manchester bridge design-build industry meeting january 8, 2013
DESCRIPTION
Manchester Bridge Design-Build industry Meeting January 8, 2013. Project Team. Susan Barry, Project Director Brian Burger, Deputy Project Director James Martin Mike Landvik Kevin Irving, FHWA. Aerial view. Project Description. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/1.jpg)
1
MANCHESTER BRIDGEDESIGN-BUILD
INDUSTRY MEETINGJANUARY 8, 2013
![Page 2: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/2.jpg)
2
Project Team
Susan Barry, Project Director Brian Burger, Deputy Project Director James Martin Mike Landvik Kevin Irving, FHWA
![Page 3: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/3.jpg)
3
Aerial view
![Page 4: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/4.jpg)
4
Project Description
Rehabilitation/reconstruction of the twin bridges (L0967) on I-70
Reconstruction of historic Blue River bridge (J0526) on US 40
Minimal impacts to traffic Potential additional scope
![Page 5: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/5.jpg)
5
Project Goals
1. Impress our customers through innovative solutions that conveniently and efficiently move drivers through the project during and after construction.
2. Construct durable structures that minimize future maintenance impacts.
3. Balance regional mobility with total project cost to achieve optimal value.
4. Deliver the project no later than December 15, 2016.
![Page 6: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/6.jpg)
6
Design-Build Model
Set Goals Two Phased Procurement Confidential Meetings Final Proposals Evaluation / Award
![Page 7: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/7.jpg)
7
Cost
$58.7 Million in STIP for Conventional Construction Methods
Balance mobility with cost
![Page 8: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/8.jpg)
8
Flexibility
Additional Applicable Standards Quality Management Plan Utility Coordination Safety Plan Co-location Contractor/MoDOT team
![Page 9: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/9.jpg)
9
Risk Allocation
MoDOT is proactively working on these risk items:
Acquisition of Temporary Construction Easement
Utility relocation Third party agreements Railroad Grade Separation Agreements Beazer RCRA site Historic Blue River bridge
![Page 10: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/10.jpg)
10
Aerial view
![Page 11: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/11.jpg)
11
Procurement ScheduleItem Date
Issue RFQ January 8, 2013
Deadline for submitting RFQ questions January 21, 2013 (2:00 pm CST)
Final responses to questions posted & Final RFQ Addendum issued
January 25, 2013
SOQ due February 8, 2013 (2:00 pm CST)
MoDOT notifies short-listed Submitters February 22, 2013
Issue RFP February 26, 2013
Final Proposal and Price Allocation due Early June 2013
![Page 12: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/12.jpg)
12
Disadvantaged Business Enterprise
12% for construction activities 18% for professional/design activities
DBE firms must be certified with the Missouri Regional Certification Committee (MRCC)http://www.modot.mo.gov/business/contractor_resources/External_Civil_Rights/DBE_program.htm
![Page 13: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/13.jpg)
13
Workforce goals
Federal workforce goals apply to project12.7% minority6.9% female
Goals apply per craft On-The-Job training goals will apply if
workforce goals aren’t met per craft.
![Page 14: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/14.jpg)
14
Project Contacts
Project Director – Susan [email protected]
816-607-2206
External Civil Rights Director - Lester [email protected]
573-751-2859
www.modot.org/ManchesterBridge
![Page 15: Manchester Bridge Design-Build industry Meeting January 8, 2013](https://reader030.vdocuments.site/reader030/viewer/2022032605/56812b9b550346895d8fbef6/html5/thumbnails/15.jpg)
15
Questions???