::manual of construction::

139
::Manual of Construction::

Upload: seda

Post on 09-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

::Manual of Construction::. MENU OF THE MANUAL. ::CHAPTER CONTENT::. ::CHAPTER CONTENT::. 01 Bases of the system. 12 Tee branch: static derivation. 02 Tools. 13 Plenum. 03 Cutting the panels. 14 Offset. 04 Type of strips. 15 Square elbow with turning vanes. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ::Manual of Construction::

::Manual of Construction::

Page 2: ::Manual of Construction::

MENU OF THE MANUAL

03 Cutting the panels

07 Straight duct

08 Elbow

10 End cap

01 Bases of the system

04 Type of strips

05 Cross joints fit

06 Longitudinal joints

09 Reduction or transition

11 Wye: dynamic derivation

12 Tee branch: static derivation

13 Plenum

14 Offset

19 Outdoor duct

20 Unit conections

15 Square elbow with turning vanes

16 Reinforcements

17 Access door

18 Hangers and supports

21 Installation of dampers & V.C.D.

22 Grilles, diffusers and flexible duct

02 Tools

::CHAPTER CONTENT:: ::CHAPTER CONTENT::

Page 3: ::Manual of Construction::

Size of the panels: 3.000x1.200x20mm

or 4.000x1.200x20mm1º1º

4.000mm

TH

E B

AS

ES

OF

TH

E S

YS

TEM

Page 4: ::Manual of Construction::

Cut of the longitudinal strips at 45º2º2º

4.000mm

TH

E B

AS

ES

OF

TH

E S

YS

TEM

Page 5: ::Manual of Construction::

Ducts assembled with four separate faces.3º3º

4.000mm

TH

E B

AS

ES

OF

TH

E S

YS

TEM

Page 6: ::Manual of Construction::

Lengthwise glued,

Aluminium tape in trhe external longitudinals angles,

Silicone in the longitudinal internal angles.

Glue

Aluminium tape

Silicone

TH

E B

AS

ES

OF

TH

E S

YS

TEM

Page 7: ::Manual of Construction::

Construction

Assembling

Easy to build

Practical

Standard

Readiness

Cost controlInternational

Standards

Respectful

Ex stock

Available with distributor

With the norms

With the environment

Own workers

DID

Competitive

mm.150200250300400500600800

10001200

Economical

ADVANTAGES OF THE SYSTEM

Page 8: ::Manual of Construction::

45º Left45º Right 45º Right

Module only 1th. cut

Remove the Module

Code: TM0090VVApplication No. 1: Single Cut 45º

“V”

SH

APE C

UTTER

Page 9: ::Manual of Construction::

Double Cut

Code: TM0090VVApplication No. 2: Double Cut 90º

2

Double Cut

3

Single Cut

1

Double Cut

4

Double Cut

5

“V”

SH

APE C

UTTER

Page 10: ::Manual of Construction::

45º Right

Code: TM0045RT

::45º RIGHT JACK PLANE::

45

º R

IGH

T JA

CK

PLA

NE

Page 11: ::Manual of Construction::

45º Straight45º Straight

Code: TM0090ST ::90º STRAIGHT JACK PLANE::

90º

STR

AU

GH

T JA

CK

PLA

NE

Page 12: ::Manual of Construction::

45º Left

Code: TM0045LT

45

º LE

FT JA

CK

PLA

NE

Page 13: ::Manual of Construction::

4.000mm

CU

T O

F TH

E P

AN

ELS

Page 14: ::Manual of Construction::

4.000mm

CU

T O

F TH

E P

AN

ELS

Page 15: ::Manual of Construction::

Module 1th. cut

Module 1th. cut

::CUT OF THE PANELS::

CU

T O

F TH

E P

AN

ELS

Page 16: ::Manual of Construction::

45ºLeft

45ºRight

11 To build ducts with section =<1.200mm

::STRIP NORMAL ::

STR

IP N

OR

MA

L

Page 17: ::Manual of Construction::

22

45º Right

45ºRight

To build ducts with section >1.200mm

STR

IP S

PEC

IAL

Page 18: ::Manual of Construction::

90º Straight

45º Right

33 To build elbows, wye and special shares. Fixed meassure: 300mm

Plenums

300 mm

SPEC

IAL

STR

IP

Page 19: ::Manual of Construction::

Glue

Glue

Air Flow

Figure 1

CR

OSS

JO

INTS:

MA

LE &

FEM

ALE

FIT

Page 20: ::Manual of Construction::

Air Flow

Aluminium tape

Aluminium tape

Figure 2

CR

OSS

JO

INTS:

MA

LE &

FEM

ALE

FIT

Page 21: ::Manual of Construction::

Female

Internal faces ofthe four strips

CR

OSS

JO

INTS:

MA

LE &

FEM

ALE

FIT

Page 22: ::Manual of Construction::

Male

Four sides of theexternal duct C

RO

SS

JO

INTS:

MA

LE &

FEM

ALE

FIT

Page 23: ::Manual of Construction::

Figure 1

Aluminium tape

Glue

LON

GU

ITU

DIN

AL

JOIN

TS

Page 24: ::Manual of Construction::

Figure 2

Silicone

Aluminium tape

LON

GU

ITU

DIN

AL

JOIN

TS

Page 25: ::Manual of Construction::

Select the four sides and to make the female before gluing.11

4.0

00

mm

STR

AIG

HT D

UC

T

Page 26: ::Manual of Construction::

Glue Glue

Glue all the sides cut at 45º22

STR

AIG

HT D

UC

T

Page 27: ::Manual of Construction::

Unite the four sides with aluminum tape for the exterior.

Level

Aluminium tape

External face

33

STR

AIG

HT D

UC

T

Page 28: ::Manual of Construction::

Rotate the duct in position with the interior face up.

Interior face

44

STR

AIG

HT D

UC

T

Page 29: ::Manual of Construction::

PRÁCTICA: Construcción

Close the first side in position 90º vertical.

11

55

STR

AIG

HT D

UC

T

Page 30: ::Manual of Construction::

22

Also close the second side in position 90º vertical. 66

STR

AIG

HT D

UC

T

Page 31: ::Manual of Construction::

33

Close the third side.77

STR

AIG

HT D

UC

T

Page 32: ::Manual of Construction::

Pressing

Pressing the closing joint with the help of a piece of PVC pipe.88

STR

AIG

HT D

UC

T

Page 33: ::Manual of Construction::

Aluminium tape

Place the aluminum tape in the closing angle and the silicone. 99

Silicone inside

STR

AIG

HT D

UC

T

Page 34: ::Manual of Construction::

Draw the template of the cover bottom and cut toward “EXTERNAL”.

W+

35

0m

m

W+

35

0m

m

W+

20

0m

m

Cover bottom Cover top

11

Aluminium tapeAluminium tape

ELB

OW

Page 35: ::Manual of Construction::

Copy the template and to cut on the contrary: toward the “INTERIOR”.

Cover bottom

Cover top

22

ELB

OW

Page 36: ::Manual of Construction::

Exterior face

Interior face

50m

m50

mm

50mm

50mm

20mm

20mm

BEN

T O

F TH

E P

AN

ELS

Page 37: ::Manual of Construction::

Possibility to bend with different forms.

BEN

T O

F TH

E P

AN

ELS

Page 38: ::Manual of Construction::

Cut the walls and make the female before of to glue.33

ELB

OW

Page 39: ::Manual of Construction::

Glue

44 Glue all the sides cut at 45º

ELB

OW

Page 40: ::Manual of Construction::

Paste the covers on the external wall.55

ELB

OW

Page 41: ::Manual of Construction::

Rotate the piece slowly on the external wall...66

ELB

OW

Page 42: ::Manual of Construction::

...until the end.77

ELB

OW

Page 43: ::Manual of Construction::

Paste the internal wall beginning with the same place. 88

ELB

OW

Page 44: ::Manual of Construction::

To press, to tape, to clip and to make the male.

Pressing

Aluminium tape

99

Silicone inside

ELB

OW

Page 45: ::Manual of Construction::

Select the four sides, draw and to cut the reduction.

1:4

11

4.0

00

mm

RED

UC

TIO

N

Page 46: ::Manual of Construction::

To make the female before gluing.22

RED

UC

TIO

N

Page 47: ::Manual of Construction::

Glue

33 Glue all the sides cut at 45º

RED

UC

TIO

N

Page 48: ::Manual of Construction::

Level

Aluminium tape

44

External face

Unite the four sides with aluminum tape for the exterior.

RED

UC

TIO

N

Page 49: ::Manual of Construction::

Interior face

55 Rotate the duct in position with the interior face up.

RED

UC

TIO

N

Page 50: ::Manual of Construction::

11

66 Close the first side in position 90º vertical.

RED

UC

TI

ON

Page 51: ::Manual of Construction::

22

77 Close the second side in position 90º vertical.

RED

UC

TIO

N

Page 52: ::Manual of Construction::

88

33

Close the third side.

RED

UC

TIO

N

Page 53: ::Manual of Construction::

Finish with the part of the reduction.99

44

RED

UC

TIO

N

Page 54: ::Manual of Construction::

1010 Pressing the closing joint with the PVC pipe.

Pressing

RED

UC

TIO

N

Page 55: ::Manual of Construction::

Aluminium tape

1111

Silicone inside

Place the aluminum tape in the closing angle and the silicone.

RED

UC

TIO

N

Page 56: ::Manual of Construction::

Cut at 45º in the end for lodging of the end cap.11

3.0

00

mm

EN

D C

AP

Page 57: ::Manual of Construction::

Glue

Glue

Glue all the sides with cut at 45º22

EN

D C

AP

Page 58: ::Manual of Construction::

Unite the four sides with aluminum tape for the exterior.

Level

Aluminium tape

33

External face

EN

D C

AP

Page 59: ::Manual of Construction::

Interior face

44 Rotate the duct in position with the interior face up.

EN

D C

AP

Page 60: ::Manual of Construction::

Paste the Cover in position on the base.55

End cap

EN

D C

AP

Page 61: ::Manual of Construction::

11

66 Close the first side in position 90º vertical.

EN

D C

AP

Page 62: ::Manual of Construction::

22

77 Also close the second side in position 90º vertical.

EN

D C

AP

Page 63: ::Manual of Construction::

88

33

Close the third side and pressing the closing joint with the PVC pipe.

Pressing

Pressing

EN

D C

AP

Page 64: ::Manual of Construction::

Aluminium tape

Aluminium tape

99

Silicone inside

Place the aluminum tape in the closing angle and the silicone.

EN

D C

AP

Page 65: ::Manual of Construction::

11

Cover bottom Cover top

Radius 150mm

1:7

W+

20

0m

m

4.0

00

mm

Aluminium tape

Draw the template of the cover bottom and cut toward “EXTERNAL”.

WYE

Page 66: ::Manual of Construction::

22

Cover top

Cover bottom

4.0

00

mm

Copy the template and to cut on the contrary: toward the “INTERIOR”.

WYE

Page 67: ::Manual of Construction::

33

=4.000mm

Cut the walls and make the female before of to glue.

WYE

Page 68: ::Manual of Construction::

Detail of the internal deflector. 44

Aluminium tape

Bent

WYE

Page 69: ::Manual of Construction::

55

Glue

Glue all the sides cut at 45º

WYE

Page 70: ::Manual of Construction::

66

Aluminium tape

Exterior face

Unite the four sides with aluminum tape for the exterior.

WYE

Page 71: ::Manual of Construction::

77

Interior face

Rotate the duct in position with the interior face up.

WYE

Page 72: ::Manual of Construction::

Place the wall of the deflector.99

Internal deflector

33

WYE

Page 73: ::Manual of Construction::

Close the piece follow the order.88

11

22

WYE

Page 74: ::Manual of Construction::

Adapt the internal deflector in the correct position.1010

Positioninternal

deflector

Internaldeflector

44

WYE

Page 75: ::Manual of Construction::

Place the external wall of the elbow part.1111

55

WYE

Page 76: ::Manual of Construction::

Finish off of the internal deflector.1212

Triangleclipspanel

Glue

Aluminium tape

WYE

Page 77: ::Manual of Construction::

1313 Place the internal wall of the elbow part.

66

WYE

Page 78: ::Manual of Construction::

1414

Aluminium tape

Pressing

Silicone inside

To press, to tape, to clip and to make the male.

WYE

Page 79: ::Manual of Construction::

Samples of application: wye of “SHORT ENTRANCE” (1)

4.000mm

WYE

Page 80: ::Manual of Construction::

4.0

00

mm

Samples of application: wye of “LONG ENTRANCE” (1)

WYE

Page 81: ::Manual of Construction::

4.0

00

mm

Samples of application: wye of “LONG ENTRANCE” (2)

WYE

Page 82: ::Manual of Construction::

11 Mark, to cut the hole +20mm and to glue.

H+20mm

W+20mm Glue

±300mm

Male fit

Male fit

TEE B

RA

NC

H

Page 83: ::Manual of Construction::

Insert in the hole, press and put silicone outside.

Silicone

22

Pressing

TEE B

RA

NC

H

Page 84: ::Manual of Construction::

Take an “STRIP SPECIAL”,cut the four faces plus the end cap.

W+400mm W+400mm H+400mm H+400mm W+400mm

H+400mmTapa

30

0m

m

11

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 85: ::Manual of Construction::

With the tool “BASE” cut 45º

Tapa

22

End cap

Four sides

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 86: ::Manual of Construction::

33

Glue

End cap

Glue all the sides cut at 45º

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 87: ::Manual of Construction::

End cap

44

Aluminium tape

Exterior face

Unite the four sides with aluminum tape for the exterior.

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 88: ::Manual of Construction::

55

Interior face

End cap

Rotate the duct in position with the interior face up.

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 89: ::Manual of Construction::

66

End cap

Paste the end cap in position on the base.

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 90: ::Manual of Construction::

77

End cap

11

Close the first side in position 90º vertical.

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 91: ::Manual of Construction::

88

22

Close the second side in position 90º vertical.

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 92: ::Manual of Construction::

99

33

Close the third side in position 90º vertical and press.

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 93: ::Manual of Construction::

1010 Put the aluminium tape and the silicone inside.

Aluminium tape

Silicone inside

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 94: ::Manual of Construction::

Frame of grill

Flexible duct

Grill

Plenum grill

Plenum diffuser

PLE

NU

M F

OR

GR

ILLE

S &

DIF

FUS

ER

S

Page 95: ::Manual of Construction::

11

4.0

00

mm

Cover bottom Cover top

Aluminium tape

Draw the template of the cover bottom and cut toward “EXTERNAL”.

OFF

SET

Page 96: ::Manual of Construction::

22

3.0

00

mm

Cover top

Cover bottom

Copy the template and to cut on the contrary: toward the “INTERIOR”.

OFF

SET

Page 97: ::Manual of Construction::

33 Cut the walls and make the male fit before to glue.

OFF

SET

Page 98: ::Manual of Construction::

44

Glue

Glue all the sides cut at 45º

OFF

SET

Page 99: ::Manual of Construction::

66

Glue

Internal face

Rotate the duct in position with the interior face up.

OFF

SET

Page 100: ::Manual of Construction::

55

Aluminium tape

Aluminium tape

External face

Unite the four sides with aluminum tape for the exterior.

OFF

SET

Page 101: ::Manual of Construction::

77

22

11

Close the piece follow the order.

OFF

SET

Page 102: ::Manual of Construction::

88

33

Close the piece follow the order.

OFF

SET

Page 103: ::Manual of Construction::

99

44

Close the piece follow the order.

OFF

SET

Page 104: ::Manual of Construction::

99 Close the piece follow the order.

OFF

SET

Page 105: ::Manual of Construction::

1010

55

Close the piece follow the order.

OFF

SET

Page 106: ::Manual of Construction::

1111

66

Close the piece follow the order.

OFF

SET

Page 107: ::Manual of Construction::

1212

Aluminium tapePressing

Silicone inside

To press, to tape, to clip and to make the male.

OFF

SET

Page 108: ::Manual of Construction::

W+

35

0m

m

W+

35

0m

m

W+

20

0m

m

Cover bottom Cover top

11

Aluminium tape Aluminium tape

LN

Draw the template of the cover bottom and cut toward “EXTERNAL”.

SQ

UA

RE E

LBO

W

Page 109: ::Manual of Construction::

22 Cut the walls and make the female before of to glue.

SQ

UA

RE E

LBO

W

Page 110: ::Manual of Construction::

33

Glue

Glue all the sides cut at 45º

SQ

UA

RE E

LBO

W

Page 111: ::Manual of Construction::

44

Aluminium tape

Exterior face

Unite the four sides with aluminum tape for the exterior.

SQ

UA

RE E

LBO

W

Page 112: ::Manual of Construction::

55

Interior face

Rotate the piece in position with the interior face up.

SQ

UA

RE E

LBO

W

Page 113: ::Manual of Construction::

66 Close the first side in position 90º vertical.

SQ

UA

RE E

LBO

W

Page 114: ::Manual of Construction::

77 Close the second side in position 90º vertical.

SQ

UA

RE E

LBO

W

Page 115: ::Manual of Construction::

88 Close the third side.

SQ

UA

RE E

LBO

W

Page 116: ::Manual of Construction::

99 Place the interior walls.

SQ

UA

RE E

LBO

W

Page 117: ::Manual of Construction::

1010

Silicone inside

Pressing

Aluminium tape

To press, to tape, to clip and to make the male.

SQ

UA

RE E

LBO

W

Page 118: ::Manual of Construction::

1111 Insert the kit “Turning Vanes”.

SQ

UA

RE E

LBO

W

Page 119: ::Manual of Construction::

1212 Insert the kit of “Turning Vanes”.

Reinforcement disk

Reinforcement disk

Tierod M6

Nut M6

Nut M6

SQ

UA

RE E

LBO

W

Page 120: ::Manual of Construction::

REIN

FOR

CEM

EN

TS

Page 121: ::Manual of Construction::

LL

Step final=<L

Start 100mm

Position of the reinforcements.

REIN

FOR

CEM

EN

TS

Page 122: ::Manual of Construction::

Nut M6

Nut M6

PVC pipe Ø 9mm

Components of a reinforcement.

Reinforcement disk

Reinforcement disk

Reinforcement disk

Tie rod M6

REIN

FOR

CEM

EN

TS

Page 123: ::Manual of Construction::

Size of the door

11 Mark and cut the hold at the size of the door.

AC

CESS

DO

OR

Page 124: ::Manual of Construction::

Clip of the door

22 Take advantage of the clip of the door.

AC

CESS

DO

OR

Page 125: ::Manual of Construction::

Door + 40mm

Clip of the door

33 Cut an piece of the panel with add 40mm arround.

AC

CESS

DO

OR

Page 126: ::Manual of Construction::

Glue

44 To glue the two faces and to allow to dry off.

AC

CESS

DO

OR

Page 127: ::Manual of Construction::

Hold Ø tie rod M6

55 Paste the two pieces.

AC

CESS

DO

OR

Page 128: ::Manual of Construction::

Nut M6

Reinforcement disk

Tie rod M6

Support profile:L=Wx1,5

Nut M6

Gasket

Combineddoor

66 Install the control of the access door.

AC

CESS

DO

OR

Page 129: ::Manual of Construction::

Door kit

Inside Duct

Access door kit finished.

AC

CESS

DO

OR

Page 130: ::Manual of Construction::

Inside Duct

Ready to install.

Door kit

AC

CESS

DO

OR

Page 131: ::Manual of Construction::

Weigth m² of duct: ±1,1 Kg.

Plug

Support profile& nut M6

Tie rod M6

2.500mm

LENGTH of the PANEL: 4.000mm

2.500mm 1.500mm1.500mm

Types of profiles

± 40x20mm.

HANGERS & SUPPORTS

Page 132: ::Manual of Construction::

RecommendedTHREE hands

Application withbrush or roller

Standard rubber paintingfor terraces

Recommended: panel thickness 30mm

INDOORINDOOR

OUTDOOROUTDOOR

OU

TS

IDE D

UC

T

Page 133: ::Manual of Construction::

Application of the “F” profile

“F” profile

Gasket

Rivet

Glue inside ofthe “F” profile

Duct

UN

IT C

ON

EC

TIO

NS

Page 134: ::Manual of Construction::

“F” profile

Gasket

Rivet

Glue inside ofthe “F” profile

Duct

Application of the “F” profile

::INSTALLATION OF DAMPERS & V.C.D.::

Page 135: ::Manual of Construction::

Application of the “U” profile

Profile of 20x10x20mmglued in the male

Profile glued of25x20x20mm

Profile of25x20x20mm

INSTA

LLA

TIO

N O

F G

RIL

LES

Fixation of the grilles:See the recommendationof every producer.

Page 136: ::Manual of Construction::

(1) Doublereinforcementdisk withdouble nut M6

Tie rod M6

Support adjustableSupport adjustable

Standardcollar Øin aluminium

Kit of diffusor withspecial support toadapt the flexible duct

Application in the ceiling

INS

TA

LLA

TIO

N O

F R

OU

ND

DIF

FUS

ER

S

Fixation of the diffusers:See the recommendationof every producer.

Page 137: ::Manual of Construction::

Application in the ceiling

(2) Angle bracketand nut M6

Tie rod M6

SupportSupportadjustableadjustable

Collarwith panel

INSTA

LLA

TIO

N O

F S

QU

AR

E D

IFFU

SER

S

Fixation of the diffusers:See the recommendationof every producer.

Page 138: ::Manual of Construction::

(1) Doublereinforcement disk

Tie rod M6

(2) Angle bracket

Support adjustableSupport adjustable

Nut M6

Application in the ceilingFixation of the diffusers:See the recommendationof every producer.

::INSTALLATION OF LINEAL DIFFUSERS::

INSTA

LLA

TIO

N O

F LI

NEA

R S

LOT D

IFFU

SER

S

Page 139: ::Manual of Construction::

Mark Ø collar

To cut

Install the spin collar

Bend the lashesof the collar insideof the duct

Install theFlexible duct

Metalic ornylon climp

Seal with siliconfor the exteriorof the colar

Standard Ø aluminium collar with lashes

::INSTALLATION OF FLEXIBLE DUCT::

INSTA

LLA

TIO

N O

F FL

EX

IBLE

DU

CT