manual gate valve kick-off meeting (brand : velan)
DESCRIPTION
Manual Gate Valve Kick-off Meeting (brand : VELAN) presented by one of Approved Manufacturer List of BP Berau, LtdTRANSCRIPT
![Page 1: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/1.jpg)
NEW CONDENSATE &
DIESEL TANKS(NCDT)
![Page 2: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/2.jpg)
PT KSD Indonesia ( “ PT. KSDI “ ) is a subsidiary of KS Distribution Pte
Ltd which has its headquarter in Singapore and presence in 10
countries included Indonesia. Similiar line focus of businesses with its
parent company , PT KSDI is a seamlessly integrated one-stop solution
provider for customers from the oil & gas, marine & offshore,
petrochemical, green energy, mining and other industries.
Headquaterred in Jakarta, and it has offices in Batam, Pekan Baru,
Surabaya and Balikpapan.
PT KSDI distributes a broad spectrum of products representing major
international brands. Combined with its workforce across 5 major
cities and its distributorship in Indonesia, PT KSDI is in an excellent
position to tap into the economic growth of Indonesia in the year
ahead.
Through forging strong patnership with strategic product principals
and service contractors, PT KSDI aims to be the centre in and efficient
solutions, high quality standard and excellent services by developing
and continously improving its resources, teamwork , leadership and
engineering with its strong customer focus.
![Page 3: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/3.jpg)
Sales & Project Leader
Fery Wiharto
Engineering
Ruwan
Administration
Adriyanti Panjaitan
Finance
Diana Yang
Import Department
Ridho Aji P
![Page 4: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/4.jpg)
Model
Number
1
GATE-V A105 CL800 API 602 SW TRIM NO. 1 BB-BG-OS&Y
HANDWHEEL 1/2 W03-2054B-02TY 2
2
GATE-V A105 CL800 API 602 SW-NPT TRIM NO. 1 BB-BG-OS&Y
HANDWHEEL 1/2 S03-2054B-02TY 3
3
GATE-V A105 CL800 API 602 SW TRIM NO. 1 BB-BG-OS&Y
HANDWHEEL 3/4 W04-2054B-02TY 12
4
GATE-V A105 CL800 API 602 SW-NPT TRIM NO. 1 BB-BG-OS&Y
HANDWHEEL 3/4 S04-2054B-02TY 152
5
GATE-V A182-F316L CL800 API 602 SW-NPT TRIM NO. 12 BB-BG-
OS&Y HANDWHEEL 3/4 S04-2054B-14MY 30
6
GATE-V A182-F316L CL800 API 602 SW-NPT TRIM NO. 12 BB-BG-
OS&Y HANDWHEEL 1 S05-2054B-14MY 1
7
GATE-V A105 CL800 API 602 SW TRIM NO. 1 BB-BG-OS&Y
HANDWHEEL 1 W05-2054B-02TY 4
8CHECK-V A105 CL800 API 602 TYPE SW TRIM NO.1 LIFT TYPE BC 3/4 W04-2034B-02TY 3
9
CHECK-V A216-WCB CL150 ASME B16.34 FLG B16.5 RF TRIM
NO.1 SWING TYPE BC 2 F08-0114C-02TY 10
10
GLOBE-V A105 CL800 API 602 TYPE SW TRIM NO.1 BB-BG-
OS&Y HANDWHEEL 3/4 W04-2074B-02TY 1
11
DUAL-PL CHECK-V A216-WCB CL150 API 594 LUG TYPE B16.5
RF TRIM AND WETTED PART 13 CR SPRING INCONEL4 PL12-002D10-3DB 6
12
DUAL-PL CHECK-V A216-WCB CL150 API 594 LUG TYPE B16.5
RF TRIM AND WETTED PART 13 CR SPRING INCONEL6 PL14-002D10-3DB 1
13
DUAL-PL CHECK-V A216-WCB CL150 API 594 LUG TYPE B16.5
RF TRIM AND WETTED PART 13 CR SPRING INCONEL8 PL15-002D10-3DB 7
14
DUAL-PL CHECK-V A351-CF3M CL150 API 594 LUG TYPE B16.5
RF TRIM AND WETTED PART SS316 SPRING INCONEL8 PL15-013D10-3DB 1
No. Deskripsi BarangSize
(Inch)
Qty
(Ea)
![Page 5: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/5.jpg)
FORGED STEEL GATE VALVE (Item 1-6)
![Page 6: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/6.jpg)
FORGED STEEL PISTON CHECK VALVE (Item 7)
![Page 7: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/7.jpg)
CAST STEEL SWING CHECK VALVE (Item 8)
![Page 8: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/8.jpg)
FORGED STEEL GLOBE VALVE (Item 9)
![Page 9: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/9.jpg)
DUAL PLATE CHECK VALVE (Item 10-13)
![Page 10: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/10.jpg)
ETD
Singapore
ETA Jakarta Customs
Clearance
Delivery to
WIKA
6 October
2014
10 October
2014
13-24 October
2014
27-31 October
2014
ETD
Singapore
ETA Jakarta Customs
Clearance
Delivery to
WIKA
9 March 2014 13 March
2015
16-27 March
2014
30 March – 3
April 2015
First Shipment
Second Shipment
![Page 11: Manual Gate Valve Kick-off Meeting (brand : VELAN)](https://reader036.vdocuments.site/reader036/viewer/2022082223/559439f61a28ab2a7c8b4714/html5/thumbnails/11.jpg)
6
26
2
2
2
2
1
1
0 10 20 30 40
1st Shipment
2nd Shipment
ETD Singapore
ETA Jakarta
Customs Clearance
Delivery to WIKA