CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Maintenance Program2008, February 6th
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Agenda
Introduction
Let’s have a look back at 2007
ECT - The available tools
2008 works schedule presentation
A plan to reduce works schedule impacts
Visit of Cuvilly
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
GRTgaz network well placed as gateway to the French and European markets
Highly interconnected network with international gas infrastructures
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Capacity developments
Before 2009 As of 2009
GRTgaz’ balancing zone reduction : 4 2
310 M€
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
A large-scale 10 year investment
program
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Maintenance programFocus on 2007
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
2007: status of capacities more reduced than initially planned
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
2007: status of capacities less reduced than initially planned
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
How to use ECT for maintenance work
Section Maintenance Schedule
Includes all paths and all periods
Includes paths and periods selected by
the shipper
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
How to use ECT for maintenance work
Total firm capacity which could be
subscribed
Total firm capacity already subscribed Capacities minimum and maximum
available during the maintenance
Restriction rates depends on capacities→ allows to calculate your available capacity in case of restriction1- If CFS is available (after 20th M-1), best information is « Reduction CFS »2- If CFS is not available (before 20th M-1), first information is « Reduction CFC »
Information regarding this
maintenance task
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Important points in 2007
Planned maintenance works vs actual maintenance works assessment: • willingness to keep reliable the initial information
Improving the “design” of ECT data
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Work scheduling management
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Obligations & Recommandations
Transmission contract• Best efforts to minimize reduction in capacities• Publication of engineering works schedules at least 2 months in advance• Impact evaluation at least 5 days before engineering work starts
Guidelines from ERGEG• Coordination with other TSO and french Storage & LNG Operator in
order to minimize impact• Publication of the whole program with capacity reductions, at least once
a year
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Main Steps in the engineering works programListing of works • June for the work with the significant impact on capacities• September-October for all works from the Operating Divisions
Schedule planning : October-December• Dialogue with other TSO and french Storage & LNG Operators to coordinate
operations that with have an impacts on the interconnections
Evaluation of capacity availability and validation of programfeasibility : December-January
End of January: first draft of works program sent to shippers• Description of day to day capacity available for each contractual path
Any remarks to be received by the end of February
Reference Works Schedule is official at the beginning of March
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Discussion with shippers
This year we sent the first information on the program in August, followed by 2 other sendings in December and mid-January
Final draft version of the work schedule sent at the end of January
GRTgaz’s expectations• Remarks and questions from shippers in february => possibility to organize
bilateral meetings (call your operational usual contact)• Important in case of adaptation needed• Difficulties to adapt the program after the beginning of march
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Coordination
Meeting with adjacent operators• Between october and december year N-1• Storage and LNG terminal operator : several working meetings are required• Gassco• Fluxys• Eon Gas Transport• Transitgas• TIGF
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Method of evaluation of capacityrestrictions
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Principle used to calculate capacity
The tariff scheme represents the physicalconstraints on the network
Contractual capacity is a maximum flow in a pipe or the sum of flows in several pipes
A capacity is associated with a set direction
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Physical vs Contractual(Tariff zones)
DUNKERQUE
MONTOIR
EAG Sud OuestIZAUTE
TAISNIERES
OBERGAILBACH
FOS
OLTINGUE
ENAGAS
North - West
Capacity North - East = Q MNE+ Q Lorraines +Q Seine
East - South
West - Center + West - South
Center – South + West - South
West
TIGF Castillon
TIGF Cruzy
South
East
North
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Principle used to calculate capacity
Capacity depends on:• Upstream and downstream saturation• consumption• nominations
Firm capacity :• is calculated with the most restrictive scenario, for consumption and
nominations• To determine the flow guaranted in all circumstances excepted works
and « force majeure »
Interruptible capacity:• Corresponds to the technical limits under favourable situation
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Physical versus Contractual
DUNKERQUE
MONTOIR
EAG Sud OuestIZAUTE
TAISNIERES
OBERGAILBACH
FOS
OLTINGUE
ENAGAS
WEST
TIGF Castillon
TIGF Cruzy
SOUTH
EAST
NORTH
Impact on theEast-South path
WORK
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
DUNKERQUE
MONTOIR
EAG Sud OuestIZAUTE
TAISNIERES
OBERGAILBACH
FOS ?
OLTINGUE
ENAGAS
WEST
TIGF Castillon
TIGF Cruzy
SOUTH
EAST
NORTH
Impact ?WORK
Physical vs Contractual
Hérault ?
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
How to distribute the capacity restrictions ?
Order of priority :• Links• Entry points• Transport Storage Interface Points
The aim of distributing impact is :• To minimize the inconvenience caused by the work• To maximize flows• To conduct works in good conditions
The same restriction rate is applied to all the shippers
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
In case of work
Unsold daily firm
Sold firm
Sold Interruptible
Unsold InterruptibleMax.
(daily, monthly or yearly)Sold
unsold
Capacity
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
In case of work
Unsold daily firm
Sold firm
Sold Interruptible
Max.
(daily, monthly or yearly)Sold
unsold
Capacity
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
In case of work
Sold firm
Sold Interruptible
Max.
(daily, monthly or yearly)Sold
Capacity
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
In case of work
Sold firm
Max.
(daily, monthly or yearly)Sold
Capacity
Reduction of firm capacity
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Example of work
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Stopple
Heavy technical operation
To avoid a complete interruption of the flux
Movie
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
T-stopple fitting (1)
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
T-stopple fitting (2)
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Pipelines inspection & repair 2008 program
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Bouc - AubagneDN400 – 27 km
W14 and 15
AUVERS - CHERREDN 900 – 83,5km
W16 et 17
Saint–Clair - AncemeauvilleDN 600
W14 et 15
TERSANNE – LA BEGUDEDN 600 – 77 km
W18 and 19
TERSANNE – GRANGES LES BEAUMONTDN 800 – 21 km
W 27, 28
GUYENNE DN 600 – 255 km
W39, 40, 41 and 42
GOURNAY ARLEUX DN 800 – 86 km
W14 and W21 and 22
Seine (Evry- Villius)DN 750 – 60 km
W21 et 22
Ancemeauville – Seine NordDN 450 58 km
W16 et 17
Saint Laurent - VindecyDN 250 – 59 km
S25 et 26
Fos - Courthezon DN 600 – 50 km
W23 and 24
Lorraine 1 (Aubenton – Avrima)DN 250 – 59 km
W 17 and 18
Nord 2 Taisnières - GournayDN 900 – 122 km
W25 et 26
Pigging inspection in 2008
Fos 2 - St Martin DN 1100 – 27 km
W41 and 42
GUYENNE 2DN 900 – 125 km
W 43 and 44
SERPAIZE – LES HAIESDN 600
W 36 and 37
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
What is a Pig ?
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Repairs and safety control on the Network 2008
national Network
Regional network
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Investment programworks in 2008
Courthezon
Dierrey
Fos Cavaouconnection
Evry-GregyNozay
Auvers le Hamon
Laneuvelotte 2
Nord Est 2 pipelineBeauce 2
Taisnières B
Guyenne 2
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Main entry points firm capacities in 2008
(Dunkerque, Taisnières H, Obergailbach)
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Dunkerque firm capacity with works
0
100
200
300
400
500
600
01/01
/2008
15/01
/2008
29/01
/2008
12/02
/2008
26/02
/2008
11/03
/2008
25/03
/2008
08/04
/2008
22/04
/2008
06/05
/2008
20/05
/2008
03/06
/2008
17/06
/2008
01/07
/2008
15/07
/2008
29/07
/2008
12/08
/2008
26/08
/2008
09/09
/2008
23/09
/2008
07/10
/2008
21/10
/2008
04/11
/2008
18/11
/2008
02/12
/2008
16/12
/2008
30/12
/2008
Date
Cap
acity
(GW
h/da
y)
Firm capacity with works Firm capacity
Block valves test on the Hauts de France
i
Block valves test on the Nord 1 and 2 i
Intelligent pig on the Nord 2 pipe
Works on Morelmaison t ti
Block valve tests on Hauts de France pipe (2nd) and on Cuvilly station
Maintenance on Pitgam
2nd Block valve tests on Nord 1
and 2 pipes
Block valve tests on
Plateaux du V i i
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Taisnières H firm capacity with works
200
250
300
350
400
450
500
550
600
650
01/0
1/20
08
15/0
1/20
08
29/0
1/20
08
12/0
2/20
08
26/0
2/20
08
11/0
3/20
08
25/0
3/20
08
08/0
4/20
08
22/0
4/20
08
06/0
5/20
08
20/0
5/20
08
03/0
6/20
08
17/0
6/20
08
01/0
7/20
08
15/0
7/20
08
29/0
7/20
08
12/0
8/20
08
26/0
8/20
08
09/0
9/20
08
23/0
9/20
08
07/1
0/20
08
21/1
0/20
08
04/1
1/20
08
18/1
1/20
08
02/1
2/20
08
16/1
2/20
08
30/1
2/20
08
Date
Cap
acité
s G
Wh/
j
Firm capacity with works Firm capacity
Block valve test on Plateau du Vexin pipe
Maintenance and block valve test at Taisnières H TROLL-EKOFISK
Block valve test on Nord 2 pipe
Intelligent pig on Lorraine 1
Intelligent pig on artère de Seine
Works on Nord 2 pipe at Taisnières Station
Works on Artère de Beauce
Works on Morelmaison compression station
Works on Artère de Beauce 2
Works on Taisnières odorization
Works on Nord 2 pipe
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Obergailbach firm capacity with works
0
100
200
300
400
500
600
01/01
/2008
15/01
/2008
29/01
/2008
12/02
/2008
26/02
/2008
11/03
/2008
25/03
/2008
08/04
/2008
22/04
/2008
06/05
/2008
20/05
/2008
03/06
/2008
17/06
/2008
01/07
/2008
15/07
/2008
29/07
/2008
12/08
/2008
26/08
/2008
09/09
/2008
23/09
/2008
07/10
/2008
21/10
/2008
04/11
/2008
18/11
/2008
02/12
/2008
16/12
/2008
30/12
/2008
Date
Cap
aciti
es G
WH
/day
Firm capacity withworksFirm capacity
No dehydratation system at Obergailbach weeks 38, 39, 42 and 43
Obergailbach new installation testT-stopples installation
AT Obergailbach
works on electric network at laneuvelotte
ESD0 at Laneuvelotte
Maintenance at Laneuvelotte station
Instrumented pigging on Artère de Seine Safety repairs on artère de
Seine
works on Laneuvelotte
Bourgogne pipe repairs
Maintenance at Voisines station
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Capacities with works at the Fos LNG terminalaccording to the consumpion and Herault nominations probability
0
100
200
300
400
500
600
01/01
/2008
15/01
/2008
29/01
/2008
12/02
/2008
26/02
/2008
11/03
/2008
25/03
/2008
08/04
/2008
22/04
/2008
06/05
/2008
20/05
/2008
03/06
/2008
17/06
/2008
01/07
/2008
15/07
/2008
29/07
/2008
12/08
/2008
26/08
/2008
09/09
/2008
23/09
/2008
07/10
/2008
21/10
/2008
04/11
/2008
18/11
/2008
02/12
/2008
16/12
/2008
30/12
/2008
date
Cap
aciti
es (G
Wh/
Day
)
Maximum Minimum
Repairs on the midi pipe
Intelligent pigging on Rhône pipe between Tersanne and la Bégude
Intelligent pigging on Rhône pipe between Fos and Courthezon
Works on Courthezon station
Intelligent pigging on Rhône pipe between Tersanne and Granges
Safety control after intelligent pigging between Fos and Courthezon
Safety control after intelligent pigging between Tersanne and la Bégude
Repairs on the Provence pipe
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Capacities with works at the Montoir LNG terminalaccording to the consumpion probability
0
50
100
150
200
250
300
350
400
450
500
01/01
/2008
15/01
/2008
29/01
/2008
12/02
/2008
26/02
/2008
11/03
/2008
25/03
/2008
08/04
/2008
22/04
/2008
06/05
/2008
20/05
/2008
03/06
/2008
17/06
/2008
01/07
/2008
15/07
/2008
29/07
/2008
12/08
/2008
26/08
/2008
09/09
/2008
23/09
/2008
07/10
/2008
21/10
/2008
04/11
/2008
18/11
/2008
02/12
/2008
16/12
/2008
30/12
/2008
date
Cap
aciti
es (G
Wh/
day)
Maximum Minimum
Intelligent pigging on the Maine pipe
Works on Nozay and Auvers
stations
Repairs on Loire pipe
Works on Nozay
Safety control on Maine pipe
Works on Auvers station
Works on Cherré station
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Prospects
Customers input and feedback
GRTgaz sells a commodity but is also an industrial company
The constraints are becoming even tougher• Changes in French rules • Heavy investments in the network
We are looking at all ideas to reduce impacts• Reduce physical impacts • Design of the Sales offering • Level of Information to manage the restrictions• ….
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Prospects
Maintenance schedule is identified as a strategic component in GRTgaz activity
Contribution of shippers and exchanges
Communication on the subject
If any of you are particularly interested in the subject
• E-mail : [email protected]
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Visit of Cuvilly Compressor Station
Cuvilly is strategically located on the GRTgaz network : gaz coming in from Dunkerque and Taisnieres
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Tour of Cuvilly Compressor Station
A new station• Works completed in 2007• Investments : 45 M€
Power : 2 x 7MW (+1 optional)
Max compression : 3 000 000 (n) m3/h from 58 to 67 bars
No operational teams on the plant • Automatic station• Remotely controlled from Paris
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS
Cuvilly – a very recent plant
CENTRE ACHEMINEMENTS ET MOUVEMENTS DE GAZDEPARTEMENT GESTION OPERATIONNELLE DES CONTRATS