for Groups A, B, and C for the 2020 Asphalt Overlay Project. With members Lammers, Prieksat, and Schuler voting “Aye”, motion carried.

City Engineer gave an update on the 2020 Lift Station Flood Protection Improvements Project. The grant application is

in.

Member Schuler made a motion to introduce Ordinance 761 entitled:

AN ORDINANCE ADOPTING AND INCORPORATING BY REFERENCE A REVISED COMPREHENSIVE ZONING AND SUBDIVISION REGULATIONS FOR THE CITY OF FORT CALHOUN, NEBRASKA; REPEALING ORDINANCE NO. 687, ADOPTED FEBRUARY 18, 2013, AND ALL OTHER ORDINANCES OR PARTS OF ORDINANCES IN CONFLICT HEREWITH; AND TO PROVIDE WHEN THIS ORDINANCE SHALL BE IN FULL FORCE AND EFFECT.

Member Schuler moved that the statutory rule requiring an ordinance to be fully and distinctly read on three different days be suspended. Member Prieksat seconded the motion. With members Schuler, Lammers, and Prieksat voting “Aye”, motion carried.

Member Schuler made a motion for final approval of Ordinance 761, and member Lammers seconded. With members Prieksat, Schuler, and Lammers voting “Aye”, motion carried

Member Prieksat made a motion seconded by member Schuler to not approve Resolution 2020-3 – Traffic Control (15th Street). With members Lammers, Prieksat, and Schuler voting “Aye”, motion carried.

Member Prieksat made a motion to introduce Ordinance 762 entitled:

AN ORDINANCE OF THE CITY OF FORT CALHOUN, NEBRASKA, REVISING AND CODIFYING THE GENERAL ORDINANCES OF THE CITY AND REPEALING PRIOR ORDINANCES IN CONFLICT HEREWITH.

Member Prieksat moved that the statutory rule requiring an ordinance to be fully and distinctly read on three different days be suspended. Member Schuler seconded the motion. With members Schuler, Lammers, and Prieksat voting “Aye”, motion carried.

Member Prieksat made a motion for final approval of Ordinance 762, and member Schuler seconded. With members Prieksat, Schuler, and Lammers voting “Aye”, motion carried

Member Prieksat introduced Resolution 2020-4 – Authorizing the revised Municipal Code Book to be printed and published and moved for its passage and adoption. Member Schuler seconded the motion. On roll call the following voted “Aye”: Lammers, Prieksat, and Schuler. The passage and adoption of said Resolution having been concurred by most of all members of the Council, the Mayor declared the Resolution adopted and, in the presence of the Council, signed and approved the Resolution and the Clerk attested the passage and approval of the same and affixed her signature thereto.

A true and complete copy of the said Resolution is as follows:

RESOLUTION NO. 2020-4

A RESOLUTION BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FORT CALHOUN, NEBRASKA, DIRECTING THE CITY CLERK TO CAUSE ORDINANCE NO. 762 TO BE PRINTED AND PUBLSIHED IN BOOK FORM BY MUNICIPAL CODE SERVICES OF NELIGH, NEBRASKA. BE IT RESOLVED by the Mayor and City Council of the City of Fort Calhoun, Nebraska, that the City Clerk of said City be and she hereby is directed to cause Ordinance No. 762 of the City of Fort Calhoun, Nebraska, which was on this date duly passed by said City Council and approved by the Mayor of said City, to be printed and published in book form by Municipal Code Services of Neligh, Nebraska, within 30 days after this date, and that said printed ordinances be kept in the custody of the City Clerk. IN WITNESS WHEREOF, this resolution was approved and executed this 16th day of March 2020. CITY OF FORT CALHOUN, NEBRASKA Mitch Robinson, Mayor ATTEST: Alicia Koziol, City Clerk

Council accepted the resignation of Terry Fitzgerald. Mayor Robinson announced a vacancy on the City Council, which will be advertised. Council discussed the 2020 Triple Crown Sports Agreement. Member Schuler made a motion to approve the agreement. With no second, the motion died. Maintenance Supervisor, Corban Helmandollar, discussed purchasing brine equipment using the proceeds from the sale of the truck. The truck sold by auction for $15,500. They are looking at purchasing a 450-gallon brine maker for $14,950 and using the rest of the proceeds for brine applicating equipment. Member Prieksat made a motion seconded by member Schuler to approve the purchase. With members Lammers, Prieksat, and Schuler voting “Aye”, motion carried. The Mayor announced the dates for the Annual Spring Clean-Up, providing Dumpster(s) at the City Shop: Saturday, April 4th through Sunday, April 26th.

Note, FCFD Fire Chief Dan Mallory will allow Open Burning with a BURN PERMIT during this time.

Mayor Robinson entertained a motion to add an agenda item for an Emergency Corona Virus Update. Member Prieksat made a motion, seconded by member Lammers. With members Schuler, Lammers, and Prieksat voting “Aye”, motion carried. -City offices will remain open to the public for the time being, but that could change anytime, depending on … -City parks and ball fields will remain open -There will be no unofficial City functions or meetings (Parks, Enhancement, or Planning Commission) -Will be looking into video conferencing for upcoming Council meetings

Following a motion and vote, Mayor Robinson declared the meeting adjourned at 8:09 p.m.

Mitch Robinson, Mayor ATTEST: Alicia Koziol, City Clerk

City of Fort Calhoun Parks Board

March 5, 2020 Meeting Minutes Roll Call: 1. Kris Richardson called the meeting to order at 7:08 pm. 2. Kris announced the Open Meeting Compliance act.

3. Roll Call: Board Members Jerry Barabas, Kris Richardson, Sara Ruthven and Bob Lammers all in attendance. Board Member James Totten absent. Members of the public: None.

4. Approval of February Meeting Minutes was moved by Bob. Seconded by Jerry. All in favor to approve.

Unfinished Business:

5. Multi-purpose Court Update.

a. The city received grading and concrete advise from JEO. The Board will continue planning the new court install.

New Business: 6. Schedule annual parks audit

a. Scheduled for April 2, 2020 at 5:45 starting at City Baseball fields b. Board members will individually do site observations on their own prior to the meeting.

Meeting Adjourned: At 7:57 pm meeting adjournment was motioned by Bob and seconded by Kris. All in favor.

Maintenance Tasks Completed Report March 13th – April 16th, 2020

PUBLIC WORKS

• NRD 1&2 read/logged daily • w/w station daily inspection & log • Locates • Monthly & quarterly water samples taken • Water meter’s read & data logs • Water meters/readouts repaired as needed/new installed • Emergency locates • Respond to w/w alarms • Water System drawings and measurements (in progress) • Sewer lining started and finished/manhole still to be lined • Salt/Sand (3/20 & 4/2)

STREETS

• F-550 Pickup-brine setup installed and batter boards • Sign/post repair • Cleaned storm sewer • Stored plows and sander

EQUIPMENT MAINTENANCE

• 1999 F-450 sold • Brine setup design and fabrication • Vehicles washed as needed • Brine maker and hydro seeder ordered and delivered • Maintenance shop cleaned weekly • Organizing shop • Snow removal equipment repaired • Trees removed and trimmed • 2008 F250 brakes and evap

PARKS

• Daily park checks and clean-up • Branches removed (as needed) • Trash removed • WMS pickup sticks, repaired drainage, and mowed leaves • Pioneer tree removed, leaves mowed, and drainage of springs • Ballfields: mowed, sprayed, staining building, loop hoe, drag infields, and install new sign-hwy

MEETINGS

• Council meeting(s) • Locate meets – several • Splash pad plans • COVID-19 • City Hall remote log-in • Hwy roads about water on hwy

OTHER

• Dan social isolation from employees/public (COVID-19 preventative measure)-worked at ball diamonds and read meters

• Dumpster started for spring clean-up • Zoom meeting setup

CONTRACT STATS:

City of: Ft Calhoun Month: March Year: 2020

Reports: 3 0

Accidents: 0 2Business Checks: 348 336

Parking Complaints: 1 5Arrests: 0 1

Citations Issued: 2 2

Mar 29 to Mar 31 19 hrs 50 minutes

Total Weekly Hours: 49 hrs 17 minutes

Total Monthly Hours: 218 hrs 14 minutes

Monthy Activities Previous MonthWarnings Issued: 29 18

Mar 8 to Mar 14 51 hrs 40 minutes

Mar 15 to Mar 21 48 hrs 30 minutes

Mar 22 to Mar 28 49 hrs 22 minutes

WASHINGTON COUNTY SHERIFF'S OFFICE

Average hours per Day: 7 hrs 2 minutes

Hours per week: Mar 1 to Mar 7 48 hrs 52 minutes

Month Officer CityDate

Day

Arrival

Time

Departure

Time

Total

Time Warnings

Parking

Warnings Citations Accidents

Report

(s) Arrests

March Kelley Ft Calhoun 3/1/2020 Sunday 0:00 0:10 10 0 0 0 0 0 0

March Kelley Ft Calhoun 3/1/2020 Sunday 2:20 2:55 35 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/1/2020 Sunday 0:00 0:15 15 0 0 0 0 0 0

March Anderson Ft Calhoun 3/1/2020 Sunday 8:15 8:55 40 0 0 0 0 0 0

March Anderson Ft Calhoun 3/1/2020 Sunday 10:20 11:25 65 1 0 0 0 0 0

March Anderson Ft Calhoun 3/1/2020 Sunday 14:50 16:10 80 1 0 0 0 0 0

March Spilinek Ft Calhoun 3/1/2020 Sunday 20:40 22:45 125 1 0 0 0 0 0

March Robinson Ft Calhoun 3/1/2020 Sunday 19:15 20:30 75 0 0 0 0 0 0

March Robinson Ft Calhoun 3/1/2020 Sunday 22:15 22:35 20 1 0 0 0 0 0

March Judkins Ft Calhoun 3/1/2020 Sunday 18:20 18:40 20 0 0 0 0 0 0

March Judkins Ft Calhoun 3/1/2020 Sunday 19:25 20:30 65 0 0 0 0 0 0

March Robinson Ft Calhoun 3/2/2020 Monday 0:05 1:00 55 0 0 0 0 0 0

March Judkins Ft Calhoun 3/2/2020 Monday 2:55 4:00 65 0 0 0 0 0 0

March Menke Ft Calhoun 3/2/2020 Monday 6:45 7:10 25 0 0 0 0 0 0

March Menke Ft Calhoun 3/2/2020 Monday 7:35 9:10 95 0 0 0 0 0 0

March Menke Ft Calhoun 3/2/2020 Monday 14:45 15:15 30 0 0 0 0 0 0

March Hiles Ft Calhoun 3/2/2020 Monday 7:20 7:35 15 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/2/2020 Monday 19:45 21:45 120 1 0 0 0 0 0

March Bebensee Ft Calhoun 3/2/2020 Monday 21:45 22:00 15 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/2/2020 Monday 23:50 0:10 20 0 0 0 0 0 0

March Corns Ft Calhoun 3/2/2020 Monday 20:40 21:45 65 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/3/2020 Tuesday 2:30 3:00 30 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/3/2020 Tuesday 3:50 4:00 10 0 0 0 0 0 0

March Shawn Ft Calhoun 3/3/2020 Tuesday 7:15 8:15 60 0 0 0 0 0 0

March Shawn Ft Calhoun 3/3/2020 Tuesday 10:45 11:45 60 0 0 0 0 0 0

March Shawn Ft Calhoun 3/3/2020 Tuesday 15:15 15:45 30 0 0 0 0 0 0

March Hiles Ft Calhoun 3/3/2020 Tuesday 10:05 10:35 30 1 0 0 0 0 0

March Peters Ft Calhoun 3/3/2020 Tuesday 22:35 23:25 50 0 0 0 0 0 0

March Carey Ft Calhoun 3/3/2020 Tuesday 19:45 20:45 60 3 0 0 0 0 0

March Corns Ft Calhoun 3/4/2020 Wednesday 4:00 4:40 40 0 0 0 0 0 0

March Carey Ft Calhoun 3/4/2020 Wednesday 2:45 3:45 60 0 0 0 0 0 0

March Kelley Ft Calhoun 3/4/2020 Wednesday 6:25 6:50 25 0 0 0 0 0 0

March Kelley Ft Calhoun 3/4/2020 Wednesday 7:15 8:20 65 0 0 0 0 0 0

March Kelley Ft Calhoun 3/4/2020 Wednesday 13:05 14:30 85 1 0 0 0 1 0

March Spilinek Ft Calhoun 3/4/2020 Wednesday 7:40 8:05 25 1 0 0 0 0 0

March Spilinek Ft Calhoun 3/4/2020 Wednesday 10:45 11:25 40 0 0 0 0 0 0

March Dein Ft Calhoun 3/4/2020 Wednesday 19:25 20:25 60 0 0 0 0 0 0

March Judkins Ft Calhoun 3/4/2020 Wednesday 20:00 20:30 30 0 0 0 0 0 0

March Judkins Ft Calhoun 3/4/2020 Wednesday 23:05 23:45 40 1 0 0 0 0 0

March Thallas Ft Calhoun 3/4/2020 Wednesday 23:00 23:40 40 0 0 0 0 0 0

March Dein Ft Calhoun 3/5/2020 Thursday 2:15 2:45 30 0 0 0 0 0 0

March Robinson Ft Calhoun 3/5/2020 Thursday 7:05 8:05 60 0 0 0 0 0 0

March Robinson Ft Calhoun 3/5/2020 Thursday 8:55 9:10 15 0 0 0 0 0 0

March Robinson Ft Calhoun 3/5/2020 Thursday 10:15 11:10 55 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/5/2020 Thursday 15:00 15:15 15 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/5/2020 Thursday 16:00 16:05 5 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/5/2020 Thursday 16:10 16:30 20 0 0 0 0 0 0

March Anderson Ft Calhoun 3/5/2020 Thursday 20:05 20:45 40 1 0 0 0 0 0

March Anderson Ft Calhoun 3/5/2020 Thursday 22:10 22:55 45 1 0 0 0 0 0

March Anderson Ft Calhoun 3/5/2020 Thursday 12:55 13:35 40 0 0 0 0 0 0

March Judkins Ft Calhoun 3/5/2020 Thursday 20:20 20:25 5 0 0 0 0 0 0

March Anderson Ft Calhoun 3/6/2020 Friday 2:10 3:30 80 0 0 0 0 0 0

March Peters Ft Calhoun 3/6/2020 Friday 7:05 7:25 20 0 0 0 0 0 0

March Peters Ft Calhoun 3/6/2020 Friday 7:35 8:15 40 0 0 0 0 0 0

March Peters Ft Calhoun 3/6/2020 Friday 14:00 14:50 50 0 0 0 0 0 0

March Peters Ft Calhoun 3/6/2020 Friday 16:20 17:05 45 0 0 0 0 0 0

March Menke Ft Calhoun 3/6/2020 Friday 21:40 22:55 75 0 0 0 0 0 0

March Carey Ft Calhoun 3/7/2020 Saturday 3:40 4:45 65 0 0 0 0 0 0

March Grove Ft Calhoun 3/7/2020 Saturday 10:38 11:40 62 0 0 0 0 0 0

March Grove Ft Calhoun 3/7/2020 Saturday 13:30 15:40 130 0 0 0 0 0 0

March Shawn Ft Calhoun 3/7/2020 Saturday 18:40 19:35 55 0 0 0 0 0 0

March Menke Ft Calhoun 3/7/2020 Saturday 21:35 23:00 85 0 0 0 0 0 0

2932 14 0 0 0 1 0

March Hiles Ft Calhoun 3/8/2020 Sunday 1:45 3:10 85 0 0 0 0 0 0

March Menke Ft Calhoun 3/8/2020 Sunday 1:40 4:00 140 0 0 0 0 0 0

March Menke Ft Calhoun 3/8/2020 Sunday 3:20 3:30 10 0 0 0 0 0 0

March Corns Ft Calhoun 3/8/2020 Sunday 13:55 14:05 10 0 0 0 0 0 0

March Peters Ft Calhoun 3/8/2020 Sunday 7:20 8:25 65 0 0 0 0 0 0

March Peters Ft Calhoun 3/8/2020 Sunday 10:50 11:45 55 0 0 0 0 0 0

March Peters Ft Calhoun 3/8/2020 Sunday 14:00 15:00 60 0 0 0 0 0 0

March Hiles Ft Calhoun 3/8/2020 Sunday 18:20 19:20 60 0 0 0 0 0 0

March Hiles Ft Calhoun 3/8/2020 Sunday 19:45 21:30 105 0 0 0 0 0 0

March Hiles Ft Calhoun 3/8/2020 Sunday 21:45 22:05 20 0 0 0 0 0 0

March Shawn Ft Calhoun 3/8/2020 Sunday 20:15 20:50 35 0 0 0 0 0 0

March Carey Ft Calhoun 3/9/2020 Monday 0:05 1:05 60 0 1 0 0 0 0

March Shawn Ft Calhoun 3/9/2020 Monday 3:10 4:10 60 0 0 0 0 0 0

March Kelley Ft Calhoun 3/9/2020 Monday 7:05 7:25 20 0 0 0 0 0 0

March Kelley Ft Calhoun 3/9/2020 Monday 8:10 9:30 80 0 0 0 0 0 0

March Kelley Ft Calhoun 3/9/2020 Monday 15:10 15:55 45 0 0 0 0 0 0

March Judkins Ft Calhoun 3/9/2020 Monday 18:50 20:00 70 0 0 0 0 0 0

March Dein Ft Calhoun 3/9/2020 Monday 22:45 23:45 60 0 0 0 0 0 0

March Dein Ft Calhoun 3/10/2020 Tuesday 2:15 3:15 60 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/10/2020 Tuesday 8:50 9:40 50 0 0 0 0 0 0

March Robinson Ft Calhoun 3/10/2020 Tuesday 7:15 8:10 55 0 0 0 0 0 0

March Robinson Ft Calhoun 3/10/2020 Tuesday 10:30 10:55 25 0 0 0 0 0 0

March Robinson Ft Calhoun 3/10/2020 Tuesday 12:45 13:30 45 0 0 0 0 0 0

March Robinson Ft Calhoun 3/10/2020 Tuesday 15:10 16:15 65 0 0 0 0 0 0

March Judkins Ft Calhoun 3/10/2020 Tuesday 19:50 20:20 30 0 0 0 0 0 0

March Anderson Ft Calhoun 3/10/2020 Tuesday 21:00 22:10 70 2 0 0 0 0 0

March Anderson Ft Calhoun 3/10/2020 Tuesday 23:30 0:15 45 0 0 0 0 0 0

March Anderson Ft Calhoun 3/11/2020 Wednesday 1:55 2:25 30 0 0 0 0 0 0

March Anderson Ft Calhoun 3/11/2020 Wednesday 2:55 3:20 25 0 0 0 0 0 0

March Leehy Ft Calhoun 3/11/2020 Wednesday 12:20 13:00 40 0 0 0 0 0 0

March Leehy Ft Calhoun 3/11/2020 Wednesday 17:15 17:30 15 0 0 0 0 0 0

March Corns Ft Calhoun 3/11/2020 Wednesday 8:00 8:45 45 0 0 0 0 0 0

March Peters Ft Calhoun 3/11/2020 Wednesday 7:10 8:35 85 0 0 0 0 0 0

March Peters Ft Calhoun 3/11/2020 Wednesday 15:05 15:25 20 0 0 0 0 0 0

March Carey Ft Calhoun 3/11/2020 Wednesday 19:35 20:35 60 0 0 0 0 0 0

March Hiles Ft Calhoun 3/12/2020 Thursday 1:00 1:45 45 0 0 0 0 0 0

March Corns Ft Calhoun 3/12/2020 Thursday 10:30 11:00 30 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/12/2020 Thursday 7:45 8:45 60 0 0 0 0 0 0

March Shawn Ft Calhoun 3/12/2020 Thursday 20:30 21:00 30 0 0 0 0 0 0

March Menke Ft Calhoun 3/12/2020 Thursday 18:35 23:05 270 0 0 0 0 0 0

March Menke Ft Calhoun 3/12/2020 Thursday 22:05 23:05 60 0 0 0 0 0 0

March Hiles Ft Calhoun 3/12/2020 Thursday 18:45 19:45 60 1 0 0 0 0 0

March Menke Ft Calhoun 3/13/2020 Friday 3:30 4:05 35 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/13/2020 Friday 7:40 8:40 60 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/13/2020 Friday 13:00 14:30 90 0 0 0 0 0 0

March Dorau Ft Calhoun 3/13/2020 Friday 18:10 19:00 50 0 0 0 0 0 0

March Dorau Ft Calhoun 3/13/2020 Friday 20:30 21:00 30 0 0 0 0 0 0

March Dorau Ft Calhoun 3/13/2020 Friday 21:30 22:45 75 0 0 0 0 0 0

March Judkins Ft Calhoun 3/13/2020 Friday 18:15 18:45 30 0 0 0 0 0 0

March Dein Ft Calhoun 3/14/2020 Saturday 1:50 2:20 30 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/14/2020 Saturday 13:25 14:15 50 0 0 0 0 0 0

March Robinson Ft Calhoun 3/14/2020 Saturday 6:50 7:50 60 0 0 0 0 0 0

March Robinson Ft Calhoun 3/14/2020 Saturday 10:45 11:15 30 0 0 0 0 0 0

March Robinson Ft Calhoun 3/14/2020 Saturday 15:45 16:30 45 0 0 0 0 0 0

March Anderson Ft Calhoun 3/14/2020 Saturday 19:45 20:20 35 0 0 0 0 0 0

March Anderson Ft Calhoun 3/14/2020 Saturday 22:15 23:15 60 0 0 0 0 0 0

March Judkins Ft Calhoun 3/14/2020 Saturday 17:45 18:15 30 0 0 0 0 0 0

March Judkins Ft Calhoun 3/14/2020 Saturday 23:05 23:35 30 0 0 0 0 0 0

3100 3 1 0 0 0 0

March Anderson Ft Calhoun 3/15/2020 Sunday 1:45 2:20 35 0 0 0 0 0 0

March Judkins Ft Calhoun 3/15/2020 Sunday 4:00 5:05 65 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/15/2020 Sunday 8:00 9:00 60 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/15/2020 Sunday 11:55 12:15 20 0 0 0 0 0 0

March Kelley Ft Calhoun 3/15/2020 Sunday 7:20 8:35 75 0 0 0 0 0 0

March Kelley Ft Calhoun 3/15/2020 Sunday 15:40 16:30 50 0 0 0 0 0 0

March Dein Ft Calhoun 3/15/2020 Sunday 19:25 20:40 75 1 0 0 0 0 0

March Dein Ft Calhoun 3/15/2020 Sunday 23:30 0:45 75 0 0 0 0 0 0

March Judkins Ft Calhoun 3/15/2020 Sunday 18:45 19:15 30 0 0 0 0 0 0

March Peters Ft Calhoun 3/16/2020 Monday 9:10 10:10 60 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/16/2020 Monday 8:15 9:15 60 4 0 0 0 0 0

March Bebensee Ft Calhoun 3/16/2020 Monday 13:10 14:15 65 1 0 1 0 0 0

March Menke Ft Calhoun 3/16/2020 Monday 22:20 23:20 60 0 0 0 0 0 0

March Shawn Ft Calhoun 3/16/2020 Monday 19:40 21:40 120 1 0 0 0 0 0

March Shawn Ft Calhoun 3/17/2020 Tuesday 0:00 0:30 30 0 0 0 0 0 0

March Shawn Ft Calhoun 3/17/2020 Tuesday 1:45 2:15 30 0 0 0 0 0 0

March Shawn Ft Calhoun 3/17/2020 Tuesday 4:15 4:45 30 0 0 0 0 0 0

March Byelick Ft Calhoun 3/17/2020 Tuesday 7:15 10:20 185 1 0 0 0 0 0

March Byelick Ft Calhoun 3/17/2020 Tuesday 13:45 14:15 30 0 0 0 0 0 0

March Byelick Ft Calhoun 3/17/2020 Tuesday 14:50 15:45 55 1 0 0 0 0 0

March Menke Ft Calhoun 3/17/2020 Tuesday 21:00 22:00 60 0 0 0 0 0 0

March Carey Ft Calhoun 3/17/2020 Tuesday 19:10 20:10 60 0 0 0 0 0 0

March Carey Ft Calhoun 3/17/2020 Tuesday 21:00 22:00 60 0 0 0 0 0 0

March Carey Ft Calhoun 3/18/2020 Wednesday 1:50 2:50 60 0 0 0 0 0 0

March Byelick Ft Calhoun 3/18/2020 Wednesday 7:45 8:45 60 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/18/2020 Wednesday 9:05 10:20 75 0 0 0 0 0 0

March Anderson Ft Calhoun 3/18/2020 Wednesday 14:40 15:40 60 1 0 0 0 0 0

March Anderson Ft Calhoun 3/18/2020 Wednesday 21:10 21:55 45 0 0 0 0 0 0

March Thallas Ft Calhoun 3/18/2020 Wednesday 23:15 0:30 75 0 0 0 0 0 0

March Anderson Ft Calhoun 3/19/2020 Thursday 0:25 1:30 65 0 0 0 0 0 0

March Kelley Ft Calhoun 3/19/2020 Thursday 6:55 8:25 90 0 0 0 0 0 0

March Kelley Ft Calhoun 3/19/2020 Thursday 11:40 12:50 70 0 0 0 0 0 0

March Dein Ft Calhoun 3/19/2020 Thursday 19:30 20:30 60 0 0 0 0 0 0

March Dein Ft Calhoun 3/20/2020 Friday 1:05 2:05 60 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/20/2020 Friday 14:15 15:15 60 0 0 0 0 0 0

March Corns Ft Calhoun 3/20/2020 Friday 9:10 9:40 30 0 0 0 0 0 0

March Hiles Ft Calhoun 3/20/2020 Friday 22:45 23:45 60 0 0 0 0 0 0

March Menke Ft Calhoun 3/20/2020 Friday 20:20 21:15 55 0 0 0 0 0 0

March Menke Ft Calhoun 3/20/2020 Friday 2:55 3:40 45 0 0 0 0 0 0

March Menke Ft Calhoun 3/20/2020 Friday 3:05 3:15 10 0 0 0 0 0 0

March Carey Ft Calhoun 3/21/2020 Saturday 2:05 3:05 60 0 0 0 0 0 0

March Peters Ft Calhoun 3/21/2020 Saturday 8:00 9:05 65 0 0 0 0 0 0

March Peters Ft Calhoun 3/21/2020 Saturday 13:05 14:05 60 0 0 0 0 0 0

March Peters Ft Calhoun 3/21/2020 Saturday 16:05 17:10 65 0 0 0 0 0 0

March Hiles Ft Calhoun 3/21/2020 Saturday 20:15 21:35 80 0 0 0 0 0 0

March Shawn Ft Calhoun 3/21/2020 Saturday 23:15 0:15 60 0 0 0 0 0 0

March Carey Ft Calhoun 3/21/2020 Saturday 19:35 22:05 150 1 0 1 0 1 0

2910 11 0 2 0 1 0

March Carey Ft Calhoun 3/22/2020 Sunday 2:50 3:00 10 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/22/2020 Sunday 7:00 8:00 60 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/22/2020 Sunday 14:35 16:35 120 0 0 0 0 0 0

March Hiles Ft Calhoun 3/22/2020 Sunday 22:15 22:45 30 0 0 0 0 0 0

March Shawn Ft Calhoun 3/22/2020 Sunday 20:00 21:00 60 0 0 0 0 0 0

March Shawn Ft Calhoun 3/22/2020 Sunday 23:40 0:10 30 0 0 0 0 0 0

March Menke Ft Calhoun 3/22/2020 Sunday 21:35 22:05 30 0 0 0 0 0 0

March Shawn Ft Calhoun 3/23/2020 Monday 3:30 4:00 30 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/23/2020 Monday 12:15 12:45 30 0 0 0 0 0 0

March Robinson Ft Calhoun 3/23/2020 Monday 6:20 7:05 45 0 0 0 0 0 0

March Robinson Ft Calhoun 3/23/2020 Monday 11:00 11:30 30 0 0 0 0 0 0

March Robinson Ft Calhoun 3/23/2020 Monday 16:45 17:15 30 0 0 0 0 0 0

March Judkins Ft Calhoun 3/23/2020 Monday 18:20 18:55 35 1 0 0 0 0 0

March Judkins Ft Calhoun 3/23/2020 Monday 22:28 23:00 32 0 0 0 0 0 0

March Anderson Ft Calhoun 3/23/2020 Monday 20:35 21:35 60 0 0 0 0 0 0

March Anderson Ft Calhoun 3/23/2020 Monday 22:30 23:10 40 0 0 0 0 0 0

March Byelick Ft Calhoun 3/23/2020 Monday 9:30 11:30 120 0 0 0 0 0 0

March Thallas Ft Calhoun 3/23/2020 Monday 19:00 19:45 45 0 0 0 0 0 0

March Anderson Ft Calhoun 3/24/2020 Tuesday 1:00 1:30 30 0 0 0 0 0 0

March Byelick Ft Calhoun 3/24/2020 Tuesday 10:55 11:55 60 0 0 0 0 0 0

March Thallas Ft Calhoun 3/24/2020 Tuesday 23:50 0:15 25 0 0 0 0 0 0

March Judkins Ft Calhoun 3/24/2020 Tuesday 18:10 20:00 110 0 0 0 0 0 0

March Dein Ft Calhoun 3/24/2020 Tuesday 19:40 20:00 20 0 0 0 0 0 0

March Dein Ft Calhoun 3/25/2020 Wednesday 0:50 1:20 30 0 0 0 0 0 0

March Corns Ft Calhoun 3/25/2020 Wednesday 14:15 15:15 60 0 0 0 0 0 0

March Peters Ft Calhoun 3/25/2020 Wednesday 9:55 10:15 20 0 0 0 0 0 0

March Peters Ft Calhoun 3/25/2020 Wednesday 14:10 15:20 70 0 0 0 0 0 0

March Menke Ft Calhoun 3/25/2020 Wednesday 21:55 22:15 20 0 0 0 0 0 0

March Hiles Ft Calhoun 3/25/2020 Wednesday 20:10 20:40 30 0 0 0 0 0 0

March Byelick Ft Calhoun 3/25/2020 Wednesday 9:20 11:00 100 0 0 0 0 0 0

March Byelick Ft Calhoun 3/25/2020 Wednesday 14:50 15:25 35 0 0 0 0 0 0

March Menke Ft Calhoun 3/26/2020 Thursday 0:45 2:55 130 0 0 0 0 0 0

March Byelick Ft Calhoun 3/26/2020 Thursday 7:50 10:10 140 0 0 0 0 0 0

March Byelick Ft Calhoun 3/26/2020 Thursday 14:35 15:25 50 0 0 0 0 0 0

March Corns Ft Calhoun 3/26/2020 Thursday 7:00 8:10 70 0 0 0 0 0 0

March Shawn Ft Calhoun 3/26/2020 Thursday 18:50 19:50 60 0 0 0 0 0 0

March Carey Ft Calhoun 3/26/2020 Thursday 20:40 21:05 25 0 0 0 0 0 0

March Carey Ft Calhoun 3/26/2020 Thursday 22:40 23:40 60 0 0 0 0 0 0

March Carey Ft Calhoun 3/27/2020 Friday 1:30 2:20 50 0 0 0 0 0 0

March Byelick Ft Calhoun 3/27/2020 Friday 9:30 11:10 100 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/27/2020 Friday 10:55 12:00 65 0 0 0 0 0 0

March Judkins Ft Calhoun 3/27/2020 Friday 19:40 20:40 60 0 0 0 0 0 0

March Anderson Ft Calhoun 3/27/2020 Friday 20:00 20:30 30 0 0 0 0 0 0

March Anderson Ft Calhoun 3/27/2020 Friday 22:00 23:05 65 0 0 0 0 0 0

March Thallas Ft Calhoun 3/28/2020 Saturday 0:00 1:00 60 0 0 0 0 0 0

March Anderson Ft Calhoun 3/28/2020 Saturday 1:25 2:25 60 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/28/2020 Saturday 8:05 9:05 60 0 0 0 0 0 0

March Kelley Ft Calhoun 3/28/2020 Saturday 8:45 9:45 60 0 0 0 0 0 0

March Kelley Ft Calhoun 3/28/2020 Saturday 12:20 13:25 65 0 0 0 0 0 0

March Judkins Ft Calhoun 3/28/2020 Saturday 19:00 20:00 60 0 0 0 0 0 0

March Dein Ft Calhoun 3/28/2020 Saturday 22:35 23:20 45 0 0 0 0 0 0

March Spilinek Ft Calhoun 3/28/2020 Saturday 11:00 11:35 35 0 0 0 0 0 0

March Robinson Ft Calhoun 3/28/2020 Saturday 8:00 8:40 40 0 0 0 0 0 0

March Robinson Ft Calhoun 3/28/2020 Saturday 10:00 10:45 45 0 0 0 0 0 0

March Robinson Ft Calhoun 3/28/2020 Saturday 14:40 16:00 80 0 0 0 0 0 0

2962 1 0 0 0 0 0

March Dein Ft Calhoun 3/29/2020 Sunday 1:30 1:40 10 0 0 0 0 0 0

March Thallas Ft Calhoun 3/29/2020 Sunday 21:05 23:05 120 0 0 0 0 0 0

March Thallas Ft Calhoun 3/29/2020 Sunday 23:45 0:15 30 0 0 0 0 0 0

March Anderson Ft Calhoun 3/29/2020 Sunday 21:25 23:25 120 0 0 0 0 0 0

March Judkins Ft Calhoun 3/29/2020 Sunday 18:45 19:25 40 0 0 0 0 0 0

March Anderson Ft Calhoun 3/30/2020 Monday 2:20 3:10 50 0 0 0 0 0 0

March Peters Ft Calhoun 3/30/2020 Monday 11:50 12:35 45 0 0 0 0 0 0

March Peters Ft Calhoun 3/30/2020 Monday 16:35 17:00 25 0 0 0 0 0 0

March Shawn Ft Calhoun 3/30/2020 Monday 20:45 21:45 60 0 0 0 0 0 0

March Hiles Ft Calhoun 3/31/2020 Tuesday 1:00 1:45 45 0 0 0 0 0 0

March Shawn Ft Calhoun 3/31/2020 Tuesday 0:15 1:00 45 0 0 0 0 0 0

March Shawn Ft Calhoun 3/31/2020 Tuesday 2:45 3:45 60 0 0 0 0 0 0

March Byelick Ft Calhoun 3/31/2020 Tuesday 9:00 10:15 75 0 0 0 0 0 0

March Byelick Ft Calhoun 3/31/2020 Tuesday 13:00 15:10 130 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/31/2020 Tuesday 6:30 8:45 135 0 0 0 0 0 0

March Bebensee Ft Calhoun 3/31/2020 Tuesday 11:40 12:30 50 0 0 0 0 0 0

March Menke Ft Calhoun 3/31/2020 Tuesday 20:05 21:05 60 0 0 0 0 1 0

March Carey Ft Calhoun 3/31/2020 Tuesday 22:25 23:25 60 0 0 0 0 0 0

March Hiles Ft Calhoun 3/31/2020 Tuesday 19:35 20:05 30 0 0 0 0 0 0

1190 0 0 0 0 1 0

TOTALS: 13094 29 1 2 0 3 0

Change to Scope of Services - Approval Form No. 1

Date: 4/15/2020

Client: City of Fort Calhoun, NE

Engineer: JEO Consulting Group, Inc.

Project: Adams Street Corridor

Project No.: 131216.27

Description of Change or Addition/Deletion to Scope of Services:

Change to Fees:

Phase Fee Type

Fees per

Agreement

Prior

Adjustments

Adjustments this

Change New Fees

Phase I- Design Lump Sum 49,500.00$ - $ 8,700.00 $ 58,200.00

Phase II - Bidding Lump Sum 3,000.00$ - $ 400.00 $ 3,400.00

Phase III - Construction Services Lump Sum 8,000.00$ - $ 690.00 $ 8,690.00

Phase IV - RPR Hourly to Max 6,000.00$ - $ - $ 6,000.00

Phase V - Post Construction Lump Sum 3,000.00$ - $ - $ 3,000.00

Totals: 69,500.00$ -$ 9,790.00$ 79,290.00$

Requested By:

Andrew Pennekamp

Project Manager - JEO

Approved By: Attest:

Addition of sanitary sewer, storm sewer services beyond original scope of services.

Design storm sewer offsite to allow splashpad to drain to storm sewer rather than sanitary sewer.

Approval of this form shall constitute an amendment to the agreement dated 04/09/2020 between the parties identified and

for the project listed at the top of this form.

Exhibit B

This is EXHIBIT B, consisting of 3 pages, referred to in and part of the Master Agreement between Owner and Engineer for Professional Services dated March 17, 2014.

This is Task Order No. 131216.28, Consisting of 3 pages

Task Order In accordance with the Master Services Agreement Between Owner and Engineer for Professional Services dated March 17, 2014 (“Agreement”), Owner and Engineer agree as follows: Specific Project Data A. Title: Fort Calhoun 2020 Lift Station Flood Mitigation Improvements

B. Description: Includes basic engineering services (design, bidding, and construction) and

additional services for the construction of a flood protection wall/berm around the

perimeter of the City’s main lift station. The project also includes raising the rim of

sanitary sewer manholes 1-foot above the 100-year flood elevation for all manholes

located within the floodplain.

1. Services of Engineer See Attachment “A”. 2. Owner’s Responsibilities

Exhibit “A” from the Master Agreement Between Owner and Engineer for Professional Services as referenced above is modified as follows:

3. Times for Rendering Services

Phase Completion Date

Design Phase Services 90 Calendar Days from NTP after grant award

Bid and Contracting Phase Services 60 Calendar Days after 30% review meting

Construction Phase Services 120 Calendar Days (estimated)

Post Construction Phase Services 12 months after Owner accepts project

4. Payments to Engineer A. For Lump Sum Method of Payment A

1. The total compensation for services identified under paragraph 1 of the Task Order is

estimated to be $37,700.00 based on the following assumed distribution.

Exhibit B

This is EXHIBIT B, consisting of 3 pages, referred to in and part of the Master Agreement between Owner and Engineer for Professional Services dated March 17, 2014.

2. Engineer may alter the distribution of compensation between individual phases noted herein to be consistent with services actually rendered but shall not exceed the total Lump Sum amount unless approved in by the Owner.

Phase Compensation

Basic Engineering Services $29,000.00

Topographic Survey & Construction Staking $4,000.00

Permit Preparation $4,700.00

TOTAL $37,700.00

B. For Standard Hourly Rates Method of Payment:

1. The Standard Hourly Rates shall be as shown on Exhibit C of the Master Agreement. 2. Current hourly rate schedule is attached and subject to adjustment approximately

February 1st of each year. 3. The total compensation for services identified under paragraph 1 of the Task Order is

estimated to be $15,000.00 based on the following assumed distribution. 4. Engineer’s estimate of the amounts that will become payable are only estimates for

planning purposes, are not binding on the parties, and are not the minimum or maximum amounts payable to Engineer under the Agreement.

5. When estimated compensation amounts have been stated herein and it subsequently becomes apparent to Engineer that a compensation amount thus estimated will be exceeded, Engineer shall give Owner written notice thereof. Promptly thereafter Owner and Engineer shall review the matter of services remaining to be performed and compensation for such services. Owner shall either agree to such compensation exceeding said estimated amount or Owner and Engineer shall agree to a reduction in the remaining services to be rendered by Engineer, so that total compensation for such services will not exceed said estimated amount when such services are completed. If Engineer exceeds the estimated amount before Owner and Engineer have agreed to an increase in the compensation due Engineer or a reduction in the remaining services, the Engineer shall be paid for all services rendered hereunder.

Phase Estimated Compensation

Resident Project Construction Observation $5,000.00

Grant Management $10,000.00

5. Other Modifications to Master Agreement: NOT APPLICABLE

Exhibit B

This is EXHIBIT B, consisting of 3 pages, referred to in and part of the Master Agreement between Owner and Engineer for Professional Services dated March 17, 2014.

Approval and Acceptance: Approval and Acceptance of this Task Order, including the attachments listed above, shall incorporate this document as part of the Agreement. Engineer is authorized to begin performance upon its receipt of a copy of this Task Order signed by Owner. The Effective Date of this Task Order is March 16, 2020. Engineer Owner 04-16-2020 Signature Date Signature Date Lucas C. Billesbach, PE Mitch Robinson Name Name City Engineer Mayor Title Title DESIGNATED REPRESENTATIVE FOR TASK ORDER: DESIGNATED REPRESENTATIVE FOR TASK

ORDER: Zach Schulz Alicia Koziol Name Name Project Engineer/Manager Clerk Title Title 11717 Burt Street, Ste. 210, Omaha, 68154 110 S. 14th Street, Fort Calhoun NE 68023 Address Address [email protected] [email protected] E-Mail Address E-Mail Address 402.392.9926 402.468.5305 Phone Phone

Attachment A to Exhibit B

Page 1 of 7

This is Attachment A to Task Order No. 131216.28, Consisting of 7 pages

Project Description:

Construct improvements to protect the City’s main lift station and sanitary sewer conveyance system

against damages resulting from future flood events. The improvements include the following:

1. Construct a flood wall/berm around the perimeter of the lift station site providing flood

protection for the lift station, standby generator, two (2) sanitary manholes, and a

transformer on the electrical service for the lift station. The flood wall/berm will be

constructed to provide protection to the 500-year flood elevation. The flood wall/berm is

planned to be constructed of reinforced concrete on the south and east sides of the site and

is planned to be an earthen berm on the west and north sides of the site. The work also

includes modifications to site features such as relocation of the buried electrical service line

to avoid a conflict with the flood wall foundation and relocation of the existing chain link

security fence.

2. Raise the rim elevation to 1-foot above the 100-year flood elevation for all sanitary sewer

manholes located within the floodplain (4 total).

Basic Engineering Services (Lump Sum):

Project Management (All Phases):

1. Provide project management oversight over all facets and phases of the project. Project

management shall include the following services:

a. Coordination of design disciplines including facilitating communication and transfer

of documents between disciplines to minimize errors in the plans and specifications

as well as ensure a timely project design.

b. Provide timely and coordinated communication to and from the Owner for requests

for information, providing progress updates, scheduling meetings, and receiving and

providing feedback.

c. Provide oversight to ensure scope of services and schedule are met.

d. Work with disciplines to identify potential risks and how to mitigate those risks.

e. Review billed hours by design team and prepare invoice statements for Owner.

f. Provide timely and coordinated communication to and from the Contractor for

requests for information and to receive and provide feedback.

Attachment A to Exhibit B

Page 2 of 7

Preliminary Design Phase:

1. Project Initiation/Kick-off Meeting – Meet with the Owner to review project goals and

objectives. Review proposed scope of work and collect existing information necessary for

completion of the design.

2. Assist with procuring the services of a geotechnical engineer to conduct a geotechnical

investigation to obtain data on subsurface properties necessary for the design of the flood

protection wall/berm. The services of a geotechnical engineer would be paid for directly by

the City outside of this agreement.

3. Review flood wall access options to allow for at-grade entry/exit while the area is not

flooded. The selected access system shall allow for a quick and easy installation in the event

a flood event is anticipated.

4. Coordinate with Washington County on applicable requirements for any construction within

their Rights of Way.

5. 30% Design:

a. Prepare preliminary plan for the proposed flood wall/berm. It is expected that the

flood wall/berm will be constructed entirely on City property.

b. Prepare preliminary structural details for the flood wall and flood wall access

system.

c. Prepare preliminary details for raising rim elevations for sanitary manholes located

within the floodplain

d. Prepare a 30% plan set to include a title sheet, location map, civil plan sheets,

structural sheets, and details sheets to illustrate the work.

e. Prepare a 30% preliminary opinion of cost for the project.

f. Conduct an internal QA/QC review of the 30% plan set.

Final Design Phase:

1. 60% Design:

a. Revise 30% plan set as necessary following input from Owner, and internal QA/QC.

b. Revise details for the flood protection wall/berm.

c. Revise details for the flood access system.

d. Prepare details for all site modifications including site fencing.

e. Prepare details for the electrical service relocation, as necessary.

f. Revise standard details sheets for installation of the improvements.

g. Prepare a 60% plan set to include the revised sheets from the 30% plan set as well

as additional details created during the 60% design.

h. Conduct an internal QA/QC review of the 60% plan set.

2. 90% Design:

a. Revise 60% plan set as necessary following input from internal QA/QC.

b. Prepare final Specifications, including technical specifications related to the

materials and installation for the improvements.

Attachment A to Exhibit B

Page 3 of 7

c. Prepare forms for Contract Documents including the Invitation to Bid used for the

advertisement, Notice of Public Hearing, Bid Form, construction contracts between

Owner and Contractor(s), and necessary payment and performance bonds and

insurance requirements.

d. Incorporate appropriate FEMA/NEMA documents into the bidding documents.

e. Prepare a 90% plan and specification set to include revisions from 60% review and

final specifications.

f. Prepare a 90% engineer’s opinion of probable cost.

g. Conduct an internal QA/QC of the 90% plan and specification set.

h. Conduct a 90% review with the Owner and Owner’s attorney of the plans, opinion of

probable cost, technical specifications, bidding documents, and contract

documents.

3. Design Finalization Process:

a. Revised 90% plan and specification set as necessary following input from Owner,

Owner’s attorney, and internal QA/QC.

b. Prepare a final engineer’s opinion of probable cost.

c. Create final plan and specification set and sign and seal by an engineer registered in

the State of Nebraska.

Bidding and Negotiation Phase:

1. Obtain approval of plans and specifications and authorization to advertise for bids from

Owner and assist Owner with the development of an Invitation to Bid to be placed into

publication.

2. Furnish copies of plans, specifications, and contract documents of the project to prospective

bidders, material suppliers, and other interested parties upon their request upon receipt of

a non-refundable fee to be determined by Engineer.

3. Respond to inquiries from prospective bidders and prepare and issue any addenda required.

4. Assist the Owner at the bid opening consisting of one (1) meeting to ensure proper rules are

followed and adhered to during the process to ensure all requirements of State and Federal

law are fulfilled.

5. Tabulate and analyze construction bids and report on them to the Owner at one (1)

meeting. A written recommendation will be provided by the Engineer, along with any

supporting documentation to advise and assist the Owner in award of a construction

contract.

6. Prepare Contract Documents (Notice of Award, Construction Contract, Notice to Proceed)

for execution by Contractor and the Owner; provide cursory reviews of all insurance and

bonds submittals and present to the Owner’s legal and insurance counsel for approval; then

advise the Owner to proceed with execution of all documents.

7. Provide copies of all executed Contract Documents to the Owner and Contractor(s).

Attachment A to Exhibit B

Page 4 of 7

Construction Administration Phase: 1. Schedule and conduct a Pre-construction Conference, on site, consisting of one (1) meeting

prior to construction beginning. This conference (Pre-Con) will review the required

timelines set forth in the specifications, lines of communication, key contacts of those

involved, review any conflicts with utilities or schedules, review the schedule proposed by

the Contractor, review any requirements of the Contractor for locates and staking needs,

etc.

2. Review shop drawings (submittals) and related data supplied by the Contractor. This will

provide the Engineer and Owner the opportunity to review the materials and equipment

that will be supplied for the improvements prior to the Contractor securing and obtaining

them; which allows the Engineer to compare the selected materials and equipment with the

specifications to ensure compliance.

3. Provide interpretation of the plans and specifications, when necessary.

4. Review and process Contractor’s monthly payment applications and change orders (if

necessary) and provide to Owner for review and approval.

5. Schedule and conduct progress meetings on an as needed basis with Owner and Contractor

onsite.

6. Consult with and advise Owner during construction regarding all aspects of the project.

7. Conduct a final inspection of the project with the Contractor and Owner to ensure all

components of the project have been completed and are acceptable to all parties prior to

final payment. A list of items (also known as a Punch List) will be produced for the

Contractor to complete prior to the entire final payment being released.

8. Recommend to the Owner the acceptance of the project and complete the necessary

certificate. This recommendation will be based on the Engineer’s observation of

construction utilizing professional judgment and accepted tests to determine that the

Contractor has completed their contracts in substantial compliance with the plans,

specifications and contract documents.

9. Prepare a report of total project costs, as necessary.

Post Construction Phase:

1. Prepare Record Drawings to illustrate the final location of the water main and pit locations

should there be any modifications.

2. Submit project closeout documentation to FEMA/NEMA.

3. Conduct an 11 month on site review with Owner and contractor if necessary.

Attachment A to Exhibit B

Page 5 of 7

Topographic Survey & Construction Staking (Lump Sum):

Design Phase:

1. Complete preliminary field surveys:

a. Establish vertical and horizontal control on the State Plane coordinate system near

the project area(s).

b. Conduct a topographic survey of the lift station site and collect the location and

elevation of all sanitary manholes located within the floodplain.

c. Survey the locations of all physical features within the proposed site locations

(concrete, asphalt, gravel, rock, driveways, sidewalks, trees, utility poles, utility

locates, valves, manholes, signs, drainage structures, water features, terrain

profiles, etc.).

d. Locate the Rights of Way location along County Road 34.

e. Schedule utility location information and incorporate on preliminary plans (gas,

telephone, electric, water, sanitary sewer, communications, etc.).

f. Create an electronic drawing illustrating elevations, site features, and existing

utilities resulting from the surveys performed.

Construction Phase:

1. Provide baseline survey for horizontal and vertical controls for the proposed improvements,

to be referenced by both the Engineer and Contractor during the construction of the

project.

2. Provide construction staking of the proposed improvements; including corners for the

proposed flood protection berm/wall.

Permit Preparation (Lump Sum):

Design Phase:

1. Prepare Rights of Way permit for Washington County as necessary for any work within the

Right of Way. Owner shall be responsible for all applicable review and permitting fees.

2. Prepare Washington County Floodplain Development Permit for improvements located

within the floodplain. Owner shall be responsible for all applicable review and permitting

fees.

3. Prepare Nebraska Department of Environment and Energy (NDEE) construction permit.

Owner shall be responsible for all applicable review and permitting fees.

Post Construction Phase:

1. Prepare Elevation Certificate after construction of the improvements are complete to

validate compliance with local floodplain management ordinances.

2. Submit permit closeout documentation to all permitting agencies as necessary.

Attachment A to Exhibit B

Page 6 of 7

Resident Project Construction Observation (Hourly):

Resident Project Representation:

1. The Resident Project Representation (RPR) will be provided part-time during the entire

construction phase up to a total of 45 hours.

2. The RPR will assist the Engineer with the following tasks:

a. Review the progress schedules and schedule of values. b. Communicate with the Engineer regarding suggestions and recommendations made

by the Contractor. c. Conduct on-site observations of the Contractor’s work and report their progress to

the Engineer. d. Consult with the Engineer regarding scheduling inspections, tests, and system start-

ups, and accompany visiting inspectors and technicians during said events. e. Maintain reports of inspections, progress and other pertinent construction data and

questions during the construction phase. f. Review payment applications from the Contractor for compliance with the established

procedures. g. Participate in final inspection; prepare final list of items to be completed or deficient.

Grant Management (Hourly):

Grant Pre-Award Phase:

1. Provide grant writing assistance to develop and finalize the HMGP application. Respond to

comments from NEMA and FEMA as necessary prior to grant award.

2. Coordinate with City staff to obtain necessary information and documentation for inclusion

in the grant application.

3. Develop and finalize the Benefit Cost Analysis (BCA).

a. Prepare a detailed scope of work and cost estimate for the project.

b. Survey site features to determine infrastructure impacted by various flood events.

c. Evaluate future damage avoidance and loss of service impacts to quantify the

project benefits.

d. Utilize FEMA BCA software to prepare final BCA documentation.

4. Request and gather Environmental and Historic Preservation (EHP) information required for

the HMGP application.

a. Prepare consultation letters, figures, and project descriptions.

b. Gather correspondence from various EHP agencies and respond to questions and

comments.

Attachment A to Exhibit B

Page 7 of 7

Meetings included with this scope:

1. Preliminary Design: a. Attendance at design kick-off meeting.

2. Final Design: a. Attendance at 90% review meeting with City staff.

3. Bidding and Negotiation: a. Attendance at City Council meeting to approve plans and specifications and receive

authorization to advertise.

b. Attendance at Bid Opening.

c. Attendance at City Council meeting to award bid.

4. Construction Phase: a. Attendance at Pre-Construction Conference.

b. Attendance at construction progress meetings on an as needed basis with Owner

and Contractor.

Items not included with this scope of services:

1. Land acquisition services and property acquisition descriptions.

2. Geotechnical investigation.

3. Materials testing services including concrete and soil testing.

4. Utility potholing to evaluate depth of utilities in the project area.

5. Stormwater Pollution Prevention Plan (SWPPP) preparation and BMP maintenance.

6. Obtaining any permits not expressly stated above.

7. Payment of review and permitting fees.

8. Davis-Bacon Wage Rate certification and interviews. Can be provided for an additional fee if

required.

9. Services not expressly stated as being provided within this agreement.

Project Time Frame:

1. Preliminary Design Phase – 90 calendar days from notice to proceed following grant award

2. Final Design Phase – 60 calendar days from 30% review meeting

3. Bidding and Negotiation Phase – 60-90 calendar days from authorization to proceed

4. Construction Phase – estimate 120 calendar days from authorization to proceed

5. Post Construction Phase – end of Contractors correction period

OFFICIAL NOTIFICATION

CITY OF FORT CALHOUN STATE OF EMERGENCY Fort Calhoun, Nebraska, has a great potential of suffering from county-wide damages resulting from the Covid-19/Corona Virus event(s) that has/will occur beginning January 31, 2020 and ongoing and continuing indefinitely causing disruption of services, cost-incurred prevention, and protection and the endangerment of the health and safety of the citizens and businesses of Fort Calhoun. Therefore, the Mayor of the City of Fort Calhoun has declared a state of emergency authorized under Nebraska State Statute R.R.S. 81-829.50 on behalf of Fort Calhoun, and will execute for and on behalf of Fort Calhoun, the expenditure of emergency funds from all available sources, the involving of mutual aid agreements, the applying to the State of Nebraska for assistance from the Governor’s Emergency Fund, and any other resources he deems necessary in the fulfillment of his duties. ______________________________ WITNESS my hand and seal of my office Mitch Robinson, Mayor City of Fort Calhoun this _____ day of ______________ 2020 ______________________________ ____________________________________ Date Alicia Koziol Fort Calhoun Clerk

Fort Calhoun Project Status

04.20.2020

lcb

Project Project # Stage Funding Source Recent Activity Activity Needed City Action Needed Upcoming Deadline

Clay Street Drainage Conceptual Conceptual GO Fund

Presented cost estimate to City

Council. Tabled until further notice due to cost. Select budget year. None

Sanitary Sewer Investigation 131216.13 Promo Sewer Fund

Investigation was tabled until after

manhole repairs completed. None

Approval of JEO agreement

when/if desired. None

Monroe Street Paving District

131216.00

(General

Engineering) Conceptual

Paving District / Street Fund

for City portion of work

City has inquired about a title search,

awaiting results. Conduct title search and acquire property

Property acquistion of ROW

steps. None

2018 Sanitary Sewer Rehabiliation 131216.18 Construction Sewer Fund

Contractor was able to line the

sanitary sewer mains and JEO has

received post-construction televising

reports. Lining of manholes is held up

due to product availability. Finish lining manholes.

Approve Pay Application No.

1

CO#3 accepted to extend deadline

to June 1, 2020

2020 7th and Monroe Intersection

Improvements 131216.19 Design GO Fund

City approved JEO agreement, NGPC

approved JEO agreement. Design is

underway. Complete design and turn over to NDOT. None at this time. Final Design, May 2020

Trail Feasibility Study 131216.20 Funding GO Fund

NGPC indicated Fort Calhoun was not

awarded a grant. Due to limited

funding, only one grant was

distributed.

Re-apply for a grant in future budget

year. None None

Bett's Circle Drainage 131216.22 Post Construction GO Fund Project is complete. Monitor warranty period. None None at this time.

2018 Street Maintenance

131216.00

(General

Engineering) Post Construction GO Fund Project is complete. Monitor warranty period. None None at this time.

2018 Maintenance Building Demolition

131216.00

(General

Engineering) Post Construction GO Fund / Sales Tax Final seeding was conducted. Monitor warranty period. None None at this time.

GIS Utility Mapping 131216.24 Promo Water/Sewer Fund

Grant being considered was not

applicable to GIS mapping.

Await further grant opportunities or

budget for project. None Unknown at this time

Water Extension to Campground (meter

pit and backflow pit)

131216.00

(General

Engineering) Promo Water/Sewer Fund

Project has been put on pause until

we await further notice from the

owner.

Complete design and turn over to

campground owner. None Unknown at this time

Adams Street Watermain Extension

131216.00

(General

Engineering) Post Construction Water/Sewer Fund Work is complete. Monitor warranty period. None None at this time.

2020 Asphalt Overlays 131216.26 Construction GO Fund / Bonding

Contracts with Western Engineering

are proceeding. Schedule kick-off meeting.

Participate in kick-off

meeting.

Construction complete by October

2020.

Adams Street Corridor Phase 2 and 2 131216.27 Bidding Sales Tax / Private Project was bid on April 14th, 2020

Approve a contract to lowest bidder for

Group A. Consider award for Group B in

July.

Award a contract for Group

A. Sept. 1 completion for Group A.

2020 Lift Station Flood Protection

Improvements 131216.28 Grant Funding HMGP / Sewer Fund

We have responded to an initial round

of questions about the grant

application. JEO has prepared a

design agreement. Consider approval of JEO Task Order.

Considere approval of JEO

Task Order. None at this time.

Headwall Replacement at 14th and

Court

131216.00

(General

Engineering) Design GO Fund

Mayor has authorized JEO to proceed

with a design for the replacement of

the headwall structure at 14th and

Court due to condition of existing

structure. Complete survey and design. None at this time. None at this time.