  • KP4 Seminar Managing Ageing Assets via ALE OGRE

    28th May 2014

  • Agenda/Topics Covered

    Asset Overview

    Operating Management System

    MAH Management via Asset Integrity & ALE Process

    ALE Process and OGRE Assessment Tool Asset Integrity Rectification Programme

    2

  • Asset Overview

  • Operating Management System

    4

  • Operating Management System

    5

  • MAH Management via Asset Integrity & ALE Processes

    6

    Asset Safety CasesJustification for safe operation, minimise risk from

    Major Accident HazardsThrough identification of

    Safety Critical Elements (SCE)And establishing

    Performance StandardsOn which to base effective

    Integrity AssuranceWhich is required for independent

    Verification To demonstrate

    SCEs IntegrityIn support of the safety cases

  • MAH Management via Asset Integrity & ALE Processes

    7

    A

    gein

    g &

    Obs

    oles

    cenc

    e

    Asset Safety CasesJustification for safe operation, minimise risk from

    Major Accident HazardsThrough identification of

    Safety Critical Elements (SCE)And establishing

    Performance StandardsOn which to base effective

    Integrity AssuranceWhich is required for independent

    Verification To demonstrate

    SCEs IntegrityIn support of the safety cases

    UK-00554 Asset Integrity Process

  • MAH Management via Asset Integrity & ALE Processes

    8

    A

    gein

    g &

    Obs

    oles

    cenc

    e

    Life

    Ext

    ensi

    on

    Asset Safety CasesJustification for safe operation, minimise risk from

    Major Accident HazardsThrough identification of

    Safety Critical Elements (SCE)And establishing

    Performance StandardsOn which to base effective

    Integrity AssuranceWhich is required for independent

    Verification To demonstrate

    SCEs IntegrityIn support of the safety cases

    UK-00554 Asset Integrity Process

    UK-00555 Asset Life Extension

    Process

  • Asset Life Extension Process

    9

    Life

    Ext

    ensi

    on

    UK-00555 Asset Life Extension

    Process

    Goal; Demonstrate fitness for purpose & suitability of

    an asset for specified Life Extension period

    By; Identifying ageing, obsolescence and life

    extension issues via systematic assessment (OGRE)

    Fully supporting Safety Case Thorough Review requirements

    Providing key inputs to Basis of Design documents allowing for planning & execution of identified actions

  • 10

    Oil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managed

    Identifies issues associated with maintaining fitness for purpose of an asset for a specified Life Extension period

    Facilitator led assessment carried out by multi-functional team reviewing ~60 ALE considerations against all SCE, BCE and ECEs

    Prioritise issues/gaps:

    Red Process/procedure gap and condition issues Amber Condition issues only Green No gaps/issues

    Issues/gaps validated against ALE strategy of Maintain; Repair; Replace; Remove criteria

    Defined scopes implemented via Asset Integrity Rectification Programme

    Ageing is not about how old your equipment is; its about what you know about its condition, and how thats changing over time

  • 11

    Oil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managed

    Asset Life Extension Considerations Plant & Equipment History & Information ; Programmes & Procedures; Degradation Mechanisms; ALE Strategy

    SCE

    s; B

    CEs;

    ECE

    s

  • SNS Asset Integrity Rectification Programme

    Ensures Asset & Operating Integrity fitness for purpose is maintained through to the end of field life

    Programme commenced mid 2012 with scopes executed via 106POB walk-to-work barge over ~ 60-80 day duration per asset

    Key focus areas/workscopes derived from ALE/OGRE process output combined with existing prioritised defects (100% P1 P2; X% P3) Decommissioning / Rationalisation of redundant equipment Construction Fabric Maintenance / Tertiary Steel Scope Fabric Maintenance (blasting & painting) Obsolescence

    LOS Microwave System, UPS, Navaids, etc Maintenance

    Power Generation, Crane, etc

    12

  • GMS Endurance at SNS NUI

    13

  • Asset Integrity Rectification Programme Status

    Completed Ongoing

  • Asset Integrity Rectification Programme Key Stats

    4 satellite scopes completed over 21 month period (>300,000 man hours)

    Completed circa 1300 workscopes

    Replaced 12 obsolete systems (UPS, NAVAID & LOS) from each asset

    1 Helideck replacement carried out

    Removed circa 480Te of redundant steel

    Replaced 3.75km of Unistrut

    5000 litres of paint applied

    527Te scaffolding erected/dismantled

  • Helideck Removal/Replacement

    16

  • Plant Optimisation

    17

  • Rationalisation of Process Plant

    18

  • Wellhead/Tree Fabric Maintenance

    KP4 SeminarManaging Ageing Assets via ALE OGRE Agenda/Topics CoveredAsset OverviewOperating Management System Operating Management System MAH Management via Asset Integrity & ALE Processes MAH Management via Asset Integrity & ALE Processes MAH Management via Asset Integrity & ALE Processes Asset Life Extension Process Oil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managedOil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managedSlide Number 12GMS Endurance at SNS NUIAsset Integrity Rectification Programme Status Asset Integrity Rectification Programme Key Stats Helideck Removal/ReplacementPlant Optimisation Rationalisation of Process PlantWellhead/Tree Fabric Maintenance