maintenance support room
TRANSCRIPT
WOVC 5S EVENT MAINTENANCE SUPPORT ROOM
Lean Industrial Services JULY [email protected]
AN OUTDATED ROOMThis “tool crib” as it is called was built many years ago and in need of an update. A room like this is not serving the mechanics using it
AN OUTDATED ROOMThis “tool crib” as it is called was built many years ago and in need of an update. A room like this is not serving the mechanics using it.
AN OUTDATED ROOMThis “tool crib” as it is called was built many years ago and in need of an update. A room like this is not serving the mechanics using it.
AN OUTDATED ROOMThis “tool crib” as it is called was built many years ago and in need of an update. A room like this is not serving the mechanics using it.
A Continuous Improvement. 5S EventSORT: Keep what’s needed and let go of the rest!!I KNOW THIS IS HARD TO DO!!
SHINE: The room was emptied, cleaned, and repainted.
A Continuous Improvement. 5S EventSET IN PLACE: a place for everything and everything in it’s place!
A Continuous Improvement. 5S EventSET IN PLACE: a place for everything and in it’s place!
STANDARIZE: departments created, limits set, visual controls
A Continuous Improvement. 5S EventSET IN PLACE: a place for everything and in it’s place!
STANDARIZE: departments created, limits set, visual controls
A Continuous Improvement. 5S EventSUSTAIN: Nobody wants to go back to the way they were working before executing this “Lean 5S Event”. Your workspace should be helping support the type work being done. The room will be audited every Thursday, the results discussed at the Thursday morning safety meeting and all corrections made by end of day Friday.
BEFORE AND AFTER SHOTS
BEFORE AND AFTER SHOTS
BEFORE AND AFTER SHOTS
BEFORE AND AFTER SHOTS
BEFORE AND AFTER SHOTS