Project Name Mangrove Passage Piled Cyclone Moorings Client Saipem Leighton Consortium Sit e Mangrove Passage (approximately 25 nm from the town of Onslow) EPCM No Duration 5 months Vessels Used AMS Boss ASL96 Platinum DETAILS OVERVIEW Total AMS were contracted by Saipem Leighton Consortium (SLC) to install 23 No. piled cyclone moorings for marine plant working on the Gorgon LNG Plant. The project involved driving 1350mm diameter piles into the seabed in a remote part of the WA coast line near Onslow. The piles were installed by Total AMS?s propose built 180? piling barge equipped with 200t crawler crane and IHC S-280 piling hammer. After being driven 15m into the seabed the piles were cut off by divers and a rotating pile head was installed to receive the mooring chain. The mooring are capable of accommodating horizontal mooring loads up to 250t. MANGROVE PASSAGE MOORINGS PROJECT SPECIFICATION SHEET 4 Mews Road, Fremantle WA 6160 +61 08 9430 5889 totalams.com.au

Upload: dinhlien

Post on 17-May-2018

224 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Mangrove Passage Moorings - tamsgroup.com.au · Mangrove Passage Piled ... seabed the piles were cut off by divers and a rotating pile ... MANGROVE PASSAGE MOORINGS PROJECT SPECIFICATION

Project Nam eMangrove Passage PiledCyclone Moorings

Client Saipem Leighton Consortium

Sit eMangrove Passage (approximately25 nm from the town of Onslow)

EPCM No

Durat ion 5 months

Vessels UsedAMS BossASL96Platinum

DETAILSOVERVIEWTotal AMS were contracted by Saipem Leighton Consortium (SLC) to install 23 No. piled cyclone moorings for marine plant working on the Gorgon LNG Plant. The project involved driving 1350mm diameter piles into the seabed in a remote part of the WA coast line near Onslow.

The piles were installed by Total AMS?s propose built 180? piling barge equipped with 200t crawler crane and IHC S-280 piling hammer. After being driven 15m into the seabed the piles were cut off by divers and a rotating pile head was installed to receive the mooring chain. The mooring are capable of accommodating horizontal mooring loads up to 250t.