Page 1: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

MANGA LNG TERMINAL IN TORNIO, FINLAND23.03.2017 VAASA GAS EXCHANGE

Mika Kolehmainen

CEO

Manga LNG

Kenneth Engblom

Director Sales & Marketing

Wärtsilä LNG Solutions

Page 2: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

EFFICIENCY FUEL FLEXIBILITY ENVIRONMENTAL

SOLUTIONS

LE

AD

ER

IN

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

MARINE SOLUTIONS

SERVICES

18,800

THIS IS WÄRTSILÄ

Marine Solutions

35% (34)

Energy Solutions

20% (22)

Services

46% (43)

NET SALES

BY BUSINESS

2016

LISTED IN HELSINKI

5,0 BILLION € TURNOVER

2,6% OR 132M€ IN R&D

200

PROFESSIONALS

LOCATIONS

70 COUNTRIES

ENERGY SOLUTIONS

Page 3: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä @Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

A GLOBAL SYSTEM INTEGRATOR FOR GREENER

AND MORE EFFICIENT ENERGY SYSTEMS

Page 4: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Medium Scale LNG Terminals Small Scale LNG Terminals &

Liquefaction plants

Re-gas-systems, Engines and other

gas handling systems for FSRU:s

Complete Power and LNG tank

systems for ships

Fuel gas systems for Ships &

Power Plants

Gas Power Plant with LNG

Terminal

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

THESE ARE SOME OF THE THINGS WÄRTSILÄ DOES IN LNG TODAY

Page 5: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

• Project management

• Process engineering

• System design

• Procurement

• Package management

• Provide process guarantee

• Provide dynamic simulator integrated with control system

• Construction management

• Mechanical designs

• Safety studies

• Pipe stress analysis

• Civil design and foundation

• Control logic

• Buildings

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

TYPICAL SCOPE IN WÄRTSILÄ LNG PROJECTS

Page 6: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Manga LNG terminal project in Tornio , Finland

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 7: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

MANGA LNG TERMINAL BACKGROUND

- Manga LNG Oy shareholders:Outokumpu 45%

SSAB 25%

Skangas 25%

EPV Energia 5%

MANGA LNG TERMINAL IN TORNIO, FINLAND

- Manga Terminal Oy is subsidiary of Manga LNG Oy

- Manga Terminal Oy is the investor of LNG terminal in Tornio

- Customers:- Outokumpu in own production in Tornio

- SSAB in own production in Raahe

- EPV Energia for energy production in Tornio

- Skangas is reselling to market in Finland and Sweden

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 8: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

LNG MARKET IN FINLAND/NORDICS

- Natural gas network limited in Finland (and Sweden)

- In EU 24% of primary energy production by natural gas

- Finland 8%

- Sweden 2%

- Emission controlling in Baltic Sea area is increasing the demand of LNG

- Emission control in industry

MANGA LNG TERMINAL IN TORNIO, FINLAND

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 9: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Preparation and execution

- Basic engineering 2012

- EPCM quotations 12/2012

- EPC quotations 2013- 13 RFQ’s

- Agreement with Wärtsilä 12/2013

Main benefits- EPC Contractor’s competence in power plant

and gas processes

- Resourcing and scheduling of project

Main challenges- General challenges of EPC type contract

- Possibility to influence on technical solutions

MANGA LNG TERMINAL IN TORNIO, FINLAND

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 10: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Commissioning and Operations

- Long term LNG purchase agreements

- New vessel under construction

- Coral Energice 18 000 m3

- 24/7 operations at terminal:

- Re-gasification

- LNG loading processes

- 2 shifts + remote control

MANGA LNG TERMINAL IN TORNIO, FINLAND

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 11: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

December 2013 – Contract signing

On 31 December, 2013 Wärtsilä signed a turnkey contract with Manga LNG Oy to build a liquefied natural gas receiving terminal in Tornio, Finland.

Construction work started a year later.

MANGA LNG TERMINAL IN TORNIO, FINLAND

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 12: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Scope of work

MANGA LNG TERMINAL IN TORNIO, FINLAND

The turnkey delivery of the import terminal, supplied by Wärtsilä, includes

• EPC scope

• LNG storage tank

• BOG handling equipment

• Regasification plant

• Pressure control station

• Metering station

• Control system

• Flare

• Loading arms

• All piping and electrical works

• Civil works

• Buildings

• Installation

• Maintenance

• Facilitating finance

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 13: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Main data

MANGA LNG TERMINAL IN TORNIO, FINLAND

LNG storage tank

Net volume 50 000 m3

Tank height 48.5 m

Tank diameter 43.6 m

Outer tank Concrete

Inner tank 9% Ni steel

Functionalities

Gas send-out 39 t/h

Outlet gas pressure 6.0 barg

Truck loading 75 m3/h

Ship bunkering 300 m3/h

Ship unloading rate 3 000 m3/h

Ship unloading time 12 hours

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 14: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Project schedule

MANGA LNG TERMINAL IN TORNIO, FINLAND

Tornio ManGa LNG Terminal

Tue 31.12.2013 – Thu Q3.2018

START Tue 31.12.2013 Signing of LNG terminal CONTRACT2014

2015

2016

2017

2018

April 2014 Building permit design LNG terminal READY

Dec 2014 Occurrence of COMMENCEMENT DATE

July 2015 Completion of LNG tank PILING

Nov 2016 Completion of LNG tank INNER TANK CONSTRUCTION

Q3 2017 Mechanical completion of LNG terminal

Q2 2018 Successful completion of PERFORMANCE TEST

Q3 12.7.2018 DELIVERY OF THE CONTRACT OBJECT

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 15: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

Manga, Tornio, Finland – Project site

MANGA LNG TERMINAL IN TORNIO, FINLAND

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 16: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

MANGA LNG TERMINAL IN TORNIO, FINLAND

August 2015The groundbreaking ceremony on 26 August 2015 gathered representatives from all companies investing in the project.

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 17: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

MANGA LNG TERMINAL IN TORNIO, FINLAND

The 50,000m3 Tank

• Slip-forming height 42 m

• Wall thickness 0,6 m

• Diameter of the tank (CL) 43 m

• Reinforcement 320 ton

• Ducts for post tensioning 5000 m

• Concrete 3990 m3

• Labor in 2 shifts, totally 100+ workers

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 18: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

MANGA LNG TERMINAL IN TORNIO, FINLAND

October 2015 – LNG tank covered with roof dome

The 1250-ton mobile crane, largest in Scandinavia, lifting the dome structure on top of the tank.

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

Page 19: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen

MANGA LNG TERMINAL IN TORNIO, FINLAND

October 2016 – Process equipment and pipework to start.Expected to receive first commissioning LNG shipment in November 2017

Page 20: MANGA LNG TERMINAL IN TORNIO, FINLAND - …vaasanseutu.fi/app/uploads/sites/7/2015/10/Seminar_1_4_Kolehmainen... · - EPCM quotations 12/2012 - EPC quotations 2013 ... MANGA LNG TERMINAL

© Wärtsilä

THANK YOU!

@Wärtsilä- 23.03.2017 Vaasa Gas Exhchange- Tornio Manga LNG Terminal Kenneth Engblom/ Mika Kolehmainen