MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE
69
TWP007RGE01
E1M
TWP008RGE01
E1M
TWP007RGE01W1MTWP008
RGE01W1M
NWNW
NE
SW
NESE
SE
SW
NE
NW
NESE
NW
NW SW
NE
NW
NE
SW
SE
SE
SW
SE
SW
1
19
2425
3031
36
6
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft
±
1:10,000
0 250 500125Metres
Map 315
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Construction Section S2Environmentally Sensitive Site Locations
ESS FeaturesWater!( Water Crossing
WaterGroundwater
Points of Access*!( Proposed Access Point!( Major Stream Crossing
Abandoned Rail CrossingRail Crossing
") Transmission Line Crossing
Project Infrastructure
Proposed Access Route
Land Base
66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations
#
#
*Labels correspond to BPIII Access Management Database
Mining
! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation
Provincial ForestDraft: For Discussion Purposes Only
ProposedConverter Station
Ground Electrode Line
Township/Range
Version: DRAFT
ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS Name Easting Northing UTM
Zone Channel Width
Wet Width
Fish Habitat Class
Habitat Sensitivity
S2-S09 S2-Aqua-109 Parker Drain 611290 5495282 14N N/A 4m Low Marginal
S2-S09 S2-Aqua-110
Unnamed Drain 611293 5495151 14N N/A N/A None None
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within
these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream
Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction ESS Group: Groundwater
Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance
S2-S08 S2-Aqua-200 Saline artesian areas Site: 5 to 6 E-605565 N-5496688
E-611257 N-5496792 14N 5693m
S2-S09 S2-Aqua-200 Saline artesian areas Site: 9 to 10 E-611257 N-5496792
E-611391 N-5490218 14N 6574m
Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:
• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.
MAP NUMBER: 315
!l
!l
!(
!(
¾À305
S2-S
10
S2-S0975RT
Tower 146E-611392, N-5490219
S2-Aqua-200
S2-Aqua-111
S2-Aqua-112
G A R B E R D R A I N
MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE
1011
TWP007RGE01
E1M
TWP007RGE01W1M
NW
SE
NW
NE
SWSW
NE
SE
NW
NE
SW
SE
NW
SESE SE
SW
NE
SW
NE
NW
NW
SW
NE
1213
18
19
24
7
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft
±
1:10,000
0 250 500125Metres
Map 316
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Construction Section S2Environmentally Sensitive Site Locations
ESS FeaturesWater!( Water Crossing
WaterGroundwater
Points of Access*!( Proposed Access Point!( Major Stream Crossing
Abandoned Rail CrossingRail Crossing
") Transmission Line Crossing
Project Infrastructure
Proposed Access Route
Land Base
66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations
#
#
*Labels correspond to BPIII Access Management Database
Mining
! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation
Provincial ForestDraft: For Discussion Purposes Only
ProposedConverter Station
Ground Electrode Line
Township/Range
Version: DRAFT
ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS
Name Easting Northing UTM Zone
Channel Width
Wet Width
Fish Habitat Class
Habitat Sensitivity
S2-S10 S2-Aqua-111
Garber Drain 611387 5490553 14N N/A 7m Low Marginal
S2-S10 S2-Aqua-112
Garber Drain 611558 5490222 14N N/A 4m Low Marginal
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within
these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream
Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction ESS Group: Groundwater
Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance
S2-S09 S2-Aqua-200 Saline artesian areas Site: 9 to 10 E-611257 N-5496792
E-611391 N-5490218 14N 6574m
S2-S10 S2-Aqua-200 Saline artesian areas Site: 11 to 12 E-611391 N-5490218
E-619944 N-5490397 14N 8554m
Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:
• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.
MAP NUMBER: 316
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
")
! l
! l
!(
Y51L
S2-S10
S2-S1021
S2-Aqua-200
S2-Aqua-113
MAP SHEET FULLY WITHIN THE S2-AQUA-200 FEATURE
10
151617
18
3456
7
89
TWP007RGE01
E1M
NWNW
NW
SW
NW
SW
NE
NE
SWSE
SE
SWSW
NE
NW NE
SW SE
NW
SE
NE
SE
SE
NE
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft
±
1:10,000
0 250 500125Metres
Map 317
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Construction Section S2Environmentally Sensitive Site Locations
ESS FeaturesWater
Groundwater
Points of Access*!( Proposed Access Point!( Major Stream Crossing
Abandoned Rail CrossingRail Crossing
") Transmission Line Crossing
Project Infrastructure
Proposed Access Route
Land Base
66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations
#
#
*Labels correspond to BPIII Access Management Database
Mining
! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation
Provincial ForestDraft: For Discussion Purposes Only
ProposedConverter Station
Ground Electrode Line
Township/Range
Version: DRAFT
ESS Group: Groundwater
Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance
S2-S10 S2-Aqua-200 Saline artesian areas Site: 11 to 12 E-611391 N-5490218
E-619944 N-5490397 14N 8554m
Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:
• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.
MAP NUMBER: 317
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
# !(!(
!(
!(
¾À330
S2-S10S2-S1016 76RT
S2-Aqua-200
S2-Aqua-114 S2-Aqua-115S2-Aqua-113
MA
NN
ESS
DR
AIN
R OB E R T S
D R A I N
12
TWP007RGE01
E1M
NW
SE
NW NE
SW
SE
SW
SW
NE
SE
NE
SE
NW
SW
SE
SE
SW
NE
SW
NE
NW
NW NWNE1
10
11
12
131415
23
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft
±
1:10,000
0 250 500125Metres
Map 318
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Construction Section S2Environmentally Sensitive Site Locations
ESS FeaturesWater!( Water Crossing
WaterGroundwater
Points of Access*!( Proposed Access Point!( Major Stream Crossing
Abandoned Rail CrossingRail Crossing
") Transmission Line Crossing
Project Infrastructure
Proposed Access Route
Land Base
66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations
#
#
*Labels correspond to BPIII Access Management Database
Mining
! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation
Provincial ForestDraft: For Discussion Purposes Only
ProposedConverter Station
Ground Electrode Line
Township/Range
Version: DRAFT
ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS Name Easting Northing UTM
Zone Channel Width
Wet Width
Fish Habitat Class
Habitat Sensitivity
S2-S10 S2-Aqua-113
Unnamed Drain 616907 5490335 14N N/A 3m Low Marginal
S2-S10 S2-Aqua-114
Manness Drain 618051 5490359 14N N/A 7m Low Marginal
S2-S10 S2-Aqua-115
Roberts Drain 620518 5490417 14N N/A 7m Low Marginal
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within
these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream
Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction ESS Group: Groundwater
Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance
S2-S10 S2-Aqua-200 Saline artesian areas Site: 11 to 12 E-611391 N-5490218
E-619944 N-5490397 14N 8554m
Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:
• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.
MAP NUMBER: 318
! l
! l
!(
!(
!(S2-S10
S2-Aqua-115
S2-Aqua-116 S2-Aqua-117
R OB E R T S
D R A I N
DO
MA
IND
RA
I N
SW SE
NW
NW
SW
NE
SE
NE
SE
SE
NE
NE
SE
NW
SW
NE
SE
NW
SW
NE1
12
131718
56
78
TWP007RGE01
E1M
TWP007RGE02
E1M
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft
±
1:10,000
0 250 500125Metres
Map 319
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Construction Section S2Environmentally Sensitive Site Locations
ESS FeaturesWater!( Water Crossing
Points of Access*!( Proposed Access Point!( Major Stream Crossing
Abandoned Rail CrossingRail Crossing
") Transmission Line Crossing
Project Infrastructure
Proposed Access Route
Land Base
66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations
#
#
*Labels correspond to BPIII Access Management Database
Mining
! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation
Provincial ForestDraft: For Discussion Purposes Only
ProposedConverter Station
Ground Electrode Line
Township/Range
Version: DRAFT
ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS
Name Easting Northing UTM Zone
Channel Width
Wet Width
Fish Habitat Class
Habitat Sensitivity
S2-S11 S2-Aqua-116
Domain Drain 623839 5490470 14N N/A 2m Low Marginal
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within
these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice
Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from April 1 to June 30
MAP NUMBER: 319
! l
! l
! l
! l
! l
!(
!(
!(
!(
S2-S11 S2-S12S2-S13S2-S10
Tower 147E-626224, N-5490538
Tower 148E-626709, N-5490589
Tower 149E-627627, N-5490613
S2-Aqua-118
S2-Aqua-119S2-Aqua-117
S2-Hert-100
L AP
OI N
T EC
OU
L E E
TWP007RGE02
E1M
10
141516
45
8
9
RL
557
555
549
551
545
547
533
535
553
543
541
539
537
SE
NW
SW SE
SW
NE
NENW
SE
NE
NE
SW
SW
NE
SE
NW
SW
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft
±
1:10,000
0 250 500125Metres
Map 320
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Construction Section S2Environmentally Sensitive Site Locations
ESS FeaturesHeritage!( Archaeological
Water!( Water Crossing
Points of Access*!( Proposed Access Point!( Major Stream Crossing
Abandoned Rail CrossingRail Crossing
") Transmission Line Crossing
Project Infrastructure
Proposed Access Route
Land Base
66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations
#
#
*Labels correspond to BPIII Access Management Database
Mining
! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation
Provincial ForestDraft: For Discussion Purposes Only
ProposedConverter Station
Ground Electrode Line
Township/Range
Version: DRAFT
ESS Group: Archaeological
Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone
S2-S14 S2-Hert-100 Old creek bed east of current drain 628452 5490429 14N Potential Effects: Potential disturbance to heritage resources. Specific Mitigation:
• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental
Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS Name Easting Northing UTM
Zone Channel Width
Wet Width
Fish Habitat Class
Habitat Sensitivity
S2-S14 S2-Aqua-117
Unnamed Drain 624682 5490494 14N N/A N/A None None
S2-S14 S2-Aqua-118
Unnamed Drain 626330 5490549 14N N/A N/A Low Marginal
S2-S14 S2-Aqua-119
La Pointe Coulee 628394 5490443 14N N/A 4m Low Marginal
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams; Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within
these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Timing Windows, Temporary Stream
Crossings, Ice Bridges and Snow Fills, and Overhead Line Construction
MAP NUMBER: 320
#
!(
!(
!(
! l
! l
! l
! l
! l
! l
!(
!(
!(
!(!(
!(!(
Pembin
a Trail
¾À246
¾À200
[\75
S2-S14
S2-S13
S2-S15
S2-S15
17
77RT
78RT
Tower 150E-629850, N-5490069
Tower 151E-630164, N-5489742
S2-Aqua-201
S2-Wild-100
S2-Aqua-119
S2-Hert-100
S2-Aqua-120
S2-Hert-102
S2-Hert-103
S2-Hert-101
S2-Hert-300
R E DR I V E R
L AP O
I NT E
CO
UL E E
13
L1
L2
535
537
553
539
557
555
547
549
551
541
545
543
548
555
550
549
551
545
547
552
533
534
546
542
535
540
538
544
553
543
536
541
556
539
558
554
537
560
RL
RL
RL
TWP007RGE02
E1M
TWP007RGE03
E1M
Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: July 23, 2014 Version: Draft
±
1:10,000
0 250 500125Metres
Map 321
Bipole III Transmission ProjectConstruction Environmental Protection Plan
Construction Section S2Environmentally Sensitive Site Locations
ESS FeaturesHeritage!( Archaeological!( Cultural or Historic
Water!( Water Crossing
WildlifeBirds and Habitat
WaterGroundwater
Points of Access*!( Proposed Access Point!( Major Stream Crossing
Abandoned Rail CrossingRail Crossing
") Transmission Line Crossing
Project Infrastructure
Proposed Access Route
Land Base
66 m Right of WayBPIII Final Preferred RouteAngle Tower Locations
#
#
*Labels correspond to BPIII Access Management Database
Mining
! ! Transmission LineHighwayMajor RoadLocal RoadRailway (Operational)Railway (Discontinued)First Nation
Provincial ForestDraft: For Discussion Purposes Only
ProposedConverter Station
Ground Electrode Line
Township/Range
Version: DRAFT
ESS Group: Archaeological
Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone
S2-S15 S2-Hert-101 Potential Archaeological Site - Red River west shore 630003 5489915 14N
S2-S15 S2-Hert-102 Registered Archaeological Site 630019 5489897 14N
S2-S15 S2-Hert-103 Potential Archaeological Site - Red River east shore 630119 5489790 14N Potential Effects: Potential disturbance to heritage resources. Specific Mitigation:
• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental
Inspector • Implement additional mitigation from site investigation ESS Group: Historic
Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone
S2-S15 S2-Hert-300 Heritage River (Red River) 630075 5489837 14N Potential Effects: Potential aesthetic concerns with presence to canoe route traffic; disruption from operational activities Specific Mitigation:
• Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion • Identify and flag prior to start of work • Conduct site investigation with Archaeologist post clearing and prior to construction • Minimize surface disturbance around the site to the extent possible • Inspect excavated materials or surface disturbance for heritage resources and report any finds to Environmental
Inspector • Implement additional mitigation from site investigation ESS Group: Water Crossing
Sec-Seg ID ESS ID ESS
Name Easting Northing UTM Zone
Channel Width
Wet Width
Fish Habitat Class
Habitat Sensitivity
S2-S15 S2-Aqua-120
Red River 630071 5489841 14N 50m N/A High Important
Potential Effects: Habitat loss and contamination from structure foundations & installations; increased erosion & sedimentation of streams;
Damage to stream banks; Loss of riparian vegetation; Fish habitat disturbances and impeded fish movement; Rutting of floodplain Specific Mitigation:
• Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion • Use existing trails, roads or cut lines whenever possible as access routes • Identify and flag buffer areas prior to start of work • Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within
these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.
• 7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. • Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice
Bridges and Snow Fills, and Overhead Line Construction • No instream work or fording from September 15 to June 30 ESS Group: Birds and Habitat
Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance
S2-S15 S2-Wild-100 Red River crossing Site: L1 to L2 E-630036 N-5489875
E-630115 N-5489792 14N 113m
Potential Effects:
Higher risk of wire collision; risk of wire collision is localized to the right-of-way. Specific Mitigation:
• Adhere to reduced risk timing windows for protection of birds (August 1- April 30) • Maintain applicable setback during nesting and breeding timing window • Conduct priority assessment for bird diverters and other measures prior to transmission line stringing • Install bird diverters or other measures at high priority sites ESS Group: Groundwater
Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance
S2-S15 S2-Aqua-201 Saline artesian areas Site: 13 to 14 E-632182 N-5489241
E-633123 N-5489008 14N 970m
Potential Effects: Increase in salinity of soils and surface water in case of potential groundwater discharge to the surface; wetting the surficial environment (ground saturation); effect on local vegetation. Specific Mitigation:
• Qualified driller with appropriate experience will be contracted to work in areas affected by artesian conditions. • Emergency response plans for sealing/grouting and pumping will be implemented as required. • Follow up inspections of installed foundations will be undertaken to monitor for excess moisture.
MAP NUMBER: 321