manufacture's representative – power generation/oil & gas covering tx, ok, la, ak, in...
TRANSCRIPT
• Manufacture's Representative – Power Generation/Oil & Gas
• Covering TX, OK, LA, AK, in some cases NM and MS
• Extensive Power Gen Experience
• Extensive Docking Station Experience – Design, installation, operation
The Vanjen Group, LLC
www.vanjen.net
Brochures, Guides Specs, Data Sheets, Our Blog, Contact Info, Links to our manufacturers websites, & Presentations
Question
How does a temporary genset get connected to a building in an emergency?
How do generator service companies connect their load bank when performing their annual testing?
Typical Temporary Genset Hook-Up
How do cables get connected?
A. Knock a hole into existing switchgear
B. Run cable through the building
Typical Temporary Loadbank Hook-Up
How do cables get connected?
Most Common – Disconnect the permanent conductors from the output side of genset circuit breaker – tie in
load bank cables
Typical Temporary Connection
The problem for owners:
Temp Genset
DOWNTIME
Damage to gear
Unsecured building
Outage to connect & disconnect
Electrician required
Load Bank
Customer is exposed to an outage
During connection, testing, and disconnection
Cable terminations exposed during operation
Excessive wear to breaker lugs – not torqued-stripped
Trystar Docking Stations
What is a Docking Station?
Termination station
Quickly, Safely and Legally connect/disconnect
Temporary Generators
Temporary Load Banks
Temporary Chillers
Temporary Power
Go from this To this
Standard Construction
Available from 100A to 5000A
UL 50 powder coated aluminum or stainless steel enclosure
Lockable rake system reduces cable theft & cable disconnection
Cam lock style inputs and/or outputs, mechanical lugs, or pin and sleeve
Phase rotation meter
Standard Docking Station
Simple Camlock or Mechanical Lug connection box.
Provides no isolation between sources
Temporary generator
Temporary load bank
Temporary chiller
Company switch
Can be factory mounted to 3rd Party MTS and shipped pre-packaged together
Attaching to transfer switches
Ship the transfer switch to Trystar and will mount and wire the docking station to the transfer switch.
• Includes 2 wire auto start terminal and phase rotation monitor.
• Available with battery charger and water heater outlets• Available as dual purpose for load banking permanent gen
Docking Station With Kirk Key
Kirk Key Provides isolation between sources
Temporary generator
Temporary load bank
Temporary chiller
Company switch
Many variations can be achieved through multiple kirk key Interlocks
How does a Kirk Key System work?
Key is Captive and cannot be removed while Breaker is “On”
Docking station door cannot be unlocked without key
How does a Kirk Key System work?
Once breaker is in ”Off” position captive key can be removed
Key can then be used to unlock docking station door
Breakered Docking Stations
Service Entrance Rated
Distributions & Feeder Breakers
Temporary Generator Breaker
Temporary generator
Temporary chiller
Company switch
Distribution breakers allow for maximum flexibility
Dual Purpose Docking Stations
Used in conjunction with a permanent installed generator
Provides temporary generator connection & temporary load bank connection
Offer load dump circuitry
Offers remote start capability
DPGDS-083W-LMF-K_-.pdf
SBDS-325P-LMF-AK2QS.pdf
How does the Remote Start circuit work?
Circuit wired in parallel with automatic transfer switch
How does the Load Dump circuit work?
Circuit wired in parallel with automatic transfer switch position contacts
Load Dump Wiring.pdf
Rotary Docking Stations
Integrated Manual Transfer Switch and Docking Station
Three Position Utility-Off-Generator,
Up to 1200A
Option for Service Entrance Rating
Temporary Chiller
Used to quickly connect temporary chillers
Healthcare & Data Centers
Company Switches
Convention Center, Stadiums & Arenas
Output Docking Stations
Gland Plates
Mount to temporary gensets, ATS, or Switchgear
Inlet Panels
Designed to be mounted on single and double throw type disconnect switches.
Accessories
Recap
Construction:
Up to 5,000A
Nema 3R and 4X
Used for connections:
Temporary generators
Load banks
Chillers
Output power (Company switches)
Models:
Generator Docking Station – with and without Kirk Key
Breakered Docking Station
Dual Purpose Docking Stations
Rotary Docking Stations
Options include:
Kirk key interlocks
Service entrance breakers
Distribution breakers
Remote start terminals
Load dump terminals
www.vanjen.net