7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 1 of 48
MAHARASHTRA POLLUTION CONTROL BOARD
Minutes of 7th Consent Appraisal Committee Meeting of 2017-2018 held on 12.12.2017 at 3.00 p.m. at MHADA Office, Grihanirman Bhavan,
Kalanagar, Bandra (East), Mumbai, Maharashtra 400051.
……….
The Consent Appraisal Committee meeting of the Board was held on 12.12.2017. Following members of the Consent Appraisal Committee were
present:
1. Shri Milind Mhaiskar, Chairman
Vice President & CEO, MHADA and
Chairperson, MPCB, Mumbai.
2. Shri. P. K. Mirashe, Member
Member Secretary, MPC Board, Mumbai
3. Shri. Padmakar Nandusekar Member
Technical Advisor (Environment), MIDC, Mumbai
4. Tuhin Banarjee Special Invitee
Scientist, NEERI
5. Shri. P. K. Mirashe Member Convener
Assistant Secretary (Technical), MPC Board, Mumbai
Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.
Following Officer of MPCB were present for the meeting:
1. Shri A. R. Supate, PSO, Mumbai, Special Invitee
2. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee
The meeting thereafter deliberated on the fresh agenda items of [Book-let no. 000000000012] is placed before the committee and following decisions
were taken.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 2 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
Book-let No 12 Renewal of Consent to Operate
1 MPCB-
CONSENT-
0000009510
Rattan India Nasik Power
Limited, Plot No. 1
Additional MIDC
Industrial Area, Sinnar
SEZ, Nasik
APPROVED
Renewal of
consent to
operate
31.08.2018 The Committee noted that industry has made the agreement with
washeries to get the blended/ beneficiated coal with ash content less
than 34%.
Considering the commitment made by the industry, It was decided to
grant renewal of consent to operate for Coal based Power Generation
Unit- 270 MW x 2 Nos. by extending all the existing BG’s and by
imposing following conditions:-
1. Industry shall submit the BG of Rs. 10 lakh towards use of
blended/beneficiated coal with ash content less than 34%.
2. Industry shall install the Automatic real time monitoring system for coal
ash analysis. 3. Industry shall obtain specific permission from RO, Nasik before
restarting the actual electricity generation unit.
Consent shall be issued after obtaining additional requisite consent fee,
if any.
2 MPCB-
CONSENT-
0000009530
Mouda Super Thermal
Power Project NTPC-
Mouda, Nagpur
APPROVED
Renewal of
Consent to
Operate with
increase in CI
31.08.2020 It was decided to grant renewal of consent to operate with increase in
CI for Coal based Power Plant- 1000 MW (2 x 500 MW) by imposing
following conditions:-
1. Industry shall either make the agreement with coal washeries or
shall provide own washeries to get the blended/ beneficiated coal
with ash content less than 34% and submit the BG of Rs. 10 lakh
towards compliance of the same.
2. Industry shall install the Automatic real time monitoring system for
coal ash analysis.
Consent shall be issued after receipt of BG compliance report from
SRO along with latest JVS results accordingly, proportionate BG will
be forfeited, if non-compliance reported and after submission of
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 3 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
additional requisite consent fee.
Consent shall be issued after obtaining additional requisite consent fee,
if any.
3 MPCB-
CONSENT-
0000013718
Lavgan Dockyard Pvt.
Ltd. Village-Sande
Lavgan, Post-Jaigad, Tal
& Dist-Ratnagiri
APPROVED
Renewal of
consent to
operate with
increase in CI
30.09.2021 Committee noted the say of industry dated 26.09.2017 about increase
in capital investment towards improvements in existing facility like
plant and machineries, electrical installations, store yard, office
equipment and furniture and fixtures progressively to meet the
customer requirement and there is no change in existing infrastructure
facilities of the yard. Also noted that the existing facility is
underutilized due to limitation of current consented quantity for Ship
repairing and maintenance of 100 Nos. of vessels. Also noted that there
is no Ship braking activity carried out at the site.
In the view of above, it was decided to grant renewal of consent to
operate for Ship Repairing and Maintenance activity (without ship
breaking activities at 6 berths) for 200 Nos. of vessels by imposing
following conditions:-
1. PP shall extend BG of Rs 10 lakh towards O & M of Pollution
Control Systems.
Consent shall be issued after obtaining additional requisite consent fee,
if any.
4 MPCB-
CONSENT-
0000009069
Viraj Profiles Limited,
Unit-II, Plot No. G-2, 1/2,
1/3 MIDC Tarapur
Palghar
NOT
APPROVED
1st consent to
operate for
expansion and
Renewal of
consent to
operate with
increase in CI
and their
--- Committee noted that Board has issued SCN for refusal of 1st consent
to operate for expansion and Renewal of consent to operate with
increase in CI and their amalgamation due to various non-compliances.
Committee also noted that industry vide letter dated 03.10.2017
submitted the reply towards SCN and reported that they have installed
secondary fume extraction system, they are in the process of issuance
of PO for installation of CAAQMS, and CI of Rs. 115 Cr increased due
to up-gradation of plant and machinery, infrastructure development, up-
gradation of pollution control system etc. Further industry stated that
due to increase in CI there is no increase in production capacity.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 4 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
amalgamation
The reply submitted by the industry is not satisfactory. Therefore, it
was decided to call the industry for personal hearing before Member
Secretary and revert back to next CAC.
5 MPCB-
CONSENT-
0000011020
Varron Industries Pvt.
Ltd., MIDC, Mirjole, Plot
N0. B-33/1, Ratnagiri.
APPROVED
Renewal of
consent to
operate
31.07.2021 It was decided to grant renewal of consent to manufacture Aluminium
Alloy Ingots- 800 MT/M by imposing following conditions.
1. Industry shall obtain the authorization under Hazardous and Other
Wastes (M&TM) 2016 as the industry is using aluminum scrap as a
raw material.
2. Industry shall extend the existing BG of Rs. 10 lakh obtained
towards O& M of pollution control system.
Consent shall be issued after submission of SRO’s verification report
regarding number of furnaces installed with capacity and number of
heats taken per day in respect of total consented production quantity
and HW generation and after submission of additional requisite consent
fee, if any.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 5 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
6 MPCB-
CONSENT-
0000017194
Koradi Thermal Power
Station, Koradi, 23/1
Koradi, Tq. Kamptee,
Nagpur
APPROVED
Renewal of
Consent to
Operate
(unit V, VI, &
VII)
31.08.2018 Committee noted that the plant is in operation since last more than 30
years. Industry has provided air pollution control measures as
Electrostatic Precipitators (ESP) to each boiler with 90 mtrs stack
height including online monitoring system.
At present, it is noted that unit- V is shutdown, unit-VII at renovation
stage and unit- VI is in regular operation.
In view of above, it was decided to grant renewal of consent to Operate
for Coal based Thermal Power Plant (Unit V, VI & VII)- 620 MW by
extending existing BG regime and by imposing following specific
conditions:-
1. Industry shall either make the agreement with coal washeries or
shall provide own washeries to get the blended/ beneficiated coal
with ash content less than 34% and submit the BG of Rs. 10 lakh
towards compliance of the same.
2. Industry shall install the Automatic real time monitoring system for
coal ash analysis.
3. Industry shall provide online monitoring connectivity to Board’s
server as per the guidelines and the calibration details shall be
provided to the Board regularly.
Consent shall be issued after receipt of BG compliance report from
SRO along with latest JVS results accordingly, proportionate BG will
be forfeited, and after submission of additional requisite consent fee.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 6 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
7 MPCB-
CONSENT-
0000019644
TAL Manufacturing
Solutions Limited, 215 to
225 & 227 to 229 (part) ,
village Kalkuhi Sector 3
MIHAN SEZ, Nagpur
APPROVED
Renewal of
consent to
operate with
increase in CI
28.02.2019 It was decided to grant renewal of consent to operate to manufacture-
Aerospace Assemblies & Sub-Assemblies- 1000 Nos/M and Aerospace
Component- 50,000 Nos/M by imposing following conditions:-
1. BG of Rs. 5 lakh obtained towards provision of 100% recycle/reuse
of all treated trade effluent in a process is forfeited. Discharge of
treated trade effluent is not allowed on land for gardening as
industry has not complied the same and obtain double amount of BG
of Rs. 10 lakh towards compliance of the condition within 06
months.
2. Next renewal of consent or expansion will be considered only after
provision of 100% recycle/reuse all treated trade effluent in the
process. Discharge of treated trade effluent is not allowed on land
for gardening.
8 MPCB-
CONSENT-
0000020056
ACC Ltd, Sindola
Limestone Mine, Village -
Yenak, Paramdoh,
Sindola, Kurli, Chanak,
Velabai , Gopalpur ,
Chanaka & Pardi Wani,
Dist. Yvatmal
APPROVED
Renewal of
consent to
operate with
increase in CI
31.03.2022 or
up to validity
of mine lease
period
whichever is
earlier
It was decided to grant renewal of consent to operate with increase in
CI for Lime Stone Mining activity- 6 lakh Ton/Annum and Limestone
Crushing and Transportation- 34.9 lakh Ton/Annum by imposing
following conditions
1. Industry shall extend the BG of Rs. 5 lakh obtained towards O&M
of pollution control system.
2. Mining authority shall take the specific permission from Regional
Officer, Chandrapur prior to re-start the mining activity and submit
the BG of Rs. 5 lakh towards compliance of the same.
3. Industry shall comply the conditions stipulated in Environmental
Clearance granted by MOEF vide letter dated 22.08.2007.
Consent shall be issued after obtaining clarity on consented quantities
i.e. Lime stone Mining and its crushing capacity, submission of
additional consent fee, if any.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 7 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
9 MPCB-
CONSENT-
0000018201
Ball Beverage Packaging
(India) Private Limited,
Plot No. C-7, MIDC
Taloja, Tal-Panvel, Dist-
Raigad
APPROVED
Renewal of
consent to
operate with
increase in CI
and HW
quantity with
name change
28.02.2020 It was decided to grant renewal of consent to operate with increased CI,
HW & Non-HW quantity and change in name from M/s. Rexam
Beverage Can (India) Pvt. Ltd., to M/s. Ball Beverage Packaging
(India) Private Limited by imposing following conditions:-
1. BG of Rs. 5 lakh towards O&M of pollution control system is
forfeited as the JVS samples collected on 13.01.2017 is exceeding
the consented standards and obtain top-up BG of Rs. 10 lakh
towards O&M of pollution control system.
Decision regarding release/forfeiture of BG of Rs. 2 lakh obtained
towards details of process adopted for surface treatment and details of
APC will be taken after receipt of verification report from SRO.
Consent shall be issued after submission requisite consent fee, if any.
10 MPCB-
CONSENT-
0000022365
Saint-Gobain India Private
Limited, 300/1, 2, 301, 2,
303/1, 304.5, 6, 7, 8, 9,
311/1, 348/2, 3, Village
Nare & Vadavali, Post-
Uchat, Wada, Dist.
Palghar
NOT
APPROVED
Renewal of
consent to
operate with
increased in
production
quantity of 02
products and
addition of one
new product
with decrease in
CI
---- Committee noted that Board has issued restart conditional direction
vide letter dated 27.03.2017. Committee also referred the compliance
report submitted by SRO, Kalyan III vide email dated 12.12.2017 and
reported as under:-
1. Industry failed to submit the NEERI report in respect of health
assessment of resident of villages in 3 km periphery due to air
pollution caused by the industry.
2. Industry failed to provide the Multiple Effect Evaporator (MEE) to
treat the RO reject.
3. Industry failed to carry out the qualitative assessment of open well
and ground water with reference to potability & irrigations standards
in 1.0 km periphery of the plant.
4. Industry has started production of Ready Mix-2,000 MT/A without
obtaining consent from the Board.
5. Industry has increased the production quantity of Gypsum Board
and Jointing compound/Finishing Plaster without obtaining consent
from the Board.
In view of above, it was decided to issue SCN for refusal of renewal of
consent to operate with increase in production quantity due to above
non compliances.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 8 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
11 MPCB-
CONSENT-
0000017724
NRB Industrial Bearings
Ltd. Plot No.B-18, Five
Star MIDC Area, Shendra,
Aurangabad
APPROVED
Renewal of
consent to
operate
28.02.2022 It was decided to grant renewal of consent to operate to manufacture
Ball and Roller Bearing- 5,00,000 Nos/M by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards
O&M of pollution control system.
Decision regarding release of BG of Rs. 10 lakh obtained towards not
to carryout Phosphating activity without prior permission from the
Board will be taken after receipt of SRO’s verification report.
Consent shall be issued after submission of requisite consent fee and
latest JVS results from SRO.
12 MPCB-
CONSENT-
0000022248
HUF India Pvt. Ltd.,
Gat. No. 304,305
Nanekarwadi, Opp. Auto
Line Plant Chakan, Khed
Dist. Pune.
APPROVED
Renewal of
consent to
operate with
increase in CI
and downsizing
of production
quantity of one
product and
increased
production
quantity of three
products
28.02.2022 It was decided to grant Renewal of consent to operate with increase in
CI and production quantity of three products (Door Lock Sets, Ignition
Switches and Steering Column Lock Housing) and downsizing of
production quantity of one product (Door Handles) without increase in
trade effluent by imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards
O&M of pollution control system.
Consent shall be issued after receipt of additional consent fee for the
increased CI by 26.21 Cr including consent to establish and operate fee
separately from the industry.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 9 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
13 MPCB-
CONSENT-
0000024111
Bhanegaon Open Cast
Coal Mine Project Of M/s.
Western Coal Fields Ltd.,
(WCL), - 550/3, Khasrea
No 12/1D & 12/2 Village
Bina Post- Khaperkheda,
Kamptee, Nagpur.
NOT
APPROVED
Renewal of
Consent to
Operate
--- It was decided to keep the case in abeyance and put up in next CAC
after obtaining reply from SRO, Nagpur-I regarding BG compliance
with latest JVS results, and clarification about increase in CI from 22
Cr to 84.66 Cr.
14 MPCB-
CONSENT-
0000024240
Giriraj Enterprises,
Sr.No.43,46,47,48,49
Mundhavare, Tq. Maval,
Pune
NOT
APPROVED
Renewal of
Consent to
Operate
--- It was decided to keep the case in abeyance and revert back to next
CAC along with following information from PP
1. Clarification regarding increase in CI from 99.55 Cr to 155.11 Cr.
without obtaining consent from the Board.
2. Details regarding Sewage Treatment Plant, Effluent Treatment Plant
for laundry activity & Organic Waste Converter (OWC).
3. Details regarding submission of Bank Guarantee as per condition
stipulated in earlier consent.
4. Provision made regarding 60 % recycled of treated effluent.
It was also decided to call the verification report from SRO regarding
adequacy of STP, ETP, OWC and latest JVS results from SRO.
15 MPCB-
CONSENT-
0000024423
Western Coal Fields Ltd.,
Sirpur, Rev. Survey P.C.
21 & 22 Umrer Project,
WCL Umred, Dist.
Nagpur
APPROVED
Renewal of
Consent to
Operate
31.03.2021 It was decided to grant renewal of consent to operate for Opencast Coal
Mine- 3.5 Million Tons/Annum by imposing following conditions:-
1. BG of Rs. 10 lakh obtained towards installation and operation of
STP is forfeited as mining authority failed to provide the same and
obtain top-up BG of Rs. 20 lakh towards provision of STP within six
month.
2. Industry to extend the existing BG of Rs. 5 lakhs obtained against
O&M of pollution control systems.
Consent to be issued after obtaining requisite consent fees from the
industry.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 10 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
16 MPCB-
CONSENT-
0000023424
Graphite India Ltd., Plot
No.88, MIDC Satpur,
Dist. Nashik
APPROVED
Renewal of
consent to
operate with
removal of
captive Power
Plant 7.65 MW
and change in
water budget
31.03.2022 It was decided to grant renewal of consent to operate with removal of
Captive Power Plant 7.65 MW and change in water budget by
imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 10 obtained towards
O&M of pollution control system.
It was also decided to return the BG of Rs. 2 lakh obtained towards
submission of details of APC system and design details of combined
ETP cum STP as industry has submitted the same reported by SRO.
Consent shall be issued after submission of latest JVS results and
additional consent fee.
17 MPCB-
CONSENT-
0000022696
Gajanan Oil Pvt. Ltd.
(Formerly Known as M/s.
Bhaskar Foods Pvt. Ltd),
Sr. No 16/1, 2, 3, & 22/6
Akola Road, Village.
Bopi, Tal. Nandgaon
Khandeshwar, Dist.
Amravati.
APPROVED
Renewal of
consent to
operate with
name change
31.03.2022 It was decided to grant renewal of consent to operate with change of
name from M/s. Bhaskar Foods Pvt. Ltd. to M/s. Gajanan Oil Pvt. Ltd.,
by imposing following conditions:-
1. Bank Guarantee of Rs. 5 lakh submitted towards up-gradation of
APC system for Boiler No 1 & 2 by providing wet
scrubber/ESP/Bag filters is forfeited as industry has not complied
the same and obtain top-up BG of Rs. 10 lakh towards up gradation
of APC system within 6 months.
2. Industry shall extend existing Bank Guarantee of Rs. 7.5 lakh
submitted towards O & M of pollution control system.
Consent shall be issued after submission of latest JVS results and
additional consent fee.
18 MPCB-
CONSENT-
0000020395
Western Coal Fields
Limited, (Padmapur Open
Cast Mine), P.O. –
Padmapur, Chandrapur
NOT
APPROVED
Renewal of
Consent to
Operate
--- It was decided to keep the case in abeyance and call the PP for personal
hearing to discuss about various non-compliances reported by SRO/RO
from time to time before Hon’ble Chairman/Member Secretary and
revert back to next CAC.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 11 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
19 MPCB-
CONSENT-
0000024208
Erlingklinger Automobile
Components (I) Pvt. Ltd.,
Plot No. G-2, MIDC
Ranjangaon, Shirur, Pune
APPROVED
1st consent to
operate for
expansion and
amalgamation
with existing
consent with
increase in CI
30.04.2020 It was decided to grant 1st Consent to Operate for Expansion to
manufacture Rubber Gasket-10,000 Nos./M and Plastic Cam Cover-
25,000 Nos./M and amalgamation with existing consent with increase
in CI by imposing following conditions:-
1. This consent is issued with the overriding effect of earlier consent to
operate granted by the Board vide consent no. BO/EIC No. PN-
24527-15/CAC-2534 dated 11.03.2016.
Consent shall be issued after submission of additional consent fee.
20 MPCB-
CONSENT-
0000023198
Trion Properties Pvt. Ltd.,
(Inorbit Mall India Pvt.
Ltd)., IT building &
Commercial Mall, Survey
No. 35, Hissa No.
9+10+11+12/C (IT
building) & Hissa No.
9+10+11+12/B (Mall
building) Village Vadgaon
Sheri Haveli, Pune
NOT
APPROVED
Renewal of
Consent with
expansion
for Mall & IT
Building
--- Committee noted that Board has granted Consent to Operate dated
27.08.2013 with the specific condition that "The applicant shall
separately apply for EC & C to E for additional construction area and
no further effective steps shall be taken for additional construction
area." Till dated PP has not made the application and also noted
following non-compliances
1. It is noted that IT and Mall Building for increased in BUA without
obtaining amended Environmental Clearance for Total Plot area of
36,015.05 sq. mtrs and Total Construction BUA of 1,00,406.97 sq.
mtrs in the name of M/s. Trion Properties Ltd.,
2. PP failed to submit the BG of Rs.10 Lakh
3. PP failed to install online monitoring system for the parameters
Flow, BOD, TSS at the outlet of STP.
In view of above, it was decided to issue SCN for Renewal of Consent
with expansion and for Mall & IT Building with Stop work order.
21 MPCB-
CONSENT-
0000024637
Ascendas IT Park (Pune)
Pvt. Ltd., Plot No-18,
Phase III, Hinjewadi, Pune
Hinjewadi, Mulshi, Pune
APPROVED
Renewal of
Consent to
Operate (Part)
31.03.2022 It was decided to grant renewal of consent for IT/ITES activities by
imposing following conditions:
Industry shall extend the existing BG of Rs. 10 lakh obtained towards
O&M of pollution control system.
Consent shall be issued after verification report from SRO regarding
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 12 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
provision of OWC and BG details.
22 MPCB-
CONSENT-
0000025679
Shrinivas Engineering
Auto Components Pvt.
Ltd., Plot No. A-24
Talegaon MIDC (Phase-
IV) Maval, Pune
APPROVED
Renewal of
Consent to
Operate
30.04.2022 It was decided to grant Renewal of Consent to manufacture Grey Iron
and Nodular Casting Components-50,000 MT/A by imposing
following conditions:-
1. Industry shall extend the existing Bank Guarantee of Rs. 5 lakh
obtained towards O&M of pollution control system.
Consent shall be issued after submission of additional consent fee.
23 MPCB-
CONSENT-
0000024529
SRJ Peety Steels Private
Limited, Plot No: D-51/1,
D-51/2, D-50/1, D-52/1,
E-8/9 and E-8/10,
Additional MIDC Jalna,
Jalna
APPROVED
Renewal of
existing consent
NOT
APPROVED
1st consent to
operate for
expansion
31.05.2022
----
Committee noted that industry has obtained EC dated 17.05.2016. The
Analysis results of stack monitoring carried on 16.06.2016, 12.10.2016,
07.02.2017 are within consented limit.
Therefore, it was decided to grant plain renewal of consent to Operate
to manufacture MS Ingots/Billets-9,500 MT/M (316 MT/D) and MS
round and Twisted Bars-15,000 MT/M (500 MT/D) by imposing
following conditions:-
1. Industry shall extend the BG of Rs. 1.5 lakh obtained towards
compliance of consent conditions.
2. Industry shall extend the BG of Rs. 10 lakh obtained towards
compliance of consent to establish and EC conditions.
Committee also noted Board has issued the specific direction to the
industry dated 13.05.2016 and 19.12.2016 regarding up-gradation of
existing APC system, whereas industry failed to provide secondary
fume extraction system (at roof top) as stipulated in C to E and also
failed to submit the BG of Rs. 5 lakh towards up gradation of existing
APC System. Industry has failed to provide adequate stack height i.e.
40 mtrs to the furnaces as per EC conditions.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 13 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
Therefore, it was decided not to consider the 1st Consent to Operate for
expansion to manufacture MS Ingots/Billets-684 MT/D and MS TMT
Bars-500 MT/D and call the industry for personal hearing before
Member Secretary and revert back to next CAC.
24 MPCB-
CONSENT-
0000025826
Aurangabad Electricals
Ltd, Plant 3, Gut. No.
120/122 Village Pangra
Paithan, Aurangabad
NOT
APPROVED
1st consent to
operate for
expansion (Part)
with additional
one new
products and
Renewal of
existing unit and
their
amalgamation
---- Committee noted that industry has applied for additional one new
products Powder Coated Aluminium Pressure Die Casting- 1500
MT/M and also installed 03 Nos. of shot blasting units, 01 no. of
Melting plant, 03 Nos. of Powder Coating Booth and 04 Nos. of stacks
in Asbestos plant without obtaining consent to establish from the
Board. Board has already imposed the condition to submit the Board
resolution for carrying out expansion and making additional investment
of Rs. 11.47 Cr for modernization in previous consent. From the above
non-compliances, it seems that industry is habitual to violate the
environmental laws.
In view of above, it was decided to issue SCN for refusal 1st consent to
operate for expansion (Part) with additional one new products and
Renewal of existing unit and their amalgamation and why not to stop
the manufacturing activity direction due to above non-compliances.
25 MPCB-
CONSENT-
0000024996
Viraj Profiles Ltd. Survey
No. 25 (1), 25 (2), 26 &
34 Village Maan, Dist.
Palghar
NOT
APPROVED
Renewal of
consent to
operate with
change in water
--- Committee noted the following non-compliances reported by SRO
1. Industry has increased the CI by 296.22 Cr for replacement of old
machinery with new machinery without obtaining consent from the
Board.
2. Industry has neither install MEE to achieve ZLD nor submitted the
BG of Rs. 50 lakh towards compliance of the same.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 14 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
budget, HW
catg. and
increased CI
3. Industry has revised the water budget by increasing water
consumption for domestic by 87 CMD and reduced water
consumption for processing by 5 CMD and for industrial cooling by
862.5 CMD compared to previous consent.
4. Industry has newly added 03 Nos. of Thermic Fluid Heater and one
DG set compared to previous consent. Industry has also change the
fuel patter from FO to Natural Gas
5. Industry has newly added HW catg. 5.1, 5.2 and 20.2 also increased
HW quantity of Chemical Sludge from 295 MT/M compared to
previous consent.
In view of above, it was decided to issue SCN for refusal of renewal of
consent to operate with increase in CI due to above non-compliances.
26 MPCB-
CONSENT-
0000025186
Bhagwati Ferro Metal Pvt.
Ltd., G-7 & G-8 MIDC
Malegaon Sinnar,
Ahmednagar
APPROVED
Renewal of
consent to
operate with
increase in CI
and
amalgamation of
two plots
31.05.2022 Committee noted that the industry has obtained Environment Clearance
vide letter SEAC-2011/CR-524/TC-2 dated 01.04.2015 for
manufacturing of M.S. Billets- 25,000 TPM at plot no.- G-7 MIDC
Malegaon, Tal.-Sinnar, Dist.- Nashik.
Committee also noted that industry has obtained consent to establish
for Phase – I & II on plot No.- G-7 MIDC
Malegaon Sinnar vide letter No.- BO/AS(T)/EIC No.- NK-7944-
11/E/CC-186 dated 14.09.2011 for a products of M.S. Billets -12,500
TPM (Phase-I) & 12,500 TPM (Phase-II). Industry has obtained
consent to operate (part)- M.S. Billets -12,500 TPM (Phase-I).
Industry has also obtained consent to establish in the Name of M/s.
Bhagwati Ferro Metal Pvt. Ltd., (Rolling Mill Division) on Plot No.-
G-8 MIDC Malegaon , Tal.- Sinnar, Dist.- Nashik vide letter No.-
MPCB/RONK/CON/1021/412/2014 dated 13.02.2014 for a products
CTD/TMT Bars-11000 MT/Month by the Regional office, MPCB
Nashik in Orange Category.
MIDC vide letter dated 04.11.2011 granted waiver of marginal distance
along the common boundaries of plot no G-7 & G-8.
Now industry has applied for renewal of consent (phase-I) to
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 15 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
manufacture- M.S. Billets -12,500 TPM and amalgamation of plot No.
G-7 & G-8.
In view of above, it was decided to grant renewal of consent to operate
with increase in CI and amalgamation of two plots (G-7 & G-8) under
Red category by imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh towards O&M of
pollution control system.
2. Industry shall amend the EC for inclusion of plot no G-8 and their
product within 03 months.
3. Industry shall revalidate consent to establish for Phase II on plot
No.- G-7 MIDC which was valid upto 13.09.2016.
The request of the industry for change in category was not considered
as EC is granted for Sponge Iron project to manufacture M.S. Billet-
25,000 TPM and having high Air pollution potential.
Consent shall be issued after receipt of latest JVS results of stack
emission from SRO and additional requisite consent fee.
27 MPCB-
CONSENT-
0000026208
Rajuri Steel and Alloys
Pvt. Ltd., Plot No. B-6, 7
& 8 MIDC Mul, Mul,
Dist. Chandrapur
NOT
APPROVED
Renewal of
consent to
operate with
decrease in CI
--- Committee noted that the existing consent is valid up to 30.06.2015 and
industry is not in operation since from last three year and there is no
clarity about decrease in CI from 189.97 Cr to 33.57 Cr
Therefore, it was decided to issue SCN for refusal of renewal of
consent.
28 MPCB-
CONSENT-
0000021924
Cummins India Limited,
S. No 3 to 7, 37, 38, 41,
42 & 43 Dahanukar
Colony, Kothrud, Haveli,
Pune
APPROVED
Renewal of
consent with
increase in CI
30.04.2022 Committee noted that industry has made the leave and license
agreement between M/s. Cummins India Ltd and M/s. Cummins
Technologies India Pvt. Ltd., dated 31.01.2017.
Committee also noted that 1st consent to operate to M/s. Cummins
Technologies India Pvt. Ltd for R&D of Engines Testing and related
activities was approved in the CAC dated 08.08.2017 in the part of
M/s. Cummins India Ltd, premises.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 16 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
In view of above, it was decided to grant renewal of consent to operate
with increase in CI to manufacture Spares and Accessories- 48,000
MT/A and Internal Combustion Engines-19,200 Nos/A with decrease
in 27 Nos. of stack attached to test cell by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 10 lakh submitted
towards O&M of pollution control system
2. Industry shall extend the existing BG of Rs. 10 lakh submitted
towards reuse/recycle the treated trade and domestic effluent as per
consent conditions.
3. Industry shall install online flow meter within one month to measure
the treated effluent reuse/recycle in the process.
Decision regarding release/forfeiture of BG of Rs. 2 lakh towards
submission of Board resolution as per previous consent conditions will
be taken after receipt of verification report of SRO.
Consent shall be issued after submission of additional consent fee.
29 MPCB-
CONSENT-
0000025713
Cummins India Limited
(DBU)- TTC, MIDC
Suravadi, Phaltan-Lonand
Road Plot No. A1 & A1/2
Phaltan, Dist. Satara
APPROVED
Renewal of
consent to
operate
31.01.2028 It was decided to grant renewal of consent to operate for Technical
Training Center-2821.82 sq. mtrs. in Orange category for the period
upto 31.01.2028 by imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh obtained
towards O&M of pollution control system.
Consent shall be issued after receipt of additional consent fee.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 17 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
30 MPCB-
CONSENT-
0000026535
Bharat Gears Ltd.,
At. Kausa Shill Phata,
Mumbra, Old Mumbai-
Pune Road, Thane
APPROVED
Renewal of
consent with
decease in CI
30.04.2022 It was decided to grant renewal of consent to operate with decrease in
CI to manufacture Automobile Gears- 300 MT/M by imposing
following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh submitted
towards O&M of pollution control system.
It was also decided to return the BG of Rs.2 lakh obtained towards
submission of design details of ETP & STP and APC system in TAC
format as industry has submitted the same.
Consent shall be issued after submission of latest audited balance sheet
for verification and requisite consent fee.
31 MPCB-
CONSENT-
0000022820
Neosym Industry Limited,
Gat no. 201 Sanaswadi
Shirur, Dist. Pune.
APPROVED
Renewal of
consent to
operate
30.04.2022 It was decided to grant renewal of consent to operate for SI Casting
activity by imposing following conditions;
1. BG of Rs. 2.5 lakh out of BG of Rs. 5 lakh obtained towards O&M
of pollution control system is forfeited as JVS result is exceeding the
consented standards and the poor O&M of pollution control system
and obtain top-up BG of Rs. 5 lakh to make the total BG of Rs. 7.5
lakh towards compliance of the same.
2. Industry shall provide closed sewage collection system and connect
to STP within 02 months and submit the BG of Rs. 5 lakh.
3. Industry shall provide scientific disposal of slag and sand within one
month and submit the BG of Rs. 5 lakh towards compliance of the
same.
4. Industry shall provide adequate APC system to sand mixing unit and
spray painting unit within 03 months.
Decision regarding release/forfeiture of BG of Rs. 2 lakh obtained
towards submission of detailed water budget calculation and details of
APC system and BG of Rs. 5 lakh for installation of STP will be taken
after receipt of verification report of SRO.
32 MPCB-
CONSENT-
Kirloskar Brothers Ltd.,
610 Kirloskarvadi , Palus,
APPROVED
31.05.2022 It was decided to grant 1st consent to operate for modernization and
acid pickling activity for existing products and renewal of consent and
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 18 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
0000026665 Sangali 1st consent to
operate for
modernization
and renewal of
consent and
their
amalgamation
their amalgamation to manufacture Pump- 5486 Nos/M, Valve- 985
Nos/M and Machine Tools/Turbines- 32 Nos/M by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 10 lakh submitted
towards O&M of pollution control system.
2. Industry shall segregate metal bearing effluent for treatment and
100% reuse/recycle in the process, cooling tower within 03 months
and treated metal bearing effluent shall not be0020use on land for
gardening and submit the BG of Rs. 5 lakh towards compliance of
the same.
It was also decided to return the BG of Rs. 4 lakh and Rs. 2 lakh
obtained towards submission of Board resolution and carryout
performance evaluation of STP as industry has complied the same.
Consent shall be issued after submission of clarification/justification
regarding increased quantity of Non-HW and its disposal path by the
industry and requisite consent fee.
33 MPCB-
CONSENT-
0000025178
Thermax Babcock &
Wilcox Energy Solutions
Pvt. Ltd., Plot No. A-2 &
A3 MIDC, Khandala
Industrial Area, PH.01,
Kesurdi, Khandala, dist.
Satara.
APPROVED
Renewal of
consent with
increase in
production
quantity of one
product and
decrease in CI
30.04.2022 It was decided to grant plain Renewal of consent with decrease in CI by
imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh submitted
towards O&M of pollution control system.
2. Industry shall carryout the hazardous waste audit from renowned
institute within 03 months and submit the report to CAC Cell,
accordingly, HW quantity will be amended in the consent.
It was also decided not to consider the increase in production quantity
of one product i.e. Structural Material- from 20 MT/M to 100 MT/M
and without increase in HW quantity. Industry shall separately apply
for consent to establish.
Consent shall be issued after submission of latest JVS results and
requisite consent fee.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 19 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
34 MPCB-
CONSENT-
0000025960
Grindwell Noton Limited,
G-51 MIDC Butibori,
Hingna, Dist. Nagpur
APPROVED
Renewal of
consent to
operate with
increase in CI
30.04.2022 It was decided to grant renewal of consent to operate with increase in
CI to manufacture Grinding Wheel (Thin Wheel, Bonded Wheel and
Coated Disc)- 1000 MT/M by imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh submitted
towards O& M of pollution control system
The decision regarding return/forfeiture of BG of Rs. 2 lakh regarding
Submission of design details of ETP, STP & APC system in TAC
format shall be taken after verification report of SRO.
Consent shall be issued after submission of additional requisite consent
fee
35 MPCB-
CONSENT-
0000027052
KEC International Ltd.,
Plot No. B-190 MIDC
Industrial Area, Butibori,
Hingna, Dist. Nagpur
APPROVED
Renewal of
consent to
operate with
increase in CI
31.05.2022 It was decided to grant renewal of consent to operate with increase in
CI to manufacture Galvanised Transmission Towers-6675 MT/M by
imposing following conditions:-
1. Industry shall submit the BG of Rs. 5 lakh towards O& M of
pollution control system.
2. Industry shall 100% reuse/recycle the treated trade effluent into the
process and shall not discharge to CETP as per commitment given
by the Industry vide letter dated 31.07.2017.
3. BG of Rs. 4 lakh obtained towards installation of ARP
(combine/individual) is forfeited as industry failed to comply with
the condition imposed in interim direction and obtain top-up BG of
Rs. 8 lakh towards compliance of the same within 06 months.
Consent shall be issued after submission of additional consent fee.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 20 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
36 MPCB-
CONSENT-
0000018025
Bharat Forge Ltd.
Baramati, Plot No. E-1/1
Plot No. E-1/1, MIDC
Baramati, Dist. Pune
APPROVED
Renewal of
consent to
operate
28.02.2022 It was decided to grant renewal of consent to manufacture Forging-
98,000 Ton/A and Machining-3,50,000 Nos./A by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 10 lakh submitted
towards O& M of pollution control system.
Consent shall be issued after submission of additional consent fee &
latest JVS report and if JVS exceeds then proportionate BG shall be
forfeited.
37 MPCB-
CONSENT-
0000012726
Mahindra & Mahindra
Limited, S. No.- 159
Kandivali, Mumbai
APPROVED
Renewal of
consent to
operate with
increased
production
quantity of one
product, and
increased
effluent quantity
and CI
30.09.2021 It was decided to grant plain Renewal of consent to operate by
imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards
O&M of pollution control system.
2. Industry shall carryout the detailed water audit from renowned
institute like IIT/NEERI within 03 months and after submission of
audit report, consent shall be amend for change in water budget and
submit the BG of Rs. 2 lakh towards compliance of the same.
It was also decided not to consider the increase in production quantity
of Casting from 15,000 MT/A to 25,000 MT/A and without increase in
water consumption. Industry shall separately apply for consent to
establish for the same.
SRO shall submit the verification report in respect of increased
production quantity of Casting from 15,000 MT/A to 25,000 MT/A to
CAC cell by taking cognizance of increase in CI.
It was decided to consider the request of the industry to change the
disposal path of HW category 5.2- Oil soaked waste- 160 T/A and
category 21.1- Residue of coating and Painting- 550 Ton/A from
CHWTSDF to sale to authorized re-processor/CHWTSDF.
Consent shall be issued after receipt of CA certificate in Board’s
prescribed format and submission of additional requisite consent fee.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 21 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
38 MPCB-
CONSENT-
0000022664
Indapur Dairy & Milk
Products Ltd., S.N.94/1,
94/2, 104 At/Post-
Gokhali, Indapur-
Baramati Road, Tal-
Indapur, Dist.-Pune
APPROVED
Renewal of
consent to
operate with
increase in CI
30.04.2018 It was decided to grant plain renewal of consent to operate to
manufacture dairy products by imposing following conditions:-
1. Industry shall submit Board resolution within one month for
increasing C.I. from 53.94 Cr to 130.05 Cr without obtaining
consent from the Board and submit Bank Guarantee of Rs. 2 lakh
towards compliance of same.
2. Industry shall construct concrete wall, between ETP and adjacent
water pound (TALAV) so as to avoid any leakage/seepages of
effluent into water pond, within 3 months and submit Bank
Guarantee of Rs. 5 lakh towards compliance of same.
3. Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M
pollution control systems and compliance of consent conditions.
Consent shall be issued after obtaining requisite fee, if any.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 22 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
39 MPCB-
CONSENT-
0000027364
Dr. D. Y Patil Medical
College, Hospital &
Research Center, 171
Pimpri, Haveli, Pune
APPROVED
Combined
Consent &
BMW
Authorization
Consent to
Renewal
30.06.2022 It is noted that earlier combined consent and authorization is valid upto
30.06.2017 for 300 Beds and now applied fro 1417 Beds. PP has
obtained certificate under Bombay Nursing Home Registration for
1470 Beds.
Committee also noted that total BUA is 7731.57 sq. mtrs for hospital
component. Noted that SEIAA in its minutes of meeting dated
20.04.2017, total BUA for hospital is 7731.57 sq. mtrs hence, EC is not
applicable.
In view of above, it was decided to grant renewal of consent to operate
and BMW authorization by imposing standard conditions:-
1. PP shall provide Organic Waste Converter within 4 months period.
2. PP shall extend the Bank Guarantees as per the B.G. regime of the
HCE.
3. PP shall install online monitoring system for the parameters Flow,
BOD, TSS at the outlet of STP and shall submit BG of Rs 5 lakh
towards the compliance of the same.
Consent shall be issued after verification report of SRO regarding
provision of STP.
40 MPCB-
CONSENT-
0000027707
Tata Consultancy
Services, Hiranandani
Builders SEZ,
Hiranandani Business
Park, Powai, Mumbai
NOT
APPROVED
Renewal of
consent to
operate
--- Committee noted that PP has failed to install Organic Waste Converter
(OWC) for the treatment of biodegradable waste and failed to submit
the details total area of the project.
Therefore, it was decided to issue SCN for refusal of renewal of
consent to operate for IT and ITES activity.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 23 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
41 MPCB-
CONSENT-
0000026055
Hotel Conrad Palm Grove
Beach Hotels Pvt. Ltd., S.
NO. 468, C.T.S. No. 2F
S.No. 468, C.T.S. No. 2F,
Mangaldas Road, Pune
NOT
APPROVED
Renewal of
Consent to
Operate
--- It was decided to keep the case in abeyance and revert back to next
CAC along with details of EC and design details of STP, ETP, OWC
provided including online monitoring system and NOC obtained form
CGWA for use of ground water, and latest three JVS reports.
42 MPCB-
CONSENT-
0000027816
Kansai Nerolac Paints
Limited, Plot No. F-1/2,
F-2 & F-3 Village:
Awashi, MIDC Lote,
Khed, Dist. Ratnagiri
APPROVED
Renewal of
consent to
oeprate
31.07.2020 Committee noted that industry has provided RO and MEE so as to
achieve ZLD.
In view of above, it was decided to grant plain renewal of consent to
operate with increase in CI by imposing following conditions:-
1. Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M
of pollution control systems.
It was also decided not to consider the increase in production quantity
of two products 1) Water based paints from 12,000 MT/A to 13,000
MT/A and 2) Paints- 22,800 MT/A to 23,100 MT/A. Industry shall
separately apply for consent to establish for the same.
Consent shall be issued after submission of additional consent fee.
43 MPCB-
CONSENT-
0000019537
ESIC Model Hospital,
Opposite MIDC Police
Station, Andheri ( E )
Mumbai
NOT
APPROVED
Combined
Consent &
BMW
Authorization
--- Committee noted that PP failed to provide Sewage Treatment Plant
/Effluent Treatment Plant and also not submitted Bank Guarantee as
per earlier BMW Authorization.
Therefore, it was decided to issue SCN for Combined Consent &
BMW Authorization.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 24 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
44 MPCB-
CONSENT-
0000028231
Uttam Galva Steel
Limited, Village - Donvat,
Khopoli - Pen Road,
Khalapur, Dist. Raigad
NOT
APPROVED
Renewal of
consent to
operate with
increase in CI
--- Committee noted that industry has increased the CI from 2294.42 Cr to
6002.75 Cr i.e. by 3708.33 Cr (161%) without obtaining consent to
establish form the Board. Industry has not submitted any clarification
regarding the same.
In view of above, it was decided to issue SCN for refusal of renewal of
consent to operate and stop work due to above non-compliances.
45 MPCB-
CONSENT-
0000026638
Dr. Balabhai Nanavati
Hospital, 1403, 1403/1 TO
1403/21,1403/35, Vile
Parle, Andheri, Mumbai
APPROVED
Combined
Consent &
BMW
Authorization
20.07.2019 It was decided to grant renewal of combine consent to operate and
BMW authorization of Total Plot Area - 15,960 sq. mtrs. and Total
Construction BUA of 22,491 sq. mtrs. by imposing following
conditions:-
4. Bank Guarantee Rs. 1.00 lakhs is forfeited as PP failed to provided
STP within stipulated time period.
5. PP shall provide Organic Waste Converter within 4 months period.
6. PP shall submit Bank Guarantees as per the B.G. regime of the
HCE.
7. PP shall submit affidavit regarding not increase in BUA as per
consent dtd. 08.01.2016 (BUA - 22,491 sq. mtrs.)
8. PP shall install online monitoring system for the parameters Flow,
BOD, TSS at the outlet of STP and shall submit BG of Rs 5 lakh
towards the compliance of the same.
Consent shall be issued after verification report of SRO regarding
provision of STP.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 25 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
46 MPCB-
CONSENT-
0000026580
Tarapur Atomic Power
Station 1&2, Nuclear
Power Corporation of
India Limited, City &
Revenue Survey No. 56
Village Ghivali, Dist.
Palghar
APPROVED
Renewal of
consent to
operate with
increase in CI
31.07.2022 It was decided to grant renewal of consent to operate with increase in
CI for Power Generation-320 MW by imposing following conditions:-
1. Industry shall install adequate capacity of STP within 06 months for
sewage generated from Plant and submit the BG of Rs. 5 lakh
towards compliance of the same.
Consent shall be issued after submission of existing BG of Rs. 10 lakh
towards O&M of pollution control system and additional requisite
consent fee.
47 MPCB-
CONSENT-
0000028101
India Security Press, 136
to 139P, 132, 133,
134B+135B Nashik Road,
Dist. Nashik
APPROVED
Renewal of
consent to
operate with
increase in CI
30.06.2022 It was decided to grant renewal of consent to operate with increase in
CI by imposing following conditions.
Industry shall provide ETP and STP within six months and submit
the BG of Rs. 10 lakh towards compliance of the same.
Consent shall be issued after receipt of disposal details of HW, Water
budget and after submission of BG.
48 MPCB-
CONSENT-
0000028585
Kumbhi Kasari SSK. Ltd,
Gat. No. 304,305 & 306
Kuditre Karvir, Dist.
Kolhapur
APPROVED
Renewal of
consent to
operate
31.08.2018 Committee noted that industry has provided bio-digester followed by
concrete compost yard on 7 acres for the treatment of spent wash along
with leachate collection system.
It was decided to grant renewal of consent to operate to Distillery unit
of 30 KLPD by imposing following conditions:-
1. Industry shall carryout monitoring of open well nearby vicinity on
quarterly basis and submit the report to Regional/Sub-Regional
Office.
2. BG of Rs. 5 lakh obtained towards O & M of pollution control
systems is forfeited due to non-compliance of consent conditions
and submit the top-up BG of Rs. 10 lakh towards compliance of the
same.
3. Industry shall submit performance bank guarantee of Rs. 10 lakh
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 26 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
towards not to use treated/untreated spent-wash other than
composting.
49 MPCB-
CONSENT-
0000029037
Sadhu Vaswani Mission's
Medical Complex, 7-9
Sadhu Vaswani Mission,
Koregaon Park, Pune
APPROVED
Combined
Consent &
BMW
Authorization ,
31.08.2020 It was decided to grant Combined Consent to Operate and BMW
Authorization (CCA) under Red category for Health Care
Establishment having 369 beds on Total Plot Area of 13,763.25 sq.
mtrs. and Total Construction BUA of 19,110 sq. mtrs. by imposing
standard conditions with BG regime and following specific conditions:-
1. PP shall provide Organic Waste Converter (OWC) for
Biodegradable waste within 03 months’ time period and submit BG
of Rs 5 lakh towards the compliance of the same.
2. PP shall extend BG stipulated in existing Combined Consent and
Authorization for further period.
3. PP shall install online monitoring system for parameters BOD, TSS
flow at the outlet of STP
with a period of three months and submit BG of Rs 5 lakh towards
compliance of the same.
4. The treated domestic effluent shall be 60% recycled for secondary
purposes such as toilet flushing, air conditioning, cooling tower
make up, firefighting etc. and remaining shall be utilized on land for
gardening and connected to the sewerage system provided by local
body.
Combined Consent to Operate and renewal of BMW Authorization
shall be issued after submission of:-
a) PP shall submit affidavit stating that there is no applicability of EC
as per EIA Notification dtd. 14th September, 2006 as amended and
after submission of additional fees, if applicable.
50 MPCB-
CONSENT-
0000029363
Finolex Industries
Limited, 133 - 144, 146,
154 - 174, 177-180, 186-
193, 199, 202, 205-206,
APPROVED
Renewal of
consent to
31.08.2022 It was decided to grant renewal of consent to operate with increase in
CI by imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh towards O&M of
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 27 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
252 & 254 Ranpar-Golap,
Ratnagiri Pawas Road,
Dist. Ratnagiri
operate with
increase in CI
pollution control system.
2. Industry shall upgrade the existing ETP so as to achieve the standard
30 mg/lit for the parameter BOD within three months as industry is
partly using the treated effluent on land for gardening.
It was decided to return the BG of Rs. 2 lakh each obtained towards for
carrying out Water audit & ETP performance evaluation as industry has
complied.
Consent shall be issued after submission of additional requisite consent
fee, if any.
51 MPCB-
CONSENT-
0000028080
Hindustan Aeronautics
Ltd., Gat No 2729, Ojahr,
Niphad, Dist. Nasik
APPROVED
Renewal of
consent to
operate with
increase in CI
30.06.2022 It was decided to grant renewal of consent to operate with increase in
CI for Fighter Aircraft, SU-30 MKI- 14 Nos by imposing following
conditions:-
1. Industry shall submit the BG of Rs. 5 lakh towards O&M of
pollution control system.
Consent shall be issued after receipt of additional consent fee.
52 MPCB-
CONSENT-
0000029375
Evita Construction Pvt.
Ltd., Plot bearing survey
No.193 to 197, 198/1,
198/2, 199 to 214, 218 to
221, 224 to 232, 241, 242,
245 to 250, 253 to 255,
268, 269, 532, 534,At
Village-Dharumbre,Tal-
Maval, Dist-Pune
NOT
APPROVED
Re-validation of
Consent to
Establish
--- Committee noted that PP has failed to revalidate the EC from
competent Authority.
Therefore, it was decided to issue Show Cause Notice for revalidation
of Consent to Establish with stop work order.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 28 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
53 MPCB-
CONSENT-
0000025831
Flagship Infrastructure
Pvt. Ltd., CTS No.120 to
125, 154 to 171 and 173.
Hinjewadi, Mulshi, Pune
NOT
APPROVED
Renewal of
Consent to
Operate (Part-
i.e. combine for
3 different
phases) for SEZ
and Township
project
--- Committee noted that PP failed to provide following information,
1. PP has failed to obtain amendment in C to E for proposed expansion
for Total plot area of 5,94,675 Sq. M and Total Construction BUA
of 14,02,149.29 sq. mtrs. For increased construction.
2. PP has failed to amend the EC for increased construction BUA in
the name of Blue Ridge.
3. PP has failed to provide Building wise details, as per EC & for
proposed expansion and constructed area.
4. Architecture Certificate for Total construction completed area not
submitted.
5. PP has failed to upload/provide all the existing consent copies.
6. PP has failed to submit the BG details as per consent.
7. PP has failed to provide STP & OWC details, its adequacy, domestic
effluent generation & Non Hazardous waste generation, E-waste
generation.
8. PP has increased the CI from 376 Cr to 841.38 without obtaining
consent from the Board.
In view of above, it was decided to issue SCN for renewal of consent
(Part) with stop work.
54 MPCB-
CONSENT-
0000021405
Naiknavare Housing
Development Pvt. Ltd.,
88(P), 90to97, 113/2, 124
to127, 128/1 to 128/3,
122, 123 Village-
Mhalunghe, Khed, Dist.
Pune
NOT
APPROVED
Renewal of
Consent to
Operate (part)
with expansion
--- Committee noted that PP has failed to complete up-gradation work of
STP and installation of OWC.
Therefore, it was decided to issue SCN for refusal of renewal of
Consent to Operate (part) with expansion.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 29 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
55 MPCB-
CONSENT-
0000027861
Rieter India Private
Limited, 134/1 Gat No.
134/1, Vadu Road,
Koregaon Bhima, Tal-
Shirur, Dist- Pune
NOT
APPROVED
Renewal of
consent to
operate with
decrease in CI
--- Committee noted that unit is closed since last two years, at present, unit
is having 3 no. of sheds at site, out of which one is used as ware house
for storage of machines and remaining two are vacant.
In view of above, it was decided to issue SCN for refusal of renewal of
consent due to above non-compliance.
56 MPCB-
CONSENT-
0000029320
JSW Steel Coated
Products Limited, Plot
No.B-7/1, MIDC Tarapur,
Industrial Area, Tarapur
Palghar
APPROVED
Renewal of
consent
31.08.2022 It was decided to grant renewal of consent to operate for Captive Power
Plant- 30 MW by extending the existing BG’s.
Consent shall be issued after receipt of verification report regarding
installation of online monitoring system and requisite consent fee.
57 MPCB-
CONSENT-
0000029835
Apollo Hospitals
Enterprise Ltd., Plot
No.13 Sector 23, plot
No.13, Parsik hill road,
Belapur, Navi Mumbai
APPROVED
Combined
Consent &
BMW
Authorization
30.07.2018 It was decided to grant renewal of combine consent to operate and
BMW authorization for 252 Beds on total Plot area - 14,783.960 sq.
mtrs. and Total Construction BUA of 60,724.591 sq. mtrs. by imposing
following conditions:-
1. To provide Organic Waste Converter within 4 months period.
2. PP shall submit Bank Guarantees as per the B.G. regime of the
HCE.
3. PP shall install online monitoring system for the parameters Flow,
BOD, TSS at the outlet of STP and shall submit BG ofRs 5 lakh
towards the compliance of the same.
PP shall apply separately for additional beds after obtaining Certificate
under Bombay Nursing Home Act.
Consent shall be issued after:-Verification report from SRO regarding
adequacy of STP and OWC and
58 MPCB-
CONSENT-
0000029591
Reliance Industries
Limited, 2/1, 2/2, A-1, A-
1/1 MIDC Industrial Area,
Nagothane, pen, Dist.
Raigad
APPROVED
Renewal of
consent to
operate
31.08.2022 It was decided to grant renewal of consent to operate by imposing
following conditions:-
1. Industry shall comply with the recommendations of Water Audit
report and ETP feasibility report carried out by NEERI and submit
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 30 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
the compliance report to RO/SRO within 1 month.
2. Industry shall complete repairs of O&G removal system within 1
months and submit Bank Guarantee of Rs. 2 lakh towards
compliance of same.
3. Industry shall extend/submit Bank Guarantee of Rs. 5 lakh towards
O & M of pollution control systems and compliance of consent
conditions.
4. Industry shall carryout repair works of effluent carrying pipeline on
priority wafting and submit the report.
Consent shall be issued after submission of additional requisite consent
fee.
59 MPCB-
CONSENT-
0000030308
Ashok Leyland Limited,
P.No.1, MIDC Industrial
Area Bhandara Lakhani.
Dist. Bhandara
APPROVED
Renewal of
consent to
operate with
increase in CI
30.09.2022 It was decided to grant renewal of consent to operate with increase in
CI by imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards
O&M of pollution control system.
Consent shall be issued after receipt of latest JVS results from SRO and
after receipt of additional consent fee
60 MPCB-
CONSENT-
0000030662
The Saswad Mali Sugar
Factory Ltd., 1B
Malinagar, Malshiras,
Dist. Solapur
APPROVED
Renewal of
consent to
operate
31.08.2018 It was decided to grant renewal of consent to operate for 30 KLPD
molasses based distillery unit by imposing following conditions:-
1. Industry shall extend existing Bank Guarantee of Rs. 5 lakh towards
O&M of pollution control systems.
61 MPCB-
CONSENT-
0000030345
Mouda Super Thermal
Power Project , NTPC
Limited, MIDC Mouda,
Dist. Nagpur
APPROVED
Renewal of
Consent to
Operate and
amalgamation
with existing
31.08.2018 It was decided to grant renewal of consent to operate with increase in
CI for Coal based Power Plant- 660 MW by imposing following
conditions:-
1. Industry shall either make the agreement with coal washeries or
shall provide own washeries to get the blended/ beneficiated coal
with ash content less than 34% and submit the BG of Rs. 10 lakh
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 31 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
consent of 660
MW
towards compliance of the same.
2. Industry shall install the Automatic real time monitoring system for
coal ash analysis.
3. Consent shall be issued with the overriding effect of earlier consent
granted by the Board dated 18.10.2017.
Consent shall be issued after receipt of BG compliance report from
SRO along with latest JVS results accordingly, proportionate BG will
be forfeited, if non-compliance reported and after submission of
additional requisite consent fee.
Consent shall be issued after obtaining additional requisite consent fee,
if any.
62 MPCB-
CONSENT-
0000024071
Ordnance Factory,
Ambajhari, Total 3492.11
Acres Amravati Road,
Dist. Nagpur
NOT
APPROVED
Renewal of
consent with
increased CI
--- It was decided to issued SCN for refusal of renewal of consent due to
following non-compliance:-
1. The installation work for provision of ZLD like PSF, CSF for
combined treated effluent was found completed but it not in
operation.
2. Industry has failed to provide APC system to anodizing and
chromodizing bath in Fuse shop and 04 Nos. of electroplating bath
having capacity 200 lit each.
3. Industry has failed to provide APC system to 04 Nos. of hydraulic
press machine resulting fugitive emission was observed in that area.
4. Industry has failed to submit the BG as per consent condition
5. Industry has increased about 155 Cr CI without obtaining consent
from the Board.
6. Industry has increased the HW quantity in each categ. compared to
previous consent.
63 MPCB-
CONSENT-
0000030800
Tata Motors Limited, Plot
No. F1 MIDC Pimpri
Pimpri, Haveli, Pune
APPROVED
Renewal of
consent with
increased CI
30.09.2022 The committee noted that industry has provided ETP and two Nos. of
STP. Treated effluent is used for gardening within premises. JVS
results are within the consented limit.
Therefore, it was decided to grant renewal of consent to operate with
increase in CI to manufacture- Commercial & Passenger Vehicles-
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 32 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
3,00,000 Nos./A and Power-34.8 MW by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh and Rs. 2 lakh
obtained towards O&M of pollution control system.
2. Industry shall recycle/reuse maximum quantity of treated effluent
into process, cooling tower, toilet flushing and remaining used on 53
acres of land for gardening. Industry shall install online flow meter
to ETP and STP outlet and recycle system within one month to
monitor the quantity of treated effluent recycle.
Consent shall be issued after submission of additional consent fee,
water balance details and HW details from industry
64 MPCB-
CONSENT-
0000030839
Tata Motors Ltd.
Passenger Car Unit
Chikhali, Sector 16 & 15
A Chikhali, Haveli, Pune
APPROVED
Renewal of
consent with
increase in CI
30.09.2022 It was decided to grant renewal of consent to operate with increase in
CI to manufacture Passenger Car Vehicles (Inclusive of Jaquar,
Landrover Production)- 3,00,000 Nos/A by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 10 lakh towards O&M
of pollution control system.
2. Industry shall install online flow meter to ETP and STP outlet and
recycle system within one month to monitor the quantity of treated
effluent recycle.
Consent shall be issued after submission of requisite consent fee, water
budget, and HW details from industry.
65 MPCB-
CONSENT-
0000031131
Piaggio Vehicles Pvt.
Ltd., Plot No F19, MIDC
Baramati, Dist. Pune
APPROVED
Renewal of
consent to
operate with
increase in CI
30.09.2022 It was decided to grant renewal of consent to operate with increase in
CI to manufacture Two Wheeler- 1,50,000 Nos/A by imposing
following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh submitted
towards O&M of pollution control system.
2. Industry shall submit the Board resolution within one month towards
increased CI by 39.81 Cr (22%) due to modernization of machinery
without obtaining consent from the Board and submit the BG of Rs.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 33 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
2 lakh towards compliance of the same.
The decision regarding release/forfeiture of BG of Rs. 2 lakh each
obtained towards submission of details of biological unit of STP and
design details of the PAC system in TAC format and submission of
design details of APC system respectively will be taken after receipt of
verification report of SRO.
Consent shall be issued after receipt of additional consent fee and latest
JVS results from SRO.
66 MPCB-
CONSENT-
0000030637
General Motors India
Private Limited, A-16
MIDC Talegaon, Maval,
Dist. Pune
APPROVED
Renewal of
consent to
operate with
decrease in CI
30.09.2022 It was decided to grant renewal of consent to operate with decrease in
CI to manufacture Automotive Units-1,84,000 Nos/A and ICP Engines
& Accessories N.E.C. for motor vehicle- 1,60,000 Nos/A by imposing
following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh submitted
towards O&M of pollution control system
Decision regarding release/forfeiture of BG of Rs. 2 lakh each for
carryout performance evaluation of ETP and For submission of design
details of Control equipment’s provided to primer surface, hace coat
and clear coat booths & details of scrubber provided at pre-treatment
section will be taken after receipt of verification report of SRO.
Consent shall be issued after receipt of latest audited balance sheet for
verification, HW details and latest JVS results.
67 MPCB-
CONSENT-
0000031209
Fiat India Automobiles
Private Limited, B-19
MIDC Ranjangaon,
Shirur, Dist. Pune
APPROVED
Renewal of
consent with
increase in CI
30.09.2022 It was decided to grant renewal of consent to operate with increase in
CI for manufacturing of Motor Cars (without Engines, Parts and
Accessories)- 1,68,000 Nos./A, Manufacturing of Engines- 3,00,000
Nos./A and Manufacturing of Parts and Accessories- 3,00,000 Nos./A
by imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards
O&M of pollution control system.
2. As per the consent condition, treated effluent shall be recycled to the
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 34 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
maximum extent, to monitor the same, industry shall install online
flow meter to ETP and STP outlet and recycle system within one
month to monitor the quantity of treated effluent recycle and submit
the BG of Rs. 5 lakh towards compliance of the same.
Consent shall be issued after submission of additional consent fee.
68 MPCB-
CONSENT-
0000030878
Tarapur Automatic Power
Station, NPCIL, 11 to 13
Tarapur Village-
Akkarpatti, Palghar
APPROVED
Renewal of
consent to
operate
31.08.2022 It was decided to grant renewal of consent to operate for manufacturing
of Electricity- 1080 MW (2 x 540 MW) by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh obtained towards
compliance of consent conditions.
2. BG of Rs. 5 lakh obtained towards installation of adequate capacity
of STP is forfeited as industry has not installed the STP and obtain
top-up BG of Rs. 10 lakh towards compliance of the same within 06
months.
Consent shall be issued after submission of additional requisite consent
fee.
69 MPCB-
CONSENT-
0000031622
PMT Machines Limited,
PO. Box no. 1102 Pimpri
Haveli, Pune
APPROVED
Renewal of
consent with
increase in CI
30.04.2019 It was decided to grant renewal of consent to operate with increase in
CI to manufacture Automatics- 40 Nos./M, Voumard Grinding
Machines- 2 Nos./M and CNC turning Lathe- 15 Nos./M by imposing
following conditions:-
1. BG of Rs. 2.5 lakh out of BG of Rs. 5 lakh obtained towards O&M
of pollution control system is forfeited as out of two JVS results, one
JVS result is exceeding for the parameter BOD, COD & SS more
than 100% and obtain top-up BG of Rs. 5 lakh to make the total BG
of Rs. 7.5 lakh towards O&M of pollution control system.
Consent shall be issued after submission of additional requisite consent
fee, if any.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 35 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
70 MPCB-
CONSENT-
0000031150
Sigma Electric
Manufacturing
Corporation Pvt. Ltd.,
(Unit-III), Plot No. B-27
MIDC Chakan, Khed,
Dist. Pune.
APPROVED
Renewal of
consent with
increase in CI
30.09.2019 It was decided to grant renewal of consent to operate with increase in
CI to manufacture Electrical Fittings & Accessories- 550 MT/M by
imposing following conditions:-
1. Industry shall extend the existing BG of Rs. 5 lakh submitted
towards O&M of pollution control system.
2. Industry shall segregate the metal bearing effluent and treat
separately and 100% reuse/recycle in the process and remaining
non-metal bearing treated trade effluent shall be disposed on land for
gardening within 03 months and submit the BG of Rs. 5 lakh
towards compliance of the same.
3. Industry shall recycle/reuse 100 CMD treated effluent in process,
cooling tower, toilet flushing and remaining 22 CMD effluent shall
be used on 1 acres of land for gardening purpose. Industry shall
install online flow meter within one month to monitor the same.
Consent shall be issued after receipt of latest JVS results and
submission of additional consent fee, if any.
71 MPCB-
CONSENT-
0000030416
Sai Wardha Power
Generation Limited, Plot
No. B-2, Warora Growth
Center, MIDC Warora,
Warora, Dist. Chandrapur
APPROVED
Renewal of
Consent with
increase in
Capital
Investment
31.08.2022 It was decided to grant renewal of Consent to Operate with increase in
CI to Power generating Unit of capacity 540 MW (135 MW x 4 Nos.)
by imposing following conditions:-
1. Industry shall extend the existing BG as per previous consent
conditions
Decision regarding release/forfeiture of BG will be taken after receipt
of BG compliance and latest results of Stack report from SRO.
Consent shall be issued after:-
Obtaining additional requisite consent fees, verification of report of
SRO regarding provision of online monitoring system, flow meter.
72 MPCB-
CONSENT-
0000030993
Bajaj auto ltd., Plot A-1,
Mahalunge MIDC Chakan
Khed, Dist. Pune
APPROVED
Renewal of
consent with
increase in CI
30.09.2022 It was decided to grant renewal of consent to operate with increase in
CI to manufacture Motorised Two Wheeler-15,00,000 Nos./A and
Engines for Two Wheeler-6,00,000 Nos./A by imposing following
conditions:-
1. Industry shall extend the existing BG of Rs. 6 lakh obtained towards
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 36 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
O&M of pollution control system.
2. Industry shall carryout the hazardous waste audit within 03 months
from renowned institute like IIT/NEERI as variation observed in
consented hazardous waste quantity and actual generation of
hazardous waste with respect to actual level of production, i.e.
generation of HW is very less with respect to actual level of
production and submit the BG of Rs. 2 lakh towards compliance of
the same.
3. Industry shall stop the incineration activity and discard the same
within three months & send the paint sludge to authorized paint
sludge recycler/CHWTSDF
Consent shall be issued after submission of additional consent fee, if
any.
73 MPCB-
CONSENT-
0000031389
K.E.M. Hospital, 489
Rasta Peth, Pune
NOT
APPROVED
Combined
Consent &
BMW
Authorization
Consent to
Renewal
---- It was decided to issue SCN for refusal of CCA and consent to operate
on following non-compliance:-
1. PP is not operating the STP and discharging untreated effluent
directly to municipal sewer line without any treatment and not
operating
2. CA Certificate submitted is not in in Boards prescribed format.
3. PP has increased the CI form 45.2 Cr to 63.08 Cr without obtaining
consent from the Board.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 37 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
74 MPCB-
CONSENT-
0000032655
Paras Thermal Power
Station, MSPGCL,
S.No.120A,120B,120C,12
0D,1032 & 1184 Paras
Balapur, Dist. Akola
APPROVED
Renewal of
Consent to
operate
31.08.2019 It was decided to grant renewal of consent to operate to Power
Generating Unit- 500 MW (2 x 250 MW) by imposing following
conditions:-
1. PP shall submit the Bank Guarantee as per BG regime.
2. PP shall install Continuous Ambient Air Quality Monitoring System
within 06 months period i.e. Up to 30.06.2018.
3. PP shall provide scientific arrangement for collection of leachate.
Consent shall be issued after receipt of BG compliance report from
SRO and after submission of additional requisite consent fees if
applicable.
75 MPCB-
CONSENT-
0000032686
M. S. P.G. C. L.,
Khaperkheda thermal
Power Station, Silewara:
71 to 117 & Bhanegaon :
1 to 35 Khaperkheda,
Saoner, Dist. Nagpur
APPROVED
Renewal of
consent to
operate
31.08.2018 It was decided to grant renewal of consent to operate to Power
Generating Unit- 500 MW by imposing following conditions:-
1. PP shall submit the Bank Guarantee as per BG regime.
2. PP shall install Continuous Ambient Air Quality Monitoring System
within 06 months period i.e. Up to 30.06.2018.
3. Industry shall either make the agreement with coal washeries or
shall provide own washeries to get the blended/ beneficiated coal
with ash content less than 34% and submit the BG of Rs. 10 lakh
towards compliance of the same.
Consent shall be issued after receipt of BG compliance report from
SRO along with latest JVS results accordingly, proportionate BG will
be forfeited, if non-compliance reported and after submission of
additional requisite consent fee.
76 MPCB-
CONSENT-
0000032658
M. S. P.G. C. L.,
Khaperkheda thermal
Power Station, Silewara:
71 to 117 & Bhanegaon :
1 to 35 Khaperkheda,
Saoner, Dist. Nagpur
APPROVED
Renewal of
consent to
operate
31.08.2018 It was decided to grant renewal of consent to operate to Power
Generating Unit- 840 MW (210 MW x 4 Nos) by imposing following
conditions:-
1. PP shall submit the Bank Guarantee as per BG regime.
2. PP shall install Continuous Ambient Air Quality Monitoring System
within 06 months period i.e. Up to 30.06.2018.
3. Industry shall either make the agreement with coal washeries or
shall provide own washeries to get the blended/ beneficiated coal
with ash content less than 34% and submit the BG of Rs. 10 lakh
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 38 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
towards compliance of the same.
Consent shall be issued after receipt of BG compliance report from
SRO along with latest JVS results accordingly, proportionate BG will
be forfeited, if non-compliance reported and after submission of
additional requisite consent fee.
77 MPCB-
CONSENT-
0000032708
United Breweries Ltd., M-
1, MIDC, Taloja M-1,
MIDC, Taloja Panvel,
Dist. Raigad
APPROVED
Renewal of
consent to
operate
31.10.2022 It was decided to grant renewal of consent to operate with increase in
CI for Beer manufacturing unit by imposing following conditions:-
1. Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M
of pollution control systems and compliance of consent conditions.
Consent shall be issued after receipt of additional requisite consent fees
if applicable.
78 MPCB-
CONSENT-
0000030904
Piaggio Vehicles Pvt Ltd.,
E-2 & F-1 Katphal Road ,
MIDC Baramati, Tal.
Baramati, Dist. Pune
NOT
APPROVED
Renewal of
consent with
increase in CI
--- Committee noted that there is large variation in consented hazardous
waste quantity and actual generation of hazardous waste with respect to
production, i.e. generation of HW is very less with respect to actual
level of production of the same.
It is also noted that the JVS result is exceeding the consented standards
for the Parameter Phosphate-9.30 mg/lit against the standards 5mg/lit
and BOD 38 mg/lit
Therefore, it was decided to issue SCN for refusal of Renewal of
consent to operate with increase in CI due to above non-compliances.
79 MPCB-
CONSENT-
0000032879
Raheja Universal (Pvt.)
Ltd. (Raheja Exotica
Project), CTS No. 1965,
2053/B, 2053/C, 2053/C-
1, 2053/D, 2053/E,
2055/B & 2055/C Village
Erangal, Patilwadi Road,
Malad (E) Borivali,
Mumbai
NOT
APPROVED
Renewal of
consent to
operate
--- It was decided to issue SCN for Renewal of Consent to operate as PP
failed to provide Organic waste converter for treatment of
Biodegradable waste and not applied for amendment in C to E for Total
Construction area of 3,38,665.03 sq. mtrs as per Environmental
clearance dated 21/6/2016, as Condition No. 14 mentioned in earlier
consent dated 21/7/2016.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 39 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
80 MPCB-
CONSENT-
0000033788
Indospace AS Industrial
Park Pvt. Ltd., 341 (P)
Mahalunge Village, Near
Chakan Industrial Area
Phase I, Off Talegaon
Chakan Road, Tal. Khed,
Dist. Pune
APPROVED
Renewal of
Consent to
Operate with
amalgamation of
additional 2
Nos. of
buildings
30.09.2018 It was decided to grant Renewal of Consent to operate for 8 Nos. of
industrial buildings with amalgamation of additional 2 Nos. of
buildings for total plot area of 1,74,800 sq. mtrs. and total construction
BUA of 82,000.63 sq. mtrs. by imposing following conditions:-
1. PP shall submit the BG of Rs. 25 lakhs obtained towards O & M of
Pollution control system.
2. PP shall install online monitoring system for the parameters BOD,
SS and flow at the outlet of STP and submit BG of Rs 5 lakh for the
compliance of the same.
3. PP shall achieve the treated domestic effluent standard for the
parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for
gardening and connected to the sewerage system provided by local
body.
81 MPCB-
CONSENT-
0000031775
ICC Realty (I) Pvt. Ltd.,
International Convention
Centre, F.P. No. 403,
403A/1 & 2 CTS No. 985,
985/1, 985/2, Shivaji
Nagar, Pune
APPROVED
Renewal of
Consent to
operate
31.08.2022 It was decided to grant Renewal of Consent to Operate for IT & ITES
Park, Hotel with Laundry activity and Mall in the name of ICC Realty
(I) Pvt. Ltd., International Convention Centre, Pune, for Total Plot area
of 50,794.05 sq. mtrs. and Total Built up area of 97,371.60 sq. mtrs by
imposing following conditions:-
1. PP shall extend/ top up the BG to form total sum of Rs. 25 lakh
towards O&M of pollution control system.
2. PP shall achieve the treated domestic effluent standard for the
parameter BOD- 10 mg/lit. within 6 month time period and shall
submit BG of Rs. 10 lakhs for the same.
3. The treated domestic effluent shall be 60% recycled for secondary
purposes such as toilet, flushing, air conditioning, cooling tower
make up, firefighting etc. and remaining shall be utilized on land for
gardening and connected to the sewerage system provided by local
body.
4. PP shall submit Board Resolution from company Board, towards
continuing the operation of the project without obtaining consent to
operate from the MPC Board thus violated the provisions of
Environmental Laws and in future, they will not do such violations
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 40 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
and BG of Rs. 2 lakh towards submission of Board resolution within
one month of issue of consent.
Consent shall be issued after receipt of additional requisite consent fees
if applicable.
82 MPCB-
CONSENT-
0000029956
Saifee Hospital, 15/17, C.
S. no. 37 fo Girgaon
Division, Maharshi Karve
Road, Charni Road, (E)
Mumbai
NOT
APPROVED
Combined
Consent &
BMW
Authorization
--- It was decided to issue Show Cause Notice for refusal of Combined
Consent & BMW Authorization due to following non-compliance:-
1. PP has increased the investment from 82.34 Cr to 261.7 Cr and Nos.
of beds by 17 Nos. without obtaining valid consent from the Board.
2. PP has increased the trade effluent quantity compared to previous
consent.
3. PP failed to submit/upload the reply of discrepancy letter vide email
dtd. 24.10.2017.
It was also decided to call the PP for presentation before Member
Secretary due to above non-compliances.
83 MPCB-
CONSENT-
0000035080
Kaira District Co-
Operative Milk Producers
Union Ltd. (Amul Dairy),
31/2-a, 31/2-b, 31/2-c,
31/2-d, 31/2-e and 44/2
Tokre Village Tokre, Tal.
Vasai, Dist.Thane
APPROVED
Renewal of
consent to
operate
30.04.2022 It was decided to grant renewal of consent to operate for manufacturing
of Packaged Pasteurized Milk- 182.50 Lack Ltr/M, Butter Milk 30
Lack Ltr/M, Curd (Yoghurt)- 600 MT/M, Ice Cream- 15 Lack Ltr/M,
by imposing following conditions:-
1. Industry shall extend existing Bank Guarantee of Rs. 7.5 lakh
towards O &M of pollution control systems and compliance of
consent conditions.
Consent shall be issued after receipt of additional requisite consent fees
if applicable.
Review Item
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 41 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
1 Request to waive the condition of obtaining EC in the
Consent to Establish for expansion granted by the Board to
M/s. JSW Steel Coated Products Ltd., Vasind Works, Tal.
Shahapur, Dist. Thane
APPROVED Committee noted that Board has granted consent to establish for
expansion to manufacture 1) Cold Rolled Coils, Sheets and Zinc
Coated products- Galvanized, Galvalume- 82,500 MT/M 9,90,000
MT/A) 2) Colour Coated Products- 22,917 MT/M (2,75,004 MT/A).
Industry stated that in the manufacturing process they do not use any
furnaces like Induction furnace, Electric Arc Furnace, Sub-merged Arc
Furnace and Cupola Furnace.
As per EIA Notification schedule 3(a) i.e project activity of
Metallurgical Industries (ferrous & non-ferrous), it is applicable to only
primary metallurgical industry, sponge iron manufacturing, secondary
metallurgical processing industry all toxic and heavy metal producing
units and all other non-toxic secondary metallurgical processing
industries involving operations of furnace only such as induction,
electrical arc furnace, submerged arc furnace and cupola with capacity
more than 30000 TPA.
In view of above, it was decided to consider the request of the industry
and waive the condition to obtain EC as industry do not use any
furnaces like Induction furnace, Electric Arc Furnace, Sub-merged Arc
Furnace and Cupola Furnace for in manufacturing activity.
2 Request for amendment in consent to operate for change in
hazardous waste disposal path
i. Mahindra Vehicle Manufacturing Ltd., Plot No. A-1,
MIDC Chakan, Phase-IV, Khed, Pune
ii. M/s. Mahindra and Mahindra Ltd., (Tractor Division),
Akruli Road, Kandivali, Mumbai
iii. M/s. Mahindra and Mahindra Ltd., (Automotive sector),
89, MIDC Satpur, Nasik
iv. M/s. Mahindra and Mahindra Ltd., (Automotive Sector),
Plant II, 80, MIDC Satpur, Nasik
APPROVED Committee noted that Board has granted authorization for HW
reprocessing and consent to operate to M/s. Alchemist Oil Pvt. Ltd., gat
No. 15/2, Arvi, Tal. Haveli, Pune for refining of Waste Oil, paint
sludge which is valid upto 08.10.2021.
Considering the request of the industry, it was decided to amend the
consent to change the path of following HW categories from
CHWTSDF to sale to authorized recycler/ re-processor/CHWTSDF as
Board has granted authorization and consent to various hazardous
waste reprocessing units.
Sr.
No. Catg. Hazardous waste
1 5.2 Waste & Oily Sludge including oil &
wax soaked cotton waste/rags waste
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 42 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
2 21.1 Paint Sludge/waste & residue
3 20.2 Spent Solvent
4 33.1 Discarded containers/barrels (after
decontamination)
Industry shall sold the above HW categories to authorized recycler/ re-
processor/CHWTSDF only and submit manifest copy as per H&OW
(M&TM) Rule 2016.
3 Request for release of BG of M/s. Sunflag Iron and Steel Co.
Ltd., Village Eklari (Warthi), Tal. Mohadi, Dist. Bhandara
APPROVED Committee noted that SRO, Bhandara has submitted the compliance
report of conditional direction issued by the Board and reported that
industry had complied the conditional directions dated 29.07.2016.
In view of above, it was decided to return the BG of Rs. 16 lakhs and
Rs. 18 lakh obtained towards compliance of conditional direction dated
29.07.2016 as industry has complied the conditional direction.
4 Request for amendment in renewal of consent of M/s. JSW
Energy Ltd., At Nandiwade, Post Jaigad, Tal. & Dist.
Ratnagiri
APPROVED Committee noted that the industry has obtain EC dated 16.04.2010 with
a condition to use 100% imported coal with ash and sulphur content
less than 12% and 0.6% respectively.
Committee also noted that industry has obtained the amendment in EC
dated 10.07.2017 from MoEF&CC, GoI for change in Coal source
from 100% imported coal to 50% imported and 50% domestic coal
with following major conditions
1. Domestic coal will be sourced from Eastern Coal Field (ECL) ltd
with indicative coal characteristics Ash content- 22-30%, Sulphur-
0.4-0.6% and from Mahanadi Coal Fields Ltd., indicative coal
characteristics- Ash content- 34%, Sulphur-0.4-0.5%.
2. The total coal requirement shall not exceed 5 Million Ton per
Annum. Ash and Sulphur content in the blended coal (Domestic-
50% and imported coal- 50%) shall be less than 25% and 0.6%
respectively.
3. At present for reduction of SO2, industry has provided FGD with
90% efficiency.
4. Industry has provided ESP’s for both boilers to achieve TPM below
50mg/Nm3
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 43 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
In view of above, considering the request of the industry for
amendment in the consent, it was decided to grant amendment in the
existing consent to operate for coal quantity to be used not to exceed 5
Million Ton per Annum and Ash quantity- 1.25 Million Ton per
Annum by imposing following conditions:-
1. The total coal requirement shall not exceed 5 Million Ton per
Annum. Ash and Sulphur content in the blended coal (Domestic-
50% and imported coal- 50%) shall be less than 25% and 0.6%
respectively.
2. Industry shall comply the conditions stipulated in Amended EC
granted by MoEF&CC dated 10.07.2017.
3. Industry shall achieve emission standard 50 mg/Nm3. If industry
failed to achieve the emission standards by using blended coal then
they shall up-grade the existing ESP’s so as to achieve the
consented standards. And submit the performance BG of Rs. 25
lakh towards compliance of the same.
5 Request for waiving the BG condition of M/s. Emerson
Climate Technologies (India) Pvt. Ltd., gat No. 119, A/p.
Atit, Tal. & Dist. Satara
APPROVED Committee noted that Board has granted renewal of consent to M/s.
Emerson Climate Technologies (India) Pvt. Limited, Gat No. 119, A/p.
Atit, Tal. & Dist. Satara vide consent dated 13.01.2017 with the
condition that “industry shall achieve the BOD standards of treated
effluent of 30 mg/lit.”
Committee also noted that industry has installed RO followed by MEE
to treat the trade and domestic effluent so as to achieve the zero liquid
discharge.
In view of above, it was decided to consider the request of the industry
and decided to waive the condition to submit the BG of Rs. 5 lakh to
achieve BOD standards of 30 mg/lit as industry has install RO and
MEE to achieve zero liquid discharge and not to utilize treated trade
and domestic effluent for land disposal.
6 Request for amendment in Consent to Establish for
expansion of M/s. Owens Corning (I) Pvt. Ltd., T-28, MIDC
APPROVED Committee noted that the existing ETP comprising of primary,
secondary and tertiary treatment units is being suitably upgraded for
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 44 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
Phase-II, Taloja, Dist. Raigad taking care of additional effluent from expansion project. The total
quantity of effluent will remain within present consented quantity. The
quality will also be within the consent limits and there will not be any
additional hydraulic load on CETP. Industry will provide necessary
online system for recycled effluent and final outlet for flow and a few
key parameters.
Committee further noted that the industry proposed that the total
effluent generated from existing and proposed expansion project i.e.
1362 CMD. Out of 1362 CMD, 1000 CMD will be treated by RO
system in which 750 CMD of RO permeate will be recycle and 250
CMD RO reject will be discharge to CETP along with 362 CMD
treated effluent. The total treated effluent of about 612 CMD will be
discharge to CETP.
The representation given by the industry, was discussed in TAC
committee meeting held on 30.10.2017. “TAC committee noted that
as such there is no TDS generation source from the process and
considering the proposal of the industry towards maintaining
pollution and hydraulic load remain same (within consented
quantity). TAC recommended to consider the proposal of industry
to amend the condition for omission of MEE for effluent generated
due to expansion project” by imposing condition that 1. Industry shall provide online monitoring system at the outlet of
ETP, flow measuring devices for recycling of treated effluent
including SCADA system for pH, flow, BOD, COD & TDS
parameter.
Considering the recommendations of TAC, it was decided to amend the
consent to establish for expansion of the condition for omission of
MEE for effluent generated due to expansion project.
7 Representation of M/s. Embassy Industrial Parks Pvt. Ltd.,
MIDC Chakan, Phase-II, Khed Pune for waving of EC
condition
APPROVED Committee noted that PP has obtained clarification from Environment
Dept. vide letter dated 11.11.2016 stating that the proposed activity
does not required prior environmental clearance subject to the
condition that no activity mentioned in the schedule of the EIA
Notification 2006 is carried out on the location of proposed project.
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 45 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
Committee also noted that the PP is developing the project on plot area
of 2,13,247.53 sq. mtrs. which is less than 50 hector and expected BUA
of 1,06,624 sq. mtrs. Which is less than 1,50,000 Sq. mtrs. Hence, may
not attract EIA Notification 2006 and amendment thereof under
Schedule 8 i.e. Area development project.
In view of above, it was decided to waive the condition of not to take
effective steps before obtaining EC and to submit BG of Rs 10 lakh
towards compliance of the same by imposing following condition:-
1. PP shall not allow any industry /activity mentioned in the Schedule
of the EIA Notification, 2006 attracting prior EC in the proposed
project.
2. Industry shall submit an undertaking that they will not violate
schedule 8 of EIA Notification 2006 at any given time and will stick
up to the development on proposed plot area of 2,13,247.53 sq.
mtrs. and proposed BUA of 1,06,624 sq. mtrs. and submit the BG of
Rs. 25 lakh towards compliance of the same.
8 Application of M/s. Godrej Vikroli Properties LLP, Phase-
IV, on plot bearing CTS No. 51/B of Village Vikroli, for
consent to establish.
NOT
APPROVED
Committee noted that the case was discussed in CAC meeting dated
24.01.2017 and was decided to return back the application to PP
considering the order passed by Hon’ble High Court, Mumbai dated
26th & 29 th Feb. 2016 in Civil application no 221 of 2013 in PIL no.
2017 of 2009.
PP has requested to reconsider their application for proposed project as
they have obtained the permission prior the Hon’ble High Court order.
Committee noted that PP has submitted the application for the
proposed phase to MCGM on 28.10.2014 i.e. prior to 1st March 2016
operative date of High Court Order. Also obtained IOD and CC
permission from MCGM on 22.02.2017. Also noted that PP has
obtained EC for Phase-IV on 02.02.2017.
The Hon’ble High Court has passed an order dated 26th & 29th Feb.
2016 in the PIL no. 217/2009 which restrict grant of development
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 46 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
permission/intimation disapproval of construction of new building for
residential or commercial use on applications/proposals submitted post
March 1st 2016.
In view of above, it was decided to keep the case in abeyance and refer
to Advocate General, GoM for seeking clarification about applicability
of Hon’ble High Court Order in the present case.
9 Application of M/s. PSC Pacific “Xion, CTS No. 15/5, 15/6,
15/7, 15/8, 15/8, 16…. Hinjewadi, Pune for revalidation of
Consent to Establish and 1st Consent to Operate for
Commercial Complex Project (Mall & Multiplex, Hotel,
Shop)
APPROVED Committee noted that Environment Dep, GoM has submitted
clarification stating that if construction is completed within the validity
of EC, then no fresh EC or extension to EC is required.
In view of above, it was decided to grant revalidation of consent to
establish for construction of commercial complex named as “Xion” at
PSC Pacific CTS no 15/5, 15/6, 15/7, 15/8, 16, 17/1, 17/2, 17/2/2,
17/3,18/1 & 18/2 at village Hinjewadi, Tal Mulshi, Dist Pune on Total
Plot area of 31,451 sq. mtrs. and total Construction BUA of 46,040 sq.
mtrs. by imposing following conditions:-
1. PP shall submit an affidavit in prescribed format regarding
compliance of conditions of EC and Consent to Establish condition.
2. PP shall achieve the treated domestic effluent standard for the
parameter BOD- 10 mg/lit.
3. The treated effluent shall be 60% recycled for secondary purposes
such as toilet flushing, air conditioning, cooling tower make up,
firefighting etc. and remaining shall be utilized on land for
gardening.
4. PP shall install online monitoring system for BOD, TSS and flow at
the outlet of STP.
5. PP shall submit BG of Rs. 25 lakh towards compliance of EC and
Consent to Establish condition.
Revalidated consent to establish shall be granted after the receipt of
additional fees.
It was also decided to grant consent to 1st operate for commercial
complex project (Mall & Multiplex, Hotel & shop) named as “Xion” at
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 47 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
PSC Pacific CTS no 15/5, 15/6, 15/7, 15/8, 16, 17/1, 17/2, 17/2/2, 17/3,
18/1 & 18/2 at village Hinjewadi, Tal Mulshi, Dist Pune on Total Plot
area of 31,451 sq. mtrs. and total Construction BUA of sq. mtrs. of
28,511.03 sq. mtrs. (Out of total construction BUA of 46,040 sq. mtrs.
as per EC dated 04.03.2008) by imposing following conditions:-
1. PP shall submit affidavit an affidavit in Board’s prescribed format
within 15 days regarding compliance of conditions of
Environmental Clearance (EC) and Consent to Establish.
2. PP shall submit the affidavit within 15 days in the prescribed format
regarding the part of the built up area/ building for which
application for 1st Consent to Operate (Part) is made and that the
same is included in the Environmental Clearance accorded.
3. Project Proponent shall extend/ submit the BG of Rs. 25 lakhs
towards O & M of pollution control system.
4. PP shall achieve the treated domestic effluent standard for the
parameter BOD- 10 mg/lit.
5. The treated domestic effluent shall be 60% recycled for secondary
purposes such as toilet flushing, air conditioning, cooling tower
make up, firefighting etc. and remaining shall be utilized on land for
gardening and connected to the sewerage system provided by local
body. Till the time of availability of local body sewer system,
applicant shall utilize entire treated domestic effluent for Flushing,
Construction of remaining phase and on own land for gardening.
Consent shall be granted after: (1) Grant of revalidation of consent to
establish (2) Submission of Certificate from Architect regarding BUA
completed for which they have applied for 1st Consent to Operate. (3)
After installation of online monitoring system for the parameters Flow,
BOD, and TSS at STP outlet and verification of the same from
SRO/RO.
10 Representation for non-applicability of CRZ Clearance of
M/s. India Oil Corporation Ltd., Lube Complex, Near Tata
thermal Power plant, Corridor Road Trombay, Mumbai
NOT
APPROVED
Committee noted the minutes of MCZMA meeting held on 21.04.2017
but industry failed to submit the permission letter received from
MCZMA.
Hence, it was decided not to consider industries request of waiving the
7th CAC meeting of 2017-2018 (Book-let no. 12 of Renewal of Consent to Operate) dated 12.12.2017 Page 48 of 48
Sr
No
Application
Unique
Number
Industry Name &
Address
Decision on
grant of
consent
Consent
granted upto Remarks/Discussion
condition of CRZ clearance. Industry shall comply the CRZ
Notification 2011.
11 Application of M/s. DRT Anthea Aroma Chemicals Ltd.,
Roha for Consent to 1st Operate for expansion
APPROVED Committee noted that Roha CETP is still not complying. However,
industry has requested to grant consent to operate of the existing
consented quantities from the amalgamated manufacturing facilities for
Plots 49, 50 & 51 A as interim measure with no increase in pollution
load.
In view of above, it was decided to grant consent to 1st operate for
expansion and amalgamation with existing consent with overriding
effect by imposing following conditions:
1. Industry shall comply with the conditions of EC dated 08.04.2015.
2. Industry shall carry out manufacturing activity as per existing
consented quantity and not undertake any expansion activity till
Roha CETP is complying.
3. Industry shall restrict the quantity of trade effluent 60 CMD to
CETP as per the existing consent condition.
It was also decided to call the industry for presentation before Member
Secretary, regarding present manufacturing activity, pollution load
generated and existing treatment system, before issuing the consent.
12 Policy guidelines for utilization of Pond/bottom ash
generating from Thermal Power Plants for backfilling in
Abandoned Mines/Stone quarry.
NOT
APPROVED
It was decided to defer the case and keep the case in ensuing CAC
meeting.
13 Policy guidelines for use of Pet Coke as a fuel in Cement
Kiln
NOT
APPROVED
It was decided to defer the case and keep the case in ensuing CAC
meeting.
14 Policy decision in respect of grant of Consent to Establish or
expansion of the industrial unit in the area of non-performing
CETP’s
NOT
APPROVED
It was decided to defer the case and keep the case in ensuing CAC
meeting.
The meeting is ended with vote of thanks