manufacturing multi station wizard tutorialmanufacturing multi station wizard tutorial 3 a012 0 a013...
TRANSCRIPT
Copyright © 2015 The eVSM Group, All Rights Reserved
This tutorial will guide you through the steps to draw a simple map and perform
common calculations using the Manufacturing Multi Station Wizard.
Manufacturing Multi Station Wizard Tutorial
3
A012
0
A013
0
A014
0
Z001
0
Machine 1 Machine 2 Machine 3
Multiple Station Equiv.
Viewing/printing eVSM Tutorial:
This tutorial is designed for two
page layout. If printing, you will
need double-sided print.
For on-screen viewing, save the PDF
file to your PC and then open it in
Acrobat Reader (not in a web
browser). In the Acrobat menus,
click “View>Page Display", make
sure “Show Cover Page in Two Page
View” is checked and then select
"Two Page View”.
Copyright © 2015 The eVSM Group, All Rights Reserved
On your Desktop, click
the “Start eVSM” icon.
1
Click to enable
macros.Click “Trust all from
publisher” to avoid the
security notice in future.
3
4
If you see a message like this,
you must “Enable” macros.
2
Step 1: Start eVSM
4
Copyright © 2015 The eVSM Group, All Rights Reserved 5
Copyright © 2015 The eVSM Group, All Rights Reserved
Quick_eVSM
Learn eVSM BasicsStep 2:
Avoid re-sizing eVSM shapes. Instead
grow the drawing page when needed.
To resize the page, hold down the “Ctrl”
key, and then drag any page edge to the
required size. This method works on all
four edges of the page.
2
VSM
Save your Visio file and then
insert a new page via the right-
mouse menus on the page-tabs.
5
6
Copyright © 2015 The eVSM Group, All Rights Reserved
Learn eVSM Basics
Blue icons in the main stencil
represent families of shapes. Drag
out the Transport icon.
3
Use the shape’s
right-mouse menus
to turn it into a car
4
7
eVSM Help resources are available in
the Learn module of the toolbar. Hover
over each one to see what they do.
1
Copyright © 2015 The eVSM Group, All Rights Reserved
Click the Open button.
Select Mfg Multi Station
and click OK.
Drag out the
red icon first.
This is very
important!
3
1
Initiate the map for Manufacturing Multi Station WizardStep 3:
8
Mfg Multi-Station Data
Open
14
Day
Hr
Units
Enter the
amount of hours
per day.
The Manufacturing Multi
Station Wizard stencil will
open on the left.
4
2
Copyright © 2015 The eVSM Group, All Rights Reserved
Initiate the map for Manufacturing Multi Station Wizard
9
Copyright © 2015 The eVSM Group, All Rights Reserved
The green shapes are
called “Centers”. Use
the centers to represent
the flow.
Do not change any of
the “Auto” fields.
These will calculated
later.
Complete as shown
below, including
annotation and data
values.
Double-click the
unit to change it
from Min to Sec.
Set Up Each MachineStep 4:
1
2
Activity Center
4
3
14
Day
Hr
Units
A012
0
A013
0
A014
0
Machine 1 Machine 2 Machine 3
Capacity Per Day
ItemAuto
Cycle Time_M Sec10
Qty Per Cycle_M
Item1
Stations_M Stn3
Activity Time_M
HrDay
12
OEE Percent_M
%98
Cycle Time Per Item
MinAuto
CT Capacity Per Day
ItemAuto
All Stations Time
HrDay
Auto
QPC Contributor
ItSqAuto
Capacity Per Day
ItemAuto
Cycle Time_M Sec15
Qty Per Cycle_M
Item1
Stations_M Stn2
Activity Time_M
HrDay
10
OEE Percent_M
%98
Cycle Time Per Item
MinAuto
CT Capacity Per Day
ItemAuto
All Stations Time
HrDay
Auto
QPC Contributor
ItSqAuto
Capacity Per Day
ItemAuto
Cycle Time_M Min1
Qty Per Cycle_M
Item4
Stations_M Stn1
Activity Time_M
HrDay
14
OEE Percent_M
%95
Cycle Time Per Item
MinAuto
CT Capacity Per Day
ItemAuto
All Stations Time
HrDay
Auto
QPC Contributor
ItSqAuto
Copyright © 2015 The eVSM Group, All Rights Reserved
Set Up Each Machine
Copyright © 2015 The eVSM Group, All Rights Reserved
Multi-Station SummaryStep 5:
Multi-Station Summary
14
Day
Hr
Units
A012
0
A013
0
A014
0
Machine 1 Machine 2 Machine 3
Capacity Per Day
ItemAuto
Cycle Time_M Sec10
Qty Per Cycle_M
Item1
Stations_M Stn3
Activity Time_M
HrDay
12
OEE Percent_M
%98
Cycle Time Per Item
MinAuto
CT Capacity Per Day
ItemAuto
All Stations Time
HrDay
Auto
QPC Contributor
ItSqAuto
Capacity Per Day
ItemAuto
Cycle Time_M Sec15
Qty Per Cycle_M
Item1
Stations_M Stn2
Activity Time_M
HrDay
10
OEE Percent_M
%98
Cycle Time Per Item
MinAuto
CT Capacity Per Day
ItemAuto
All Stations Time
HrDay
Auto
QPC Contributor
ItSqAuto
Capacity Per Day
ItemAuto
Cycle Time_M Min1
Qty Per Cycle_M
Item4
Stations_M Stn1
Activity Time_M
HrDay
14
OEE Percent_M
%95
Cycle Time Per Item
MinAuto
CT Capacity Per Day
ItemAuto
All Stations Time
HrDay
Auto
QPC Contributor
ItSqAuto
Copyright © 2015 The eVSM Group, All Rights Reserved
Drag out the Multi-
Station Summary
Center.
Multi-Station Summary
1
Z001
0
Multiple Station Equiv.
Cycle Time MinAuto
Qty Per Cycle ItemAuto
Stations StnAuto
OEE Percent %Auto
Activity TimeHr
DayAuto
MS CT Capacity Per Day ItemAuto
MS Capacity Per Day
ItemAuto
MS Cycle Time Per Item MinAuto
Copyright © 2015 The eVSM Group, All Rights Reserved
Click the “Check” and
button fix any problems
flagged
Click the “Solve” button
to calculate
Perform CalculationsStep 6:
21
Check
Solve
14
Day
Hr
Units
A012
0
A013
0
A014
0
Machine 1 Machine 2 Machine 3
Capacity Per Day
Item12700.8
0
Cycle Time_M Sec10
Qty Per Cycle_M
Item1
Stations_M Stn3
Activity Time_M
HrDay
12
OEE Percent_M
%98
Cycle Time Per Item
Min0.06
CT Capacity Per Day
Item12960.0
0All Stations
TimeHr
Day36.00
QPC Contributor
ItSq12960.0
0Capacity Per
DayItem4704.00
Cycle Time_M Sec15
Qty Per Cycle_M
Item1
Stations_M Stn2
Activity Time_M
HrDay
10
OEE Percent_M
%98
Cycle Time Per Item
Min0.13
CT Capacity Per Day
Item4800.00
All Stations Time
HrDay
20.00
QPC Contributor
ItSq4800.00
Capacity Per Day
Item3192.00
Cycle Time_M Min1
Qty Per Cycle_M
Item4
Stations_M Stn1
Activity Time_M
HrDay
14
OEE Percent_M
%95
Cycle Time Per Item
Min0.25
CT Capacity Per Day
Item3360.00
All Stations Time
HrDay
14.00
QPC Contributor
ItSq13440.0
0
Copyright © 2015 The eVSM Group, All Rights Reserved
When complete, note that all blue
values show calculated results. The
values for the equivalent machine
have been calculated from the three
individual machines.
Perform Calculations
3
Z001
0
Multiple Station Equiv.
Cycle Time Min0.29
Qty Per Cycle Item1.48
Stations Stn6.00
OEE Percent %97.52
Activity TimeHr
Day11.67
MS CT Capacity Per Day Item
21120.00
MS Capacity Per Day
Item20596.8
0
MS Cycle Time Per Item Min0.03
20150512