Mandal Becharaji Special Investment Region (MBSIR) Report 2 - General Development Control Regulations (GDCR) Mandal Becharaji Special Investment Regional Development Authority, Gandhinagar C/O : MBSIRDA, Block No. 11/12, 3 rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017 FINAL DEVELOPMENT PLAN SACTIONED U/S 6(2)(iv) AND 17(2) OF THE GSIR ACT 2009 AND U/S 17(1)(a)(i) and U/S 17(1)(d)&(e) OF THE GTP & UD ACT 1976 ON DATED :15/03/2016 BY APEX AUTHORITY (GIDB)

Upload: others

Post on 23-Oct-2020

24 views

Category:

Documents


1 download

TRANSCRIPT

  • Mandal Becharaji Special Investment Region

    (MBSIR)

    Report 2 - General Development Control Regulations

    (GDCR)

    May 2013

    Mandal Becharaji Special Investment Regional

    Development Authority, Gandhinagar

    C/O : MBSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017

    FINAL DEVELOPMENT PLAN SACTIONED U/S 6(2)(iv) AND

    17(2) OF THE GSIR ACT 2009 AND U/S 17(1)(a)(i) and U/S 17(1)(d)&(e) OF THE GTP & UD ACT 1976 ON DATED :15/03/2016 BY APEX AUTHORITY (GIDB)

  • Mandal Becharaji Special Investment Region

    (MBSIR)

    Report 2 – General Development Control Regulations

    (GDCR)

    Mandal Becharaji Special Investment Regional

    Development Authority, Gandhinagar

    C/O : MBSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017

    FINAL DEVELOPMENT PLAN SACTIONED U/S 6(2)(iv) AND

    17(2)OF THE GSIR ACT 2009 AND U/S 17(1)(a)(i) and U/S 17(1)(d)&(e) OF THE GTP & UD ACT 1976 ON DATED :15/03/2016 BY APEX AUTHORITY (GIDB)

  • General Development Control Regulations (GDCR)

    MBSIRDA i

    Contents

    Contents ................................................................................................................................................. i

    List of Figures ....................................................................................................................................... xv

    List of Tables ....................................................................................................................................... xvi

    1. Preamble ........................................................................................................................................ 1

    1.1 Short Title, Extent and Commencement .................................................................................... 1

    2. Definitions ...................................................................................................................................... 2

    2.1 Act........................................................................................................................................... 2

    2.2 Adaptive Reuse ........................................................................................................................ 2

    2.3 Additions And /Or Alterations .................................................................................................. 2

    2.4 Advertising Display Infrastructure/Sign/Hoarding ..................................................................... 2

    2.5 Agricultural Use ....................................................................................................................... 2

    2.6 Air-Conditioning ....................................................................................................................... 2

    2.7 Amenities ................................................................................................................................ 3

    2.8 Amusement Park ..................................................................................................................... 3

    2.9 Apartments or Flats ................................................................................................................. 3

    2.10 Appropriate Authority .............................................................................................................. 3

    2.11 Atrium (plural atria) ................................................................................................................. 3

    2.12 Authorised officer .................................................................................................................... 3

    2.13 Auto Repair Workshop ............................................................................................................. 4

    2.14 Auxiliary Power Backup ............................................................................................................ 4

    2.15 Automatic Sprinkler System ..................................................................................................... 4

    2.16 Banquet Hall ............................................................................................................................ 4

    2.17 Basement or Cellar ................................................................................................................... 4

    2.18 Botanical Garden ..................................................................................................................... 4

    2.19 Building ................................................................................................................................... 4

    2.20 Building Line ............................................................................................................................ 7

    2.21 Build-to-line ............................................................................................................................. 8

    2.22 Building Unit ............................................................................................................................ 8

    2.23 Building Unit Area .................................................................................................................... 9

    2.24 Building Unit Level ................................................................................................................... 9

    2.25 Built-Up Area ........................................................................................................................... 9

    2.26 Unit built-up area..................................................................................................................... 9

    2.27 Call centre ............................................................................................................................. 10

  • General Development Control Regulations (GDCR)

    MBSIRDA ii

    2.28 Camping Ground .................................................................................................................... 10

    2.29 Carpet Area ........................................................................................................................... 10

    2.30 Competent Authority ............................................................................................................. 10

    2.31 Chimney ................................................................................................................................ 10

    2.32 Clear Height ........................................................................................................................... 11

    2.33 Club ....................................................................................................................................... 11

    2.34 Club house ............................................................................................................................. 11

    2.35 Cold Storage .......................................................................................................................... 11

    2.36 Community Hall ..................................................................................................................... 11

    2.37 Convention centre/Exhibition centre ...................................................................................... 11

    2.38 Cottage industry .................................................................................................................... 11

    2.39 Chhajja .................................................................................................................................. 11

    2.40 Chowk / Courtyard ................................................................................................................. 11

    2.41 Combustible Material............................................................................................................. 12

    2.42 Contiguous Holding ................................................................................................................ 12

    2.43 Corridor ................................................................................................................................. 12

    2.44 Common Plot ......................................................................................................................... 12

    2.45 Cul-De-Sac ............................................................................................................................. 12

    2.46 Developer .............................................................................................................................. 13

    2.47 Development ......................................................................................................................... 13

    2.48 Dharmashala ......................................................................................................................... 13

    2.49 Disability ............................................................................................................................... 13

    2.50 Drain ..................................................................................................................................... 13

    2.51 Dwelling Unit ......................................................................................................................... 14

    2.52 Domestic waste water............................................................................................................ 14

    2.53 Drive-in cinema ...................................................................................................................... 14

    2.54 Emergency Lighting ................................................................................................................ 14

    2.55 Emergency Lighting system .................................................................................................... 14

    2.56 Enclosed Staircase .................................................................................................................. 14

    2.57 Escalator [Newly added] ........................................................................................................ 14

    2.58 Exhibition Hall ....................................................................................................................... 14

    2.59 Existing Development/Building/Use ....................................................................................... 15

    2.60 Exit ........................................................................................................................................ 15

    2.61 External Wall ......................................................................................................................... 15

    2.62 Escape Route ......................................................................................................................... 15

  • General Development Control Regulations (GDCR)

    MBSIRDA iii

    2.63 Escape lighting ....................................................................................................................... 15

    2.64 Fabrication Workshop ............................................................................................................ 15

    2.65 Farm House ........................................................................................................................... 15

    2.66 Fire and/or Emergency Alarm System ..................................................................................... 15

    2.67 Fire Lift .................................................................................................................................. 16

    2.68 Fire Proof Door ...................................................................................................................... 16

    2.69 Fire Pump .............................................................................................................................. 16

    2.70 Booster Fire Pump ................................................................................................................. 16

    2.71 Fire Resistance ....................................................................................................................... 16

    2.72 Fire Resistance Rating ............................................................................................................ 16

    2.73 Fire Separation ...................................................................................................................... 16

    2.74 Fire Service Inlet .................................................................................................................... 16

    2.75 Fire stairs ............................................................................................................................... 16

    2.76 Fire Stop ................................................................................................................................ 17

    2.77 Down Comer .......................................................................................................................... 17

    2.78 Dry Riser ................................................................................................................................ 17

    2.79 Fire Tower ............................................................................................................................. 17

    2.80 Pressurisation ........................................................................................................................ 17

    2.81 Smoke-stop door ................................................................................................................... 17

    2.82 Venting Fire ........................................................................................................................... 17

    2.83 Wet riser ............................................................................................................................... 17

    2.84 Floor ...................................................................................................................................... 17

    2.85 Floor Space Index (F.S.I.)/Floor Area Ratio (F.A.R.) .................................................................. 18

    2.86 Floor Area .............................................................................................................................. 18

    2.87 Front ..................................................................................................................................... 18

    2.88 Frontage ................................................................................................................................ 19

    2.89 Footing .................................................................................................................................. 19

    2.90 Foundation ............................................................................................................................ 19

    2.91 Fuel Filling and Service Stations .............................................................................................. 19

    2.92 Gamtal (Village Settlement) ................................................................................................... 19

    2.93 Garden .................................................................................................................................. 19

    2.94 Garden Restaurant ................................................................................................................. 19

    2.95 Golf Course ............................................................................................................................ 19

    2.96 Grey Water ............................................................................................................................ 20

    2.97 Ground Coverage ................................................................................................................... 20

  • General Development Control Regulations (GDCR)

    MBSIRDA iv

    2.98 Ground Level ......................................................................................................................... 20

    2.99 Garage-Private ....................................................................................................................... 20

    2.100 Garage-Public ........................................................................................................................ 20

    2.101 Guest House .......................................................................................................................... 20

    2.102 Guiding Floor Material ........................................................................................................... 20

    2.103 Habitable Room ..................................................................................................................... 20

    2.104 Hazardous Material ................................................................................................................ 20

    2.105 Headroom ............................................................................................................................. 21

    2.106 Height of Building .................................................................................................................. 21

    2.107 Height of a Room ................................................................................................................... 21

    2.108 Heavy Industry ....................................................................................................................... 21

    2.109 Home Occupation .................................................................................................................. 21

    2.110 Hostel .................................................................................................................................... 22

    2.111 Hotel ..................................................................................................................................... 22

    2.112 Laboratory ............................................................................................................................. 22

    2.113 Light Industry ......................................................................................................................... 22

    2.114 Lift ......................................................................................................................................... 22

    2.115 Lobby .................................................................................................................................... 22

    2.116 Loft ........................................................................................................................................ 22

    2.117 Logistics Hub .......................................................................................................................... 22

    2.118 Liquefied Petroleum Gas (LPG) Delivery Centre ....................................................................... 23

    2.119 Margin / Setback ................................................................................................................... 23

    2.120 Means of Egress ..................................................................................................................... 23

    2.121 Mezzanine Floor .................................................................................................................... 23

    2.122 Mixed use building ................................................................................................................. 24

    2.123 Multilevel parking .................................................................................................................. 24

    2.124 Multiplex Complex ................................................................................................................. 24

    2.125 Museum ................................................................................................................................ 24

    2.126 Neighbourhood Centre and Civic Centre ................................................................................. 24

    2.127 Natural Hazard ....................................................................................................................... 24

    2.128 Natural Hazard Prone Areas ................................................................................................... 24

    2.129 Non-Combustible ................................................................................................................... 25

    2.130 Non-Potable Water ................................................................................................................ 25

    2.131 Occupancy or Use .................................................................................................................. 25

    2.132 Occupant Load ....................................................................................................................... 25

  • General Development Control Regulations (GDCR)

    MBSIRDA v

    2.133 Occupiable Space ................................................................................................................... 25

    2.134 Occupier ................................................................................................................................ 25

    2.135 Open Space ............................................................................................................................ 25

    2.136 Operational Construction ....................................................................................................... 25

    2.137 Owner ................................................................................................................................... 26

    2.138 Parapet .................................................................................................................................. 26

    2.139 Parking Space ........................................................................................................................ 26

    2.140 Party Plot ............................................................................................................................... 27

    2.141 Partition ................................................................................................................................ 27

    2.142 Percolation Well .................................................................................................................... 27

    2.143 Permanent Open Air Space ..................................................................................................... 27

    2.144 Permission by competent authority ........................................................................................ 27

    2.145 Person ................................................................................................................................... 27

    2.146 Person on Record ................................................................................................................... 27

    2.147 Petroleum Products Retail Outlets .......................................................................................... 27

    2.148 Planetarium ........................................................................................................................... 28

    2.149 Playfield ................................................................................................................................ 28

    2.150 Plinth ..................................................................................................................................... 28

    2.151 Plinth Area ............................................................................................................................. 28

    2.152 Podium .................................................................................................................................. 28

    2.153 Porch ..................................................................................................................................... 29

    2.154 Poultry Farm .......................................................................................................................... 29

    2.155 Pre-treatment ........................................................................................................................ 29

    2.156 Prohibited Industrial Waste .................................................................................................... 29

    2.157 Public Library ......................................................................................................................... 29

    2.158 Public Purpose ....................................................................................................................... 29

    2.159 Refuge Area ........................................................................................................................... 30

    2.160 Registered Architect / Engineer / Structural Designer, Clerk of Works, Site Supervisor,

    Developer ......................................................................................................................................... 30

    2.161 Retention of Non-conforming Activity .................................................................................... 30

    2.162 Research Centre ..................................................................................................................... 30

    2.163 Restaurant ............................................................................................................................. 30

    2.164 Residential Use ...................................................................................................................... 31

    2.165 Road / Street ......................................................................................................................... 31

    2.166 Road / Street-Level or Grade .................................................................................................. 31

  • General Development Control Regulations (GDCR)

    MBSIRDA vi

    2.167 Road / Street Line .................................................................................................................. 31

    2.168 “Road Width” or “Width of Road / Street” .............................................................................. 31

    2.169 Roof Exit ................................................................................................................................ 31

    2.170 Row House ............................................................................................................................ 31

    2.171 Right-Of Way (ROW) .............................................................................................................. 31

    2.172 Rules ..................................................................................................................................... 31

    2.173 Salt pan ................................................................................................................................. 31

    2.174 School ................................................................................................................................... 32

    2.175 Self-Use Development ............................................................................................................ 32

    2.176 Service Road .......................................................................................................................... 32

    2.177 Septic Tank ............................................................................................................................ 32

    2.178 Sewerage system ................................................................................................................... 32

    2.179 Sewage .................................................................................................................................. 33

    2.180 Sewer .................................................................................................................................... 33

    2.181 Shop ...................................................................................................................................... 33

    2.182 Shopping Centre or Commercial Centre .................................................................................. 33

    2.183 Shopping Mall ........................................................................................................................ 33

    2.184 Special Investment Region ..................................................................................................... 33

    2.185 Skip Floor............................................................................................................................... 33

    2.186 Slum Rehabilitation ................................................................................................................ 34

    2.187 Smoke-Stop Door ................................................................................................................... 34

    2.188 Solar Park .............................................................................................................................. 34

    2.189 Solar Assisted water heating system ....................................................................................... 34

    2.190 Sports Complex ...................................................................................................................... 34

    2.191 Staircase ................................................................................................................................ 34

    2.192 Stair Cover ............................................................................................................................. 34

    2.193 Stairwell ................................................................................................................................ 34

    2.194 Storey .................................................................................................................................... 34

    2.195 Stub Street............................................................................................................................. 35

    2.196 Subdivisions ........................................................................................................................... 35

    2.197 Swimming Pool ...................................................................................................................... 35

    2.198 Temporary structure .............................................................................................................. 35

    2.199 Tenement .............................................................................................................................. 35

    2.200 Tenement Building and Ownership Flats ................................................................................. 35

    2.201 Theatre .................................................................................................................................. 35

  • General Development Control Regulations (GDCR)

    MBSIRDA vii

    2.202 Township ............................................................................................................................... 35

    2.203 Training Center ...................................................................................................................... 35

    2.204 Travel Distance / Skill Development Centre ............................................................................ 35

    2.205 Trunk Infrastructure ............................................................................................................... 36

    2.206 Use ........................................................................................................................................ 36

    2.207 Ventilation ............................................................................................................................. 36

    2.208 Waste .................................................................................................................................... 36

    2.209 Water Closet (W.C) ................................................................................................................ 36

    2.210 Water Course ......................................................................................................................... 36

    2.211 Water Course, Major .............................................................................................................. 36

    2.212 Water Harvesting ................................................................................................................... 36

    2.213 Waterbody or Talav or Pond or Lake ....................................................................................... 37

    2.214 Warehouse or Godown .......................................................................................................... 37

    2.215 Window ................................................................................................................................. 37

    2.216 Wood Workshop .................................................................................................................... 37

    2.217 Width of a Road / Street ........................................................................................................ 37

    2.218 Zoo ........................................................................................................................................ 37

    3. Procedure for Securing Development Permission ........................................................................... 38

    3.1 Application for Development Permission ................................................................................ 38

    3.2 Necessity of Obtaining Permission .......................................................................................... 38

    3.3 Development and constructions ............................................................................................. 38

    3.4 List of building works that do not require Development Permission ........................................ 38

    3.5 Scrutiny Fee ........................................................................................................................... 39

    3.6 Forms of Application .............................................................................................................. 40

    3.7 General Notation for Plan ...................................................................................................... 44

    3.8 Documents to be furnished with the Application .................................................................... 44

    3.9 Plans and Specifications to be prepared by Registered Architect / Engineer ............................. 45

    3.10 Rejection of Application ......................................................................................................... 45

    3.11 Cancellation of Development Permission ................................................................................ 45

    4. General Requirements for Development ........................................................................................ 46

    4.1 Margin and/or Setback .......................................................................................................... 46

    4.2 Development of land in the Development Area ...................................................................... 46

    4.3 Development Work to be in Conformity with the Regulations ................................................. 48

    4.4 Document at site ................................................................................................................... 48

    4.5 Inspection .............................................................................................................................. 48

  • General Development Control Regulations (GDCR)

    MBSIRDA viii

    4.6 General .................................................................................................................................. 49

    5. Decision of the Authority ............................................................................................................... 50

    5.1 Grant or Refuse of the Permission Application ........................................................................ 50

    5.2 Suspension of Permission ....................................................................................................... 51

    5.3 Grant of Development Permission .......................................................................................... 51

    5.4 Liability .................................................................................................................................. 52

    5.5 Responsibilities of the Applicant............................................................................................. 52

    5.6 Development without prior Legitimate Permission ................................................................. 52

    5.7 Deviation during course of Construction ................................................................................. 52

    6. Inspection ..................................................................................................................................... 53

    6.1 General Requirements ........................................................................................................... 53

    6.2 Procedure during Construction ............................................................................................... 53

    6.3 Occupancy Certificate ............................................................................................................ 54

    6.4 Illegal Occupation of Building ................................................................................................. 54

    6.5 Illegal Development ............................................................................................................... 55

    6.6 Development without Permission .......................................................................................... 55

    7. Occupancy Certificate .................................................................................................................... 56

    7.1 Application for Occupancy...................................................................................................... 56

    7.2 Issue of Occupancy Certificate ................................................................................................ 56

    8. Development Undertaken On Behalf Of Government ..................................................................... 57

    9. Registrations of Professionals ........................................................................................................ 58

    9.1 Application for Registration .................................................................................................... 58

    9.2 Revocation of Registration ..................................................................................................... 58

    9.3 Duties & Responsibilities ........................................................................................................ 58

    9.4 Appointment of Employees .................................................................................................... 66

    10. General Development and Building Requirements ...................................................................... 67

    10.1 Development Control ............................................................................................................. 67

    10.2 Open Spaces .......................................................................................................................... 67

    10.3 Sustainability ......................................................................................................................... 68

    10.4 Minimum Plot Sizes ............................................................................................................... 68

    10.5 Parking .................................................................................................................................. 69

    10.6 Plantation and Maintenance of Trees ..................................................................................... 74

    10.7 Distance from Water Course .................................................................................................. 75

    10.8 Drainage and Flood Prevention .............................................................................................. 75

    10.9 Design for Wind and Seismic Loads ......................................................................................... 77

  • General Development Control Regulations (GDCR)

    MBSIRDA ix

    10.10 Compound Walls and Gates ................................................................................................... 77

    10.11 General Building Requirements .............................................................................................. 78

    10.12 Recycle and Reuse of Water ................................................................................................... 89

    11. Fire prevention and safety ......................................................................................................... 90

    11.1 Requirement for Fire Safety Professionals in Buildings ............................................................ 90

    11.2 Applicability of Fire Prevention Provisions .............................................................................. 91

    11.3 Marginal Open Space ............................................................................................................. 93

    11.4 Corridors and Passageways .................................................................................................... 94

    11.5 Exit Requirements .................................................................................................................. 94

    11.6 Staircase ................................................................................................................................ 95

    11.7 Ramp ..................................................................................................................................... 97

    11.8 Lifts ....................................................................................................................................... 97

    11.9 Escape Lighting and Signages .................................................................................................. 99

    11.10 Fire Alarm System ................................................................................................................ 100

    11.11 Smoke and Fire Venting ....................................................................................................... 100

    11.12 Electrical Services for all buildings ........................................................................................ 100

    11.13 Electrical Sub‐station for all buildings ................................................................................... 101

    11.14 Emergency Power Supply for Buildings with height more than 45mts and Special Buildings ... 101

    11.15 Electric Supply and Installation for Buildings with height more than 25mts and Special

    Buildings ......................................................................................................................................... 101

    11.16 Lightning Arrester for Buildings with height more than 25mts ............................................... 102

    11.17 Service Ducts / Shafts for Buildings with height more than 25mts and Special Buildings ......... 102

    11.18 Ventilation for all Buildings .................................................................................................. 102

    11.19 Air‐conditioning ................................................................................................................... 102

    11.20 Boiler and Boiler‐room ......................................................................................................... 103

    11.21 Water Storage Tank ............................................................................................................. 103

    11.22 Fire Fighting System ............................................................................................................. 103

    11.23 Basement ............................................................................................................................ 105

    11.24 Refuge Area for Buildings with height more than 25 mts ....................................................... 105

    11.25 Skip Floor for Buildings with height more than 45 mts .......................................................... 106

    11.26 Control Room for Buildings with height more than 45 mts .................................................... 106

    11.27 Materials ............................................................................................................................. 106

    11.28 Fire Prevention and Safety Provisions during Construction .................................................... 106

    11.29 Fire Safety of Existing Buildings ............................................................................................ 107

    11.30 Classification of Buildings for Fire Prevention and Safety Provisions ...................................... 107

  • General Development Control Regulations (GDCR)

    MBSIRDA x

    12. Zoning Regulations .................................................................................................................. 108

    12.1 Introduction ........................................................................................................................ 108

    12.2 Residential Zone .................................................................................................................. 110

    12.3 Affordable Housing Zone ...................................................................................................... 113

    12.4 High Access Corridor ............................................................................................................ 115

    12.5 Mixed Use Corridor .............................................................................................................. 118

    12.6 Knowledge and IT Zone ........................................................................................................ 121

    12.7 Industrial Zone / MSIL & Automobile Anchor ........................................................................ 124

    12.8 Logistic Zone ........................................................................................................................ 126

    12.9 Village Buffer Zone ............................................................................................................... 128

    12.10 Recreation, Sports and Entertainment Zone .......................................................................... 130

    13. Development of Land and Sub-division Regulations .................................................................. 133

    13.1 Scope................................................................................................................................... 133

    13.2 General Requirements ......................................................................................................... 133

    13.3 Plan Requirements ............................................................................................................... 134

    13.4 Community Facilities and Open Spaces ................................................................................. 135

    13.5 Design Standards for Internal roads / Approach .................................................................... 135

    13.6 Design Standards for Lots ..................................................................................................... 138

    13.7 amalgamation and subdivision of building unit ..................................................................... 139

    13.8 Amalgamation and subdivision of building unit with existing structures ................................ 139

    13.9 Layout for Amalgamation and / or Subdivision of Building unit ............................................. 139

    13.10 Common Plot ....................................................................................................................... 139

    14. Development of Low Cost Housing ........................................................................................... 142

    14.1 Planning .............................................................................................................................. 142

    14.2 General Building Requirements ............................................................................................ 142

    14.3 Structural Requirements ...................................................................................................... 143

    14.4 Roads and Path Ways ........................................................................................................... 143

    14.5 Minimum Required Accommodation .................................................................................... 143

    15. Fuel Filling and Service Stations................................................................................................ 144

    15.1 Requirements of Filling Stations and Service Station ............................................................. 144

    15.2 Location ............................................................................................................................... 144

    15.3 Entry and Exit Considerations ............................................................................................... 145

    15.4 No basement shall be allowed. ............................................................................................. 145

    16. Control of Signs (Hoardings) and Outdoor Display Structures and Paging Tower and Telephone

    Tower and Outdoor Display Structures ................................................................................................ 146

  • General Development Control Regulations (GDCR)

    MBSIRDA xi

    16.1 Documents and Fees Required with Application forAdvertising Display & Communication

    Infrastructures ................................................................................................................................ 146

    16.2 Design and Size .................................................................................................................... 147

    16.3 Hoardings in Marginal Space ................................................................................................ 147

    16.4 Hoardings on Roof tops / Terrace ......................................................................................... 148

    16.5 Hoardings on Public Roads ................................................................................................... 148

    16.6 Prohibited Signs ................................................................................................................... 148

    16.7 General Restrictions ............................................................................................................. 149

    16.8 Wall Signs ............................................................................................................................ 149

    16.9 Projecting Signs.................................................................................................................... 150

    16.10 Signs In Urban Renewal Project Areas ................................................................................... 150

    16.11 Historic Buildings ................................................................................................................. 150

    16.12 Telecommunication Infrastructure (Paging, Cellular Mobiles, ‘V’ Sat., MTNL Etc.) .................. 150

    16.13 Control Sign Board ............................................................................................................... 151

    17. Mining, Quarrying and Brick Kiln .............................................................................................. 152

    18. Applicability of Regulations ...................................................................................................... 153

    18.1 General ................................................................................................................................ 153

    18.2 Addition or Extension to a Building ....................................................................................... 153

    18.3 Safe-guard Against Reduction of Open Spaces ...................................................................... 153

    18.4 Maintenance of Buildings ..................................................................................................... 153

    19. Facilities for Physically Handicapped Persons ........................................................................... 155

    19.1 Short Title, Extent & Commencement ................................................................................... 155

    19.2 Definitions ........................................................................................................................... 155

    19.3 Scope................................................................................................................................... 155

    19.4 Site Development ................................................................................................................ 155

    19.5 Building Requirements ......................................................................................................... 156

    19.6 Explanatory Notes ................................................................................................................ 159

    20. Heritage Regulations ............................................................................................................... 161

    20.1 Applicability ......................................................................................................................... 161

    20.2 Restriction on Development / Redevelopment / Repairs Etc. ................................................ 161

    20.3 Preparation of List of Heritage Buildings, Heritage Precincts and Listed Natural Features ....... 161

    20.4 Power to Alter, Modify or Relax Other General Development Control Regulations ................ 162

    20.5 Special Regulations for Listed Heritage Precincts ................................................................... 162

    20.6 Applicability of Development Proposals to Listed Heritage Building Listed Heritage Precincts 163

    20.7 Incentive Uses for Listed Heritage Buildings .......................................................................... 163

  • General Development Control Regulations (GDCR)

    MBSIRDA xii

    20.8 Creation of New Incentives for Heritage Conservation .......................................................... 163

    20.9 Maintaining Skyline and Architectural Harmony ................................................................... 163

    20.10 Restrictive Covenants ........................................................................................................... 164

    20.11 Grading of the Listed Heritage Buildings / Listed Heritage Precincts ....................................... 164

    20.12 Demolition / Reconstruction / Alteration .............................................................................. 165

    20.13 Exterior Design and Height of Buildings ................................................................................ 165

    20.14 Composition of Heritage Conservation Committee ................................................................ 165

    20.15 Provision of Letter Box ......................................................................................................... 168

    21. Regulations for Special Structures ............................................................................................ 169

    21.1 General Requirements ......................................................................................................... 169

    21.2 Fire-protection: General ....................................................................................................... 172

    21.3 Fire Escape Exits ................................................................................................................... 173

    21.4 Individual Fire Escape Exits at Each Floor .............................................................................. 174

    21.5 Structural Safety: General .................................................................................................... 175

    21.6 Building Services .................................................................................................................. 178

    21.7 Communication Devices ....................................................................................................... 178

    21.8 Renewable Energy Devices ................................................................................................... 179

    21.9 Public Safety ........................................................................................................................ 179

    22. Pollution Control ..................................................................................................................... 180

    22.1 Air Pollution......................................................................................................................... 180

    22.2 Water Pollution ................................................................................................................... 180

    22.3 Noise Pollution .................................................................................................................... 180

    22.4 Industrial Pollution .............................................................................................................. 180

    23. Supplemental and Miscellaneous Provisions ............................................................................ 181

    23.1 Interpretation ...................................................................................................................... 181

    23.2 Discretionary Powers ........................................................................................................... 181

    23.3 Appeal Committee ............................................................................................................... 181

    24. Penalties ................................................................................................................................. 182

    25. Relaxation ............................................................................................................................... 183

    25.1 In Case of Public Ownership ................................................................................................. 183

    25.2 In Case of Private Ownership ................................................................................................ 183

    25.3 In Case of Existing Building Units .......................................................................................... 183

    26. Regulations for Residential Township ....................................................................................... 184

    26.1 Short Title, Extent and Commencement ................................................................................ 184

    26.2 Applicability ......................................................................................................................... 184

  • General Development Control Regulations (GDCR)

    MBSIRDA xiii

    26.3 Definition ............................................................................................................................ 184

    26.4 Duties of the Prescribed Officer: ........................................................................................... 185

    26.5 State Level Screening Committee: ........................................................................................ 186

    26.6 Procedure to Notify any Area ............................................................................................... 186

    26.7 Procedure for Securing the Permission ................................................................................. 186

    26.8 Contents of the Township Proposals ..................................................................................... 186

    26.9 Public Purpose Infrastructure ............................................................................................... 187

    26.10 Socially & Economically Weaker Section Housing (SEWH) and Other Infrastructure ............... 187

    26.11 Physical Planning Parameters; .............................................................................................. 187

    26.12 Responsibilities of the Township Developer .......................................................................... 188

    26.13 Grant / Refusal of the Permission: ........................................................................................ 189

    26.14 Floor Area Ratio ................................................................................................................... 189

    26.15 Built-Up Area and Height:..................................................................................................... 189

    26.16 Zoning, Ground Coverage & Other Regulations ..................................................................... 190

    26.17 Development of External (Offsite Infrastructure) .................................................................. 190

    26.18 Supervision and Monitoring Of the Quality of Construction ................................................... 190

    26.19 Grievance Redressal: ............................................................................................................ 190

    27. Regulations for the Rehabilitation and Redevelopment of the Slums ........................................ 193

    27.1 Short Title, Extent and Commencement ................................................................................ 193

    27.2 Applicability ......................................................................................................................... 193

    27.3 Definitions ........................................................................................................................... 193

    27.4 Prescribed Authority ............................................................................................................ 195

    27.5 Functions of the Slum Rehabilitation Committee (SRC) ......................................................... 195

    27.6 Notification of the Slum Area ............................................................................................... 195

    27.7 Notification of the Slum Rehabilitation Zone ........................................................................ 195

    27.8 Contents of a Rehabilitation Scheme .................................................................................... 196

    27.9 Duties of the Scheme Developer ........................................................................................... 196

    27.10 Procedure for Securing the Permission: ................................................................................ 196

    27.11 Grant or Refusal of the Permission: ...................................................................................... 197

    27.12 Planning Regulations for Rehabilitation Scheme ................................................................... 198

    27.13 Rehabilitation of the Project Affected Persons and Other Eligible Slum Dwellers ................... 199

    27.14 Regulations for Allotment .................................................................................................... 199

    27.15 External Development Charges ............................................................................................. 199

    27.16 De-Notification of Slums ...................................................................................................... 199

    27.17 Effect of Other Zones and Regulations; ................................................................................. 200

  • General Development Control Regulations (GDCR)

    MBSIRDA xiv

    27.18 Supervision and Monitoring of the Quality of Construction ................................................... 200

    27.19 Grievance Redressal ............................................................................................................. 200

    28. Grey Water Reuse .................................................................................................................... 201

    28.1 Byelaws for MBSIRDA (The Grey Water Recycling and Reuse Byelaws) .................................. 201

    28.2 Definitions ........................................................................................................................... 201

    28.3 Section – I: Grey Water Reuse Byelaws ................................................................................. 204

    28.4 Section – II: Water incentive Byelaws ................................................................................... 207

    29. Draft Regulations for Control of Pollution due to Sewage / Industrial Waste Water in Mandal

    Becharaji Special Investment Region ................................................................................................... 210

    30. Special Regulations for Hospital ............................................................................................... 216

    30.1 Short Title, Extent and Commencement ................................................................................ 216

    30.2 Applicability ......................................................................................................................... 216

    30.3 Definition ............................................................................................................................ 216

    30.4 Duties of MBSIRDA: ............................................................................................................. 217

    30.5 Procedure for Securing the Permission: ................................................................................ 217

    30.6 Planning Provision ............................................................................................................... 218

    30.7 Structure Safety ................................................................................................................... 221

    30.8 Miscellaneous Provisions ..................................................................................................... 221

    30.9 Special Planning Provisions (SPP) Where 4.0 or More FAR Is Granted: ................................... 221

    30.10 Special Regulations for Hotel ................................................................................................ 231

    30.11 Short Title Extent and Commencement ................................................................................. 231

    30.12 Applicability ......................................................................................................................... 231

    30.13 Definition ............................................................................................................................ 231

    30.14 Duties of the MBSIRDA:........................................................................................................ 232

    30.15 Procedure for Securing the Permission: ................................................................................ 232

    30.16 Planning Provisions .............................................................................................................. 232

    30.17 Structure Safety ................................................................................................................... 235

    30.18 Miscellaneous Provisions ..................................................................................................... 235

    APPENDICES ....................................................................................................................................... 243

    31. Appendices .............................................................................................................................. 244

    Appendix A: Classification of Industries ........................................................................................... 244

    Appendix B: Protection of Buildings, Structures and Infrastructures in Hazard Prone Areas ............... 249

    Appendix C: Guideline for Determination of Industrial Plot Sizes ...................................................... 251

    Appendix D: Forms .......................................................................................................................... 252

  • General Development Control Regulations (GDCR)

    MBSIRDA xv

    List of Figures

    2.11-1 (Atrium).............................................................................................................................................. 3

    2.17-1 (Basement) ......................................................................................................................................... 4

    2.20-1 (Building Line) .................................................................................................................................... 8

    2.21-1 (Build-to-line) ..................................................................................................................................... 8

    2.22-1(Building Unit) ..................................................................................................................................... 8

    2.23-1 (Building Unit Area) ........................................................................................................................... 9

    2.25-1 (Built up Area) .................................................................................................................................... 9

    2.26-1 (Unit Built up Area) .......................................................................................................................... 10

    2.29-1 (Carpet Area) ................................................................................................................................... 10

    2.42-1 (Contiguous Holding) ....................................................................................................................... 12

    2.43-1 (Corridor) ......................................................................................................................................... 12

    2.87-1 (Front) .............................................................................................................................................. 19

    2.107-1(Height of a Rooom) ....................................................................................................................... 21

    2.119-1 (Margin) ......................................................................................................................................... 23

    2.121-1 (Mezzanine Floor) .......................................................................................................................... 23

    2.123-1 (Multilevel Parking)........................................................................................................................ 24

    2.138-1 (Parapet) ........................................................................................................................................ 26

    2.139-1 (Parking space) ............................................................................................................................... 26

    2.150-1(Hollow plinth) ................................................................................................................................ 28

    2.153-1 (Porch) ........................................................................................................................................... 29

    2.159-1 (Refuge Area) ................................................................................................................................. 30

    2.185-1 (Skip Floor) ..................................................................................................................................... 33

    2.192-1 (Stair Cover) ................................................................................................................................... 34

    2.2044-1 (Travel Distance) .......................................................................................................................... 36

    10.5-1(Parking in Margin) ........................................................................................................................... 72

    10.11-1 (Margin for Basement) .................................................................................................................. 80

    10.11-2 (Height of Basement) ..................................................................................................................... 80

    10.11-3, (Percolating well For the area of building unit above 500sqm and upto 1500sqm) .................... 88

    10.11-4, (Percolating well For all building units with area more than 1000 sqm) ..................................... 88

    12.1-1, (Proposed Land Use, MBSIR) ........................................................................................................ 109

    13.5-1, (Internal road and approach to building) ..................................................................................... 136

    19.4-1, (Parking) ........................................................................................................................................ 156

    19.5-1, (Ramp) .......................................................................................................................................... 157

    19.5-2, (Exit / Entrance Door) ................................................................................................................... 157

    19.5-3, (Exit / Entrance for the handicapped) .......................................................................................... 158

    19.5-4, (Stair Ways) ................................................................................................................................... 158

    19.5-5, (Toilets & Drinking water for handicapped) ................................................................................. 159

    28.4-1: (Conceptual Grey Water Recycle system proposed under Bye-laws) .......................................... 209

  • General Development Control Regulations (GDCR)

    MBSIRDA xvi

    List of Tables

    Table 3-1 : Notation for Plan ...................................................................................................................... 44

    Table 4-1: Electrical Lines ........................................................................................................................... 47

    Table 10-1: Minimum plot sizes for buildings ............................................................................................ 68

    Table 10-2: Equivalent Car Space ............................................................................................................... 70

    Table 10-3: Standard for Minimum Parking Requirements by Building Use .............................................. 70

    Table 10-4: Planting Strip requirements for street trees ........................................................................... 75

    Table 10-5: Elevators (Lifts) ........................................................................................................................ 78

    Table 10-6: Wall thicknesses for load bearing buildings ............................................................................ 79

    Table 10-7: Minimum clear corridor widths for buildings .......................................................................... 81

    Table 10-8: Sanitary accommodation ......................................................................................................... 82

    Table 10-9: Minimum width of common Stairway/Corridors for occupancies .......................................... 84

    Table 10-10: Staircase level ........................................................................................................................ 85

    Table 11-1: Applicability of the fire safety professionals for buildings ...................................................... 90

    Table 11-2: Fire prevention and safety provisions requirement in buildings ............................................ 91

    Table 11-3: Marginal Open Space ............................................................................................................... 93

    Table 11-4: Corridors and Passageways ..................................................................................................... 94

    Table 11-5: Additional Staircase ................................................................................................................. 96

    Table 12-1: Development Control Regulations for Residential Zone ....................................................... 111

    Table 13-1: Street Right-of-Way Standards .............................................................................................. 136

    Table 13-2: Curves at the junction ............................................................................................................ 138

    Table 15-1: Filling Stations and Service Station ........................................................................................ 144

    Table 16-1 Hordings in Marginal Space .................................................................................................... 147

    Table 16-2: Hoardings on Roof tops / Terrace.......................................................................................... 148

    Table 16-3:Hoardings on Public Roads ..................................................................................................... 148

    Table 16-4: Control Sign Board ................................................................................................................. 151

    Table 20-1: Grades and basic guidelines for Heritage Buildings .............................................................. 164

    Table 20-2:Composition of Heritage Conservation Committee ............................................................... 166

    Table 20-3: Criteria for listing of Heritage sites ........................................................................................ 167

    Table 26-1: Prescribed Officer .................................................................................................................. 185

    Table 26-2: Members of the Committee .................................................................................................. 186

    Table 26-3: Additional Premium FAR ........................................................................................................ 189

  • GENERAL DEVELOPMENT CONTROL RREGULATIONS

  • General Development Control Regulations (GDCR)

    MBSIRDA 1|P a g e

    1. Preamble

    In pursuance of the provisions contained in clause (a) of sub-section (4) of section 15 and section 17 of The

    Gujarat Special Investment Region Act-2009 and Clause (m) of sub-section (2) of section 12 and clause (c) of

    sub-section (2) of section 13 of The Gujarat Town Planning and Urban Development Act-1976, the Mandal

    Becharaji Special Investment Regional Development Authority (Hereinafter referred as MBSIRDA) hereby

    makes the following Regulations:

    1.1 Short Title, Extent and Commencement

    1.1.1 Short Title

    These regulations may be called the General Development Control Regulations of the Final

    Development Plan 2040 of MBSIRDA.

    These Regulations shall come into force on and from the date prescribed in the notification of the

    sanction of the revised General Development Control Regulations.

    1.1.2 Applicability

    Subject to the provision of The Gujarat Special Investment Region Act-2009 and The Gujarat Town

    Planning and Urban Development Act-1976, these Regulations shall apply to all the developments in

    the Mandal Becharaji Special Investment Regional Development Authority area notified under section 3

    and section 4 of the Act-2009 vide Notification No. GHU/12/23/SIR/112012/1276/I Dated 1st Oct, 2012

    by Industries and Mine Department of Government of Gujarat, as may be modified or amended from

    time to time.

    1.1.3 Repeal

    The General Development Control Regulation of Mandal Becharaji Special Investment Region

    (hereinafter referred as MBSIR) sanctioned on 10th September, 2012 is hereby Modified, Revised and

    Replaced by these Regulations.

    1.1.4 Savings

    Notwithstanding such modification and revision anything done or any action taken under theregulations in

    force prior to such modification shall be deemed to be valid and continue to be so valid, unless otherwise

    specified.

  • General Development Control Regulations (GDCR)

    MBSIRDA 2|P a g e

    2. Definitions

    In these regulations, unless the context otherwise requires, the terms and expressions defined as follows

    shall have the meaning indicated against each of them.

    The terms and expressions not defined in these regulations shall have the same meanings as in The Gujarat

    Special Investment Region Act-2009 and The Gujarat Town Planning & Urban Development Act, 1976 or

    Local Acts and the rules framed there under or as mentioned in National Building Code (NBC)as the case

    may be, unless the context otherwise requires.

    2.1 Act

    Means the Gujarat Special Investment Region Act 2009 and The Gujarat Town Planning and Urban

    Development Act, 1976, hereinafter referred as the Act, 2009 and Act, 1976 respectively.

    2.2 Adaptive Reuse

    Means a method of preservation where a building/structure/open space retains its signature visual

    elements, but the structure/space is used for a purpose other than originally intended.

    2.3 Additions And /Or Alterations

    Means any change in existing authorized building or change from one use to another use, or structural

    change such as additions to the area or height, or the removal of part of a building, or change to the

    structure such as the construction or cutting into or removal of any wall or part of a wall, partition, column,

    beam, joist, floor including a mezzanine floor or other support or a change to or closing of any required

    means of ingress or egress or a change to fixtures or equipments, as provided in these regulations. The

    addition to any existing structure shall only be permitted if it complies with the current relevant provisions

    of the GDCR.

    2.4 Advertising Display Infrastructure/Sign/Hoarding

    Means any surface or a structure with character, letter or illustration, applied there to and displayed in any

    manner whatsoever out of doors for the purpose of advertising or giving information regarding or to attract

    the people to any place, person, public performance, article or merchandise, and which surface or structure

    is attached to, forms part of, or is connected with any building or is fixed to a tree or to the ground or to

    any pole, screen, fences displayed in any space or in or over any water body

    2.5 Agricultural Use

    Means use of land for the purpose of the agriculture, horticulture, sericulture, animal husbandry, poultry

    farming, plant nursery, piggery, dairy farming, vegetable farming, any activity related to agriculture or milk

    chilling plant.

    2.6 Air-Conditioning

    Means the process of altering the properties of air such as its temperature, humidity and quality to meet

    the requirement of an enclosed space.

  • General Development Control Regulations (GDCR)

    MBSIRDA 3|P a g e

    2.7 Amenities

    Means roads, streets, railways, open spaces, parks, recreational grounds, play-grounds, gardens, water

    supply, electric supply, street lighting, drainage, sewerage, gas network, information and communication

    technology, public works and other utilities, over and underground broad casting and communication

    network, surface and convenience, etc.

    2.8 Amusement Park

    Means a large outdoor and/or indoor area with fairground rides, shows, refreshments, games of chance or

    skill and other entertainment.

    2.9 Apartments or Flats

    Means residential building constructed in a detached or semi-detached manner being designed as ground

    floor with more upper floors and co