manual pir-alupiralu.com/manual/english/manual-i.pdf · for the first cut. 2 ... panel: 20mm-manual...
TRANSCRIPT
V-001
Poliuretanos, s.a. - Matamala, s/n - 17244 Cassà de la Selva - Gi - Spain - tel.: +34 972460472 - fax: +34 972460053
Application of the PIRALU-20
pre-insulated aluminium ducts boards
(thickness 20mm)
used in the construction of ducting
for air distribution in ventilation, heating
and air-conditioning systems (HVAC).
bring update: www . piralu . com
e-mail: ducts@ piralu . com
MANUAL PIR-ALU
updated: 11-11-01
jordi soler-2.001Forbidden the partial or total reproduction without written authorization of the company
V-001
Index of the Manual
Bases of the system
Types of Strips
Tool model “BASE” to cut panels thickness 20mm
Cut of Strips: panel thickness 20mm
Straight duct
End cap
Reduction
Tool model “BASE” to cut panels thickness 30mm
Tool modeo “QUATRO” to cut panels thickness 20mm
Toll model “QUATRO” to cut panels thickness 30mm
Elbow
Wye: dynamic derivation
Take-off: static derivation
Offset
Cut of the Strips: panel thickness 30mm
PageDescription
page 02
Plenum
Bend of Strips
Joints among pieces: Male & Female fit
Joints among pieces: Flange joint
Reinforcements: panel thickness 20mm
Access doors
39
40
41
Square elbow with turning vanes
Reinforcements: panel 30mm thickness
-APPENDIX FOR PANEL PIRALU-30: THICKNESS 30mm-
03
04
06
07
08
11
12
18
20
25
29
34
13
15
17
31
22
36
37
44
-bases of the system
2º.-The panels are cut by both facestransforming them in “STRIPS”.
3º.-The ducts are always built of “FOUR SEPARATE FACES” : STRIPS
There are three types of STRIPS:1- Strip Normal: “SN”
2- Strip Plus: “SP” 3- Strip Special: “SS”
4º.-The longitudinal unions are glued with special glue.The external longitudinal angles are sealedwith aluminium tape of 75mm of width.The internal longitudinal angles aresealed with special silicone.
-manual pir-alu
page 03
3.000mm
3.000mm
3.000mm
aluminium tape 75mm
special Pir-Alu glue
special silicone sealant
1º.-The panels are alway cut in longitudinal sense: “3.000mm”.
SN
45º45º
SP
45º45º
SN
SN
SNSN
SP
SP
Cut legthwise by both sides to45º rigth and left.Differents measures.It is recommended to adaptto measures recommendedby Ashrae, Smacna, Iso,Une, Din, etc...
Cut lengthwise by both sideswith the same inclination fromthe cut to 45º rigth or left.
Combining four strip type normal(SN) you get an duct.To get a duct take two strips normal(SN) of the width (W) measureand two of the height (H).The measures are alwaysinternal of the duct.
SN
SN
SNSN
W
H
They are used as supplement toform section bigger then 1.116mm.They unite with glue andaluminium tape to a stripnormal (SN).
-strip normal: SN
-strip plus: SP-manual pir-alu
-manual pir-alu
Page 04
Example: to get an sectionof 1.400mm you can take
one strip normal (SN) of160mm and to couple anstrip plus (SP) of 240mm.
-strip special: SS
90º
SS
45º
Cut lengthwise by both sides, onestraigth 90º and other 45º.The raigth cut at 90º is notnecessary cut it, because it is thecharacteristic of the panel.The measure is only: 300mm.
They are used as supplemen to strip normal (SN) to built
elbow, wye, offset andspecial pieces.
Application examples of the strip special (SS)in the construction pieces.
SN SS
3.0
00
mm
a
a
3.0
00
mm
c
a
300mm
SN
SS
R
b
-manual pir-alu
page 05
SN
R
300mm
a+
35
0m
m
150mm
a
SS
a+
20
0m
m1
50
mm
SN
SN SS
SS
300mm
-tool “base”
thicknesspanel: 20mm
45º45º45º
111
2
2
-manual pir-alu
The tool “ ” model iscomposed by two pieces: -BASE -MODULE
BASE
1 2
The module nºis useful alonefor the first cut.
2
For the other cuts itshould be removed.
length of blade: 22mm
1
2
panel 20mm
page 06
Ref.: 4008
-tool “quatro”
length of blade: 22mm 3
1
2
1+2+3
thicknesspanel: 20mm
45º45º90º
1+2
1 1
thicknesspanel: 20mm
-manual pir-alu
The tool model “ ”is composed by three pieces: -MODULE 45º to cut Rigth and Left -MODULE 90º to cut Straigth -MODULE to make Male / Female
QUATRO
1 2 3
Position of module nºcut to 45º Rigth.
1Position of module nºcut to 45º Left.
1
Position of modules nº 90º.
1+2cut to straigth
Position of the modulesnº1+2+3 to make the
Male & Female fit.
panel 20mm
page 07
Ref.: 4009
-cut of strip normal: SN
4
3.000 mm
1.2
00
mm
20 mm
1
3
5
6
2
4
2
Regla
6
Módulo
1
5
3
Regla
Módulo
-manual pir-alu
To apply the formula as show inthe drawing: internal duct measure-30mm, +20mm, +20mm, etc...To mark equally in bothends of the panel.
3.000 mm
1.2
00
mm
-30mm
+20mm
+20mm
+20mm
+20mm
-30mm
+20mm
+20mm
+20mm
+20mm
For the first cut it is necessary the MODULE of the BASE.For the other cuts it should be desassembled.The cuts nº 2, 4, 6 arein the same direction.The cuts nº 3, 5 arein contrary directionsupporting in the rule.
Follow the direction of cut asshow in the drawing.
panel 20mm
página 23page 08
rule
rule
-cut of strip plus: SP
4
3.000 mm
1.2
00
mm
20 mm
1
3
5
2
3
2
Regla
1
5
4
Regla
Módulo
Módulo
-manual pir-alu
3.000 mm
1.2
00
mm
-50mm
-70mm
-70mm
-70mm
-70mm
-50mm
-70mm
-70mm
-70mm
-70mm
panel 20mm
página 23page 09
rule
rule
Measure SP = duct measure -1.1160mm.
-50mm, -70mm, -70mm, etc...To mark equally in bothends of the panel.
To apply the formula as show inthe drawing:
Follow the direction of cut asshow in the drawing.
For the first cut it is necessary the MODULE of the BASE.For the other cuts it should be desassembled.All cuts are in the same direction.The cuts nº 2, 3 etc...supporting in the rule.
Regla
2
Regla
1
Módulo
-manual pir-alu
3.000 mm
1.2
00
mm
20 mm
1
2
3.000 mm
1.2
00
mm
230mm 230mm
230mm 230mm
The strip special (SS) it is measured only : 300mm.To apply the formula as show in the drawing.To mark equally in every angle andboth ends of the panel: 230mm..
-cut of strip special: SS
panel 20mm
page 10
ruler
ruler
It is not necessary theMODULE of the BASE.Supporting in the rule.
Follow the direction of cut asshow in the drawing.
-joints among pieces-manual pir-alu
macho&hembra
page 11
3.000mm
male
aluminium tape 75mm
aluminium tape 75mm
air flow
Figure - 2
glue
air flow
glue
Figure - 1
3.000mm
SNfemale
LNLN
SN
inside duct
outside duct
air flow
Before gluing the pieces,make the “FEMALE”
in the four strips for theinside face of the duct.
The “MALE”,make it for outside,
once closed the duct.
wholeperimeter
The male always in the same direction of the air flow.Put glue in the perimeter of the male .(Fig.1)
To enter and to press the female with the maleof the fit.To seal external with aluminium tape.(Fig.2)
in thefour faces
-straight duct
LELE SN
b
SN
a
LN
3.0
00
mm
SN
a
LELE SN
b
aluminium tape
glue
glue
To select two strips normal (SN)measure “a” and two of the “b”.
With a brus to glue all the sides at 45º with an unifor surface.Can be glued one or several strips or pieces.Wait around 10/15 minutes until thesurface are completely dry.
When they are dry, to unite the fourstrips for the external face of theduct with aluminium tape followingthe appropiate order: a, b, a, b.Always to begin with the same endof the duct, maintaining the alignementso that if there is some small defectis should be cut an end of the duct
-manual pir-alu
page 13
LELE SN
b
SN
a
SN
a
3.0
00
mm
SN
bfemale
in thefour faces
To close the duct following the described process.First close a lateral one on the base.This way taking forms and it staysperfectly to squad.
With the help a piece of PVC pipe,press the angles of close the piece,
in vertical position and then in horizontalalong the joint so that it acts well the glue.
Put the aluminium tape.Seal the four internal angles
lengthwise with silicone.
LELE SN
b
SN
a3
.00
0m
m
SN
a
LE SN
b
Rotate the duct on the table sothat it is with the externalface up to proceed tothe assembling.
malewhole
perimeter
page 14
-end cap
To select two stripsnormal (SN) measure“a” and two of the “b”.Take a piece of SNmeasure“b” and cut theend cap as is detailed indrawing.
glue
glue
45º
LELE SN
b
SN
a
3.0
00
mm
LNSN
a
LELE SN
b
aluminium tape
-manual pir-alu
page 15
45º
female
glue
45º
in thefour faces
3.0
00
mm
a+40mm
b+
40m
mSN
a
SN
a
LELE SN
bb
SN
end cap
With a brus to glue all the sides at 45º with an unifor surface.Can be glued one or several strips or pieces.Wait around 10/15 minutes until thesurface are completely dry.
When they are dry, to unite the fourstrips for the external face of theduct with aluminium tape followingthe appropiate order: a, b, a, b.Always to begin with the same endof the duct, maintaining the alignementso that if there is some small defectis should be cut an end of the duct
page 16
3.0
00
mm
SN
a
SN
a
LELE SN
b
LESN
b
Rotate the duct on the table sothat it is with the externalface up to proceed tothe assembling.
To close the duct following the described process.First put the end cap and aftherclose a lateral one on the base.This way taking forms and itstays perfectly to squad.
With the help a piece of PVC pipe,press the angles of close the piece,in vertical position and then in horizontalalong the joint so that it acts well the glue.Put the aluminium tape.Seal the four internal angleslengthwise with silicone.
-bend of strips-manual pir-alu
page 17
50mm
50mm
Interior face
50mm
50mm
external face
squadpencil of p.v.c.
20mm
20mm
With the help of an squad 50mm width and with intervals of 50mm,mark pressing with a plastic pencil without breaking the aluminium.It is very important to make perfectly parallel and square.First mark interior side.
Repeat thesame operationfor the externalside.
Application examples:
squadpencil of p.v.c.
-reduction
To select two strips normal (SN)measure “a” and two of themeasure “b”.Draw the new form and measuresmaintaining the longitude (L=gx4).Copy the contrary face.Bend the strip of should bendwith the new form.It can bend the whole strip oralone the part that should bend.
With the tool “QUATRO”in position of 45º, to cutfollowing the new form.
glueglue
-manual pir-alu
baa b
page 18
SNLE
c
SN
3.0
00
mm
c
SN SN
SN
b
3.0
00
mm
a
SN
c g
a
SN
L=
g x
4
cg
SN
b
L=
g x
4
3.0
00
mm
d
a
SN
d
a
SNSN
b
SN
b
aluminium tape
femalein the
four facesWith a brus to glue all the sides at 45º with an unifor surface.Can be glued one or several strips or pieces.Wait around 10/15 minutes until thesurface are completely dry.
When they are dry, to unite the fourstrips for the external face of the
duct with aluminium tape followingthe appropiate order: a, b, a, b.
Always to begin with the same endof the duct, maintaining the alignement
so that if there is some small defectis should be cut an end of the duct
SN
b
SN
b
d
a
SN
3.0
00
mm
a
d
SN
malewhole
perímeter
page 19
Put the aluminium tape.Seal the four internal angleslengthwise with silicone.
With the help a piece of PVC pipe,press the angles of close the piece,in vertical position and thenin horizontal along thejoint so that it actswell the glue.
Rotate the duct on the table sothat it is with the externalface up to proceed tothe assembling.
To close the duct following thedescribed process and alone thestraight part, underrating thereduction.This way taking forms and itstays perfectly to squad.
-elbow-manual pir-alu
page 20
Take one SN measure “a” and cuttwo pieces of length: L=a+350mm.Take one SS and cut two pieces oflength: L=a+200To unit with aluminium tape.Draw the form of the elbow leavingfrom the point “R”.Leave entrance and exit neck of 150mm.With the tool “QUATRO” cut 45º with theinclination toward the exterior of the piece.
Internal wall (IW)
external wall (EW)
Take one SN measure “b” and cutequivalent longitude to the developementof the external wall of the elbow +20mm,and other piece with longitude of theinternal wall +20mm.Bend the strip of shouldbend for the elbow form.
Parts of theelbow after cut.
Measure 150 200 250 300 400 500 600 800 1000 1200 1400 1600 1800 2000
EW 850 900 1000 1100 1250 1400 1550 1850 2200 2500 2800 3100 3450 3750
IW 550 550 550 550 550 550 550 550 550 550 550 550 550 550
Chart with developements external walls (EW) and internal walls (IW) of the elbowswith the standard measures recommended by ASHRAE, SMACNA, ISO, etc...
Recommendation:
To make the contrary copymarking for the exterior.Cut with the tool “QUATRO” 45º, nowwith the inclination toward interior.
bottom covertop cover
SN
R
300mm
a+
35
0m
m
150mm
a
SS
a+
20
0m
m1
50
mm
aluminium tape
SN
a
SS
aluminium tape
bottom cover top cover
SN SSSN SS
top coverbottom cover
top cover
bottom coverCopy of the top cover
femalein the
four faces
Repeatthe sameoperation
for theexternal
side.
page 21
Place the bottom cover upthe external wall as it isdetailed in the drawing.Press down so that itacts well the glue
Always beginningfrom from the same
end of the elbow,follow the same
process.
Rotate the two covers on theexternal wall.Slowly, controling theinterior of the elbow andthe two covers at sametime and speed.
glue
glueglue
glueglue
glue + aluminium tapefor both sides
glue + aluminium tapefor both sides
malewhole
perímeter
With the help a pieceof PVC pipe, press theangles of close the piece,in vertical position and thenin horizontal along the jointso that it acts well the glue.
Put the aluminium tape.Seal the four internal angleslengthwise with silicone.
With a brus to glue all the sidesat 45º with an unifor surface.Should be glued also the jointbetween SN and SS.
Wait around 10/15 minutes untilthe surface are completely dry.
-square elbow with t.v.-manual pir-alu
página 23
Copy of the top cover
SN
300mm
a+
35
0m
ma
A+
50
mm
30
0m
m
aluminium tape
SS SN
a
LESS
interior wall
external wall
LE
top cover bottom cover
interior wall
Page 22
LN
bottom cover
top cover
SN LESS SSSN
recommended
panel 30mm
Parts of theelbow after cut.
top cover
bottom cover
top coverbottom cover
aluminium tapeTake one SN measure “a” and cuttwo pieces of length: L=a+350mm.Take one SS and cut two pieces oflength: L=a+200To unit with aluminium tape.Draw the form of the square elbow.Leave entrance and exit neck of 150mm.With the tool “QUATRO” cut 45º with theinclination toward the exterior of the piece.
To make the contrary copymarking for the exterior.Cut with the tool “QUATRO” 45º, nowwith the inclination toward interior.
Take one SN measure “b” and cutequivalent longitude to the developementof the every external wall of the elbow +20mm,and other piece with every longitude of theinternal wall +20mm.
femalein the
four faces
Repeatthe sameoperation
for thetop cover.
LEglue + aluminium tapefor both sides
glue
page 23
IW-1
EW-2
EW-1
IW-2
glue glue
cola
glue
glue
EW-1
EW-2
aluminiumtape
LE
EW-2
EW-1
IW-2
IW-1
With a brus to glue all the sidesat 45º with an unifor surface.Should be glued also the jointbetween SN and SS.
Wait around 10/15minutes until
the surface arecompletely dry.
glue + aluminium tapefor both sides
bottom cover top cover
bottom covertop cover
bottom covertop cover
When they are dry, to unite the fourstrips for the external face of the
duct with aluminium tape followingthe appropiate order.
Rotate the square elbow on the tableso that it is with the externalface up to proceed tothe assembling.
page 24
Recommendation: Chart with longitudes (Lx2 unidades) rail por support and quantity turnig vanes (Nº) for square elbow with measures stanadard recommended by ASHRAE, SMACNA, ISO, etc...
Measure 150 200 250 300 400 500 600 800 1000 1200 1400 1600 1800 2000
L (2 u.) 212 283 354 425 566 707 849 1131 1414 1697 1980 2263 2546 2828
Nº 4 5 7 8 11 13 16 21 27 32 37 43 48 53
45º
Close the piece followingthe drawn process.
nutreinforcement disktie rod
kit turning vanes
w
h
rail 1
rail 2
Nºturningvanes
The form, distance and measures of the rail and turning vanes they are according standards Ashrae & Smacna.
To fix the kit with oneinternal tie rod, tworeinforcement disksand two nuts.
Cut the rails (2) and theturning vanes (Nº) in longitude and
quantity described in the chartin function to the measure of the duct.
To assemble and to install the kit.
malewhole
perímeter
reinforcement disknut
With the help a pieceof PVC pipe, press theangles of close the piece,in vertical position and thenin horizontal along the jointso that it acts well the glue.
Put the aluminium tape.Seal the four internal angles
lengthwise with silicone.
-wye: dynamic derivation-manual pir-alu
long entrance
SN
SS
page 25
90º
45º
aluminium tape
bend
1+2=3.000mm
2
1
3
4
Detail of internal deflector
a
LN
SS
SN
SS
SN
3.0
00
mm
40mm
300mm
%c %b
c
a
R 150mm
R’=e
e
e+
20
0m
m
150mm
SN
SS
3.0
00
mm
top coverbottom cover
bottom cover top cover
top cover
bottom cover
Parts of thewye after cut.
Take one SN measure “a” and cuttwo pieces of length: L=a+350mm.Take one SS and cut two pieces oflength: L=a+200To unit with aluminium tape.Draw the form of the square elbow.Leave an exit neck of 150mm.With the tool “QUATRO” cut 45º with theinclination toward the exterior of the piece.
To make the contrary copymarking for the exterior.Cut with the tool “QUATRO” 45º, nowwith the inclination toward interior.
Copy of the top cover
Take one SN measure “b” and cutequivalent longitude to the developementof the external wall of the elbow +20mm,
and other piece with longitude of theinternal wall +20mm.
Bend the strip of shouldbend for the elbow form.
femalein the
four faces
Repeatthe sameoperation
for thetop cover.
page 26
glue + aluminium tapefor both sides
glue
2
3
1
4
aluminium tape
3.0
00
mm
3.0
00
mm
not to glue theinternal deflector
glue
glue glue glue
glue
glue glue
glue
glue
glue
glue + aluminium tapefor both sides
With a brus to glue all the sidesat 45º with an unifor surface.Should be glued also the jointbetween SN and SS. Wait around 10/15
minutes untilthe surface arecompletely dry.
When they are dry, to unite the fourstrips for the external face of theduct with aluminium tapefollowing the appropiate order.
Always to begin with thesame end of the duct,
maintaining the alignementso that if there is somesmall defect is should
be cut an end of the duct
Rotate the duct on the tableso that it is with the externalface up to proceedto the assembling.
page 27
tape
triangle wastepanel
glue
4
1
2
3
2
11
So that the pieces are perfectly to squad it isvery important follow theassembling process.
The deflector, previously cuted rigth it shouldenter up 150mm before thebeginning of the radius.
Finish offamong two walls
internal deflector
positionof internaldeflector
Before gluing the wall,to enter the deflector
until the bottom.
malewhole
perímeter
With the help a pieceof PVC pipe, press the
angles of close the piece,in vertical position and thenin horizontal along the jointso that it acts well the glue.
Put the aluminium tape.Seal the four internal angles
lengthwise with silicone.
-manual pir-alu
page 28
short entrance
3.000mm
SN
SS
short entrance
SS
SN
long entrance
3.0
00
mm
SS
SS
Application examples in differents types of dynamic derivation.They can be sinple or multiple, symetrical or asymetrica and long or short entrance.It is important always maintain longitude 3.000mm, four separate faces (strips) andfollow the assembling process for can get the perfect squad ducts and pieces.
long entrance
-wye: dynamic derivation
SS
SN
3.0
00
mm
SS
long entrance
SSSS
SN
3.0
00
mm
long entrance
SS
SS
SN
3.0
00
mm
long entrance
3.000mm
SN
SS
short entrance
3.0
00
mm
SSSS
SN
long entrance
SS
SN
3.0
00
mm
SS
long entrance
long entrance
-takeoff-manual pir-alu
a
a½ a
minimum 150mm
a
SN SN
SNSN
interior wall
SN
external wall
SN
page 29
SNSN
alumininium tape
glue
Copy of the top cover
bottom cover
bottom cover
bottom cover
top cover
top cover
Parts of theelbow after cut.
glueglueglueglue
top cover
bottom cover
To make the contrary copymarking for the exterior.Cut with the tool“QUATRO” 45º, nowwith the inclinationtoward interior.
Take one SN measure “a-200mm” and cuttwo pieces of length: L=a.Draw the form of thereducton as drawing.With the tool “QUATRO”cut 45º with theinclination toward theexterior of the piece.
With a brus to glue all the sides at 45ºwith an unifor surface and wait untilthe surface are completely dry.
When they are dry, to unite the fourstrips for the external face of theduct with aluminium tapefollowing the appropiate order.
Always to begin with the same end of the duct,maintaining the alignement so that if there is some
small defect is should be cut an end of the duct
page 30
malewhole
perímeter
Rotate the square elbow on the tableso that it is with the externalface up to proceed tothe assembling.
Close the piece followingthe drawn process.
With the help a pieceof PVC pipe, press theangles of close the piece,in vertical positionand then in horizontalalong the jointso that it actswell the glue.
Put the aluminium tape.Seal the four internal angles
lengthwise with silicone.
To be able to insert in the main ductit is necessary to make “MALE”
in both sides.
-offset-manual pir-alu
page 31
tapa superior
SSSNSN SS
3.0
00
mm
3.0
00
mm
3.0
00
mm
300mm
c
a
SN SS
aluminiumtape
LE
a
SNSS
femalein the
four faces
top cover bottom coverexternal wall (EW) interior wall (IW)
bottom cover top cover
bottom cover top cover
bottom cover
top cover
Copy of the top cover
To make the contrary copymarking for the exterior.Cut with the tool “QUATRO”45º, now with the inclinationtoward interior.
Take one SN measure “a”.Take one SS and cut withlong enough to coverthe displacement.To unit with aluminium tape.Draw the form of thedisplacement.With the tool “QUATRO”cut 45º with the inclinationtoward the exterior of the piece.
Repeat the sameoperation for the
top cover.
Take twoSN measure
“b” with equivalentlongitude to the
developement ofthe external walls.
Bend the strip ofshould bend forthe elbow form.
Parts of theoffset after cut.
page 32
3.0
00
mm
3.0
00
mm
aluminium tape
aluminium tape
glue + aluminium tapefor both sides
glue + aluminium tapefor both sides
glueglue
glueglue glue
With a brus to glueall the sides at 45º
with an unifor surface.Should be glued
also the jointsbetween SN and SS.
Wait around 10/15minutes until
the surface arecompletely dry.
When they are dry,to unite the four
strips for theexternal face of theduct with aluminium
tape following theappropiate order.
Always to begin with thesame end of the duct,
maintaining the alignementso that if there is somesmall defect is should
be cut an end of the duct
Rotate the duct onthe table so that it
is with the externalface up to proceedto the assembling.
page 33
Assemble the partwith reduction formtaking it in parallel
Assembling before theright parts of the piece.
Rotate the pieceand it assemblesthe contrary part.
malewhole
perímeter
With the help a pieceof PVC pipe, press the
angles of close the piece,in vertical position and thenin horizontal along the jointso that it acts well the glue.
Put the aluminium tape.Seal the four internal angles
lengthwise with silicone.
So that the pieces areperfectly to squad it is
very important follow theassembling process.
Assemble the partwith reduction formtaking it in parallel
-plenum-manual pir-alu
page 34
a+40mm
b+
40
mm
a
LE
b b
a+40mm
b+
40
mm
a
1
3.000mm
SS
30
0m
m
a+40mma+40mma+40mm b+40mm b+40mm
1 3 42
2 3 4
LE
a+40mm
b+
40
mm
1 2 3 4 glue
LE1 2 3 4
end cap
1LE2 3 4
aluminium tape
1
a+40mm
3
a+40mm
LE
2
b+40mm
LELE
4
b+40mm
LE
all theperimeter
end cap
end cap
end cap
end cap
end cap
Take one strip special (SS).To unit with aluminium tape.Mark the measures as inthe drawing: a+40, a+40, b+40, b+40.With the tool “QUATRO”cut 90º right.
Then with the tool it BASE” to cut at 45º as in the following drawing:
Parts of theplenum
after cut.
With a brus to glueall the sides at 45ºwith an unifor surface.
Wait around10/15 minutes
until the surfaceare completely dry.
When they are dry,to unite the four
strips for theexternal face of theduct with aluminium
tape following theappropiate order.
Always to begin with thesame end of the duct,maintaining thealignement.
Rotate the piece onthe table so that it
is with the externalface up to proceedto the assembling.
glueglueglue
page 35
end cap
wall
end cap
mark grille
grille
flexibleduct
300mm
Examples for application of the plenum: - Grilles for wall or cealing, -Round, square and lineal diffussers.
Close the plenum following thedescribed process, as an straight duct.
The reference for theclosing is the end cap.
end cap
box diffusser
With the help a pieceof PVC pipe, press theangles of close the piece,in vertical position and thenin horizontal along the jointso that it acts well the glue.
Put the aluminium tape.Seal the four internal angleslengthwise with silicone.
-refuerzos-manual pir-alu
panel 20mm
page 36
Test: PNE-CEN /156/WG3N207-Ductwork Standard. Ductwork made insulation ductboards.
Class: R3
N/mm2: 199.411
Límite: 1.000 Pa
Pa 100 150 200 250 300 400 500 600 700 800 900 1000
Step (mm) 1400 110 900 800 700 600 600 500 500 400 400 400
Measure Nº Nº Nº Nº Nº Nº Nº Nº Nº Nº Nº Nº
150
200
250
300
400
500 1 1 1 1
600 1 1 1 1 1
800 1 1 1 1 1 1 1 1
1000 1 1 1 1 1 1 2 2 2 2
1200 1 1 1 1 1 1 2 2 2 2 2
1400 1 1 1 1 1 1 2 2 3 3 3 3
1600 1 1 1 1 2 2 2 2 3 3 3 3
1800 1 1 1 2 2 2 2 3 4 4 4 4
2000 1 1 2 2 3 3 3 3 4 4 4 4
Table of application of the reinforcementsPre-Insulated Aluminium Duct Boards Pi r-Alu 20 (thickness 20mm)mm
panel 30mm
-Depending on the section of the ducts and of positive or negative pressure, the ducts should be reinforced or not.-It is very important to verify these characteristics in each installation.
Step: Nº:
distance between reinforcements.number of the transversal reinforcements.
Nut
Tie rod
Nut
Reinforcement disk
b
a
Pipe of PVC 0 9mm
Descript ion Quantity
Tie rod M6 L = H + 90mm
Pipe of PVC 9mm L = H
Reinforcement disck Ref. :1270 2+2 u.
N u t M 6 1+1 u.
C o m p o ne n ts o f a re in fo rc e m e nt
step
step
first 100mm
Final <=step
Nº
Reinforcement disk
página 37
-puertas de inspección-manual pir-alu -access doors-manual pir-alu
Glue
Aluminium tape
Disko
Nut
Hanglerprofile
NutTie rodpointer M6
Gasket
b b+20mm
V-001
Poliuretanos, s.a. - Matamala, s/n - 17244 Cassà de la Selva - Gi - Spain - tel.: +34 972460472 - fax: +34 972460053
Appendix to use the
panels PIRALU-30
(thickness 30mm)
MANUAL PIR-ALU
bring update: www . piralu . com
e-mail: ducts@ piralu . com
updated: 11-11-01
jordi soler-2.001Forbidden the partial or total reproduction without written authorization of the company
-manual pir-alu
panel 30mm
page 39
thicknesspanel: 30mm
45º45º45º
111
2
2
The tool “ ” model iscomposed by two pieces: -BASE -MODULE
BASE
1 2
The module nºis useful alonefor the first cut.
2
For the other cuts itshould be removed.
length of blade: 32mm
1
2
Ref.: 4008
To displace the module nºthe external position.
2to
-tool “base”
45º45º
90º
1+2
1
1+2+3+4
thicknesspanel: 30mm
thicknesspanel: 30mm
1
1
23
4
4
32mm
-manual pir-alu
panel 30mm
page 40
Ref.: 4009
Position of module nºcut to 45º Left.
1
Position of modules nº 90º.
1+2cut to straigth
Position of module nºcut to 45º Rigth.
1
Install the module nº 4.
The tool model “ ”is composed by four pieces: -MODULE 45º to cut Rigth and Left -MODULE 90º to cut Straigth -MODULE to make Male / Female
QUATRO
1 2 3 4 -MODULE supplement for 30mm M & F
Displace the module nºto the external position
3
Position of the modulesnº1+2+3+4 to make the
Male & Female fit.
-tool “quatro”
panel 30mm
página 23page 41
-cut of strip normal: SN
4
3.000 mm
1.2
00
mm
30 mm
1
3
5
6
2
4
2
Regla
6
Módulo
1
5
3
Regla
Módulo
-manual pir-alu
To apply the formula as show inthe drawing: internal duct measure-30mm, +20mm, +20mm, etc...To mark equally in bothends of the panel.
3.000 mm
1.2
00
mm
-00mm
+00mm
+00mm
+00mm
+00mm
-00mm
+00mm
+00mm
+00mm
+00mm
For the first cut it is necessary the MODULE of the BASE.For the other cuts it should be desassembled.The cuts nº 2, 4, 6 arein the same direction.The cuts nº 3, 5 arein contrary directionsupporting in the rule.
Follow the direction of cut asshow in the drawing.
rule
rule
página 23page 42
-cut of strip plus: SP
4
3.000 mm
1.2
00
mm
30 mm
1
3
5
2
3
2
Regla
1
5
4
Regla
Módulo
Módulo
-manual pir-alu
3.000 mm
1.2
00
mm
-00mm
-00mm
-00mm
-00mm
-00mm
-00mm
-00mm
-00mm
-00mm
-00mm
rule
rule
Measure SP = duct measure -1.1160mm.
-50mm, -70mm, -70mm, etc...To mark equally in bothends of the panel.
To apply the formula as show inthe drawing:
Follow the direction of cut asshow in the drawing.
For the first cut it is necessary the MODULE of the BASE.For the other cuts it should be desassembled.All cuts are in the same direction.The cuts nº 2, 3 etc...supporting in the rule.
panel 30mm
panel 30mm
page 43
Regla
2
Regla
1
Módulo
-manual pir-alu
3.000 mm
1.2
00
mm
30 mm
1
2
3.000 mm
1.2
00
mm
000mm 000mm
000mm 000mm
The strip special (SS) it is measured only : 300mm.To apply the formula as show in the drawing.To mark equally in every angle andboth ends of the panel: 230mm..
-cut of strip special: SS
ruler
ruler
It is not necessary theMODULE of the BASE.Supporting in the rule.
Follow the direction of cut asshow in the drawing.
Test: PNE-CEN /156/WG3N207-Ductwork Standard. Ductwork made insulation ductboards.
Class: R4
N/mm2: 572.000
Límite: 1.400 Pa
Pa 200 250 300 400 500 600 700 800 900 1000 1200 1400
Step (mm) 1800 1500 1300 1000 1000 900 900 800 700 700 700 600
Measure Nº Nº Nº Nº Nº Nº Nº Nº Nº Nº Nº Nº
150
200
250
300
400
500
600
800 1 1 1 1
1000 1 1 1 1 1 1 1
1200 1 1 1 1 1 1 1 1 1
1400 1 1 1 1 1 1 2 2 2 2
1600 1 1 1 1 1 1 1 2 2 2 2
1800 1 1 1 1 1 1 1 2 2 2 2 2
2000 1 1 1 1 1 2 2 2 2 2 3 3
Table of application of the reinforcementsPre-Insulated Aluminium Duct Boards Pi r-Alu 30 (thickness 30mm)
página 44
-refuerzos-manual pir-alu
panel 30mm
-Depending on the section of the ducts and of positive or negative pressure, the ducts should be reinforced or not.-It is very important to verify these characteristics in each installation.
Step: Nº:
distance between reinforcements.number of the transversal reinforcements.
Nut
Tie rod
Nut
Reinforcement disk
b
a
Pipe of PVC 0 9mm
Descript ion Quantity
Tie rod M6 L = H + 90mm
Pipe of PVC 9mm L = H
Reinforcement disck Ref. :1270 2+2 u.
N u t M 6 1+1 u.
C o m p o ne n ts o f a re in fo rc e m e nt
step
step
first 100mm
Final <=step
Nº
Reinforcement disk