All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
PROPOSED KOMBEWA DRAINAGE ANDSEPTIC TANK FOR WRP,KISUMU COUNTY.
13,100
6,000
15,000
5,900
6,70
0
16,9
50
2,00
0
4,8754,358
32,667
5,900
2,00
08,
600
7,00
08,
050
2,00
0
101.25
101.2
5
101.25
100.50
100.25
100.25
100.25
100.25
100.00
100.00
100.00
101.00
101.
00
101.00
100.75
100.
75
100.75
100.50
100.50
100.75
102.75
102.75
102.75
102.50
102.50
102.50
102.25
102.25
102.25
102.00
102.00
102.00
101.75
101.75
101.75
101.50
101.50
101.50
103.
50
103.50
103.50
103.25
103.
25
103 .25
103.25
103.25
103.25
103.00
103.00
103.25
103.
25
103.
25
103.50
103.50
103.50
103.75
103.75
104.75104.50
104.25
104.25104.25
104.00
104.00104.00
103.75
103.75103.75
Water Tap
Canteen kichen
Canteen
Main Block Power House
Generator House
Kitchen /Dinning hall
Container
Annex Block Toilet
SCEPTIC TANK
SS
S
S
S
S
N
PR 4924905 MRU Drainage RenovationsKombewa A01
015 - 014/05
KOMBEWA SURVEY LAYOUTScale 1: 500
All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
PROPOSED KOMBEWA DRAINAGE ANDSEPTIC TANK FOR WRP,KISUMU COUNTY.
132°
STORE
SCEPTIC TANK
SCEPTIC TANK
KITCHEN/DINING
Main Block
PowerHouse
Generator House
Annex Block
PARKINGconcrete paving block.
Canteenkichen
Canteen
3 Stepsdwn
OLDSEPTIC
Container
plastic watertank
Garden
Garden
Garden
Garden
gt
gt
ENTR
Y PO
RCH
/W
AITI
NG B
AY
PARKINGconcrete paving block.
Guardhouse
IC
IC
ROAD
RES
ERVE
KOMBEWA SITE LAYOUTScale 1: 500
N
PR 4924905 MRU Drainage RenovationsKombewa A02
015 - 014/05
All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
PROPOSED KOMBEWA DRAINAGE ANDSEPTIC TANK FOR WRP,KISUMU COUNTY.
200900 1,800 900
200
4,60
0
3,00
01,
200
S S
E-01
E-0
2Line of boundarywalling
150mm deep groundedcable duct channel.Fix duct with 125 x 50 softwoodcover finished with aluminium plateall to Arch's details.
600mm deep beam
Ms louvred door.
650mm deep cabinetsto power panels.
Remove existing exhaustpipe and discard.
600 x 600mm trap door.
ROOF NOTESTake down existing clay tiles andstore/hand over to client. Fix newsand coated metal tiles to matchexisting main building.Take down existing ceilings anddiscard. Fix new ceilings in 9mmthick gypsum boards with andincluding 1No trap door.
100 x 100 x 3mmM.s RHS posts weldedon 200 x 200 x 6mm platebolted to the slab.
M.s grilled door to Archsschedule.
Supply and fix aluminium louvred ventsto Arch's details internally with mosquitoinsert netting all to Arch's details.
Transfomerspace
Kplc board
POWERHOUSE
Ms louvred door.
M.s grilled door to Archsschedule.
250 sand coated metal tilesto match existing mainbuilding.
100 x 100 x 3mmM.s RHS posts weldedon 200 x 200 x 6mm platebolted to the slab.
180 roofpitch.
80 roof pitch.
250 sand coated metal tilesto match existing mainbuilding.
Ms louvred door.
100 x 100 x 3mm M.s RHS posts.
M.s grilled door to Archs schedule.
100 x 150mm UPVC gutter.DETAIL A
125
150
Natural aluminium coverscrewed to softwood cover.
125 x 50mm cypressnatural cover.
Cable duct channel.
4' x 1' timber bearer tosuit.
2,00
020
01,
450
200
75
75 x 25 x 2mm RHS frame.
25 x 10mm flat bar.
16mm dia. round barsat 120mm centres.
100 x 100 x 3mm M.s RHS posts.
100 x 50 rafters at
75 x 75 x 6mm angle weldedon 200 x 200 x 6mm plate welded to100 x100 x 3mm post.
100 x 150mm UPVC gutter on225 x 25mm fascia board.
150 x 50mm cypress bearer screwedto angle.
75 x 75 mm cypress softwood batternsat 600mm centres.
100 x 50 mm cypress softwood raftersat 600mm centres.
80 angle IT4 roofing sheets.
150 x 50mm cypress bearer screwedto existing power house beam.POWER HOUSE PLAN
Scale 1: 50
ELEVATION 01Scale 1: 100
ELEVATION 02Scale 1: 100
SECTION S - SScale 1: 10
MS GRILL DOOR.Scale 1: 50
DETAIL AScale 1: 20
PR 4924905 MRU Drainage RenovationsKombewa A03
015 - 014/05
All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
PROPOSED KOMBEWA DRAINAGE ANDSEPTIC TANK FOR WRP,KISUMU COUNTY.
200 5,800 200
350 2,000 1,100 2,000 350
6,200
7,00
055
02,
400
1,10
02,
400
550
E-1
E-2
E-3
Existing 75 x 75 x 3mmM.s RHS posts weldedon a plate bolted to the slab.
Line of existing roofingsheets.
100 x 100 x 3mmM.s RHS posts.
200mm Masonry walling.
concrete vent blocks.
New Ms louvred door tomatch generator's house.
Generatorshed
Generator 1
Generator 2
150
1,80
0 New Ms louvred door tomatch generator's house.Internal slab level.
GL
150
1,55
025
0
200mm Masonry walling.
Existing structure.
Internal slab level.
concrete vent blocks.
GL
150
1,55
025
0
200mm Masonry walling.
concrete vent blocks.
Existing structure.
Internal slab level.GL
GENERATOR SHED PLANScale 1: 50
ELEVATION 01 (FRONT)Scale 1: 100
ELEVATION 02 (SIDE).Scale 1: 100
ELEVATION 03 (BACK).Scale 1: 100
PR 4924905 MRU Drainage RenovationsKombewa A04
015 - 014/05
Ø
Ø
Ø
Ø
Ø
BUILDING
CONTOUR
CABROS
MANHOLE
BOUNDARYWALL
MAIN GATE
DRAINAGE
PROPOSED MANHOLE
FLOW OF STORM WATER
TO OPEN POINTS
RETAINING WALL
CHANNELS CROSSING
EXISTING CHANNELS
CHANNELS AGAINST
DRIVEWAY
KERB
All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10
PROPOSED WORKS AT KOMBEWA
RESEARCH CENTER FOR WRP,
KISUMU COUNTY.
PR 4924905 MRU Drainage Renovations
Kombewa
DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
C 01
015-014/05
BAOUTLETDriveway C DDriveway OUTLET
E GFOUTLET
B' D'C'
B' GDROP MH @ D'INVERT LvL=102.980
JIL=102.086m
OUTLET
A B'OUTLET
HOUTLET
G
I J
OUTLETD H
All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
PROPOSED WORKS AT KOMBEWA
RESEARCH CENTER FOR WRP,
KISUMU COUNTY.
PR 4924905 MRU Drainage Renovations
Kombewa C 02
015-014/05
All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
PROPOSED WORKS AT KOMBEWA
RESEARCH CENTER FOR WRP,
KISUMU COUNTY.
PR 4924905 MRU Drainage Renovations
Kombewa C 03
015-014/05
TYPICAL SECTIONS
125mm Thick AC
Well Compacted Natural soil sub-grade
150mm Handcore Base
100mm Thick Murram Subbase
TYPICAL DRIVEWAY/PARKING SECTION
2.5%
PARKING/DRIVEWAYVERGE VERGEDRAIN
125mm Thick AC
Well Compacted Natural soil sub-grade
150mm Handcore Base
100mm Thick Murram Subbase
TYPICAL DRIVEWAY/PARKING SECTION
PARKING/DRIVEWAYVERGE VERGE
RETAINING WALL
2.5%
DRAIN
TYPICAL I.B.D SECTION
VERGE I.B. DRAIN VERGE
Well shaped Natural Ground
Well shaped Natural Ground
4.0%4.0%
4.0%
4.0%
4.0%
4.0%
100
TYPICAL STORM WATER MANHOLE
Ø300/450mm precast
Ø 300mm
100
100100 200 600
200
200
600
200 concrete pipe
SECTION A - A
PLASTER12mm THICK
CLASS 25/20 CONCRETE
CLASS 15/20 CONC. BLINDING
MESH A142
600 x 450mm Heavy duty cover
200100 1200 200 100
Dete
rmin
ed o
n si
te
15050
100
100
Ø300/450mmPrecast
concrete pipelaid to fall
100
200 300 200
Y8 at 150 mm c/c
Y8 @ 150 mm c/c
CROSS SECTION SHOWING REINFORCEMENTTYPICAL CONCRETE CHANNEL DRAIN
300m
m M
in
5
200
150
50mmx50mmx3mm Angle
50mmx50x3mm
RHS @ 80mm c/c
1
30mm Gap
GRATING FOR CUT-OFF DRAINLAYOUT
DETAIL 'A'
1
SECTION 1-1
50x50x3mm RHS
Concrete Infill
DETAIL A
50x50x3mm RHSWelded Joint
Concrete Infill50mmx50mmx3mmAngle
ANGLE/PLATE JOINTING DETAIL
CHANNEL DETAILKERB DETAIL
475
150
250
150
100
150
125125
125125 125
350
150
100
125
200
30050 300600
200
D.O.
S.(M
IN. 1
000
TYPICAL SECTIONMASONRY RETAINING WALL
Finished Road Level
Y8@250 B1
4 Y8@250 B2
CLASS 15/20 CONC. BLINDING
Finished Road Level
PLAN PRECAST COVER SLAB
75mm Thick ConcreteClass 25/20 with A193Reinforcement (Mesh) Placed12mm From Soffit of Slab
BEDDING AND HAUNCHCONCRETE PIPES
CONCRETE CLASS 15/20
CONCRETE PIPE
NOTES1. Number of Side slabs to be placed may vary
according to the depth of Drain. This is to bedetermined on site
2. Precast I.B. Drain to be in concrete Class 25/20300
INVERT BLOCK DRAIN
75 75450
PRECAST I.B.D
JOINT 1:310mm MORTAR
SIDE SLABS (SEE NOTE 1)
7515
0
65
37mm Ø WEEP HOLES
STONE
PITCHING
CONCRETE
CHANNEL
A
S
P
H
A
L
T
C
O
N
C
R
E
T
E
S
T
O
N
E
P
I
T
C
H
I
N
G
C
O
N
C
R
E
T
E
C
H
A
N
N
E
L
K
E
R
B
P
L
A
N
T
E
D
A
R
E
A
(
G
R
A
S
S
)
SOIL EROSION CONTROL MEASURES(PLAN)
SOIL EROSION CONTROL MEASURES(SECTION)
PLANTED
AREA(GRASS)
NOTES1. Stone pictching where slopes >60o Otherwise
plant grass.
All dimensions are in millimetres unless ortherwise stated
Drawings not to be scaled. Figured dimensions to be used andany discrepancies to be reported to the architect immediately
All conduits must be laid before plastering. All electrical worksto EEs details
5
All black cotton soil to be excavated and carted away
3
4
1
All plumbing and drainage to comply with MOH rules andregulations and to the MEs details
2
RevisionsNo. Description
R. W.D.P to dispose at ground level into 300 x 300 x300mm concretesump and cement gullies to detail
Project
All pitched roofs to have 100 x 50mm 22 gauge GCI box gutters and75mm dia. PVC down pipes and other accesories all to be painted.
All S & W. V. Pipes to be approved to 100mm diameter
All RC works to SEs details. All civil works to CEs details
6
7
9
8 All pvc pipes to be encased with chicken wire mesh and concretesorround to be plastered and painted or finished in ceramic tiles
10DRAWINGS.
DescriptionNo. Revisions
Scale:As shown
Sheet No.Date: NOVEMBER2015
Job no.
PROPOSED WORKS AT KOMBEWA
RESEARCH CENTER FOR WRP,
KISUMU COUNTY.
PR 4924905 MRU Drainage Renovations
Kombewa C 04
015-014/05