management of test & measurement data - peak solution · left to right: horizontal calendar...

4
PEAK RESOURCE PLANNER Management of test & measurement data

Upload: others

Post on 20-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Management of test & measurement data - Peak Solution · Left to right: Horizontal calendar view with ... based on daily routine work of our customers, we have developed a solution:

Peak ReSOURCe PLaNNeR

Management of test & measurement data

Page 2: Management of test & measurement data - Peak Solution · Left to right: Horizontal calendar view with ... based on daily routine work of our customers, we have developed a solution:

Left to right: Horizontal calendar view with detected conflict, detail view of that conflict and evaluation of resources

In­the­allocation­of­scarce­test­resources,­conflicts­within­a company are quick to emerge. However, multiple assignments cause costs and delay design activities. based on daily routine work of our customers, we have developed a solution: Peak Resource Planner (PRP).

Test laboratories, test benches or measure-ment technology – test facilities are resourc-es of great importance. In many companies, a lack in transparency of the availability of test resources frequently leads to annoy-ing, time-consuming and cost-intensive allocation­conflicts.­This­is­where­the­Peak­Resource Planner (PRP) takes effect. The software informs the user about the avail-ability of test resources, enables conveni-ent­allocation,­achieves­efficient­capacity­utilization and avoids multiple assignments.

Peak Resource Planner – transparent test resource allocation

UTILIZING TeST INSTaLLaTIONS TO MaXIMUM CaPaCITy WITHOUT CONFLICTS

Peak Resource Planner is perfectly tailored to the needs of test planners. The soft-ware seamlessly integrates into process chains and measurement data manage-ment systems. It is suitable both as a tool for the cross-departmental management of central test resources and as an individual system for test planning at test benches. We will be pleased to inform you in more detail about how you can implement your complex requirements of test planning with the help of Peak Resource Planner.

Page 3: Management of test & measurement data - Peak Solution · Left to right: Horizontal calendar view with ... based on daily routine work of our customers, we have developed a solution:

Process support

▪ Freely definable description of all resources and dependencies (e. g. test specimen, test benches, measuring equipment, facilities, staff etc.)

▪ Creation of test templates for efficient data acquisition

▪ definition of selection and value lists for supporting correct dialog input

▪ automated data exchange with upstream and downstream applications (e. g. order management, test specimen tracking, measurement data management etc.)

▪ User-friendly allocation of resources and display of allocation suggestions by software wizards

▪ entry of resource allocation lock times (e. g. weekends, vacations etc.)

▪ definition of fixed dates and time slices for individual allocation types (e. g. mainte-nance, calibration, conversion etc.)

▪ Graphical representation, comfortable planning and movement of allocations by drag & drop

▪ File Manager for the assignment of test results, SOPs, protocols etc

Transparency for all involved

▪ display of individual availability calendar for different types of resources (multi-dimensional planning view)

▪ display of different calendar periods (day, week, month, individual) and calendar views (horizontal, vertical)

▪ display of all resources used for an allocation (e. g. a test) as an overview

▪ efficient filter and search functions for resources and allocations (e. g. for projects, responsibilities, test types etc.)

PRP overview

▪ Issuance of warnings in case of allocation conflicts

▪ Report and usage statistics- allocation and test reports-­ Utilization­profiles-­ Report­generator­for­the­definition­of­

custom reports- Filterable downtime statistics

▪ Multilingual dialogs

Flexibility

▪ Individual application customization- definition and expansion of resource

and allocation types- definition of dialog structure- Customization of the business logic

▪ Smooth integration of individual compo-nents and functions into company specific applications

▪ Ongoing software maintenance (support, upgrade, update, individual expansions)

Security

▪ Central management and storage of test resources and test planning

▪ Network and multi-client capability▪ Central database backup▪ User administration

- Role and authorization concept- Creation of new users and user groups- Secure integration of external service

providers

What Peak Resource Planner offers you

Page 4: Management of test & measurement data - Peak Solution · Left to right: Horizontal calendar view with ... based on daily routine work of our customers, we have developed a solution:

© P

eak

Sol

utio

n G

mbH

| M

arch

201

3 | I

mag

es: ©

isto

ckph

oto.

com

TOP SOLUTIONS Made by Peak SOLUTION

Since 2005, Peak Solution has been providing support to both small and medium, as well as large internationally active companies in the planning, ­implementation­and­maintenance­of­sophisticated­solutions­in­the­field­of­test­and measurement data management, identity & access management and application life cycle management.

Peak Solution is an active member of the aSaM e.V. (association for Standardisation of automation and Measuring Systems).

Peak Solution is a committed developer and service provider in the openMdM community.

Peak Solution GmbHLina-ammon-Strasse 22 | 90471 Nuremberg | GermanyT +49 911 800927-0 | F +49 911 800 927-99 | [email protected] | www.peak-solution.de

Neuburger Strasse 47 | 85057 Ingolstadt | GermanyT +49 841 993982-72 | F +49 841 993982-74 | [email protected] | www.peak-solution.de

Peak Solution Information Technology (Shanghai) Co., Ltd.Room 1201 | 518 an yuan Road | Putuo district | 200060 Shanghai | China T +86 21 52048091 | [email protected]

www.peak-solution.de