8 th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 1 of 33 MAHARASHTRA POLLUTION CONTROL BOARD Minutes of 8 th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018 at 3.00 p.m. at MHADA Office, Grihanirman Bhavan, Kalanagar, Bandra (East), Mumbai, Maharashtra 400051. ………. The Consent Appraisal Committee meeting of the Board was held on 09.02.2018. Following members of the Consent Appraisal Committee were present: 1. Shri Milind Mhaiskar, Chairman Vice President & CEO, MHADA and Chairperson, MPCB, Mumbai. 2. Shri. P. Anbalagan Member Member Secretary, MPC Board, Mumbai 3. Shri. Padmakar Nandusekar Member Technical Advisor (Environment), MIDC, Mumbai 4. Shri. P. K. Mirashe Member Conveyor Assistant Secretary (Technical), MPC Board, Mumbai Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them. Following Officer of MPCB were present for the meeting: 1. Shri. V. M. Motghare, JD(APC), MPCB, Special Invitee 2. Shri. Y. B. Sontakke, JD(WPC), MPCB, Special Invitee 3. Shri A. R. Supate, PSO, Mumbai, Special Invitee 4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of 7 th Consent Appraisal Committee meeting held on 11.12.2017 for 1 st consent to operate and consent to establish (booklet no 10, 11) respectively and held on 12.12.2017 for renewal of consent (booklet no 12) circulated vide letter no. NO.BO/CAC-CELL/TB/B-133 dtd. 09.01.2018 were confirmed.

Upload: vuonghuong

Post on 02-Jul-2018

236 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 1 of 33

MAHARASHTRA POLLUTION CONTROL BOARD

Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018 at 3.00 p.m. at MHADA Office, Grihanirman Bhavan,

Kalanagar, Bandra (East), Mumbai, Maharashtra 400051.

……….

The Consent Appraisal Committee meeting of the Board was held on 09.02.2018. Following members of the Consent Appraisal Committee were

present:

1. Shri Milind Mhaiskar, Chairman

Vice President & CEO, MHADA and

Chairperson, MPCB, Mumbai.

2. Shri. P. Anbalagan Member

Member Secretary, MPC Board, Mumbai

3. Shri. Padmakar Nandusekar Member

Technical Advisor (Environment), MIDC, Mumbai

4. Shri. P. K. Mirashe Member Conveyor

Assistant Secretary (Technical), MPC Board, Mumbai

Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.

Following Officer of MPCB were present for the meeting:

1. Shri. V. M. Motghare, JD(APC), MPCB, Special Invitee

2. Shri. Y. B. Sontakke, JD(WPC), MPCB, Special Invitee

3. Shri A. R. Supate, PSO, Mumbai, Special Invitee

4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee

Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of 7thConsent

Appraisal Committee meeting held on 11.12.2017 for 1st consent to operate and consent to establish (booklet no 10, 11) respectively and held on 12.12.2017

for renewal of consent (booklet no 12) circulated vide letter no. NO.BO/CAC-CELL/TB/B-133 dtd. 09.01.2018 were confirmed.

Page 2: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 2 of 33

The meeting thereafter deliberated on the fresh agenda items of 1st consent to operate [Book-let no 13] is placed before the committee and following

decisions were taken.

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Book-let No. 13

Consent to 1st Operate

1. MPCB-

CONSENT-

0000003099

Western Coal Field

Limited, WCL,

Kamptee Deep Project

Near Kandri Gram

Pancjayat, Tal.

Parseoni, Dist. Nagpur

APPROVED

1st consent to Operate

for 0.5 MTPA with

increased mining area

i.e. existing 1.5 MTPA

+ expansion 0.5 MTPA

= total 2 MTPA)

31.03.2020 Committee noted that renewal of consent to operate of

existing Coal Mine-1.5 MMTPA over a mining lease

area of 249.15 Ha. was approved in the CAC meeting

dated 27.08.2015. However, Consent was not issued due

to non-submission of consent fees.

Committee also noted that industry has obtained Consent

to establish vide consent dated 03.04.2011 for coal

mining activity of Underground mining over an mining

lease area of 661.65 ha for Coal Production- 2.0 MTPA

which was expired on 02.04.2016. Further, also noted

the reply of PP that EC validity period shall be counted

from the date of issuance of EC i.e. after 11.05.2015.

It is further noted that PP has provided Sedimentation

Tanks of size 45 X 25 X 10 mtrs and 40 X 10 X 1 mtrs,

Details of Air Pollution control arrangement is provided.

As decided in earlier CAC meeting, hearing to the WCL

authority was extended on 07.02.2018. They have also

made the presentation about compliance made before

CAC and based on the presentation made by WCL

authority they have agreed to comply the consent

conditions in time bound manner.

In view of above, It was decided to grant 1st Operate for

expansion with mining area for Coal production 0.5

MTPA on a mining area of 667.65 Ha. and its

amalgamation with existing consent of 1.5 MTPA

approved in earlier CAC by imposing following

Page 3: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 3 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

conditions :-

1. PP shall provide dry deshelling / manual picking of

stray material arrangement by 31st August 2018 also

submit a plan for installation of Coal washery within

a month.

2. PP shall install CAAQMS arrangement by 31st May

2018.

3. PP shall install STP within 03 months period.

4. PP shall convert existing water sprinkling

arrangement into chemical fogging arrangement

(MgCl2) within 03 months period.

5. PP shall submit Bank Guarantee as per BG regime

within 15 days period.

6. PP shall install real-time coal ash analyser on pilot

basis by 31st May 2018.

7. PP shall provide tar road in remaining area by 31st

March 2018.

8. PP shall carry out over burden dump management as

per CPCB guidelines.

9. PP shall carry out plantation as per EC condition

before ensuing monsoon.

10. PP shall provide treatment plant for mine water

discharge and submit sedimentation tank design

details.

11. PP shall obtain NOC/clarification from CGWA

within 03 months.

Consent shall be issued after verification of consent fees

payment, after receipt of latest compliance report from

SRO and forfeiture of proportionate BG. 2. MPCB-

CONSENT-

0000007229

Asian Institute of

Medical Sciences Pvt.

Ltd. Plot No. P-72,

M.I.D.C., Milap Nagar,

Dombivli (E), Kalyan

NOT APPROVED

Consent to Operate for

Health Care

Establishment

-- The committee noted that the PP has already obtained

CCA for 100 bedded hospital which is valid. Also noted

that PP has applied for combined consent and BMW

Authorization for 250 bedded hospital vide UAN

Number – 0000011968 & 0000007229. Also noted the

request of PP for returning of both the applications as

BNH registration of hospital for 250 beds was

considering their future expansion.

Page 4: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 4 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

In view of above, it was decided to return both the

applications bearing UAN Nos. 0000011968,

000007229. With condition that PP shall not carry out

any expansion activity without prior permission of the

Board.

3. MPCB-

CONSENT-

0000013991

JSW Dharamtar Port

Pvt. Ltd.,

Waterfront Dharamtar,

Pen, Dist. Raigad

NOT APPROVED

1st Consent to Operate

(Part)

--- The committee noted that earlier the case was placed

before CAC meeting held on 08.08.2017. The case is

again resubmitted for seeking approval for part operate

for expansion and renewal. Committee deliberated the

issue in depth and made the following observations;

1. PP has applied for plain renewal of consent (Jetty

length of 331.5 mtrs) for handling capacity

13,50,000 MT/M. (i.e. 16.2 MTPA) .

2. PP has applied for first C to O for expansion for

length 395 mtrs with proportionate handling

capacity of 8,40,000 MT/M. (i.e.10.08 MTPA) (total

length 726.5 mtrs including existing Jetty length and

first phase expansion) for which C to E and EC

including CRZ Clearance already obtained.

3. The MoEF and CC has also accorded EC for Jetty

expansion project with length 1750 mtrs on

26.11.2015. 4. It is also noted from SRO remark that

the work of expansion for first phase of Jetty is

already completed and is ready to operate.

4. Committee also noted the reply received from

MMB, GoM that JSW Dharamtar Port had carried

out repairs of the Dilapidated Jetty structure of the

Jetty and integrated adjacent test pile which was

essential to prevent falling of debris in navigation

channel and also to avoid any eventualities of

accident. They have also stated that the cargo

handling operation is carried out by the company

from designated part of Jetty and restored part of the

Jetty is not use for operation.

5. Committee also noted the PP’s say that there is no

Page 5: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 5 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

court matter pending against Dharamtar port in NGT

& High Court.

6. The Committee noted that the reply towards opinion

sort from MoEF, Govt. of India is not received till

date.

7. Reminder letter to MoEF and to Env. Dep. GoM

dated 13.11.2017 has been sent. Reply still awaited.

In view of above, it was decided to keep the case in

abeyance for 1st Operate (Part) for expansion and

renewal of consent to operate till obtaining clarification

from Environment Department, Govt. of Maharashtra

and revert back to CAC.

4. MPCB-

CONSENT-

0000014149

Pegasus Properties Pvt.

Ltd. R-1/1, R-1/2, R-

1/3, R-1/4, Rajiv

Gandhi Infotech Park-

III, Village- Man &

Bhoir Wadi Mulshi,

Dist. Pune.

APPROVED

1st Consent to Operate

(Part)

31.01.2022 Committee noted that PP has obtained Environmental

Clearance from SEAC committee vide letter dated

20.11.2010 for total plot area 5,60,000 Sq. Mtrs. and

total BUA 12,13,345 Sq. Mtrs.

Committee also noted that PP has obtained consent to

establish dated 25.05.2015 for total plot area 5,60,000

Sq. Mtrs. and total construction BUA 6,72,341.66 Sq.

Mtrs. PP has also obtained 1st consent to operate (Part-I)

for total construction BUA 4,21,009 Sq. Mtrs.

In view of above, it was decided to grant 1st Consent to

Operate (Part -II) for Residential cum Commercial

Project of M/s. Pegasus Properties Pvt. Ltd,R-1/1, R-

1/2, R-1/3, R-1/4 Rajiv Gandhi Infotech Park-III,

Village- Man & Bhoir Wadi Mulshi on total plot

area 5,60,000 sqm and Construction BUA of

6,14,718.69 sq.m (out of TCBUA of 6,72,341.66 sq.m.

as per CtoE dated 25.05.2015) by imposing following

conditions:

1. PP shall submit affidavit in Board prescribed format

within 15 days regarding compliance of conditions

of Environmental Clearance (EC) and Consent to

Establish.

Page 6: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 6 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

2. PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st Consent

to Operate (Part) is made and that the same is

included in the Environmental Clearance accorded.

3. Project Proponent shall extend/ submit the BG of

Rs. 25 lakhs towards O & M of pollution control

system.

4. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

5. The treated domestic effluent shall be 60% recycled

for secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting

etc. and remaining shall be utilized on land for

gardening and connected to the sewerage system

provided by local body. Till the time of availability

of local body sewer system, applicant shall utilize

entire treated domestic effluent for Flushing,

Construction of remaining phase and on own land

for gardening.

6. PP shall revalidate EC before carrying out any

further remaining construction work.

7. PP shall submit Board Resolution from company

Board, towards discharging of sewage through the

cement pipes outside the premises into nearby nalla

same nalla meets to Gawarewadi-Mann Nalla thus

violated the provisions of Environmental Laws and

in future, they will not do such violations and BG of

Rs. 2 lakh towards submission of Board resolution

within one month of issue of consent.

8. PP shall not carryout construction activity beyond

the construction area mentioned in consent to

establish (6,72,341.66 Sq. mtrs.) and till

revalidation of EC.

Consent shall be granted after:

i. Submission of Certificate from Architect regarding

BUA completed for which they have applied for 1st

Page 7: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 7 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Consent to Operate.

ii. After installation of online monitoring system for the

parameters Flow, BOD, and TSS at STP outlet and

verification of the same from SRO/RO.

5. MPCB-

CONSENT-

0000017570

Godavari Biorefineries

Limited, 187 A/p-

Sakarwadi Kopargaon,

Dist. Ahmednagar

APPROVED

1st Consent to operate

for expansion

31.08.2022 Committee noted that the case was already discussed in

CAC meeting held on 17.04.2017 and it was kept in

abeyance for verification report of SRO regarding

compliance of the consent to establish conditions. Also,

noted that SRO has submitted the verification report

stating that industry complied with CtoE conditions and

also installed RO & MEE for achieving ZLD including

provision of online monitoring system. Also, noted that

CPCB has consented NOC for expansion.

In view of above, it was decided to grant Consent to 1st

Operate to manufacture of Crotonaldehyde -Di-Urea

(CDU) and Crotoresin by imposing following

conditions;

1. The consent is granted without prejudice of the orders

passed or being passed by the Hon’ble NGT.

2. This consent is issued in pursuance to the letter of

CPCB dated 11.08.2016.

6. MPCB-

CONSENT-

0000026455

Parag Milk Foods Ltd.

43/1A/1 & 43/1A/2 At

- Awasari Phata. Post -

Manchar. Tal -

Ambegaon. Dist -

Pune.

NOT APPROVED

1st Consent to Operate

for expansion and

amalgamation with

existing Consent to

Operate.

--- Committee noted that existing consent is valid upto

30.04.2020 and applied for 1st consent to operate for

expansion.

Committee also noted that industry has applied for NOC

of CGWA but not received the NOC till date.

In view of above, it was decided to return the application

to the industry and inform the industry to resubmit the

application after receipt of NOC of CGWA.

7. MPCB-

CONSENT-

0000025293

Evershine Developers,

(Formerly known as

Palghar Land

NOT APPROVED

Consent to 1st Operate

--- It was decided to defer the case and revert back to next

CAC along with clarity on EC revalidation, CRZ

applicability, OC status and provision of pollution

Page 8: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 8 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Development

Corporation)., Survey

no. 5, 5B, 5F, 5G, 5D

Village Dongre, Virar

(west), Taluka Vasai,

District Thane.

(Part-II) control system.

8. MPCB-

CONSENT-

0000019783

Shri Gurudatt Sugars

Ltd, Gat No. 61/A Gat

No. 61/A, Akiwat -

Takaliwadi Road,

Takaliwadi, Tal -

Shirol, Dist - Kolhapur

APPROVED

1st consent to Operate

for expansion

31.07.2019 Committee noted that industry has obtained

Environmental Clearance vide letter dated 20.03.2017

for expansion of sugar from 4900 TCD to 6000 TCD

and Co-gen unit from 15 MW to 21 MW. Industry has

applied for 1st consent to Operate for expansion for

Sugar unit- 1100 TCD (from 4900 TCD to 6000 TCD)

and Co-gen unit – 6 MW (from 15 MW to 21 MW.

Committee also noted that industry has achieved ZLD

by using treated effluent for on land for irrigation as

practice in other sugar industries. Board has also filed

case in district court Kolhapur due to excess crushing

carried out by industry in the season 2015-2016.

In view of above, it was decided to grant 1st consent to

operate for expansion by imposing following conditions.

9. MPCB-

CONSENT-

0000018990

New Majri UG to OC

Mine, 235-249 Majri

Tal. Bhadrawati, Dist.

Chandrapur

APPROVED

1st Consent to Operate

for expansion and

amalgamation with

existing consent to

operate

31.03.2021 Committee noted that industry has obtained

Environmental Clearance vide letter dated 13.02.2017

and consent to operate for coal mining of 0.8 MTPA is

valid upto 31.03.2021. Also, obtained Consent to

Establish for 0.8 to 1.2 MTPA (i.e.0.4 MTPA) on

22.03.2017.

Earlier, the application of C to O for 0.4 MTPA (from

0.8 to 1.2 MTPA) was discussed in CAC meeting dated

08.08.2017 and SCN of refusal of consent and stop work

was issued as industry has failed to provide CAAQMS

as per existing consent condition. Thereafter, PP

submitted appeal towards Environment Department.

Now, PP submitted reply and informed that they will

provide CAAQMS as per existing consent condition by

Page 9: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 9 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

July 2018 and also appeal was withdrawn vide letter

dated 07.02.2018.

As decided in earlier CAC meeting, hearing to the WCL

authority was extended on 07.02.2018. They have also

made the presentation about compliance made before

CAC and based on the presentation made by WCL

authority they have agreed to comply the following

points in time bound manner.

Considering the commitment made by the industry, it

was decided to grant 1st Consent to Operate for

expansion of Mine - 0.4 MTPA (from 0.8 to 1.2 MTPA)

with amalgamation and overriding effect on earlier

Consent to Operate by imposing following conditions;

1. PP shall provide dry deshelling / manual picking of

stray material arrangement by 31st August 2018 also

submit a plan for installation of Coal washery within

a month.

2. PP shall install CAAQMS arrangement by 31st May

2018.

3. PP shall install STP within 03 months period.

4. PP shall convert existing water sprinkling

arrangement into chemical fogging arrangement

(MgCl2) within 03 months period.

5. PP shall submit Bank Guarantee as per BG regime

within 15 days period.

6. PP shall install real-time coal ash analyser on pilot

basis by 31st May 2018.

7. PP shall provide tar road in remaining area by 31st

March 2018.

8. PP shall carry out over burden dump management as

per CPCB guidelines.

9. PP shall carry out plantation as per EC condition

before ensuing monsoon.

10. PP shall provide treatment plant for mine water

discharge and submit sedimentation tank design

details.

11. PP shall obtain NOC/clarification from CGWA

Page 10: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 10 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

within 03 months.

Consent shall be issued after verification of consent fees

payment, after receipt of latest compliance report from

SRO and forfeiture of proportionate BG.

10. MPCB-

CONSENT-

0000002745

Singhori Opencast

Coal Mine, WCL, at

Silewara, Saoner, Dist.

Nagpur

APPROVED

1st Consent to Operate

31.03.2019 Committee noted that CAC has refused the 1st consent to

operate in its CAC meeting dated 27.09.2017 due to

various non-compliances. It is also noted that PP has

obtained Environmental Clearance vide letter dated

17.05.2007.

Industry has submitted their reply and also received

verification report from concerned SRO dated

16.01.2018 and noted that now the industry has provided

adequate pollution control arrangement. JVS (treated

trade effluent) sample results are within consented

standards.

As decided in earlier CAC meeting, hearing to the WCL

authority was extended on 07.02.2018. They have also

made the presentation about compliance made before

CAC and based on the presentation made by WCL

authority they have agreed to comply the following

points in time bound manner.

Considering the assurance given by the industry and

verification report received from SRO, it was decided to

grant 1st Consent to Operate for Opencast Coal Mining

Activity of 0.8 MTPA capacity by imposing following

conditions.

1. PP shall provide dry deshelling / manual picking of

stray material arrangement by 31st August 2018 also

submit a plan for installation of Coal washery within

a month.

2. PP shall install CAAQMS arrangement by 31st May

2018.

3. PP shall install STP within 03 months period.

Page 11: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 11 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

4. PP shall convert existing water sprinkling

arrangement into chemical fogging arrangement

(MgCl2) within 03 months period.

5. PP shall submit Bank Guarantee as per BG regime

within 15 days period.

6. PP shall install real-time coal ash analyzer on pilot

basis by 31st May 2018.

7. PP shall provide tar road in remaining area by 31st

March 2018.

8. PP shall carry out over burden dump management as

per CPCB guidelines.

9. PP shall carry out plantation as per EC condition

before ensuing monsoon.

10. PP shall provide treatment plant for mine water

discharge and submit sedimentation tank design

details.

11. PP shall obtain NOC/clarification from CGWA

within 03 months.

Consent shall be issued after obtaining requisite consent

fees, if required.

11. MPCB-

CONSENT-

0000030612

Danfoss Power

Solutions India Pvt.

Ltd. Plot No. 40, Gat

No. 94 & 100 Hi-Cliff

Industrial Estate

Haveli, Dist. Pune

APPROVED

1st Consent to Operate

for expansion (part)

and amalgamation with

existing consent

31.05.2018 It was decided to grant 1st Consent to Operate for

expansion (Part) and amalgamation with existing

consent under Orange category by imposing following

conditions.

1. Industry shall extend the existing BG of Rs. 7.5 lakh

submitted towards O&M of pollution control system.

Consent shall be issued after submission of requisite

consent fee.

12. MPCB-

CONSENT-

0000032082

Suranjan Holdings and

Estate Developers Pvt.

Ltd, CTS No. G-626 &

G/164 A (part), CTS

No. G-626 & G/164 A

(part), Village -

APPROVED

1st Consent to Operate

(Part)

31.10.2019 Committee noted that PP has obtained Environmental

Clearance dated 03.12.2016 for total plot area 14184.10

Sq. Mtrs. and total BUA 89280.26 Sq. Mtrs under SRA

scheme under regulation 33(10) & 33 (14).

In view of above, it was decided to grant 1st Consent to

Page 12: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 12 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Bandra, 18th Road,

Khar (W), Mumbai.

Operate (part) for Residential Building Project under

SRA scheme on Total Plot Area 14,184.10 sq. mtrs. and

part construction BUA of 27,154.10 sq. mtrs. (Out of

Total Construction BUA of entire project as 89,280.26

sq. mtrs. as per EC dated 03.12.2016) by imposing

following conditions ;-

1. PP shall submit affidavit shall submit an affidavit in

Board’s prescribed format within 15 days regarding

compliance of conditions of Environmental Clearance

(EC) and Consent to Establish.

2. PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st Consent to

Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

3. Project Proponent shall submit the BG of Rs. 25 lakhs

towards Operation & Maintenance of pollution

control system.

4. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

5. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up,

firefighting etc. and remaining shall be connected to

the sewerage system provided by local body.

Consent shall be issued after;-

i. Obtaining Certificate from Architect regarding BUA

completed for which they have applied for 1st

Consent to Operate.

ii. After obtaining additional fees i.e. in C to E capital

investment was 140 Cr. which is increased in C to O

(part) as 318.25 Cr. requisite fees due to increase in

investment.

iii. After receipt of verification report from SRO

regarding installation of Organic Waste Converter

/digester/composting system for the treatment of

bio-degradable municipal solid waste.

Page 13: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 13 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

13. MPCB-

CONSENT-

0000031149

Cargill India Pvt. Ltd.

E 45, MIDC

Kurkumbh, Tal.

Daund, Dist. Pune.

APPROVED

Amendment in existing

consent for two Nos. of

DG sets

31.03.2021 It was decided to grant amendment in existing consent to

operate which was valid upto 31.03.2021 for two Nos. of

D.G. sets having capacity 500 KVA each.

14. MPCB-

CONSENT-

0000032035

Karanja Terminals &

Logistics Pvt. Ltd.,

Karanja Creek Uran,

Dist. Raigad

NOT APPROVED

1st Consent to Operate

(part)

--- Committee noted that PP has obtained Environmental

Clearance vide letter dated 21.08.2013 which is valid

upto 20.08.2020. It is noted that PP has applied for part

consent to operate for 3 berths out of total 10 berths.

However, construction work of these 3 berths is not

completed it date.

In view of above, it was decided to defer the case and

revert back in next CAC meeting along with Sub

Regional Officer’s latest verification report in respect of

application No. 30 of 2017 filed by Karanja Machimar

Vividha Kalyankari Society Ltd., compliance report

according to Environmental Clearance and Consent

conditions and present status report along with JVS

sampling results of water and air.

15. MPCB-

CONSENT-

0000032194

KSH Distriparks Pvt.

Ltd., P-5 Chakan

Industrial Area Phase

II, Village Khalumbare

Khed, Dist. Pune

APPROVED

1st Consent to Operate

(Part-II) and renewal of

(Part-I) and its

amalgamation

31.03.2019 Committee noted that PP has obtained Environmental

Clearance vide letter dated 26.12.2014 for Total Plot

Area of 1,52,000 Sq. Mtrs. and Total construction BUA-

1,05,641.95 Sq. Mtrs. Earlier, PP has obtained Consent

to Operate (Part-I) for Total construction BUA –

27,578.015 Sq. Mtrs. Which was valid upto 30.09.2017.

Now, PP has applied for 1st Operate (Part-II) for Total

BUA of 37,280.175 sq.mtrs & amalgamation with

renewal of Consent (Part-I) for construction BUA –

27,578.015 Sq. Mtrs i.e. (Part - I + Part - II) Total

construction BUA of 64,858.19 Sq. Mtrs.

In view of above, It was decided to grant amalgamation

Page 14: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 14 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

of Consents having Total construction BUA of

64,858.19 Sq. Mtrs. (i.e. existing part area 27,578.015

Sq. Mtrs + Presently applied 37,280.175 Sq. Mtrs) for

Multi modal Logistic & Industrial Park for Green &

Orange categories of Industries by imposing following

conditions;-

1. PP shall not allocate the area/ plot to the trade effluent

generating industry.

2. PP shall submit an affidavit in Board’s prescribed

format within 15 days regarding compliance of

conditions of Environmental Clearance (EC) and

Consent to Establish.

3. PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st Consent to

Operate (Part) is made and that the same is included

in the Environmental Clearance accorded.

4. Project Proponent shall submit the BG of Rs. 15 lakhs

towards O & M of pollution control system.

5. Individual industry in the park in existing and

proposed building will be responsible for obtaining

their Consent to Establish and Operate separately

from MPCB.

6. Applicant shall operate common pollution control

infrastructure facility and ensure that the individual

industries/units shall enter in to MOU with Industrial

park to ensure operation and maintenance of the

common STP, composting system for wet garbage.

7. PP shall achieve the treated domestic effluent standard

for the parameter BOD- 10 mg/lit.

8. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up,

firefighting etc. and remaining shall be used on own

land for gardening/irrigation purpose within premises.

Consent copy shall be issued after –

i. Obtaining SRO report regarding adequacy of

Pollution Control measures i.e. STP, Organic Waste

Page 15: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 15 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Converter /digester/composting system for the

treatment of bio-degradable municipal solid waste.

ii. After obtaining additional fees (as per sectoral

approach), if applicable.

16. MPCB-

CONSENT-

0000032442

Excel Industries

Limited, Plot No. D-9

MIDC Lote Parshuram,

Chiplun, Dist.

Ratnagiri.

APPROVED

Amendment in existing

consent to operate for

addition of capacity of

boiler (12 TPH)

31.01.2019 It was decided to grant amendment in existing consent to

operate for addition of capacity of boiler (12 TPH) and

DG set 1010 KVA, deletion of hazardous waste -flue gas

residue ( Boiler soot) and oil fired boiler and addition of

oily cotton waste with CHWTSDF as disposal path

without any change in production quantity with

overriding effect.

17. MPCB-

CONSENT-

0000031535

Reliable Sugar &

Distillery Power Ltd.

(Formerly Known As

Mahadik Sugar & Agro

Products Ltd) 29 A/p

Panori, Vill. Farale,

Tal. Radhanagari, Dist.

Kolhapur

APPROVED

1st Consent to Operate

for expansion with

name change

31.07.2019 It was decided to grant 1st Consent to Operate for

expansion of Sugar unit- 2250 TCD and 8.5 MW Cogen

unit with change of name from M/s. Mahadik Sugar and

Agro Products Ltd., to M/s. Reliable Sugar and

Distillery Power Ltd., by imposing following conditions:

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards O & M of pollution control systems.

Consent shall be issued after

i. Installation of online monitoring system within 3

months and submit Bank Guarantee of Rs. 5 lakh

towards compliance of same.

ii. Submission of NOC from CGWB/Irrigation

department for consumption of ground

water/Surface water and requisite consent fee.

18. MPCB-

CONSENT-

0000031443

DDPL Global

Infrastructures Pvt.

Ltd. (Phase-II - Pavitra

Gruh Sahay LLP) S.

NO. 23 & 24, Hissa no

1,2,4 Tal. Vasai, Dist.

Palghar

APPROVED

1st Operate

(Part-II) & revalidation

of CtoE for remaining

part

30.11.2019 Committee noted that PP has obtained consent to

establish for total plot area 1,82,870 sq. mtrs and total

BUA 4,82,354.90 Sq. mtrs vide consent dated

09.12.2011. Also obtained EC dated 20.11.2010 for total

plot area 1,82,870 sq. mtrs and total BUA 4,82,354.90

Sq. mtrs. Which was revalidated on 20.01.2017 for total

plot area 6,02,500 sq. mtrs and total BUA 4,01,763.63

Sq. mtrs.

Page 16: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 16 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Committee also noted that PP has obtained consent to

operate (Part-I) for total plot area 1,82,870 sq. mtrs and

total BUA 37,206.34 Sq. mtrs which was valid upto

31.12.2017.

Now, PP has applied for consent to operate (part-II) for

Total Construction BUA – 29,198.46 sq. mtrs.

In view of above, it was decided to grant Consent to

Operate (Part-II) by imposing following conditions;-

1. PP shall submit affidavit in Board’s prescribed

format within 15 days regarding compliance of

conditions of revised Environmental Clearance (EC)

and Consent to Establish.

2. PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st Consent

to Operate (Part) is made and that the same is

included in the Environmental Clearance accorded.

3. Project Proponent shall submit the extend/fresh BG

of Rs. 25 lakhs towards O & M of pollution control

system.

4. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

5. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting

etc. and remaining shall be connected to the

sewerage system provided by local body.

It was also decided to revalidate consent to establish for

remaining part as per revalidated EC and by imposing

standard conditions.

It was also decided to amalgamate the consent to operate

part-I & part II after obtaining requisite consent fee of

renewal of consent (part-I).

Page 17: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 17 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Consent shall be issued after:

i. Obtaining Certificate from Architect regarding

completion of construction of BUA for which they

have applied for 1st Consent to Operate (part).

ii. Obtaining undertaking regarding they have

constructed Construction BUA area as per revised

Environment Clearance (dtd 20.01.2017).

iii. Installation of online monitoring system for the

parameters flow, BOD, TSS at the outlet of STP and

verification of SRO of the same.

iv. After obtaining additional fees for re-validation of

Consent to Establish as per revised EC Built Up

Area, if required.

19. MPCB-

CONSENT-

0000031854

Pioneer Distilleries

Limited Gut No. 285

Gut No. 285, Vill.

Balapur, Dist.

Dharmabad, Dist.

Nanded.

APPROVED

1st Consent to Operate

for 52 TPH boiler

31.08.2019 Committee noted that Industry has applied for 52 TPH

boiler and also installed online monitoring system.

In view of above, it was decided to grant 1st Consent to

1st operate for 52 TPH Boiler

20. MPCB-

CONSENT-

0000032917

Shirpur Power Private

Limited, Plot No.1

Nardana (Phase-I)

Industrial area

Shindkheda, Dist.

Dhule

APPROVED

1st Consent to Operate

31.08.2019 Committee noted that earlier CAC has returned the

application due to incomplete work of laying of Railway

track for transportation of Coal by Rail as per the

condition of Environmental Clearance as per CAC

meeting dated 24 & 25.01.2017.

Committee also referred the minutes of SEAC in its

139th meeting has recommend the proposal to SEIAA

for amendment in EC for in transportation mode of coal

by Rail and or road to be allowed till rail facility is made

operative. However, the amended Environment

Clearance is not issued.

In view of above, it was in principle decided to grant

consent to Operate with condition to achieve the

standards of Particulate Matter - 30mg/Nm3 and thermal

power BG regime and standard conditions.

Page 18: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 18 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Consent shall be issued after;-

Submission of revised Environment Clearance copy and

additional requisite consent fee.

21 MPCB-

CONSENT-

0000033557

Lucina Land

Development Limited

S. No. 80A, 83/2A,

83/3, 83/7+4B+5B,

85/0,86/1, 90/1A,

90/3B, 90/4, 90/8 to

90/11 & 91/5 Survey

no.80A to 92/5, Village

Kon and Arivalli,

Taluka-Panvel,

District-Raigad

APPROVED

1st Consent to Operate

(part)

30.09.2019 Committee noted that PP has obtained environmental

Clearance vide letter dated 22.11.2010 for total plot area

95,570 Sq. Mtrs and Total BUA 6,03,339.07 Sq. Mtrs.

and further amended EC for total BUA- 5,99,875 Sq.

Mtrs.

PP has also obtained revalidated consent to establish

vide consent dated 18.01.2017 for total plot area 95,570

Sq. Mtrs. and total BUA- 5,99,875 Sq. Mtrs.

Now, PP has applied for 1st Consent to Operate (Part)

on Total Plot Area 10,675 Sq. Mtrs. (Out of Total plot

area of 95,570 Sq.Mtrs) and Total construction BUA

(FSI+Non-FSI) of 91,475.17 Sq. Mtrs. (Out of Total

Construction BUA of 5,99,875 Sq. Mtrs as per EC dated

9.08.2012) by imposing following condition(s);-

1. PP shall revalidate EC within 3 months of date of

issuance of C to O 1st Operate.

2. PP shall submit affidavit in Board’s prescribed

format within 15 days regarding compliance of

conditions of Environmental Clearance (EC) and

Consent to Establish.

3. PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st Consent

to Operate (Part) is made and that the same is

included in the Environmental Clearance accorded.

4. Project Proponent shall submit the extend/fresh BG

of Rs. 25 lakhs towards O & M of pollution control

system.

5. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

6. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

Page 19: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 19 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

conditioning, cooling tower make up, firefighting

etc. and remaining shall be connected to the

sewerage system provided by local body.

7. PP shall downsize the STP to treat the sewage of

345 m3/day so as to meet the consented standard.

Consent shall be issued after:

i. Obtaining Certificate from Architect regarding

completion of construction of BUA for which they

have applied for 1st Consent to Operate (part).

ii. Installation of online monitoring system for the

parameters flow, BOD, TSS at the outlet of STP and

verification of SRO of the same.

22 MPCB-

CONSENT-

0000032964

Dinesh Opencast

Project (MKD - III),

Makardhokra – III,

(Western Coalfields

Limited) near Hevati

Vill. Tal Umred, Dist

Nagpur.

APPROVED

1st Consent to Operate

31.03.2020 Committee noted that PP has obtained Environmental

Clearance vide letter dated 21.06.2011 for Opencast

Coal Mining activity- 3.0 MTPA on total mining area

1636.97 Ha. PP has also obtained Consent to establish

for the same vide consent dated 27.07.2015.

PP has provided Sedimentation Tank for mine water

discharge, Sewage Treatment Plant for domestic effluent

and 01 CAAQMS installation out of 03 is at final stage.

In view of above, it was decided to grant 1st Consent to

operate for Opencast Coal Mining activity- 3.0 MTPA

on total mining area 1636.97 Ha. by imposing coal mine

BG regime and following standard conditions;

1. PP shall provide dry deshelling / manual picking of

stray material arrangement by 31st August 2018 also

submit a plan for installation of Coal washery within

a month.

2. PP shall install CAAQMS arrangement by 31st May

2018.

3. PP shall install STP within 03 months period.

4. PP shall convert existing water sprinkling

arrangement into chemical fogging arrangement

Page 20: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 20 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

(MgCl2) within 03 months period.

5. PP shall submit Bank Guarantee as per BG regime

within 15 days period.

6. PP shall install real-time coal ash analyser on pilot

basis by 31st May 2018.

7. PP shall provide tar road in remaining area by 31st

March 2018.

8. PP shall carry out over burden dump management as

per CPCB guidelines.

9. PP shall carry out plantation as per EC condition

before ensuing monsoon.

10. PP shall provide treatment plant for mine water

discharge and submit sedimentation tank design

details.

11. PP shall obtain NOC/clarification from CGWA

within 03 months.

Consent shall be issued after obtaining requisite consent

fees, if required.

23 MPCB-

CONSENT-

0000033805

Krantiagrani Dr. G. D.

Bapu Lad Sahakari

Sakhar Karkhana Ltd.,

Kundal 2955 Vita

Road Palus, Sangli

APPROVED

1st Consent to Operate

31.08.2019 Committee noted that industry has obtained

Environmental Clearance vide letter dated 20.07.2017

for Distillery of capacity 60 KLPD

It was decided to grant 1st Consent to Operate for 60

KLPD Distillery unit, by imposing standard and

following conditions:

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards O & M of pollution control systems and

compliance of consent conditions.

Consent shall be issued after submission of NOC from

CGWB/Irrigation department for consumption of ground

water/Surface water.

Page 21: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 21 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

24 MPCB-

CONSENT-

0000033401

Bedmutha Industries

Ltd. Plant-6 E-1

Nardana MIDC, Phase

I Shindkheda, Dist.

Dhule

APPROVED

1st Consent to Operate

for expansion and

amalgamation with

existing consent

28.02.2022 Committee noted that industry has provided RO & MEE

to achieve ZLD. The unit consists of Multi drawing

machine & extruder. Industry is not generating any trade

effluent from expansion project and domestic effluent is

0.2 CMD.

In view of above, it was decided to grant 1st Consent to

Operate for expansion and amalgamation with existing

consent to manufacture Copper Wire& wire products,

tinned wire, PVC insulated & Sheathed Copper Flexible

Cable- 2000 MT/M.

25 MPCB-

CONSENT-

0000032989

Evonik Catalyst India

Pvt. Ltd. Plot No. F-1/1

& F-1/2 Dombivali

MIDC, Phase- I,

Kalyan

APPROVED

Consent to Establish

for relocation of

Activated Metal

Catalyst(AMC) Plant

Commissioni

ng of unit or

5 years

whichever is

earlier

Committee noted that industry has obtained consent to

operate which is valid upto 30.04.2020. They have

applied for consent to establish for relocating the

Activated Metal Catalyst (AMC) Plant within the

existing premises due to old structure. Also noted that

JVS results of the existing unit are exceeding the

consented limit.

In view of above, it was decided to consider CtoE for

relocation and SCN for exceeding the JVS results of

existing unit.

26. MPCB-

CONSENT-

0000034035

Jawaharlal Nehru Port

Trust NA Sheva, Ulwe

Uran, Dist. Raigad

APPROVED

1st Consent to Operate

30.9.2019 Industry has applied for 1st consent to operate for phase-

I of 4th Container Terminal and Marine Chemical

Terminal at JN Port. Industry has obtained consent to

establish on 26.10.2007. Industry has applied for

revalidation of consent to establish. The same was

approved in CAC meeting held on 25.01.2017 and it was

decided to grant Revalidation of consent to establish for

Development of 4th Container Terminal and Marine

Container Terminal (as per Reviewed scope) in

accordance with the EC-CRZ clearance obtained dated

29.07.2008 and further EC-CRZ validity extended vide

dated 26.02.2014.

Committee also noted that Environment Clearance is

revalidated upto 28.07.2018 and applied for amendment

Page 22: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 22 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

in EC for use of stone metal instead of dredged material.

In view of above, it was decided to grant in principle, 1st

consent to operate for phase-I of 4th Container Terminal

and Marine Chemical Terminal at JN Port by imposing

following conditions;

1. The applicant shall comply with the conditions

stipulated in EC-CRZ clearance.

2. PP shall submit BG of Rs 10 lakhs for compliance of

EC-CRZ Clearance and consent of Establish

conditions.

3. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of ECCRZ

clearance.

4. PP shall get necessary amendment in EC within 03

months.

Consnet shall be issued after submission of requisite

consent fee.

27. MPCB-

CONSENT-

0000034202

Lloyds Line Pipes Ltd.

Plot No. M-1 Plot No.

M-1, MIDC, Village

Kudavli, Murbad,

Thane Murbad, Thane.

APPROVED

1st Consent to Operate

for expansion (Part)

with increased

production quantity and

amalgamation with

existing consent

28.02.2019 It was decided to grant 1st Consent to Operate for

expansion (Part) without increase in production quantity

to manufacture HR/CH Sheet Galvanizing-36,000 MT/A

as per consent to establish quantity by imposing

following conditions:-

1. Industry shall 100% reuse/recycle the treated trade

effluent into the process and shall not dispose on

land for gardening and submit the BG of Rs. 5 lakh

towards compliance of the same.

2. BG of Rs. 5 lakh forfeited obtained towards O&M

of pollution control system as JVS results are

exceeding the consented standards and obtain top up

BG towards compliance of the same.

It was also decided that if industry not complied the

conditional restart direction issued by the Board dated

09.10.2017 proportionate BG shall be forfeited from BG

Page 23: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 23 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

of Rs. 25 lakh obtained towards compliance of

conditional direction after receipt of verification report

from SRO.

Consent shall be issued after ;-

1] Confirmation regarding 100% recycle of effluent.

2] Submission of consent fee towards re-validation of

consent to establish as it was expired 2 months before

the application for 1st CtoO.

28. MPCB-

CONSENT-

0000033438

Technocraft Industries

(India) Limited C-5, C-

2/1-2 MIDC, Murbad,

Dist. Thane.

APPROVED

1st consent to Operate

for expansion with

increase in water

consumption, effluent

quantity and

amalgamation with

existing consent

31.12.2020 It was decided to grant 1st consent to Operate for

expansion with increase in water consumption, effluent

quantity and amalgamation with existing consent to

manufacture RUBBER GASKETS / WASHER-

10,00,000 No/D (31.5 MT/M)

1. This consent is issued with the overriding effect of

the earlier consent granted by the Board vide

consent dated 31.05.2016.

We may impose the condition that industry shall not be

allowed to treat the RO reject in the MEE at sister

concern industry located in Murbad MIDC, plot no A-

4/1.

It was also decided to return the BG of Rs. 5 lakh & BG

of Rs. 2 lakh obtained towards compliance of CtoE

condition and installation of STP as industry has

complied the same.

Consent shall be issued after –Verification report about

installation of dedicated MEE at plot no. C-5, C-2/1-2

MIDC, Murbad, Dist. Thane.

29. MPCB-

CONSENT-

0000034874

Gangamai Industries

and Constructions Ltd.

(GIACL) 222,223,224

Najik Babhulagaon

Shevgaon, Dist.

APPROVED

1st Consent to Operate

for expansion and

amalgamation with

31.08.2019 Committee noted that industry has obtained

Environmental Clearance for 30 KLPD vide letter dated

18.10.2017. Industry has provided bio-metanizaton plant

followed by MEE to achieve zero liquid discharge.

Page 24: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 24 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

Ahmednagar existing consent in view of above it was decided to grant 1st consent to

operate for 30 KLPD distillery and amalgamation with

existing 30 KLPD distillery and 120 KLPD ethanol unit,

by imposing following conditions;

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards O & M of pollution control systems and

compliance of consent conditions.

Consent will be issued after submission of NOC of

CGWA/Irrigation department for water uses.

30. MPCB-

CONSENT-

0000035295

Indiabulls Real Estate

Company Pvt. Ltd C.S

No 613 & 612 Lower

Parel Division,

Elphinstone Mill

Mumbai

APPROVED

1st Consent to Operate

for MCGM car parking

30.09.2022 It was decided to grant 1st Consent to Operate (Part) for

MCGM Parking on Total Plot Area 34,383 sq. mtrs. and

construction BUA of 91,195 sq. mtrs. (Out of Total

Construction BUA of 3,60,099 sq. mtrs. of entire project

as per amended EC dated 3.07.2017) by imposing

following condition(s);

1. PP shall re-valid and amend Consent to Establish as

per amended EC dated 3.7.2017.

2. PP shall submit affidavit in Board’s prescribed

format within 15 days regarding compliance of

conditions of Environmental Clearance (EC) and

Consent to Establish.

3. PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st Consent

to Operate (Part) is made and that the same is

included in the Environmental Clearance accorded.

4. Project Proponent shall submit the BG of Rs. 25

lakhs towards O & M of pollution control system.

5. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

6. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting

etc. and remaining shall be connected to the

sewerage system provided by local body.

Consent shall be issued after:

Page 25: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 25 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

i. Obtaining Certificate from Architect regarding

completion of construction of BUA for which they

have applied for 1st Consent to Operate (part).

ii. Installation of online monitoring system for the

parameters flow, BOD, TSS at the outlet of

Centralised STP and verification of SRO of the same

31. MPCB-

CONSENT-

0000034848

Gharda Chemicals

Limited D-1/2 & B-1/7

(Unit No: 1), MIDC,

Lote Parshuram, Khed,

Dist. Ratnagiri

APPROVED

1st Consent to Operate

for expansion and

amalgamation with

existing consent

31.07.2020 It was decided to grant 1st Consent to Operate for Two

Nos. of Multiple Effect Evaporator of capacities 10,600

kg/hr and 20,000 kg/hr and Reverse Osmosis plant of

50KL/Hr, Erection of chemical treatment/recovery

systems together at common plant building such as

a) Wet air Oxidation and Chlorination,

b) Spent Acid Recovery,

c) Potassium Recovery,

d) SO2 recovery which at present exist at various

location in the premises of the plant, Vapour Absorption

Machine (VAM) of capacity 2 Nos. * 600TR each to

avoid /restrict use of CFCs with amendment in existing

consent for re-arranging the by-products without

increase in production) by imposing standard conditions.

32. MPCB-

CONSENT-

0000033145

P One Infrastructure

Pvt. Ltd., (Bldg. -

WTC IV) S. No. 1,

Hissa No.1B, 2B, 1A,

2A, Kharadi, Pune

APPROVED

1st Consent to Operate

(part)

30.06.2019 Committed noted that PP has obtained Environmental

Clearance vide letter dated 06.02.2015 for total plot area

7,74,36.43 Sq. Mtrs. and total BUA -2,01,223.92 Sq.

Mtrs.

In view of above, it was decided to grant 1st Consent to

Operate (Part) on Total Plot Area 77,436.43 sq. mtrs and

Total construction BUA(FSI+Non-FSI) of 35,182.99 sq.

mtrs. (Out of Total Construction BUA of 2,01,223.92 sq.

mtrs. of entire project as per EC dated 6.02.2015) by

imposing following condition(s)

1. PP shall submit affidavit in Board’s prescribed

format within 15 days regarding compliance of

conditions of Environmental Clearance (EC) and

Consent to Establish.

Page 26: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 26 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

2. PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st Consent

to Operate (Part) is made and that the same is

included in the Environmental Clearance accorded.

3. Project Proponent shall submit the extend/fresh BG

of Rs. 25 lakhs towards O & M of pollution control

system.

4. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

5. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting

etc. and remaining shall be connected to the

sewerage system provided by local body.

Consent shall be issued after:

i. Obtaining Certificate from Architect regarding

completion of construction of BUA for which they

have applied for 1st Consent to Operate (part).

ii. Installation of online monitoring system for the

parameters flow, BOD, TSS at the outlet of STP and

verification of SRO of the same.

33. MPCB-

CONSENT-

0000035688

Shri Dnyaneshwar

Sahakari Sakhar

Karkhana ltd, 320,334,

Bhende Bk Newasa,

Dist. Ahmednagar.

APPROVED

1st Consent to Operate

(Expansion) and

amalgamation with

existing renewal

31.07.2018 It was decided to grant 1st consent to operate for

expansion and amalgamation with existing renewal of

consent for Sugar unit- 6000 TCD & 21 MW co-

generation plant (Existing) & 1000 TCD & 10.5 MW

Co-generation unit (Proposed), by imposing following

conditions:

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards O & M of pollution control systems.

Consent shall be issued after;-

Submission of NOC from Irrigation Dept./CGWA

for use of surface/ground water.

Page 27: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 27 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

34. MPCB-

CONSENT-

0000035235

Gujrat Ambuja Exports

Ltd., A-04 MIDC

Chalisgaon,

Chalisgaon, Dist.

Dhule

NOT APPROVED

1st Consent to Operate

--- It was decided to defer the case and revert back to next

CAC along with applicability of Environmental

Clearance from TAC.

35. MPCB-

CONSENT-

0000033076

Mahindra & Mahindra

Ltd. 119, 177, 910, 84

& 86 part Akurli Road,

Kandivali (East)

Borivali

APPROVED

Amendment in product

in existing consent to

operate for change in

product, water budget

and stack details with

decrease in CI

30.09.2020 It was decided to grant amendment in existing product in

existing consent to operate with change in water budget,

stack details, HW details etc with decrease in CI as there

is reduction in water and effluent generation, fuel and

stack and HW generation and by downsizing of existing

ETP & STP.

36. MPCB-

CONSENT-

0000035280

Akzonobel India Pvt.

Ltd. Plot No. 1/1

MIDC TTC,

Koperkhairane, Thane-

Belapur road, Navi

Mumbai Thane

APPROVED

1st Consent to Operate

31.12.2022 It was decided to grant consent to 1st operate for Powder

coating paints & metallic paint by mixing & blending

only and amalgamation with existing consent to operate.

37. MPCB-

CONSENT-

0000036121

Jindal Poly Films

Limited396, 401, 405,

406, 408, 411, 413 28

Km stone, Nasik

Igatpuri Road, NH-3

Igatpuri, Dist. Nasik

APPROVED

1st operate for

expansion and

amalgamation with

existing consent to

operate

30.09.2020 It was decided to grant 1st Consent to Operate for

expansion to manufacture- Extrusion Thermal

Lamination Coated Films (BOPP & BOPET)/

Metallized Film = 600 MT/M and amalgamation with

existing consent to operate with overriding effect.

Consent will be issued after submission of NOC of

CGWA/Irrigation department for water uses.

38. MPCB-

CONSENT-

0000035761

Avery Dennison India

Pvt Ltd, Plot No G 5

Ranjangaon Industrial

Area. Shirur, Dist.

Pune

APPROVED

1st Consent to Operate

30.06.2019 Committee noted that industry has existing consent for

manufacturing of Paper & film Laminates – 607.00

Millions sq. meters /year which is valid up to

30.06.2019. Industry has applied for 1st operate

(expansion) for the proposed construction of ware

House, scrap Yard shed , canteen , occupational health

centre & expansion of Combined ETP + STP Plant of

capacity 20 CMD to 56 CMD and installation of RO

Plant for drinking water having total BUA 5800 Sq.

meter area. Industry has complied with the conditions of

consent to establish for expansion.

Page 28: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 28 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

In view of above, it was decided to grant consent to 1st

operate for expansion with overriding effect to earlier

consent.

Consent shall be issued after- Obtaining consent fees, if

required.

39. MPCB-

CONSENT-

0000036122

Asian Paints Limited

Plot No C3-B/1 TTC

MIDC , Pawane, Thane

Belapur Road Thane

APPROVED

1st Consent to Operate

and amalgamation

with existing consent to

operate

31.07.2018 It was decided to grant 1st Consent to Operate for Office

building for R & D purpose without any change in

existing production capacity and with overriding effect.

Consent shall be issued after;-

Submission of undertaking from the PP that it is not

integrated plant and therefore EIA Notification, 2006 is

not applicable.

40. MPCB-

CONSENT-

0000028756

Sahakar Maharshi

Shankarrao Mohite

Patil Sahakari Sakhar

Karkhana Ltd,

Shankarnagar

Malshiras, Dist.

Solapur

APPROVED

1st Consent to Operate

31.08.2019 It was decided to grant renewal of consent to operate for

60 KLPD molasses based distillery, by imposing

following conditions:

1. Industry shall extend existing Bank Guarantee of Rs.

5 lakh towards O & M of pollution control

systems.

Consent shall be issued after submission of NOC from

CGWB/Irrigation department for consumption of

ground water/Surface water and additional requisite

consent fee.

41. MPCB-

CONSENT-

0000035213

L G Electronics India

Pvt Ltd Plot No A-5

Ranjangaon Shirur,

Dist. Pune.

NOT APPROVED

1st Consent to Operate

for expansion and

amalgamation with

existing consent

--- It was decided to issue SCN for refusal of 1st C to O as

industry has directly applied for 1st consent to operate

without obtaining consent to establish from the Board.

Page 29: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 29 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

42. MPCB-

CONSENT-

0000038435

India Bulls Properties

Pvt. Ltd., 841 India

Bulls Properties Pvt.

Ltd., "841" Indiabulls ,

C.S No.841 of Lower

Parel (G-South Ward),

Elphis Mumbai

APPROVED

Renewal of Consent

(part-II) for MCGM

Car Parking

30.09.2022 It was decided to grant of Renewal of Consent to operate

(Part-II) for MCGM Car parking for Total plot area -

39,086.43 sq.m., and Total Construction BUA;

1,08,383.93 sq,m.,(Out of Total constriction BUA of

4,88,855.71 Sq Mtrs)as per amended EC dated

11.12.2015 by imposing following conditions;

1. PP shall extend/top-up the BG of Rs. 25 lakhs

obtained towards O & M of Pollution control

system.

2. PP shall install online monitoring system within 3

months for the parameters BOD, SS and flow at the

outlet of STP and submit BG of Rs 5 lakh for the

compliance of the same.

3. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

4. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting

etc. and remaining shall be utilized on land for

gardening and connected to the sewerage system

provided by local body.

5. PP shall downsize the STP capacity to treat the

sewage of 34.63 CMD so as to meet the consented

standard.

43. MPCB-

CONSENT-

0000037842

Kisan Veer Satara

Sahakari Sakhar

Karkhana Ltd., Survey

No. 630, Gat

APPROVED

1st Consent to Operate

31.08.2019 It was decided to grant 1st Consent to Operate for 40

KLPD distillery unit and amalgamation with existing 60

KLPD distillery unit, by imposing following conditions:

Page 30: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 30 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

No.1526/1 & 2 of

village Bhuinj, Tal:

Wai; Dist: Satara

1. Industry shall submit Bank Guarantee of Rs. 5 lakh

towards O & M of pollution control systems.

Consent shall be issued after :-

Submission of NOC of CGWB/Irrigation department for

consumption of ground water/Surface water.

44 Kapstone Construction Pvt. Ltd., Sub Plot 4, 6A, S. No. 14(pt), 15(pt) 16(pt) & 17(pt) Rustomjee 100 acres, Village Majiwade. District – Thane

As per the decision in Earlier CAC meeting dated

11.12.2017 Project Proponent was called for

presentation / Technical discussion before Consent

Appraisal Committee members.

It was noted during the presentation that PP has applied

for re-validation of Consent to Establish with expansion

and Consent to Operate (i.e. for Part-I, II, III & IV).

Also, noted that Consent to establish was issued on

10.11.2006.

Also, noted that PP has obtained amended

Commencement Certificate from Thane Municipal

Corporation including Occupancy Certificate for the

completed part as above. Also, PP reported that the

construction activity completed in NON CRZ Area, and

Architect certificate mentioning that construction is

completed in accordance with the approved CC and plan

by the planning authority. Also provided pollution

control facilities including online monitoring system.

PP has obtained Environment & CRZ Clearance dated

15.05.2012 for plot Area of 2,01,436.62 Sq. Mtr. & CRZ

affected area 1,45,834 sq. Mtrs. & outside CRZ Area of

55,602.43 sq. Mtrs. Total BUA of the Project including

CRZ Area 1,63,446 Sq. Mtrs.

44

(A) MPCB-CONSENT- 0000033944

APPROVED

Revalidation of

Consent to Establish

with expansion

5 years/EC

validity

whichever is

earlier

Revalidation of C to E with expansion:

It was decided to grant revalidation of Consent to

Establish with expansion for construction for residential

cum commercial project for Total Plot Area for

Page 31: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 31 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

5,10,613.02 sq. mtrs and total Construction BUA for

9,31,501.46 as per Environmental Clearance from GoM

dated 25.3.2014 & EC and CRZ Clearance from MoEF

dated 15.5.2012 sq. mtrs. by imposing following

conditions:

1. PP shall submit BG of Rs. 25 Lakh towards

compliance of Environment Clearance and

Consent to Establish conditions.

2. PP shall submit an affidavit in prescribed format

regarding compliance of conditions of EC and

Consent to Establish conditions.

3. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

4. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting

etc. and remaining shall be used on land for

gardening and connected to the sewerage system

provided by local body.

5. PP shall install online monitoring system for

parameters BOD, TSS and flow at outlet of STP.

44

(b)

C to O for

(Part-I, II, III

& IV)

A. For Part-

I

File No.

130514FT22

8

App. No.

CO13030001

34,

B. For Part-

II

File No.

APPROVED

1st Consent to Operate (part)

30.11.2019 B. Regarding C to O(Part-I, Part-II, Part-III & Part-

IV

Committee noted that, PP has obtained amended

Commencement Certificate from Thane Municipal

Corporation including Occupancy Certificate for the

completed part. Also, noted that the construction activity

completed in NON CRZ Area, and Architect certificate

mentioning that construction is completed in accordance

with the approved CC and plan by the planning

authority. Also noted provision of pollution control

facilities including online monitoring system.

In view of above, it was decided to grant C to O(Part-I,

Part-II, Part-III & Part-IV) for construction for

residential cum commercial project as mentioned below

Page 32: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 32 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

150202FT03

40/01502300

0193

EIC No. TN-

5761-15

C. UAN No.

00000019120

, (Part-III)

D. UAN No.

0000018862

(Part-IV)

1) C to O (Part-I) for Total Plot Area of 4,39,437 Sq.

Mtrs and Construction BUA of 63,677.89 Sq.Mtrs

out of Total Construction BUA of 9,31,501.46

Sq.Mtrs

2) C to O (Part-II) for Total Plot Area of 3,09,176.4

Sq. Mtrs and Construction BUA of 82,002.78 Sq.

Mtrs out of Total Construction BUA of

9,31,501.46 Sq.Mtrs

3) C to O (Part-III) for Total Plot Area of 3,09,176.40

Sq. Mtrs and Construction BUA of 5,589.07

Sq.Mtrs out of Total Construction BUA of

9,31,501.46 Sq.Mtrs

4) C to O (Part-IV) for Total Plot Area of 3,09,176.40

Sq. Mtrs and Construction BUA of 62,202.47

Sq.Mtrs out of Total Construction BUA of

9,31,501.46 Sq.Mtrs.

Therefore, it was decided to grant 1st Consent to

Operate (Part) by imposing following condition(s);

1. PP shall submit affidavit in Board’s prescribed

format within 15 days regarding compliance of

conditions of Environmental Clearance (EC) and

Consent to Establish.

2 PP shall submit the affidavit within 15 days in the

prescribed format regarding the part of the built up

area/ building for which application for 1st

Consent to Operate (Part) is made and that the

same is included in the Environmental

Clearance/CRZ Clearance accorded.

3. Project Proponent shall submit the BG of Rs. 25

lakhs towards O & M of pollution control system.

4. PP shall achieve the treated domestic effluent

standard for the parameter BOD- 10 mg/lit.

Page 33: MAHARASHTRA POLLUTION CONTROL BOARD - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf · Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018

8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 33 of 33

Sr.

No.

Application

unique

number

Name of Industry Decision on grant of

consent

Consent

granted up

to

Remarks/Discussion (1)

5. The treated effluent shall be 60% recycled for

secondary purposes such as toilet flushing, air

conditioning, cooling tower make up, firefighting

etc. and remaining shall be connected to the

sewerage system provided by local body.

6. PP shall not take further effective steps for

remaining BUA without obtaining revalidation of

consent to establish.

Consent shall be issued after:

i. Obtaining Certificate from Architect regarding

completion of construction of BUA for which they

have applied for 1st Consent to Operate (part).

ii. Installation of online monitoring system for the

parameters flow, BOD, TSS at the outlet of STP and

verification of SRO of the same

iii. Obtaining requisite additional consent fees.