managing rising mine water to prevent aquifer pollution
TRANSCRIPT
Managing rising mine water to
prevent aquifer pollution
Dr Ian Watson
The Coal Authority
East of Wear Mining Block
Horden
Dawdon
Easington
Minewater flow
Minewater flow
River
Wear
2002: Rising Minewater Levels
Water Level Projections for Sites East of Wear
0
50
100
150
200
250
300
350
400
450
Jun-94 Jun-95 Jun-96 Jun-97 Jun-98 Jun-99 Jun-00 Jun-01 Jun-02 Jun-03 Jun-04 Jun-05 Jun-06 Jun-07 Jun-08 Jun-09 Jun-10
Date
Wate
r L
evel
(mB
GL
)
-387
-337
-287
-237
-187
-137
-87
-37
13
63
Wate
r L
evel
(mA
OD
)
Horden (2) Horden Projected Water Level Ordnance Datum Line
Sea Level
Projection
showing impacts
starting from
2004
26 May 2011 4
The Pollution Threat in East Durham
Deep Coastal
Shaft
Colliery Beach
Adit
River Wear Inland
Permian Magnesian Limestone Aquifer
Carboniferous Coal Measures
North Sea
26 May 2011 5
Key Contaminants
Predictions made from :
Water quality during mining
Samples from shafts during rebound
Iron - up to 200 mg/l
Salinity - Hypersaline
Chlorides - 20,000 to 30,000 mg/l
Sulphate – 3,000 to 5,000 mg/l
26 May 2011 6
Source Protection Zones
Horden
Dawdon
Permian Magnesian
Limestone Aquifer
c. 36 Million Litres /
day abstracted by
Northumbrian Water
Ltd:
150,000 people rely
on this major aquifer
for drinking water
26 May 2011 7
Possible Impacts
Coastal
Pollution
Aquifer
Pollution River
Pollution
Horden Control of Water Levels
Water Levels for East of Wear - Coastal
-130
-110
-90
-70
-50
-30
-10
10
Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08
Date
Wate
r L
evel (m
AO
D)
Daw don Easington Horden Haw thorn
Pumping commenced August 2004
Horden Temporary Active Treatment Scheme
Horden Temporary Active Treatment Scheme
Horden Shaft Water Profile
Salinity and Iron
increase with
pumpingDEPTH DOWN SHAFT
Salinity and Iron
increase with
Depth
Horden Pumped Water Quality
Salinity and Iron
increase as
pumping increase
from c50 l/s to
c100 l/s
Hydraulic Control Risks
Horden
Dawdon
Easington
Minewater flow
Minewater flow
?
River
Wear
Single Roadway Connection
- Recorded as dammed
- Currently flowing freely
- Could become restricted or blocked
- Horden would not be able to control
the whole area.
26 May 2011 14
Proposed Two Site Strategy
Main pump/treat site at DawdonFor hydraulic control North of Ludworth Dyke
Dawdon shaft is deeper than Horden
Expect worse quality mine water
Higher chlorides, iron etc.
Active treatment technology to remove Iron
150 l/s capacity
Secondary pump/treat site at HordenExisting 100 to 150 l/s capacity temporary active plant
Chlorides high due to high pumping rate
Reduce to 50 l/s when Dawdon on stream
If chlorides reduce replace with passive plant
Settling lagoons and reed beds
26 May 2011 15
Twin Sea Outfalls
Transfer Pipelines
Treatment Plant
Existing Shaft (Pumps & Controls)
Cross section of sea outfall
26 May 2011 16
Treatment Layout
Blower RoomTransformers,
Panels and
Control Room Workshop/lab
Lime
Silo
Sludge Thickening and
Disposal
(Filter-press)Clarifier Clarifier Clarifier
Stage 2
Reactor
Stage 2
Reactor
Stage 2
Reactor
Sludge
Holding
Tank
Stage 1
ReactorStage 1
ReactorStage 1
Reactor
Sludge
Holding
Tank
De-
Gassing
Tank
De-
Gassing
Tank
De-
Gassing
Tank
Polymer
Make-up Area
Mixed Lime
Holding
Tank
Lime Mixing Tanks
Outlet
Tank
Process
water
stock
1 2 3
26 May 2011 17
Process Construction
Multi disciplinary project
Over 30 different sub-contractors
Complex programming
26 May 2011 18
Short Sea Outfall
Coastal Modelling:
Dispersion Modelling and Sea Bed Survey
Directional Drilling - from cliff top to sea bed
26 May 2011 19
Pumping at Dawdon
Dawdon
Starts
pumping
Control
throughout
coalfield
confirmed
26 May 2011 20
Status in 2008
Preventing Aquifer Pollution by:
2 Active Pump & Treat schemes:
Horden Temporary
Dawdon
Final Phase:
Replace Horden active with Passive
New Lagoons and reedbeds
Reedbeds depend on decreased Chloride
26 May 2011 21
Horden Quality 2004-2010
Salinity and Iron
peaked and
decreased, as
pumping
decreased from
c100 l/s to c50 l/s
26 May 2011 22
Shaft &
Cascade
Outlet Point
Settlement
Lagoons
Reedbeds
26 May 2011 23
Horden/Dawdon Timetable
June 2004 Horden active plant operational
Nov 2008 Dawdon active plant operational 150 l/s
Reduce Horden rate to ~50 l/s
2010 Commence construction of Horden passive plant
2011 Horden passive plant operational
Dismantle Horden active plant
26 May 2011 24
Horden Passive
forming of lagoon cells
26 May 2011 25
Horden Passive
- Lining the cells
26 May 2011 26
Aerial View May 2011
Treatment Area = 1.7 ha
26 May 2011 27
Morlais, South Wales
at commissioning
26 May 2011 28
Summary
Pumping at 2 sites
Dawdon Active treatment for:
High flows of poor quality water
Horden Passive treatment for:
Smaller flows of better quality water
Drinking Water Aquifer protected