KP4 Seminar Managing Ageing Assets via ALE OGRE
28th May 2014
-
Agenda/Topics Covered
Asset Overview
Operating Management System
MAH Management via Asset Integrity & ALE Process
ALE Process and OGRE Assessment Tool Asset Integrity Rectification Programme
2
-
Asset Overview
-
Operating Management System
4
-
Operating Management System
5
-
MAH Management via Asset Integrity & ALE Processes
6
Asset Safety CasesJustification for safe operation, minimise risk from
Major Accident HazardsThrough identification of
Safety Critical Elements (SCE)And establishing
Performance StandardsOn which to base effective
Integrity AssuranceWhich is required for independent
Verification To demonstrate
SCEs IntegrityIn support of the safety cases
-
MAH Management via Asset Integrity & ALE Processes
7
A
gein
g &
Obs
oles
cenc
e
Asset Safety CasesJustification for safe operation, minimise risk from
Major Accident HazardsThrough identification of
Safety Critical Elements (SCE)And establishing
Performance StandardsOn which to base effective
Integrity AssuranceWhich is required for independent
Verification To demonstrate
SCEs IntegrityIn support of the safety cases
UK-00554 Asset Integrity Process
-
MAH Management via Asset Integrity & ALE Processes
8
A
gein
g &
Obs
oles
cenc
e
Life
Ext
ensi
on
Asset Safety CasesJustification for safe operation, minimise risk from
Major Accident HazardsThrough identification of
Safety Critical Elements (SCE)And establishing
Performance StandardsOn which to base effective
Integrity AssuranceWhich is required for independent
Verification To demonstrate
SCEs IntegrityIn support of the safety cases
UK-00554 Asset Integrity Process
UK-00555 Asset Life Extension
Process
-
Asset Life Extension Process
9
Life
Ext
ensi
on
UK-00555 Asset Life Extension
Process
Goal; Demonstrate fitness for purpose & suitability of
an asset for specified Life Extension period
By; Identifying ageing, obsolescence and life
extension issues via systematic assessment (OGRE)
Fully supporting Safety Case Thorough Review requirements
Providing key inputs to Basis of Design documents allowing for planning & execution of identified actions
-
10
Oil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managed
Identifies issues associated with maintaining fitness for purpose of an asset for a specified Life Extension period
Facilitator led assessment carried out by multi-functional team reviewing ~60 ALE considerations against all SCE, BCE and ECEs
Prioritise issues/gaps:
Red Process/procedure gap and condition issues Amber Condition issues only Green No gaps/issues
Issues/gaps validated against ALE strategy of Maintain; Repair; Replace; Remove criteria
Defined scopes implemented via Asset Integrity Rectification Programme
Ageing is not about how old your equipment is; its about what you know about its condition, and how thats changing over time
-
11
Oil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managed
Asset Life Extension Considerations Plant & Equipment History & Information ; Programmes & Procedures; Degradation Mechanisms; ALE Strategy
SCE
s; B
CEs;
ECE
s
-
SNS Asset Integrity Rectification Programme
Ensures Asset & Operating Integrity fitness for purpose is maintained through to the end of field life
Programme commenced mid 2012 with scopes executed via 106POB walk-to-work barge over ~ 60-80 day duration per asset
Key focus areas/workscopes derived from ALE/OGRE process output combined with existing prioritised defects (100% P1 P2; X% P3) Decommissioning / Rationalisation of redundant equipment Construction Fabric Maintenance / Tertiary Steel Scope Fabric Maintenance (blasting & painting) Obsolescence
LOS Microwave System, UPS, Navaids, etc Maintenance
Power Generation, Crane, etc
12
-
GMS Endurance at SNS NUI
13
-
Asset Integrity Rectification Programme Status
Completed Ongoing
-
Asset Integrity Rectification Programme Key Stats
4 satellite scopes completed over 21 month period (>300,000 man hours)
Completed circa 1300 workscopes
Replaced 12 obsolete systems (UPS, NAVAID & LOS) from each asset
1 Helideck replacement carried out
Removed circa 480Te of redundant steel
Replaced 3.75km of Unistrut
5000 litres of paint applied
527Te scaffolding erected/dismantled
-
Helideck Removal/Replacement
16
-
Plant Optimisation
17
-
Rationalisation of Process Plant
18
-
Wellhead/Tree Fabric Maintenance
KP4 SeminarManaging Ageing Assets via ALE OGRE Agenda/Topics CoveredAsset OverviewOperating Management System Operating Management System MAH Management via Asset Integrity & ALE Processes MAH Management via Asset Integrity & ALE Processes MAH Management via Asset Integrity & ALE Processes Asset Life Extension Process Oil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managedOil & Gas Release Elimination (OGRE) Assessment Tool Ensures Ageing, Obsolescence & Asset Life Extension are managedSlide Number 12GMS Endurance at SNS NUIAsset Integrity Rectification Programme Status Asset Integrity Rectification Programme Key Stats Helideck Removal/ReplacementPlant Optimisation Rationalisation of Process PlantWellhead/Tree Fabric Maintenance