manufacturing reports
TRANSCRIPT
-
8/2/2019 Manufacturing Reports
1/71
Microsoft Dynamics GPManufacturing Sample Reports
-
8/2/2019 Manufacturing Reports
2/71
Copyright Copyright 2007 Microsoft Corporation. All rights reserved.
Complying with all applicable copyright laws is the responsibility of the user. Without limiting therights under copyright, no part of this document may be reproduced, stored in or introduced intoa retrieval system, or transmitted in any form or by any means (electronic, mechanical,photocopying, recording, or otherwise), or for any purpose, without the express written
permission of Microsoft Corporation. Notwithstanding the foregoing, the licensee of the softwarewith which this document was provided may make a reasonable number of copies of thisdocument solely for internal use.
Trademarks Microsoft and Microsoft Dynamics are either registered trademarks or trademarks of MicrosoftCorporation or its affiliates in the United States and/or other countries. FairCom and c-tree Plusare trademarks of FairCom Corporation and are registered in the United States and othercountries.
The names of actual companies and products mentioned herein may be trademarks or registeredmarks - in the United States and/or other countries - of their respective owners.
Unless otherwise noted, the example companies, organizations, products, domain names, e-mailaddresses, logos, people, places, and events depicted herein are fictitious. No association withany real company, organization, product, domain name, e-mail address, logo, person, place, orevent is intended or should be inferred.
Intellectual property Microsoft may have patents, patent applications, trademarks, copyrights, or other intellectualproperty rights covering subject matter in this document. Except as expressly provided in anywritten license agreement from Microsoft, the furnishing of this document does not give you anylicense to these patents, trademarks, copyrights, or other intellectual property.
Warranty disclaimer Microsoft Corporation disclaims any warranty regarding the sample code contained in thisdocumentation, including the warranties of merchantability and fitness for a particular purpose.
Limitation of liability The content of this document is furnished for informational use only, is subject to change withoutnotice, and should not be construed as a commitment by Microsoft Corporation. Microsoft
Corporation assumes no responsibility or liability for any errors or inaccuracies that may appearin this manual. Neither Microsoft Corporation nor anyone else who has been involved in thecreation, production or delivery of this documentation shall be liable for any indirect, incidental,special, exemplary or consequential damages, including but not limited to any loss of anticipatedprofit or benefits, resulting from the use of this documentation or sample code.
License agreement Use of this product is covered by a license agreement provided with the software product. If youhave any questions, please call the Microsoft Dynamics GP Customer Assistance Department at800-456-0025 (in the U.S. or Canada) or +1-701-281-6500.
Publication date May 2007
-
8/2/2019 Manufacturing Reports
3/71
M A N U F A C T U R I N G S A M P L E R E P O R T S i
ContentsManufacturing reports ..................................................................................................................... 1
Basic BOM report ..........................................................................................................................................2
Basic Where Used report ..............................................................................................................................4
BOM Summary report ..................................................................................................................................6Daily Work Center Capacity report. ...........................................................................................................8
Monthly Work Center Capacity report ....................................................................................................10
Weekly Work Center Capacity report ......................................................................................................12
Drawings Detailed report ..........................................................................................................................14
Engineering Change report .......................................................................................................................16
Item Engineering Detailed report .............................................................................................................18
Stock Status ABC report .............................................................................................................................20
Physical Inventory ABC Checklist report ...............................................................................................22
Item Engineering Costing Detailed report ..............................................................................................24
Job Detail report ..........................................................................................................................................26
Job Transactions report. ..............................................................................................................................28
Machine List report .....................................................................................................................................30
Routing Sequences Detail report ..............................................................................................................32
Manufacturing Order Variance - Production report ..............................................................................34
Picking report ..............................................................................................................................................36
MRP Exceptions report ..............................................................................................................................38
Daily Item report .........................................................................................................................................40
Daily Bucketed Workbench report ...........................................................................................................42
Daily Bucketless Workbench report .........................................................................................................44
Routing Sequences Detail report ..............................................................................................................46
QA Basic report ...........................................................................................................................................48
QA Items Received report .........................................................................................................................50
Option Category report. .............................................................................................................................52
Option Category - Promotions report ......................................................................................................54
Sales Forecasting Detailed By Item report. ..............................................................................................56
Sales Forecasting Detailed By Date report ..............................................................................................58
Sales Forecasting Summary report ...........................................................................................................60
Data Collection Indirect Labor report ...................................................................................................62
Data Collection Labor report .....................................................................................................................64
Data Collection For Machine report .........................................................................................................66
-
8/2/2019 Manufacturing Reports
4/71
ii M A N U F A C T U R I N G S A M P L E R E P O R T S
-
8/2/2019 Manufacturing Reports
5/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 1
Manufacturing reportsThis document includes information about and instructions for creatingthe most common Manufacturing reports. Samples of each report also areincluded.
The following reports are explained:
Basic BOM report Basic Where Used report BOM Summary report Daily Work Center Capacity report Monthly Work Center Capacity report Weekly Work Center Capacity report Drawings Detailed report Engineering Change report Item Engineering Detailed report Stock Status ABC report Physical Inventory ABC Checklist report Item Engineering Costing Detailed report Job Detail report Job Transactions report Machine List report Routing Sequences Detail report Manufacturing Order Variance - Production report Picking report MRP Exceptions report Daily Item report Daily Bucketed Workbench report Daily Bucketless Workbench report Routing Sequences Detail report QA Basic report QA Items Received report Option Category report
Option Category - Promotions report Sales Forecasting Detailed By Item report Sales Forecasting Detailed By Date report Sales Forecasting Summary report Data Collection Indirect Labor report Data Collection Labor report Data Collection For Machine report
-
8/2/2019 Manufacturing Reports
6/71
2 M A N U F A C T U R I N G S A M P L E R E P O R T S
Basic BOM report
The Basic BOM report lists detailed information about a bill of materialsfor an item. The report lists all components for the item, including thequantity required by the bill and the cost of the component item. Theinformation in this report was entered in the BOM Entry and ItemMaintenance windows.
Printing Instructions1. Choose Reports >> Manufacturing >> Bill of Materials >> Report
Options to open the BOM Report Options window.
2. Enter an option name, select the Basic BOM report, and create areport option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheBOM Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameBOM ReportBOM Report (Text)
Report tablesBill Of Material File Temp
Number 2 - View FileItem Engineering FileItem MasterInventory U of M Schedule
SetupBOM RevisionTA_Reference_Designator_
Line
RangesBOM NameBOM TypeEffective Date
Item Number
Sorting optionItem NumberPosition Number
Mark AllSingleMulti Level
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
7/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 3
Basic BOM report
5 : :ystem:UserDate: 4/12/2007
age:User ID sa
a r am, nc.Single Level Bill of Materials
Level Item Number Item Description Quantity
Item Number:Item Description:
512 SDRAM512 MEG RAM
Revision Level:BOM Type:
Effective Date: 0/0/0000
1
Fixed Quantity Cost
MFG. BOM
Total QuantityPos.
1 256 SDRAM 2256 meg SDRAM 0 Each
Reference Designators:
Each$495.00
2 Each1
-
8/2/2019 Manufacturing Reports
8/71
4 M A N U F A C T U R I N G S A M P L E R E P O R T S
Basic Where Used report
The Basic Where Used report shows detailed information about where acomponent part is used. The report lists the parent part item number anddescription, along with bill of materials level, cost, quantity, and cost ofthe component part. The information included in the report was enteredin the Item Engineering Data and BOM Entry windows.
Printing Instructions1. Choose Reports >> Manufacturing >> Bill of Materials >> Report
Options to open the BOM Report Options window.
2. Enter an option name, select the Basic Where Used report, and createa report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheBOM Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameBOM ReportBOM Report (Text)
Report tablesBill of Material File Temp
Number 2 - View FileItem Engineering FileItem MasterInventory U of M Schedule
SetupBOM RevisionTA_Reference_Designator_
Line
RangesItem NumberBOM TypeBOM Name
Effective Date
Sorting optionItem NumberPosition Number
Mark AllSingleMulti Level
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
9/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 5
Basic Where Used report
5 :57:ystem:UserDate: 4/12/2007
age:User ID sa
a r am, nc.Single Level Where Used Report
Level Item Number Item Description Quantity
Item Number:Item Description:
256 SDRAM256 meg SDRAM
Revision Level:
Effective Date:
Fixed Quantity CostTotal QuantityPos.
1 512 SDRAM 2512 MEG RAM 0 Each
Reference Designators:
Each$0.00
2 Each1
1 COMPUTER 1standard white computer 0 Each
Reference Designators:
Each$900.00
1 Each2
1 PROPro Computer 0
e erence esgnators:
Each$2,000.00
Each3
-
8/2/2019 Manufacturing Reports
10/71
6 M A N U F A C T U R I N G S A M P L E R E P O R T S
BOM Summary report
The BOM Summary report shows detailed information about an item inManufacturing Bill of Materials. The report lists the component part itemnumbers and descriptions, along with quantities and cost. Theinformation included in the report was entered in the Item EngineeringData and BOM Entry windows.
Printing Instructions1. Choose Reports >> Manufacturing >> Bills of Materials >> Report
Options to open the BOM Report Options window.
2. Enter an option name, select the BOM Summary Report, and create areport option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheBOM Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameBOM Summary ReportBOM Summary Report (Text)
Report tablesBill of Material File Temp
Number 2 - View FileItem Engineering FileItem MasterInventory U of M Schedule
SetupBOM Revision
RangesItem NumberBOM TypeBOM NameEffective Date
Sorting optionItem NumberPosition Number
Mark AllSingleMulti Level
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
11/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 7
BOM Summary report
8/26/2005 11:01:34 AM
Item NumberItem Description
Quantity
Item Number:Item Description:
Single Level BOM Summary
512 SDRAM512 MEG RAM
Revision Level: BOM Type:Effective Date: 0/0/0000
1
Cost
1System:User Date:
Page:User ID: sa4/12/2007
Fabrikam, Inc.
Fixed Quantity
MFG. BOM
LevelPos.
256 SDRAM256 meg SDRAM
1 Each2$495.00
Each01
$495.00 EachTotal 2
BELL100Phone Bellisimo
1 Each1$2.00
Each01
$2.00EachTotal 1
CBA100Circuit Board Assembly
1 Each1$15.50
Each02
$15.50EachTotal 1
FTRUBRubber Feet
1 Each4$0.04
Each03
$0.04EachTotal 4
KPA100Keypad Assembly
1 Each1$3.88
Each04
$3.88EachTotal 1
BACK FABRICChair back fabric
1 EACH2$2.40
EACH01
-
8/2/2019 Manufacturing Reports
12/71
8 M A N U F A C T U R I N G S A M P L E R E P O R T S
Daily Work Center Capacity report
The Daily Work Center Capacity report shows the capacity of a workcenter for the selected date criteria. The report lists the work center ID,the employee and machine capacity information for the work center load,availability, and percentage load. The information in the report iscalculated based on information entered in the Work Center Setupwindow, with additional manufacturing order entry information.
Printing Instructions1. Choose Reports >> Manufacturing >> CRP >> Report Options to
open the CRP Report Options window.
2. Enter an option name, select the Daily WC Loading report, and createa report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheCRP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameDaily WC Loading by Day
Report tablesCapacity Master FileWork Center Header File
CRP Line Item
RangesWork CenterEffective DateSystem Date
Sorting optionsWork Center ID, DateDate, Work Center ID
-
8/2/2019 Manufacturing Reports
13/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 9
Daily Work Center Capacity report
System: 5/28/2004 8:10:44 AM Fabrikam, Inc. Page: 1User Date: 4/12/2007 DAILY WORK CENTER CAPACITY - DETAIL 1 User ID: sa
Capacity Requirements PlanningStarting Date: 4/12/2007Ending Date: 7/21/2007
Effective Date: 4/12/2007
v-----------------------EMPLOYEE--------------------v v-------------------------MACHINE--------------------vWork Center Load Available % Load Overload? Load Available % Load Overload?====================================================================================================================================WC3 Released 18.16 11.83 60.5% YES 4.40 (4.40) 0.0% NO
+Open 26.16 3.83 87.2% YES 6.80 (6.80) 0.0% NO------------------------------------------------------------------------------------------------------------------------------------
WC3 Released 18.16 11.83 60.5% YES 4.40 (4.40) 0.0% NO
+Open 26.16 3.83 87.2% YES 6.80 (6.80) 0.0% NO------------------------------------------------------------------------------------------------------------------------------------
WC3 Released 18.16 11.83 60.5% YES 4.40 (4.40) 0.0% NO
+Open 26.16 3.83 87.2% YES 6.80 (6.80) 0.0% NO------------------------------------------------------------------------------------------------------------------------------------
WC3 Released 18.16 11.83 60.5% YES 4.40 (4.40) 0.0% NO
+Open 26.16 3.83 87.2% YES 6.80 (6.80) 0.0% NO------------------------------------------------------------------------------------------------------------------------------------
Total number of records in this report: 1
-
8/2/2019 Manufacturing Reports
14/71
10 M A N U F A C T U R I N G S A M P L E R E P O R T S
Monthly Work Center Capacity report
The Monthly Work Center Capacity report shows the capacity of a workcenter for the selected date criteria. The report lists the work center ID,the employee and machine capacity information for the work center load,availability, and percentage load. The information in the report iscalculated based on information entered in the Work Center Setupwindow, with additional manufacturing order entry information.
Printing Instructions1. Choose Reports >> Manufacturing >> CRP >> Report Options to
open the CRP Report Options window.
2. Enter an option name, select the Montly WC Loading report, andcreate a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheCRP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameMonthly WC Loading by
Month
Report tablesCapacity Months File
Work Center Header File
RangesWork CenterEffective DateSystem Date
Sorting optionsWork Center ID, DateDate, Work Center ID
-
8/2/2019 Manufacturing Reports
15/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 11
Monthly Work Center Capacity report
5/28/2004 Monthly Work Center Capacity - Detail 1 8:12:40 AMCompany: Fabrikam, Inc.
Starting Date: 4/1/2007Ending Date: 8/31/2015
Effective Date: 4/1/2007
v----------------------EMPLOYEE---------------------v v-----------------------MACHINE----------------------vWork Center Load Available % Load Load Available % Load====================================================================================================================================
WC3 Released 286 613 31.7% 83 -83 0.0%
+Open 438 461 48.6% 129 -129 0.0%------------------------------------------------------------------------------------------------------------------------------------
Total number of records in this report: 1
-
8/2/2019 Manufacturing Reports
16/71
12 M A N U F A C T U R I N G S A M P L E R E P O R T S
Weekly Work Center Capacity report
The Weekly Work Center Capacity report shows the capacity of a workcenter for the selected date criteria. The report lists the work center ID,employee and machine capacity information for work center load,availability, and percentage load. The information in the report iscalculated based on information entered in the Work Center Setupwindow, with additional manufacturing order entry information.
Printing Instructions1. Choose Reports >> Manufacturing >> CRP >> Report Options to
open the CRP Report Options window.
2. Enter an option name, select the Weekly WC Loading report, andcreate a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheCRP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameWeekly WC Loading by Week
Report tablesCapacity Weeks FileWork Center Header File
RangesWork CenterEffective DateSystem Date
Sorting optionsWork Center ID, DateDate, Work Center ID
-
8/2/2019 Manufacturing Reports
17/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 13
Weekly Work Center Capacity report
5/28/2004 Weekly Work Center Capacity - Detail 1 8:13:36 AMCompany: Fabrikam, Inc.
Starting Date: 4/8/2007Ending Date: 3/14/2009
Effective Date: 4/8/2007
v----------------------EMPLOYEE---------------------v v-----------------------MACHINE--------------------vWork Center Load Available % Load Load Available % Load====================================================================================================================================
WC3 Released 51 158 24.5% 13 -13 0.0%
+Open 75 134 35.9% 20 -20 0.0%------------------------------------------------------------------------------------------------------------------------------------
Total number of records in this report: 1
-
8/2/2019 Manufacturing Reports
18/71
14 M A N U F A C T U R I N G S A M P L E R E P O R T S
Drawings Detailed report
The Drawings Detailed report shows detailed information for a drawing.The report lists the drawing name and description, designer, drawingcreation date, drawing type, and storage type. The information in thisreport was entered in the Drawings window. The report can be printedwhenever you need to view information about a drawing.
Printing Instructions1. Choose Reports >> Manufacturing >> Drawings >> Report Options
to open the Drawings Report Options window.
2. Enter an option name, select the Drawings Detailed report, and createa report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheDrawings Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameDrawings Detailed
Report tablesdrawMFG_Notes
drawgrp
RangesDrawing NameDesignerCreation DateDrawing TypeStorage Type
Sorting optionsDrawing NameDesignerCreation Date
Drawing TypeStorage Type
-
8/2/2019 Manufacturing Reports
19/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 15
Drawings Detailed report
System: 5/28/2004 8:26:35 AM Page: 1User Date: 4/12/2007 User ID: sa
Fabrikam, Inc.
DRAWINGS DETAILED
Ranges: From ToDrawing Name 100XLG PHONE 100XLG PHONEDesigner First LastCreation Date First LastDrawing Type First LastStorage Type First Last
DRAWING NAME DESCRIPTION
DESIGNER DRAWING TYPE CREATION DATE STORAGE TYPESTORAGE LOCATION
-------------------------------------------------------------------------------
100XLG PHONE Basic modelBELL CAD 4/12/2007
c:\Images\100XLG.cad
NOTES:
DRAWING GROUPS:PHONES
-
8/2/2019 Manufacturing Reports
20/71
16 M A N U F A C T U R I N G S A M P L E R E P O R T S
Engineering Change report
The Engineering Change report shows detailed information about anengineering change request. The report lists the engineering changenumber and description, date, item number, status, previous revision,new revision, and information regarding the changes requested. Theinformation in this report was entered in the Engineering ChangeRequest window.
Printing Instructions1. Choose Reports >> Manufacturing >> ECM >> Report Options to
open the ECM Report Options window.
2. Enter an option name, select the EC Notice report, and create a reportoption to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheECM Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameECM Main Report
Report tablesECM_MSTRUsers Master
Item Engineering FileECM_User_DefinedECM_Report_TMPECM_Text1ECM_Text2ECM_Text3ECM_Text4
RangeEC Number
Sorting optionsItem Number
DateEC Number
-
8/2/2019 Manufacturing Reports
21/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 17
Engineering Change report
Engineering Change Report 5/28/2004 8:37:30 AM
Effective Date:
Prev. Rev. Level:
Denial Code:New Rev. Level:
DateDoneRouting User ID#
NoNo
LESSONUSER2LESSONUSER1
LESSONUSER2LESSONUSER1
21
Affected Item Number:
PHONES
6A
New
ENGINEERING
sasa100XLG
Add component to 100XLG phone (basic model 2007)
4/12/2007ECM0003EC Number:
EC Description:
Item Number:Entered By:
Date Completed:
Status:
Date Entered:
Description of Engineering Change: Reason for Change:
Notify Customer of: Expected Impact:
Drawing Group:
Requested By:
Disposition:
Routing User Name
Disposition Code: REWORK
Add two resistors to the 100XLG phone to improveperformance and reliability.
Change is requested by engineering. Change is inrequest to several customer issues regardingproblems with the 100XLG. (See customer reportsJan-Mar 2007 for more details.)
Customers who have reported problems with thephone should receive new phones. Other customer should be unaffected.
Production costs will be increased due to addition of new components and the labor needed to install theEstimated cost per unit is $8.90, excluding chargesfor updating routings and product prints, etc.
1saPrinted By:
-
8/2/2019 Manufacturing Reports
22/71
18 M A N U F A C T U R I N G S A M P L E R E P O R T S
Item Engineering Detailed report
The Item Engineering Detailed report shows detailed information aboutan item. The report gives detailed information about the item descriptionand type, design information, quantities, costs, and vendor. Theinformation in this report was entered in the Item Engineering Datawindow.
Printing Instructions1. Choose Reports >> Manufacturing >> Item Engineering >> Report
Options to open the Item Engineering Report Options window.
2. Enter an option name, select the Item Engineering Detailed report,and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheItem Engineering Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameItem Engineering Detailed
Report tablesItem Engineering FileItem Master
Item Quantity MasterItem Vendor MasterPM Vendor Master File
RangesItem Class CodeItem DescriptionItem NumberMake or Buy
Sorting optionsItem NumberItem Description
Make or BuyItem Class Code
-
8/2/2019 Manufacturing Reports
23/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 19
Item Engineering Detailed report
System: 5/28/2004 8:49:25 AM Fabrikam, Inc. Page: 1User Date: 4/12/2007 DETAILED ITEM LIST - ITEM ENGINEERING DETAILED PAGE User ID: sa
Inventory Control
Ranges: From: To:Item Number 100XLG 100XLGItem Class First LastItem Description First LastMake or Buy First Last
Sorted By: Item Number
-----------------------------------------------------------------------------------------------------------------------------------Item Number: 100XLG Item Description: Green Phone
Low Level Code: 0 Item Status: Active Fulfill Method: Make to Order - ManualItem Type: Sales Inventory Shp-Wt: 5.00 Ship. U of M: lbPrimary Routing: 100XLG PRIMARY Order Policy: Fixed Order Quantity POQ Length: 0Make/Buy Status: Made Design Authority: ENGINEERING Drawing Size: CEffective Date: 5/1/2005 Drawing Group: PHONES QA Needed:Minimum Issue: 1 Destructive Testing: Calc. MRP: XFloor Stock: Carrying Cost: $12.00 Use Up Part:Shrinkage %: 0.0% Minimum Qty: 10 Buyer ID:Setup Cost: $1,500.00 Maximum Qty: 1,000 Planner Code: LESMRP Run #: 8 Average Qty: 50 Revision Level: 6A Lead Time: 1 Standard Qty: 10 Order Multiple: 10.00
Primary Vendor ID: Vendor Name: Vendor Item Number:ACETRAVE0001 A Travel Company 100XLGADVANCED0001 Advanced Office Systems 100XLGCRUGEREN0001 Cruger Engineering Company 100XLG
-----------------------------------------------------------------------------------------------------------------------------------Total Number of Items: 1
-
8/2/2019 Manufacturing Reports
24/71
20 M A N U F A C T U R I N G S A M P L E R E P O R T S
Stock Status ABC report
The Stock Status ABC report shows detailed quantity information aboutan item with an ABC code designation. The report gives detailedinformation about the item ABC Code, quantity on hand, quantityallocated, quantity back ordered, quantity on order, quantityrequisitioned, and item cost. The report will only list those items thathave an amount in the Qty On Hand and ABC Code columns.
Printing Instructions1. Choose Reports >> Manufacturing >> Item Engineering >> Report
Options to open the Item Engineering Report Options window.
2. Enter an option name, select the Stock Status ABC report, and create areport option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheItem Engineering Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameInventory Stock Status ABC
Report tablesIV Stock Status TEMP ICItem Engineering File
Item Quantity MasterItem MasterAccount MasterIV Serial Lot Temp
RangesABC CodeItem Number
Sorting optionsItem NumberABC Code
IncludeZero or Negative QuantitiesSerial/Lot Numbers
-
8/2/2019 Manufacturing Reports
25/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 21
Stock Status ABC report
System: 5/28/2004 8:57:27 AM Fabrikam, Inc. Page: 1User Date: 4/12/2007 STOCK STATUS ABC REPORT User ID: sa
Inventory Control
Ranges: From: To:Item Number 100XLG 32X IDEABC Code First Last
Sorted By: Item Number
Include Items With Zero Quantities: NoInclude Serial/Lot Numbers: No
Item Number Item Description ABC Code QTY On Hand QTY Allocated-----------------------------------------------------------------------------------------------------------------------------
QTY Back Ordered QTY On Order QTY Requisitioned Cost Inventory Value-----------------------------------------------------------------------------------------------------------------------------100XLG Green Phone A 10 0
0 0 0 $55.50 $555.00128 SDRAM 128 meg SDRAM A 30 0
0 0 0 $152.10 $7,857,638.101GPROC 1 Ghz Processor B 20 0
0 0 0 $120.00 $2,400.00
24X IDE 24x CD-ROM A 10 00 0 0 $45.00 $450.00
256 SDRAM 256 meg SDRAM A 10 00 0 0 $247.50 $2,475.00
2GPROC 2 Ghz Processor B 20 00 0 0 $250.00 $5,000.00
32 SDRAM 32 meg SDRAM A 10 00 0 0 $40.50 $405.00
32X IDE 32x CD-ROM A 10 00 0 0 $49.50 $495.00
TOTAL ITEMS: 8 TOTAL INVENTORY VALUE: $7,869,418.10
-
8/2/2019 Manufacturing Reports
26/71
22 M A N U F A C T U R I N G S A M P L E R E P O R T S
Physical Inventory ABC Checklist report
The Physical Inventory ABC Checklist report shows information about anitem with an ABC code designation and can be used to check offquantities as they are verified. The report can be printed whenever youneed to check quantities for ABC code designated items.
Printing Instructions1. Choose Reports >> Manufacturing >> Item Engineering >> Report
Options to open the Item Engineering Report Options window.
2. Enter an option name, select the Physical Inventory ABC Checklistreport, and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheItem Engineering Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to the
Manufacturing documentation.
Report Writer namePhysical Inventory ABC
Checklist
Report tablesItem Master IC2
Item Engineering FileItem MasterItem Quantity MasterInventory U of M Schedule
SetupIV Serial Lot Temp
RangesABC CodeItem Number
Sorting optionsItem Number
ABC Code
IncludeItem QuantitiesSerial/Lot Numbers
-
8/2/2019 Manufacturing Reports
27/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 23
Physical Inventory ABC Checklist report
System: 6/1/2004 9:42:51 AM Fabrikam, Inc. Page: 1User Date: 4/12/2007 PHYSICAL INVENTORY ABC CHECKLIST User ID: sa
Inventory Control
Ranges: From: To:Item Number 100XLG 40X IDEABC Code First Last
Sorted By: Item Number
Include Item Quantities: YesInclude Serial/Lot Numbers: No
Item Number Item Description ABC Code Base U Of M CHK/CNT Qty On Hand--------------------------------------------------------------------------------------------------------------------------------100XLG Green Phone A Each ________ 10128 SDRAM 128 meg SDRAM A Each ________ 301GPROC 1 Ghz Processor B EACH ________ 2024X IDE 24x CD-ROM A Each ________ 10256 SDRAM 256 meg SDRAM A Each ________ 102GPROC 2 Ghz Processor B EACH ________ 2032 SDRAM 32 meg SDRAM A Each ________ 1032X IDE 32x CD-ROM A Each ________ 10333PROC 333 Processor A Each ________ 104.5HD 4.5 gig Hard Drive A Each ________ 10
400PROC 400 Processor A Each ________ 1040X IDE 40x CD-ROM A Each ________ 10
12 Total Items
-
8/2/2019 Manufacturing Reports
28/71
24 M A N U F A C T U R I N G S A M P L E R E P O R T S
Item Engineering Costing Detailed report
The Item Engineering Costing Detailed report shows detailedinformation about an item and associated accounts. The report showsdetailed information about the item description and type, designinformation, quantities, costs, and vendor. The information in this reportwas entered in the Item Engineering Data and Item Account Maintenancewindows.
Printing Instructions1. Choose Reports >> Manufacturing >> Item Engineering >> Report
Options to open the Item Engineering Report Options window.
2. Enter an option name, select the Item Engineering Costing Detailedreport, and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheItem Engineering Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameItem Engineering Costing
Detailed
Report tablesItem Engineering File
Item MasterItem Quantity MasterAccount MasterItem Vendor MasterPM Vendor Master FileIC_IV_STANDARDIC COST Item Master
RangesItem Class CodeItem DescriptionItem NumberMake or Buy
Sorting optionsItem NumberItem DescriptionMake or BuyItem Class Code
IncludeZero or Negative QuantitiesItem QuantitiesSerial/Lot Numbers
-
8/2/2019 Manufacturing Reports
29/71
-
8/2/2019 Manufacturing Reports
30/71
26 M A N U F A C T U R I N G S A M P L E R E P O R T S
Job Detail report
The Job Detail report shows detailed information about a created job. Thereport lists all information entered for a job, including job number,description, status, job categories, customer, dates, revenues, andexpenses. The information in this report was entered in the JobMaintenance window.
Printing Instructions1. Choose Reports >> Manufacturing >> Job Costing >> Report
Options to open the Job Costing Report Options window.
2. Enter an option name, select the Job Detail report, and create a reportoption to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. The Job Costing Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameICJC_Job_Detail
Report tablesJob Master FileICJC_Job_Actuals
Revenue_Expense_Report_File
RangesCustomer NameCustomer IDJob DescriptionJob NumberJob Status
Sorting optionsJob NumberJob Description
Customer IDCustomer Name
-
8/2/2019 Manufacturing Reports
31/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 27
Job Detail report
Fabrikam, Inc.10:32:06 AM6/1/2004 Job DetailSystem:
Use r Date: 4 /12/2007
Job Costing
Page:User ID:
1sa
Job Number : J001
PriorityPlanner Customer Size
MediumBill
Average
Job Status :On Hold/Canceled :
Job Description :
Customer ID :Customer Name :
Released
ADAMPARK0001 Adam Park Resort
Custom computers for Adam Park Resorts
Revenue/Expense Codes Revenue ExpensesMaterial $0.00 $59.80
Est. Start Date Est. End Date
Est. Job Revenue Est. Job Expenses Est. Job Profit Est. Job MarginAct. Start Date Act. End Date
Act. Job Revenue Act. Job Expenses Act. Job Profit Act. Job Margin
4/30/2007
$5,000.00 $2,500.00 $2,500.00 50.00%0/0/0000 0/0/0000
Totals $0.00 $59.80
$0.00 $59.80
$0.00
$0.00
$0.00
$0.00
$0.00
0/0/0000
0/0/0000
0/0/0000
0/0/0000
0/0/0000
($59.80) 0.00%
4/1/2007
0
0
0
0
0
-
8/2/2019 Manufacturing Reports
32/71
28 M A N U F A C T U R I N G S A M P L E R E P O R T S
Job Transactions report
The Job Transactions report shows all transactions that might have beenapplied to a job. The report lists job number and description, status,customer, estimated revenues and expenses, estimated profit and margin,actual revenues and expenses (if applied), actual profit and margin, class,source, source number, revenue and expense code, and amounts. Theinformation in this report was entered in the Job Link Maintenancewindow and linked element windows. The report also includes system-generated information.
Printing Instructions1. Choose Reports >> Manufacturing >> Job Costing >> Report
Options to open the Job Costing Report Options window.
2. Enter an option name, select the Job Transactions report, and create areport option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. The Job Costing Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameICJC_Job_Transactions
Report tablesICJC_Job_Transactions_Repo
rt_Temp
Job Master File
RangesCustomer NameCustomer IDJob DescriptionJob NumberJob Status
Sorting optionsJob NumberJob DescriptionCustomer ID
Customer Name
-
8/2/2019 Manufacturing Reports
33/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 29
Job Transactions report
Fabrikam, Inc.Job TransactionsSystem:
User Date:Page:User ID:
Job Costing
10:33:30 AM6/1/2004 1sa4/12/2007
Job Number Job DescriptionCustomer IDCustomer NameJob Status
Est. Job RevenueEst. Job ExpensesEst. Job ProfitEst. Job Margin
Act. Job RevenueAct. Job ExpensesAct. Job ProfitAct. Job Margin
ClassDateReference Num.
SourceType
Source Number
Reference Description
Rev/Exp Code Applied
Amount
J001
ADAMPARK0001 Adam Park ResortReleased
$2,500.00$2,500.00
50.00%
$5,000.00 $0.00$59.80
($59.80)0.00%
Custom computers for Adam Park Resorts
Actual Expense Applied1/13/2006
RCT1017 : Line 17734 Material
ACCS-CRD-25BK Custom computers for Adam Park Resorts $59.80
Receivings Trx History
-
8/2/2019 Manufacturing Reports
34/71
30 M A N U F A C T U R I N G S A M P L E R E P O R T S
Machine List report
The Machine List report shows detailed information about the machinesset up for the manufacturing process. The report lists the machine ID,description, vendor, location, and installation date of each machine. Theinformation in this report was entered in the Machine Definition window.
Printing Instructions1. Choose Reports >> Manufacturing >> Machines >> Report Options
to open the Machine Reports window.
2. Enter an option name, select the Machine List report, and create areport option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheMachine Reports window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to the
Manufacturing documentation.
Report Writer nameMachine List ReportMachine List Report Text
Report tableMachine Master
RangesMachine IDMachine DescriptionVendor IDInstallation DateLocation
Sorting optionsMachine IDMachine DescriptionVendor IDInstallation Date
Location
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
35/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 31
Machine List report
6/1/2004 10:34:32 AM
Machine List ReportMachine ID Machine Description Vendor ID Location
InstallationDate
INSERT Insertion BUSINESS0001 1/2/2008PAINT Machine for capturing outsourc 0/0/0000SAW Sawing machine 0/0/0000SOLDER Wave Solder BUSINESS0001 1/18/2005
1Page Number:
-
8/2/2019 Manufacturing Reports
36/71
32 M A N U F A C T U R I N G S A M P L E R E P O R T S
Routing Sequences Detail report
The Routing Sequences Detail report shows detailed information aboutthe routing sequences of a manufacturing order. The report lists the itemnumber, item description, routing type, sequences, work centers, setuptimes and codes, labor times and codes, machine times, and codes andrun times for each sequence. The information in this report was entered inthe Routing Sequence Entry window, but could have been edited in theManufacturing Order Routing Sequence Edit window.
Printing Instructions1. Choose Reports >> Manufacturing >> MO Routing >> Report
Options to open the Manufacturing Order Routing Reports window.
2. Enter an option name, select the Routing Sequences Detail report, andcreate a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheManufacturing Order Routing Reports window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameWO Router Sequence Graphic
ReportWO Router Sequence Detailed
Report tables
wtemprtMOP_Routing_LineMFG_NotesManufacture Order Master
RangesItem NumberManufacturing OrderSequence NumberWC ID
Sorting optionsWC ID
Sequence Number
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
37/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 33
Routing Sequences Detail report
ROUTING SEQUENCES DETAIL Report Time: 10:43:23 AMReport Date: 6/1/2004
Finish Time/DateStart Time/Date3/15/2006 3/20/20061:30:00 PM8:00:00 AM
MO0002
001
0.00000
0.75000
0.00000 AssembleWC3
0.00000
0.0%0
12:00:00 AM
SequenceDescriptionWork Center ID
WC Opcode
Setup TimeSetup CodeLabor TimeLabor CodeMachine TimeMachine ID
Queue Time
Drawing Group
Scheduled Actual
Time ClosedDate ClosedClosed By Percentage Next Start
Quantity Next StartParallel SequenceNext Run Sequence
User
Change DateCreate Date
Notes
sa6:25:09 AM5/16/20056:25:09 AM5/16/2005
Move Time 0.00000Cycle Time 0.75000
0# of Emp./Crews
Mfg Order Item Number 100XLG
Done? No
LC1
Auto-Backflush Labor Auto-Backflush Machine
# of Machs. 0
Run Time for one pieceTime for every additional piece Quantity
0.750000.75000 50.00000
Create TimeChange Time
Vendor ID
PO Release Offset DaysWIP Output per MO Start Qty
01
Vendor Name
1sa
-
8/2/2019 Manufacturing Reports
38/71
34 M A N U F A C T U R I N G S A M P L E R E P O R T S
Manufacturing Order Variance - Production report
The Manufacturing Order Variance - Production report shows detailedinformation about an individual manufacturing order. The report lists themanufacturing order number and description, status, schedulingpreference, schedule method, quantities, dates, estimated and actualcosts, and production variances and variance percentages. This reportreplaces the Manufacturing Order Summary report. The information inthis report was either entered in the Manufacturing Order Entry windowor calculated by the system.
Printing Instructions1. Choose Reports >> Manufacturing >> Manufacturing Orders >>
Report Options to open the MOP Report Options window.
2. Enter an option name, select the Manufacturing Order Variance -Production report, and create a report option to sort or restrict thereport.
3. Choose Destination. Select a printing destination and choose OK. The
MOP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameManufacturing Order
Variance - Production
Report tablesManufacture Order Master
Item MasterMOP_MO_Variance_Report_
TEMP
RangesMO NumberMake Item NumberRouting NameDateMO DescriptionMO Status
Sorting options
MO NumberMake Item NumberRoutingMO Status
-
8/2/2019 Manufacturing Reports
39/71
-
8/2/2019 Manufacturing Reports
40/71
36 M A N U F A C T U R I N G S A M P L E R E P O R T S
Picking report
The Picking report shows detailed information about the items picked fora manufacturing order. The report lists the manufacturing order numberand description, the manufacturing order date, routing name, pickeditem, quantity picked, and sites. The information in this report wasentered in the BOM Entry and Manufacturing Order Entry windows. Thereport can be used as a paper copy record of what actually was deliveredto the production floor.
Printing Instructions1. Choose Reports >> Manufacturing >> Manufacturing Orders >>
Report Options to open the MOP Report Options window.
2. Enter an option name, select the Picking Report, and create a reportoption to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheMOP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer namePicking Report - Item NumberPicking Report - FromPicking Report - ToPicking Report Multibin - Item
Number
Picking Report Multibin -From
Picking Report Multibin - To
Report tablesMOP_PickDoc_LineManufacture Order MasterMOP_PickDoc_MSTRMOP_Multibin_Picking_Repor
t_Temp
RangesManufacturing Pick Number
Pick Doc DateUser ID
Sorting optionsItem NumberFromTo
-
8/2/2019 Manufacturing Reports
41/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 37
Picking report
System:
User Date:
Page:
User ID:
11:30:00 AM
4/12/2007
6/1/2004
sa
1Picking ReportFabrikam, Inc.
Manufacture Orders
Ranges: From: To:
anu actur ng c oc:
Pick Doc Date:
User ID:
SortedBy: Item Number
P 00 Last
First Last
First Last
Item Number:
Pick from 1 Lot:
equ re c uant ty:
Pick From Site:
e ver o te:
Pick DocNumber:
User ID:
n s e oo :
MO Number:
Routing Name:
StartDate:
Serial/Lot Numbers Picked:
Description:
uant ty c e :
Picked From Site:
c e y:
Date Picked:
Pick DocDate:
escrpt on:
Description:
Due Date:
BLACKINK
5
WAREHOUSE
C
PK001
PE
MO0004
PEN
3/12/2007 3/12/2007
5/22/2007
Blackink cartridge
Fancy pen
No
sa
N/A
E C
Bin:
Item Number:
Pick from 1 Lot:
Required Pick Quantity:
Pick From Site:
Deliver To Site:
Pick DocNumber:
User ID:
Finished Good:
MO Number:
out n g ame:
StartDate:
Serial/Lot Numbers Picked:
Description:
Quantity Picked:
Picked From Site:
Picked By:
Date Picked:
Pick DocDate:
Description:
Description:
Due Date:
EXTERIOR ASSEMBLY
5
WAREHOUSE
WC1
PK001
PEN
MO0004
PE
3/12/2007 3/12/2007
5/22/2007
Exterior pen assembly
Fancy pen
No
sa
N/A
EACH
Bin:
-
8/2/2019 Manufacturing Reports
42/71
38 M A N U F A C T U R I N G S A M P L E R E P O R T S
MRP Exceptions report
The MRP Exceptions report shows detailed information about themanufacturing order scheduled, and actual starting and ending dates.The report lists the manufacturing order number, item number, routingname, starting and ending dates, start and end quantities, scheduleddates, actual starting anding end dates, and number of days past due. Theinformation in this report was either entered in the Manufacturing OrderEntry window or calculated by the system.
Printing instructions1. Choose Reports >> Manufacturing >> MRP >> Report Options to
open the MRP Report Options window.
2. Enter an option name, select the Exception Report, and create a reportoption to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheMRP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameMRP Exceptions Text
Report tablesMRP_ExceptionsItem Master
RangesItem NumberBuyer IDPlanner CodeDue DateRelease Date
Sorting optionsBuyer IDPlanner CodeDue DateRelease Date
-
8/2/2019 Manufacturing Reports
43/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 39
MRP Exceptions report
System: 6/1/2004 11:34:27 AM Fabrikam, Inc. Page: 1User Date: 4/12/2007 MRP EXCEPTIONS REPORT User ID: sa
Material Requirements Planning
Ranges: From: To:Item Number: START ENDDue Date: START ENDRelease Date: START ENDPlanner Code: START ENDBuyer ID: START END
Sorted By: Planner ID
Orders & Components Not Used Past Due Used
On or Before From On or After1/28/2007 2/11/2007 - 4/11/2007 4/12/2007
Item Number Type Order Number Status Exception Message--------------------------------------------------------------------------------------------------------------------------------
Item Description Site ID Due Date Release Date Qty. Due Buyer Planner--------------------------------------------------------------------------------------------------------------------------------ACCS-CRD-12WH POP PO2072 Planned Release within the next 7 days.
Phone Cord - 12' White WAREHOUSE 4/12/2007 4/12/2007 1000ACCS-CRD-12WH POP PO2072 Planned Release within the next 7 days.
Phone Cord - 12' White WAREHOUSE 4/12/2007 4/12/2007 1000ACCS-RST-DXBK MPO MRP Planned Cannot create a past-due order.
Shoulder Rest-Deluxe Black WAREHOUSE 2/11/2007 2/6/2007 44ACCS-RST-DXWH MPO MRP Planned Cannot create a past-due order.
Shoulder Rest - Deluxe White WAREHOUSE 2/11/2007 2/6/2007 47ANSW-PAN-1450 MPO MRP Planned Cannot create a past-due order.
Panache KX-T1450 answer WAREHOUSE 2/11/2007 2/11/2007 22BELL100 MPO MRP Planned Cannot create a past-due order.
Phone Bellisimo WAREHOUSE 4/11/2007 4/11/2007 30BELL100 MRP MRP00000000000018 MRP Planned Past due, but is included in MRP calculations.
Phone Bellisimo WAREHOUSE 4/11/2007 0/0/0000 40
-
8/2/2019 Manufacturing Reports
44/71
40 M A N U F A C T U R I N G S A M P L E R E P O R T S
Daily Item report
The Daily Item report shows detailed information about the MRPquantities for an item. The report lists all MRP quantity requirements,item number and description, site ID, buyer, planner, and date. Theinformation in this report is calculated by the system, based on the MRPquantity type and the MRP regeneration function. The report can beprinted whenever you need to view item quantities for all MRP quantitylabels.
Printing instructions1. Choose Reports >> Manufacturing >> MRP >> Report Options to
open the MRP Report Options window.
2. Enter an option name, select the Daily Item Report, and create areport option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheMRP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameMRP Item ReportMRP Item Report Text
Report tableMRP_Item_Temp
RangesItem NumberDateSite IDBuyer IDPlanner CodeItem Description
Sorting optionsItem NumberDateSite ID
Buyer IDPlanner Code
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
45/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 41
Daily Item report
DAILY ITEM REPORT
6/1/2004 11:40:05 AM
DailyReport Type:
1sa
Fabrikam, Inc.
Material Requirements Planning
System:User Date: 4/12/2007
Page:User ID:
Description: Green PhoneItem:
LESBuyer:Planner: Steven Levy
Quantities:
100XLG
0.000.000.000.000.00
0.000.000.00
0.000.000.000.00
0.000.000.00
0.0010.0010.0010.0010.00
Made by MO PlannedMade by MO Firm
Alloc. by MO Planned Alloc. by MO FirmReqd by MO Planned
Reqd by MO FirmConsd by Planned MOConsd by Firm MO
Order SOsBack Order SOsPlanned POsFirm POs
Required FirmRequired Planned
Acquired Firm
Acquired PlannedOn Hand FirmOn Hand Total
ATP Firm ATP Total
Date of Quantities:Site ID:
Quote SOs 0.00
4/11/2007
Description: Green PhoneItem:
LES
Buyer:
Planner: Steven Levy
Quantities:
100XLG
0.000.000.000.000.000.000.000.00
0.000.00
1,200.000.00
0.000.000.00
1,200.0010.0010.0010.00
1,210.00
Made by MO PlannedMade by MO Firm
Alloc. by MO Planned Alloc. by MO FirmReqd by MO PlannedReqd by MO FirmConsd by Planned MOConsd by Firm MO
Order SOsBack Order SOsPlanned POsFirm POs
Required FirmRequired Planned
Acquired Firm Acquired PlannedOn Hand FirmOn Hand Total
ATP Firm ATP Total
Date of Quantities:Site ID:
Quote SOs 0.00
4/12/2007
-
8/2/2019 Manufacturing Reports
46/71
42 M A N U F A C T U R I N G S A M P L E R E P O R T S
Daily Bucketed Workbench report
The Daily, Weekly, and Monthly Bucketed Workbench reports showdetailed information about item requirements throughout themanufacturing process. The report lists the item number, gross and netrequirements, scheduled receipts, planned orders, and projected available
balance. The system calculates the information in this report based on theMRP regeneration function and the purchasing and receiving functions.The report can be printed whenever you need to view information aboutitem requirements and scheduled receipts.
Printing instructions1. Choose Reports >> Manufacturing >> MRP >> Report Options to
open the MRP Report Options window.
2. Enter an option name, select the Daily Bucketed Wkbench Rpt report,and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheMRP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameMRP Daily GraphicMRP Daily Text
Report tablesMRP_Item_Temp
Item Engineering File
RangesItem NumberDateSite IDBuyer IDPlanner Code
Sorting optionsItem NumberDateSite ID
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
47/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 43
Daily Bucketed Workbench report
Acquired FirmAcquired Planned
Required FirmRequired Planned
On Hand FirmOn Hand Total
11:42:33 AM6/1/2004
Item Number Site ID Date
Daily Bucketed MRP Report
1Page:sa
System:User Date: 4/12/2007 User ID:
Fabrikam, Inc.
Material Requirements Planning
0.000.000.00
10.0010.00100XLG
Past1,200.00
0.000.00
10.0010.00100XLG
4/12/2007
10.000.00
0.000.00
10.001,210.00100XLG
4/13/20070.00
0.000.00
20.001,220.00100XLG
4/14/20070.00
0.000.00
20.001,220.00100XLG
4/15/2007
0.000.000.0020.001,220.00100XLG 4/16/20070.00
0.000.00
20.001,220.00100XLG
4/17/20070.00
0.000.00
20.001,220.00100XLG
4/18/20070.00
0.000.00
20.001,220.00100XLG
4/19/20070.00
0.000.00
20.001,220.00100XLG
4/20/20070.00
0.000.00
20.001,220.00100XLG
4/21/20070.00
0.000.00
20.001,220.00100XLG
4/22/20070.00
0.000.00
20.001,220.00100XLG
4/23/20070.00
0.000.00
20.001,220.00100XLG
4/24/20070.00
0.000.00
20.001,220.00100XLG
4/25/20070.00
0.000.00
20.001,220.00100XLG
4/26/20070.00
0.000.00
20.001,220.00100XLG
4/27/20070.00
0.000.00
20.001,220.00100XLG
4/28/20070.00
0.000.00
20.001,220.00100XLG
4/29/20070.00
0.000.00
20.001,220.00100XLG
4/30/20070.00
0.000.00
20.001,220.00100XLG
5/1/2007
-
8/2/2019 Manufacturing Reports
48/71
44 M A N U F A C T U R I N G S A M P L E R E P O R T S
Daily Bucketless Workbench report
The Daily, Weekly, and Monthly Bucketless Workbench reports showdetailed information about item requirements throughout themanufacturing process. The report lists the item number, gross and netrequirements, scheduled receipts, planned orders, and projected available
balance. The system calculates the information in the report, based on theMRP regeneration function and the purchasing and receiving functions.
Printing instructions1. Choose Reports >> Manufacturing >> MRP >> Report Options to
open the MRP Report Options window.
2. Enter an option name, select the Daily Bucketless Wkbench Rptreport, and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheMRP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameMRP Daily GraphicMRP Daily Text
Report tablesMRP_Item_Temp
Item Engineering File
RangesItem NumberDateSite IDBuyer IDPlanner Code
Sorting optionsItem NumberDateSite ID
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
49/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 45
Daily Bucketless Workbench report
Acquired FirmAcquired Planned
Required FirmRequired Planned
On Hand FirmOn Hand Total
11:49:05 AM6/1/2004
Item Number Site ID Date
Daily Bucketless MRP Report
1Page:sa
System:User Date: 4/12/2007 User ID:
Fabrikam, Inc.
Material Requirements Planning
0.000.000.00
10.0010.00100XLG
Past1,200.00
0.000.00
10.0010.00100XLG
4/12/2007
10.000.00
0.000.00
10.001,210.00100XLG
4/13/2007
50.000.00
0.000.00
20.001,220.00100XLG
6/26/20070.00
0.000.00
0.000.00100XLG
NORTH Past
0.000.000.000.000.00100XLGNORTH 4/12/2007
10.000.00
0.000.00
0.000.00100XLG
NORTH 4/13/2007
50.000.00
0.000.00
10.0010.00100XLG
NORTH 6/26/20070.00
0.000.00
0.000.00100XLG
SOUTH Past0.00
0.000.00
0.000.00100XLG
SOUTH 4/12/20070.00
0.000.00
10.0010.00100XLG
WAREHOUSE Past1,200.00
0.000.00
10.0010.00100XLG
WAREHOUSE 4/12/20070.00
0.000.00
30.0030.00128 SDRAM
Past0.00
0.000.00
30.0030.00128 SDRAM
4/12/20070.00
0.000.00
20.0020.00128 SDRAM
NORTH Past0.00
0.000.00
20.0020.00128 SDRAM
NORTH 4/12/20070.00
0.000.00
0.000.00128 SDRAM
SOUTH Past0.00
0.000.00
0.000.00128 SDRAM
SOUTH 4/12/20070.00
0.000.00
10.0010.00128 SDRAM
WAREHOUSE Past0.00
0.000.00
10.0010.00128 SDRAM
WAREHOUSE 4/12/20070.00
0.000.00
10.0010.0024X IDE
Past
-
8/2/2019 Manufacturing Reports
50/71
46 M A N U F A C T U R I N G S A M P L E R E P O R T S
Routing Sequences Detail report
The Routing Sequences Detail report shows detailed information aboutthe routing sequences for an item. The report lists the item number,routing name, sequence, work center, work center operation code, setuptime and code, labor time and code, machine time and ID, and the runtime for one piece. The information in this report was entered in theRouting Sequence Entry window.
Printing instructions1. Choose Reports >> Manufacturing >> Planning Routing >> Report
Options to open the Planning Routing Reports window.
2. Enter an option name, select the Routing Sequences Detail report, andcreate a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. ThePlanning Routing Reports window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameRouter Sequence Graphic
ReportRouter Sequence Detailed
Report tables
temprtrouting_mstrrouting_lineMFG_Notes
RangesItem NumberRouting NameLocationSequence Number
Sorting optionsItem Number
Routing NameLocationSequence Number
TypeTextGraphic
-
8/2/2019 Manufacturing Reports
51/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 47
Routing Sequences Detail report
ROUTING SEQUENCES DETAIL 6/1/200411:51:01 AM
Item Number Routing NameRevision Level
SequenceDescriptionWork Center
W.C. Opcode
% Next Start
Notes
Setup TimeSetup CodeLabor Time
Mach. Time
Queue Time
Labor Code
Draw Grp.
Create Date/TimeChange Date/Time
100XLG100XLG PRIMARY
001
Qty Next Start
Mach. ID
0.00000
10.00000
3.00000
2.50000 AssembleWC3
0.0%0
SAW
User Parallel Seq.Next Run Seq.
sa6:25:09 AM5/16/20054:39:35 PM4/12/2007
Move TimeCycle Time
0.0000012.00000
No. of Emps 0
ReleasedRouting Type Primary Routing? Yes LC1
Auto-Backflush Labor Auto-Backflush Machine
00
No. of CrewsNo. of Machs.
14.5000012.00000
Run Time for one pieceTime for every additional piece
Vendor IDVendor Name
PO Release Offset DaysWIP Output per MO Start Qty 1
0
1sa
-
8/2/2019 Manufacturing Reports
52/71
48 M A N U F A C T U R I N G S A M P L E R E P O R T S
QA Basic report
The QA Basic report shows detailed information about the qualityrequirements for a specific item receipt. The report lists the receivingnumber, purchase order number, purchase order line item number,quantity received, date received, site ID, QA complete, procedurenumber, disposition of the item, and if a Non-Standard Report (NSR) orSupplier Corrective Action Request (SCAR) was issued. The informationin this report was either entered in the QA Incoming-All Items Receivedwindow or calculated by the system, based on quality testing completionand inspector recorded results.
Printing instructions1. Choose Reports >> Manufacturing >> QA >> Report Options to open
the QA Report Options window.
2. Enter an option name, select the QA Basic report, and create a reportoption to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. The
QA Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameQA Basic by Receive TextQA Basic by PO Text
Report tablesQA_Incoming_HDR
MFG_NotesQA_Report_Note_TempQA_Procedure_History_MSTRPurchasing Receipt Line
QuantitiesQA_Incoming_MSTR
RangesReceipt DateItem NumberPO NumberReceipt NumberVendor ID
Passed Inspection QACompleted
Sorting optionsReceipt NumberPO Number
-
8/2/2019 Manufacturing Reports
53/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 49
QA Basic report
6/1/2004 1:33:52 PMQA Basic Report
Company Fabrikam, Inc.
Sort by Receipt Number
Ranges Receipt Date from 4/12/2007 to 4/12/2007
Item Number from Start to EndPO Number from Start to EndReceipt Number from Start to EndVendor ID from Start to EndPassed Inspection - No restriction usedQA Completed - No restriction used
Receipt Number RCT1163PO NumberItem Number 128 SDRAMQuantity Received 50 EachVendor ID BEAUMONT0001Receipt Date 4/12/2007Site ID NORTHQA Needed XQA Completed XProcedure Number 001QA Procedure Rev Level 1Quantity Passed 50 EachQuantity Failed 0 EachQuantity Destroyed 0 Each
NSR Number 00000000000000000001SCAR NumberDefect Description
Disposition
Lot Number 1Lot Quantity 50 EachLot QA Completed XLot Passed InspectionLot Quantity Passed 0 EachLot Quantity Failed 0 EachLot Quantity Destroyed 0 Each--------------------------------------------------------------------------
------------------------------------------------------------------------------
Printed by sa 1
-
8/2/2019 Manufacturing Reports
54/71
50 M A N U F A C T U R I N G S A M P L E R E P O R T S
QA Items Received report
The QA Items Received report shows detailed information about theinspection status of a received item. The report lists the receiving number,purchase order number, item number, site ID, date received, and whetherthe quantity passed or failed inspection. The information in this report issystem-calculated, based on information entered by the inspector duringthe inspection process.
Printing instructions1. Choose Reports >> Manufacturing >> QA >> Report Options to open
the QA Report Options window.
2. Enter an option name, select the QA Items Received report, andcreate a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheQA Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameQA Items Received by Item
TextQA Items Received by
Location TextQA Items Received by Date
TextQA Items Received by
Receiving TextQA Items Received by PO Text
Report tablesQA_Report_Items_Received_T
empQA_Imcoming_MSTR
RangesItem NumberPO NumberReceipt NumberLocation Code
Sorting optionsItem NumberLocation CodeReceipt DateReceipt NumberPO Number
-
8/2/2019 Manufacturing Reports
55/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 51
QA Items Received report
6/1/2004 QA Items Received 1:35:05 PM
Sort by Receipt Number
RangesItem Number from 128 SDRAM to 128 SDRAMPO Number from Start to EndReceipt Number from Start to EndLocation Code from Start to End
Receipt Number PO Number Item Number Site ID Receipt Date------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------RCT1163 128 SDRAM NORTH 4/12/2007
QTY Received 50 EachQTY Passed 50 EachQTY Failed 0 EachQTY Destroyed 0 Each
---------------------------------------------------------------------------------------------------------------------Lot Number 1Lot SEQ Number 1Lot Quantity 50 Each
Lot QTY Passed 0 EachLot QTY Failed 0 EachLot QTY Destroyed 0 Each
Printed by: sa 1
-
8/2/2019 Manufacturing Reports
56/71
52 M A N U F A C T U R I N G S A M P L E R E P O R T S
Option Category report
The Option Category report shows detailed information about the itemsassigned to an option category. The report lists the option category anddescription, picking options, date entered, item number, bill of materialstype, minimum and maximum quantities, price schedule, and price level.The information in this report was entered in the Option CategoryMaintenance and Item Option Assignment windows.
Printing instructions1. Choose Reports >> Manufacturing >> Sales Configurator >> Report
Options to open the Option Group Report Selector window.
2. Enter an option name, select the Option Category Report, and createa report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheOption Group Report Selector window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameOption Category
Report tablesOption Category MSTROption Category LINE
Item MasterOption Reporting TEMP
RangesItem NumberOption Category
Sorting optionOption Category
-
8/2/2019 Manufacturing Reports
57/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 53
Option Category report
6/1/2004 Option Category 1:41:34 PM
Fabrikam, Inc.
From ToOption Category ACCESSORIES STYLEItem Number First Last
Option Category Description Picking Options Changed By/DateItem Number BOM Type BOM Name Default Min. QTY Max. QTY Base UofM Price Lev.
Include\Exclude Option Category Item Number BOM Type BOM Name-------------------------------------------------------------------------------------------------------------------------------
ACCESSORIES Computer Accessories Multiple Selections sa 5/16/2005
A100 YES 1.00 1.00 Each RETAILINCLUDE
BK MOUSE YES 1.00 1.00 Each RETAILINCLUDE
COMPBOOK NO 1.00 12.00 Each RETAILINCLUDE
KB104 YES 1.00 1.00 Each RETAILINCLUDE
SCAN100F NO 1.00 1.00 Each RETAILINCLUDE
BAND Watch band Single Selection Required sa 5/21/2007
BAND-LEATHER YES 1.00 1.00 EACH RETAILINCLUDE
BAND-METAL NO 1.00 1.00 EACH RETAILINCLUDE
BAND-PLASTIC NO 1.00 1.00 EACH RETAILINCLUDE
C-PROC Computer processor Single Selection Required sa 5/21/2007
1GPROC YES 1.00 1.00 EACH RETAILINCLUDE
2GPROC NO 1.00 1.00 EACH RETAILINCLUDE
CD ROM CD ROMs Single Selection Required sa 5/16/2005
24X IDE YES 1.00 1.00 Each RETAILINCLUDE
32X IDE NO 1.00 1.00 Each RETAILINCLUDE
40X IDE NO 1.00 1.00 Each RETAILINCLUDE
FACE STYLE Watch face style Single Selection Required sa 5/21/2007
FACE-ANALOG NO 1.00 1.00 EACH RETAILINCLUDEFACE-DIGITAL YES 1.00 1.00 EACH RETAIL
INCLUDE
HARD DRIVES Hard Drives Single Selection Required sa 5/16/20054.5HD YES 1.00 2.00 Each RETAIL
INCLUDE6.5HD NO 1.00 2.00 Each RETAIL
INCLUDE8.4HD NO 1.00 2.00 Each RETAIL
INCLUDE
HDRIVE Hard Drive Single Selection Required sa 5/21/2007HD-20 NO 1.00 4.00 EACH RETAIL
INCLUDEHD-40 YES 1.00 4.00 EACH RETAIL
Printed by: sa 1
-
8/2/2019 Manufacturing Reports
58/71
54 M A N U F A C T U R I N G S A M P L E R E P O R T S
Option Category - Promotions report
The Option Category - Promotions report shows detailed informationabout the promotions that currently are available for an option. Thereport lists the option category and description, picking options, itemnumber, bill of materials type, promotion ID, starting and ending dates,markdown type, and the markdown amount or percentage depending onthe markdown type. The information in this report was entered in theOption Promotion Maintenance window.
Printing instructions1. Choose Reports >> Manufacturing >> Sales Configurator >> Report
Options to open the Option Group Report Selector window.
2. Enter an option name, select Option Promotion Report, and create areport option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheOption Group Report Selector window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameOption Category - Promotions
Report tablesOption Category MSTROption Promotion MSTR
RangesItem NumberOption CategoryEffective Date
Sorting optionOption Category
-
8/2/2019 Manufacturing Reports
59/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 55
Option Category - Promotions report
System: 6/1/2004 1:43:47 PM Fabrikam, Inc. Page: 1User Date: 4/12/2007 OPTION CATEGORY - PROMOTIONS User ID sa
Sales Configurator
From ToOption Category ACCESSORIES STYLEItem Number First LastDate First LastPromotion ID First Last
Option Category Description Picking Options
Item Number BOM Type BOM NamePromotion ID Start/End Date Markdown Type Markdown Amt Markdown %
----------------------------------------------------------------------------------------------------------------------------------ACCESSORIES Computer Accessories Multiple SelectionsBAND Watch band Single Selection RequiredC-PROC Computer processor Single Selection RequiredCD ROM CD ROMs Single Selection RequiredFACE STYLE Watch face style Single Selection RequiredHARD DRIVES Hard Drives Single Selection RequiredHDRIVE Hard Drive Single Selection RequiredMEMORY Computer Memory Single Selection RequiredMONITORS Computer Monitors Single Selection RequiredPROCESSOR Processors Single Selection RequiredRAM Computer RAM Single Selection RequiredSTYLE Style of watch Single Selection Required
-
8/2/2019 Manufacturing Reports
60/71
56 M A N U F A C T U R I N G S A M P L E R E P O R T S
Sales Forecasting Detailed By Item report
The Sales Forecasting Detailed By Item report shows detailed informationabout a sales forecast plan. The report lists the plan name and description,forecast period, forecast starting and ending dates, issue-to site,salespeople, customers, item number and description, list price, unit cost,item forecast date, item forecast quantity, and item forecast amount. Theinformation in this report was entered in the Sales Forecasting window.
Printing instructions1. Choose Reports >> Manufacturing >> Sales Forecasting >> Report
Options to open the Sales Forecasting Report Options window.
2. Enter an option name, select the Sales Forecasting Detailed By Itemreport, and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheSales Forecasting Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameSales Forecasting Detailed By
Item Graphic
Report tablesSales Forecast Master
MFG_Notestemp_forecast_plansSales Forecast LineItem MasterSales Forecast Date
RangesPlan NamePlan DescriptionHistory Start DateForecast PeriodUser IDForecast Start Date
Issue To
Sorting optionsPlan NamePlan DescriptionHistory Start DateForecast PeriodUser IDForecast Start DateIssue To
-
8/2/2019 Manufacturing Reports
61/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 57
Sales Forecasting Detailed By Item report
6/1/2004 1:45:23 PMSales Forecasting Detailed By Item
Ranges: To:From:
Plan Name:Plan Description:History Start Date:Forecast Period:
User ID:
Forecast Start Date:Issue To:
3Q06East Q3 FY06First Last0/0/0000 12/31/9999First Last0/0/0000 12/31/9999First LastFirst Last
Sorted By: Plan Name
Salespeople:
Customers:
Notes:
2/1/200612/1/2005
3rd Quarter FY06 East3Q06East
0/0/00000/0/0000
Plan Name:Plan Description:
History Start Date:History End Date:
Forecast Period:Forecast Start Date:Forecast End Date:
Issue To:
1 month
Item Number:Item Description:List Price:Unit Cost:
PRO1Pro Computer
$2,000.00$2,500.00
Forecast Date Forecast Quantity Forecast Amount
12/1/2005 250 $625,000.001/1/2006 190 $475,000.002/1/2006 185 $462,500.00
Totals: 625.00000 $1,562,500.00Count: 3
Printed By: 1sa
-
8/2/2019 Manufacturing Reports
62/71
58 M A N U F A C T U R I N G S A M P L E R E P O R T S
Sales Forecasting Detailed By Date report
The Sales Forecasting Detailed By Date report shows detailed informationabout the items for the forecasted period of a forecast plan. The reportlists the plan name and description, forecast period, forecast starting andending dates, issue-to site, salespeople, customers, item number anddescription, list price, unit cost, item forecasted quantity, and itemforecasted amount. The information in this report was entered in theSales Forecasting window.
Printing instructions1. Choose Reports >> Manufacturing >> Sales Forecasting >> Report
Options to open the Sales Forecasting Report Options window.
2. Enter an option name, select the Sales Forecasting Detailed By Datereport, and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheSales Forecasting Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameSales Forecasting Detailed By
Date Graphic
Report tablesSales Forecast Master
MFG_Notestemp_forecast_plansSales Forecast DateSales Forecast LineItem Master
RangesPlan NamePlan DescriptionHistory Start DateForecast PeriodUser IDForecast Start Date
Issue To
Sorting optionsPlan NamePlan DescriptionHistory Start DateForecast PeriodUser IDForecast Start DateIssue To
-
8/2/2019 Manufacturing Reports
63/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 59
Sales Forecasting Detailed By Date report
6/1/2004 1:46:19 PMSales Forecasting Detailed By Date
Ranges: To:From:
Plan Name:Plan Description:History Start Date:Forecast Period:
User ID:
Forecast Start Date:Issue To:
3Q06East Q3 FY06First Last0/0/0000 12/31/9999First Last0/0/0000 12/31/9999First LastFirst Last
Sorted By: Plan Name
Salespeople:
Customers:
Notes:
2/1/200612/1/2005
3rd Quarter FY06 East3Q06East
0/0/00000/0/0000
Plan Name:Plan Description:
History Start Date:History End Date:
Forecast Period:Forecast Start Date:Forecast End Date:
Issue To:
Forecast Date
Forecast Quantity Forecast AmountList Price Unit CostItem DescriptionItem Number
1 month
12/1/2005
PRO1 Pro Computer $2,000.00$2,500.00 250 $625,000.00
Totals: 250.00000 $625,000.00Count: 1
1/1/2006PRO1 Pro Computer
$2,000.00$2,500.00 190 $475,000.00
Totals: 190.00000 $475,000.00Count: 1
Printed By: 1sa
-
8/2/2019 Manufacturing Reports
64/71
60 M A N U F A C T U R I N G S A M P L E R E P O R T S
Sales Forecasting Summary report
The Sales Forecasting Summary report shows detailed information aboutthe profit margin for a forecasted item. The report lists the item number,forecast quantity, unit cost, total cost, list price, forecast amount, profitmargin, and margin percentage. The information in this report is system-calculated, based on the information entered in the Sales Forecastingwindow and item cost information.
Printing instructions1. Choose Reports >> Manufacturing >> Sales Forecasting >> Report
Options to open the Sales Forecasting Report Options window.
2. Enter an option name, select the Sales Forecasting Summary report,and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheSales Forecasting Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameSales Forecasting Summary
Graphic
Report tablesSales Forecast Master
Sales Forecast LineItem MasterSales Forecast Date
RangesPlan NamePlan DescriptionHistory Start DateForecast PeriodUser IDForecast Start DateIssue To
Sorting optionsPlan NamePlan DescriptionHistory Start DateForecast PeriodUser IDForecast Start DateIssue To
-
8/2/2019 Manufacturing Reports
65/71
M A N U F A C T U R I N G S A M P L E R E P O R T S 61
Sales Forecasting Summary report
Item Number List PriceUnit Cost Total Cost Profit Margin
6/1/2004 1:46:51 PMSales Forecasting Summary
Margin%Forecast Quantity Forecast Amt.
PRO1759 $2,000.00 $1,518,000.00 $2,500.00 $1,897,500.00 $379,500.00 20.00 %
Totals For 3Q06East:
759.00000 $1,518,000.00 $1,897,500.00 $379,500.00
PRO1550 $2,000.00 $1,100,000.00 $2,500.00 $1,375,000.00 $275,000.00 20.00 %
Totals For 3Q06West:
550.00000 $1,100,000.00 $1,375,000.00 $275,000.00
PRO1285 $2,000.00 $570,000.00 $2,500.00 $712,500.00 $142,500.00 20.00 %
Totals For 4QFY06West:
285.00000 $570,000.00 $712,500.00 $142,500.00
CHAIR750 $61.14 $45,855.00 $0.00 $0.00 ($45,855.00) 0.00 %
COMPUTER115 $900.00 $103,500.00 $0.00 $0.00 ($103,500.00) 0.00 %
WATCH2,785 $44.18 $123,041.30 $0.00 $0.00 ($123,041.30) 0.00 %
Totals For Q2Y07:
3,650.00000 $272,396.30 $0.00 ($272,396.30)
PRO11,175 $2,000.00 $2,350,000.00 $2,500.00 $2,937,500.00 $587,500.00 20.00 %
Totals For Q3 FY06:
1,175.00000 $2,350,000.00 $2,937,500.00 $587,500.00
1Printed By: sa
-
8/2/2019 Manufacturing Reports
66/71
62 M A N U F A C T U R I N G S A M P L E R E P O R T S
Data Collection Indirect Labor report
The Data Collection Indirect Labor report shows detailed informationcollected about the indirect labor cost of an employee for a labor code.The report lists the employee ID, starting and ending dates, starting andending times, elapsed time, and total indirect cost. The information in thisreport is system-calculated.
Printing instructions1. Choose Reports >> Manufacturing >> WIP >> Report Options to
open the WIP Report Options window.
2. Enter an option name, select the Data Collection Indirect Laborreport, and create a report option to sort or restrict the report.
3. Choose Destination. Select a printing destination and choose OK. TheWIP Report Options window will be redisplayed.
4. Choose File >> Print.
For more information about printing Manufacturing reports, refer to theManufacturing documentation.
Report Writer nameData Collection Indirect Labor
Report tableData Collection Line Items
RangesActual Start/End DateEmployee ID
Sorting optionsLabor Code
-
8/2/2019 Manufacturing Repo