MaPMT Readout MaPMT Readout Workshop / IntroductionWorkshop / Introduction
MaPMT Readout MaPMT Readout Workshop / IntroductionWorkshop / Introduction
MaPMT Workshop Imperial College26/27 June 2003
Franz MuheimUniversity of Edinburgh
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 2
Workshop Agenda & GoalsWorkshop Agenda & Goals Outline of MaPMT project Reports/Presentations
– MaPMT/Beetle studies
– Photo detector integration issues
– Possible Readout schemes
– Level-1 Electronics, PINT results
– Plans for this summer Define MaPMT read-out project
– Produce list of tasks necessary to get job done
– Identify conflicting requirements
– Prioritise different options (if possible)
– Planning of schedules and milestones
– MaPMT plans and schedule Hope for lots of fruitful discussions
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 3
MaPMTs for LHCb RICHMaPMTs for LHCb RICH Multianode Photo Multiplier Tubes
– Single photo tube containing8x8 array of 64 dynode chains 2.1 mm pixel size, 0.2 mm gap
– Bialkali photo cathode, UV glass window QE = 22 % at = 380 nm
Lenses– with one flat and one curved surface – Increases active area fraction to 85% – effective pixel size 3.0 mm
Readout Electronics – ASIC preamplifier chip with pipeline – Readout architecture L0 & L1
Mechanics– Photo detector mounts & motherboard– Magnetic field shielding, mu-metal
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 4
MaPMT/Beetle ProjectMaPMT/Beetle Project MaPMT R7600-03-M64 with 8 dynode stages
– gain: 50000 HV 800 V Front-End electronics
– Beetle1.2 chip
– single photon equivalent 60 mV (2 mip)
– signal / noise ratio 40
– analogue or binary readout mode
MaPMT R7600-03-M64 with 12 dynode stages – gain: 300’000 HV 800 V
– Beetle1.2-MaPMT chip with gain adaption
– single photon equivalent 30 mV (2 mip)
– signal / noise ratio 40
– analogue or binary readout mode
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 5
MaPMT Plans & ScheduleMaPMT Plans & Schedule Read out the 8 dynode stage MaPMT
– with Beetle1.2 in analogue and binary mode– using the Heidelberg board restricted to 12 channels
Jan - June 03 Read out the 12 dynode stage MaPMT
– with Beetle1.2MA0 in analogue and binary mode– using the Heidelberg board, restricted to 12 channels
April - June 03
Read out all 64 channels of one or more MaPMTs – with the Beetle1.2/Beetle-MA0 in analogue and binary mode– with Beetle PCBoard
July 03 - Testbeam
– Prepare and operate a cluster of MaPMTs in a testbeam, read out with the Beetle1.2 or Beetle-MA0 chip
May - Sep 03
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 6
Electronic Cost Comparison Electronic Cost Comparison Main Inputs
– 232 modules with 16 MaPMTs, 8 Beetle chips, 1024 channels– 220 SFr/optical link, 190 SFr/ 4 copper links 5kSFr/ L1 board
Binary Electronics – 232 optical links, 30 L1 boards 1250 kSFr
Analogue Electronics– 4x1856 copper links, 116 L1 boards 2100 kSFr– TDR cost for comparison 1600 kSFr– difference to binary 850 kSFr
Digital Electronics– 1856 optical links, 78 L1 boards 1970 kSFr– difference to binary 720 kSFr– Cost differences are understood– data links costs are rather robust O(50 kSFr) – optimisation for L1 board necessary O(100 kSFr)– absolute cost of L0 electronics needs to be reassessed
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 7
Major Issues Major Issues MaPMT/Beetle studies
– BoardBeetle July 03
– Testbeam 13 Aug - 9 Sep
MaPMT type decision– 8 vs 12 dynode stages Sep 03
Binary vs analogue/digital readout– cost versus risks (common mode, comparator)
– only decision possible now is analogue or digital
– proposal - analogue or digital as baseline June 03
Design of L0 motherboard – includes cooling, on critical path Jan 04
– report from meeting at CERN 22.5.03
Software – Performance studies, robustness Sep 03
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 8
Overall Schedule Overall Schedule 1 year old,
– produced for June 2002 review, need to update July 2002 Resume design of Beetle chip done Oct 2002 Resume Motherboard design starting now 1 Mar 2003 Choose MaPMTs Mar 2003 Start tendering not started 1 Oct 2003 Place MaPMT Order Jan 2004 L0 F/E Electronics and Motherboard (MB)
design completed Mar 2004 Start Photodetector testing July 2004 10% of MaPMTs delivered Jan 2005 L0 - F/E Electronics and MB R&D completed Mar 2006 100% of MaPMTs delivered and tested Mar 2006 100% production and testing of L0 and L1 units June 2006 100% of photodetector modules assembled
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 9
Status of MaPMT Project Status of MaPMT Project Large effort has started for MaPMT project in 2003
– Measurements of 8-dynode stage MaPMTs signal shape
with Beetle1.2 has highest priority
– Measurements with Beetle1.2MA0 are promising
More effort is needed
– Need to catch up delays, 7 months for L0 Motherboard
MaPMT is baseline
– More effort available
– Need to re-think organisation of MaPMT project now
– Many important decisions need to be taken soon
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 11
Multianode Photo MultiplierMultianode Photo Multiplier
MaPMT Single photo tube containing
8x8 array of 64 dynode chains 2.1 mm pixel size, 0.2 mm gap
Gain: 3.105 at 800 V Bialkali photo cathode,
QE = 22 % at = 380 nm UV glass window, was borosilicate,
QE dE increased by 50 %
Wavelength [nm]
QE [%]
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 12
Quartz LensesQuartz Lenses MAPMT active area fraction:
38% (includes pixel gap) Increase with quartz lens with
one flat and one curved surface to 85%
effective pixel size 3.0 mm
400 mrad
0 mrad
no lens lens
lens lens
Demagnification(f -d)/f 2/3
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 13
3x3 MaPMT Cluster Test3x3 MaPMT Cluster Test Measurements with
– MaPMT: HV = -1000V Data
– subtract cross-talk and common-mode
– Fit # of photo electrons per event:
Cherenkov ring, 6000 events Observe in data background
npe= 6.96 0.33 0.26 p.e. Expect from simulation npe=
6.49 0.17
Single channel spectrum
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 14
Electronics Costs Electronics Costs Major cost differences in
– data links– L1 boards
L0 Electronics – 232 modules – 16 MaPMTs, 1024 channels, 8 Beetle chips – 4 data links per beetle, 128: 4 multiplexing, 40 MHz clock– cost very similar for all options
Binary Electronics – optical links to L1 board
– 32 : 1 multiplexing (1bit per data link)
– 232 optical links, 1 per module (was 2)
– costs from John Bibby
– cost per optical link 220 SFr, total 50 kSFr
– 30 L1 boards, 5 kSFr/board, total 150 kSFr
– L1 costs reduced by 300 kSFr wrt to TDR
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 15
Analogue/Digital Electronics Analogue/Digital Electronics Analogue Electronics
– similar to VELO, with copper links over 60 m– link costs include driver, differential link receiver
and ADC (costs from Thomas Ruf)– 4 x 1856 links, 190 SFr / 4 links, total data links 350 kSFr– L1 board input: 64 links = 16 cables– 116 L1 boards, 5 kSFr/board, total L1 boards 580 kSFr
Analogue/Digital Electronics– similar to Inner Tracker, ADC at outer detector rim– need rad tolerant ADC (15kRad), – costs from Achim Vollhardt– 4:1 multiplexing with 8bit ADC– 1856 optical links, 252 SFr/link, total data links 470
kSFr – L1 board, input 96 optical links = 6 ribbons– 78 L1 boards, 5 kSFr/board, total L1 boards 390 kSFr
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 16
Comparator ReviewComparator Review Phone Meeting of Beetle Users
– 30 April 03 – comparing of notes– digital switching noise, 80 MHz, on analogue lines
Comparator Discussion– closed loop of understanding– small differences resolved– conclusions remain the same– 3bits are marginal, – 5bits has comfortable margin
Comparator in Beetle1.2– 3 bits, no access to negative offsets
Comparator in Beetle1.3– 5 bits, different sign for Offset and Delta IDAC– will be submitted in June
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 17
Allocation of PersonnelAllocation of Personnel Agreed at RICH group leader’s meeting CERN, 26 Feb 03 Immediate personnel requirements
– Setup of read-out and testing A) and B) Edinburgh
– Testing of BeetleMA0 B) Oxford
– Production of PCBoard for C) Imperial College
– Consulting for A) B) SW,JB,NS,DP
– Procurement strategy ok
– Design of L0 motherboard Cambridge, Oxford Genova
– Coordination FM Additional personnel required in May
– Cooling strategy Genova
– Higher channel occupancy CERN, Edinburgh
– Bleeder board for test beam Cambridge
– jigs UK/CERN
– moulded lenses Genova
MaPMT Workshop, Imperial College, 26/27 June 2003
F. Muheim 18
To Do List (on 28 April) To Do List (on 28 April) Read-out of 8-dynode MaPMT with Beetle1.2
– (re-)connect MaPMT done
– measure analogue spectra with LED done
– take data in binary mode July
Review of electronics cost– binary vs analogue vs digital read-out done
Comparator review done
Decision on binary vs analogue– cost versus risks (common mode) ???
Read-out of 12-dynode MaPMT with Beetle1.2 – testing of Beetle1.2MA0 done
– measure with LED analogue spectra done
– take data in binary mode July