maharashtra pollution control board - …mpcb.gov.in/...8th...09022018_bookletno13_06032018.pdf ·...
TRANSCRIPT
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 1 of 33
MAHARASHTRA POLLUTION CONTROL BOARD
Minutes of 8th Consent Appraisal Committee Meeting of 2017-2018 held on 09.02.2018 at 3.00 p.m. at MHADA Office, Grihanirman Bhavan,
Kalanagar, Bandra (East), Mumbai, Maharashtra 400051.
……….
The Consent Appraisal Committee meeting of the Board was held on 09.02.2018. Following members of the Consent Appraisal Committee were
present:
1. Shri Milind Mhaiskar, Chairman
Vice President & CEO, MHADA and
Chairperson, MPCB, Mumbai.
2. Shri. P. Anbalagan Member
Member Secretary, MPC Board, Mumbai
3. Shri. Padmakar Nandusekar Member
Technical Advisor (Environment), MIDC, Mumbai
4. Shri. P. K. Mirashe Member Conveyor
Assistant Secretary (Technical), MPC Board, Mumbai
Additional Chief Secretary, Home (Transport) Dept., Mumbai could not attend the meeting. Leave of absence was granted to them.
Following Officer of MPCB were present for the meeting:
1. Shri. V. M. Motghare, JD(APC), MPCB, Special Invitee
2. Shri. Y. B. Sontakke, JD(WPC), MPCB, Special Invitee
3. Shri A. R. Supate, PSO, Mumbai, Special Invitee
4. Shri. N. N. Gurav, Regional Officer (HQ), Mumbai, Special Invitee
Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of 7thConsent
Appraisal Committee meeting held on 11.12.2017 for 1st consent to operate and consent to establish (booklet no 10, 11) respectively and held on 12.12.2017
for renewal of consent (booklet no 12) circulated vide letter no. NO.BO/CAC-CELL/TB/B-133 dtd. 09.01.2018 were confirmed.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 2 of 33
The meeting thereafter deliberated on the fresh agenda items of 1st consent to operate [Book-let no 13] is placed before the committee and following
decisions were taken.
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Book-let No. 13
Consent to 1st Operate
1. MPCB-
CONSENT-
0000003099
Western Coal Field
Limited, WCL,
Kamptee Deep Project
Near Kandri Gram
Pancjayat, Tal.
Parseoni, Dist. Nagpur
APPROVED
1st consent to Operate
for 0.5 MTPA with
increased mining area
i.e. existing 1.5 MTPA
+ expansion 0.5 MTPA
= total 2 MTPA)
31.03.2020 Committee noted that renewal of consent to operate of
existing Coal Mine-1.5 MMTPA over a mining lease
area of 249.15 Ha. was approved in the CAC meeting
dated 27.08.2015. However, Consent was not issued due
to non-submission of consent fees.
Committee also noted that industry has obtained Consent
to establish vide consent dated 03.04.2011 for coal
mining activity of Underground mining over an mining
lease area of 661.65 ha for Coal Production- 2.0 MTPA
which was expired on 02.04.2016. Further, also noted
the reply of PP that EC validity period shall be counted
from the date of issuance of EC i.e. after 11.05.2015.
It is further noted that PP has provided Sedimentation
Tanks of size 45 X 25 X 10 mtrs and 40 X 10 X 1 mtrs,
Details of Air Pollution control arrangement is provided.
As decided in earlier CAC meeting, hearing to the WCL
authority was extended on 07.02.2018. They have also
made the presentation about compliance made before
CAC and based on the presentation made by WCL
authority they have agreed to comply the consent
conditions in time bound manner.
In view of above, It was decided to grant 1st Operate for
expansion with mining area for Coal production 0.5
MTPA on a mining area of 667.65 Ha. and its
amalgamation with existing consent of 1.5 MTPA
approved in earlier CAC by imposing following
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 3 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
conditions :-
1. PP shall provide dry deshelling / manual picking of
stray material arrangement by 31st August 2018 also
submit a plan for installation of Coal washery within
a month.
2. PP shall install CAAQMS arrangement by 31st May
2018.
3. PP shall install STP within 03 months period.
4. PP shall convert existing water sprinkling
arrangement into chemical fogging arrangement
(MgCl2) within 03 months period.
5. PP shall submit Bank Guarantee as per BG regime
within 15 days period.
6. PP shall install real-time coal ash analyser on pilot
basis by 31st May 2018.
7. PP shall provide tar road in remaining area by 31st
March 2018.
8. PP shall carry out over burden dump management as
per CPCB guidelines.
9. PP shall carry out plantation as per EC condition
before ensuing monsoon.
10. PP shall provide treatment plant for mine water
discharge and submit sedimentation tank design
details.
11. PP shall obtain NOC/clarification from CGWA
within 03 months.
Consent shall be issued after verification of consent fees
payment, after receipt of latest compliance report from
SRO and forfeiture of proportionate BG. 2. MPCB-
CONSENT-
0000007229
Asian Institute of
Medical Sciences Pvt.
Ltd. Plot No. P-72,
M.I.D.C., Milap Nagar,
Dombivli (E), Kalyan
NOT APPROVED
Consent to Operate for
Health Care
Establishment
-- The committee noted that the PP has already obtained
CCA for 100 bedded hospital which is valid. Also noted
that PP has applied for combined consent and BMW
Authorization for 250 bedded hospital vide UAN
Number – 0000011968 & 0000007229. Also noted the
request of PP for returning of both the applications as
BNH registration of hospital for 250 beds was
considering their future expansion.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 4 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
In view of above, it was decided to return both the
applications bearing UAN Nos. 0000011968,
000007229. With condition that PP shall not carry out
any expansion activity without prior permission of the
Board.
3. MPCB-
CONSENT-
0000013991
JSW Dharamtar Port
Pvt. Ltd.,
Waterfront Dharamtar,
Pen, Dist. Raigad
NOT APPROVED
1st Consent to Operate
(Part)
--- The committee noted that earlier the case was placed
before CAC meeting held on 08.08.2017. The case is
again resubmitted for seeking approval for part operate
for expansion and renewal. Committee deliberated the
issue in depth and made the following observations;
1. PP has applied for plain renewal of consent (Jetty
length of 331.5 mtrs) for handling capacity
13,50,000 MT/M. (i.e. 16.2 MTPA) .
2. PP has applied for first C to O for expansion for
length 395 mtrs with proportionate handling
capacity of 8,40,000 MT/M. (i.e.10.08 MTPA) (total
length 726.5 mtrs including existing Jetty length and
first phase expansion) for which C to E and EC
including CRZ Clearance already obtained.
3. The MoEF and CC has also accorded EC for Jetty
expansion project with length 1750 mtrs on
26.11.2015. 4. It is also noted from SRO remark that
the work of expansion for first phase of Jetty is
already completed and is ready to operate.
4. Committee also noted the reply received from
MMB, GoM that JSW Dharamtar Port had carried
out repairs of the Dilapidated Jetty structure of the
Jetty and integrated adjacent test pile which was
essential to prevent falling of debris in navigation
channel and also to avoid any eventualities of
accident. They have also stated that the cargo
handling operation is carried out by the company
from designated part of Jetty and restored part of the
Jetty is not use for operation.
5. Committee also noted the PP’s say that there is no
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 5 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
court matter pending against Dharamtar port in NGT
& High Court.
6. The Committee noted that the reply towards opinion
sort from MoEF, Govt. of India is not received till
date.
7. Reminder letter to MoEF and to Env. Dep. GoM
dated 13.11.2017 has been sent. Reply still awaited.
In view of above, it was decided to keep the case in
abeyance for 1st Operate (Part) for expansion and
renewal of consent to operate till obtaining clarification
from Environment Department, Govt. of Maharashtra
and revert back to CAC.
4. MPCB-
CONSENT-
0000014149
Pegasus Properties Pvt.
Ltd. R-1/1, R-1/2, R-
1/3, R-1/4, Rajiv
Gandhi Infotech Park-
III, Village- Man &
Bhoir Wadi Mulshi,
Dist. Pune.
APPROVED
1st Consent to Operate
(Part)
31.01.2022 Committee noted that PP has obtained Environmental
Clearance from SEAC committee vide letter dated
20.11.2010 for total plot area 5,60,000 Sq. Mtrs. and
total BUA 12,13,345 Sq. Mtrs.
Committee also noted that PP has obtained consent to
establish dated 25.05.2015 for total plot area 5,60,000
Sq. Mtrs. and total construction BUA 6,72,341.66 Sq.
Mtrs. PP has also obtained 1st consent to operate (Part-I)
for total construction BUA 4,21,009 Sq. Mtrs.
In view of above, it was decided to grant 1st Consent to
Operate (Part -II) for Residential cum Commercial
Project of M/s. Pegasus Properties Pvt. Ltd,R-1/1, R-
1/2, R-1/3, R-1/4 Rajiv Gandhi Infotech Park-III,
Village- Man & Bhoir Wadi Mulshi on total plot
area 5,60,000 sqm and Construction BUA of
6,14,718.69 sq.m (out of TCBUA of 6,72,341.66 sq.m.
as per CtoE dated 25.05.2015) by imposing following
conditions:
1. PP shall submit affidavit in Board prescribed format
within 15 days regarding compliance of conditions
of Environmental Clearance (EC) and Consent to
Establish.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 6 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
2. PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st Consent
to Operate (Part) is made and that the same is
included in the Environmental Clearance accorded.
3. Project Proponent shall extend/ submit the BG of
Rs. 25 lakhs towards O & M of pollution control
system.
4. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
5. The treated domestic effluent shall be 60% recycled
for secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be utilized on land for
gardening and connected to the sewerage system
provided by local body. Till the time of availability
of local body sewer system, applicant shall utilize
entire treated domestic effluent for Flushing,
Construction of remaining phase and on own land
for gardening.
6. PP shall revalidate EC before carrying out any
further remaining construction work.
7. PP shall submit Board Resolution from company
Board, towards discharging of sewage through the
cement pipes outside the premises into nearby nalla
same nalla meets to Gawarewadi-Mann Nalla thus
violated the provisions of Environmental Laws and
in future, they will not do such violations and BG of
Rs. 2 lakh towards submission of Board resolution
within one month of issue of consent.
8. PP shall not carryout construction activity beyond
the construction area mentioned in consent to
establish (6,72,341.66 Sq. mtrs.) and till
revalidation of EC.
Consent shall be granted after:
i. Submission of Certificate from Architect regarding
BUA completed for which they have applied for 1st
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 7 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Consent to Operate.
ii. After installation of online monitoring system for the
parameters Flow, BOD, and TSS at STP outlet and
verification of the same from SRO/RO.
5. MPCB-
CONSENT-
0000017570
Godavari Biorefineries
Limited, 187 A/p-
Sakarwadi Kopargaon,
Dist. Ahmednagar
APPROVED
1st Consent to operate
for expansion
31.08.2022 Committee noted that the case was already discussed in
CAC meeting held on 17.04.2017 and it was kept in
abeyance for verification report of SRO regarding
compliance of the consent to establish conditions. Also,
noted that SRO has submitted the verification report
stating that industry complied with CtoE conditions and
also installed RO & MEE for achieving ZLD including
provision of online monitoring system. Also, noted that
CPCB has consented NOC for expansion.
In view of above, it was decided to grant Consent to 1st
Operate to manufacture of Crotonaldehyde -Di-Urea
(CDU) and Crotoresin by imposing following
conditions;
1. The consent is granted without prejudice of the orders
passed or being passed by the Hon’ble NGT.
2. This consent is issued in pursuance to the letter of
CPCB dated 11.08.2016.
6. MPCB-
CONSENT-
0000026455
Parag Milk Foods Ltd.
43/1A/1 & 43/1A/2 At
- Awasari Phata. Post -
Manchar. Tal -
Ambegaon. Dist -
Pune.
NOT APPROVED
1st Consent to Operate
for expansion and
amalgamation with
existing Consent to
Operate.
--- Committee noted that existing consent is valid upto
30.04.2020 and applied for 1st consent to operate for
expansion.
Committee also noted that industry has applied for NOC
of CGWA but not received the NOC till date.
In view of above, it was decided to return the application
to the industry and inform the industry to resubmit the
application after receipt of NOC of CGWA.
7. MPCB-
CONSENT-
0000025293
Evershine Developers,
(Formerly known as
Palghar Land
NOT APPROVED
Consent to 1st Operate
--- It was decided to defer the case and revert back to next
CAC along with clarity on EC revalidation, CRZ
applicability, OC status and provision of pollution
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 8 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Development
Corporation)., Survey
no. 5, 5B, 5F, 5G, 5D
Village Dongre, Virar
(west), Taluka Vasai,
District Thane.
(Part-II) control system.
8. MPCB-
CONSENT-
0000019783
Shri Gurudatt Sugars
Ltd, Gat No. 61/A Gat
No. 61/A, Akiwat -
Takaliwadi Road,
Takaliwadi, Tal -
Shirol, Dist - Kolhapur
APPROVED
1st consent to Operate
for expansion
31.07.2019 Committee noted that industry has obtained
Environmental Clearance vide letter dated 20.03.2017
for expansion of sugar from 4900 TCD to 6000 TCD
and Co-gen unit from 15 MW to 21 MW. Industry has
applied for 1st consent to Operate for expansion for
Sugar unit- 1100 TCD (from 4900 TCD to 6000 TCD)
and Co-gen unit – 6 MW (from 15 MW to 21 MW.
Committee also noted that industry has achieved ZLD
by using treated effluent for on land for irrigation as
practice in other sugar industries. Board has also filed
case in district court Kolhapur due to excess crushing
carried out by industry in the season 2015-2016.
In view of above, it was decided to grant 1st consent to
operate for expansion by imposing following conditions.
9. MPCB-
CONSENT-
0000018990
New Majri UG to OC
Mine, 235-249 Majri
Tal. Bhadrawati, Dist.
Chandrapur
APPROVED
1st Consent to Operate
for expansion and
amalgamation with
existing consent to
operate
31.03.2021 Committee noted that industry has obtained
Environmental Clearance vide letter dated 13.02.2017
and consent to operate for coal mining of 0.8 MTPA is
valid upto 31.03.2021. Also, obtained Consent to
Establish for 0.8 to 1.2 MTPA (i.e.0.4 MTPA) on
22.03.2017.
Earlier, the application of C to O for 0.4 MTPA (from
0.8 to 1.2 MTPA) was discussed in CAC meeting dated
08.08.2017 and SCN of refusal of consent and stop work
was issued as industry has failed to provide CAAQMS
as per existing consent condition. Thereafter, PP
submitted appeal towards Environment Department.
Now, PP submitted reply and informed that they will
provide CAAQMS as per existing consent condition by
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 9 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
July 2018 and also appeal was withdrawn vide letter
dated 07.02.2018.
As decided in earlier CAC meeting, hearing to the WCL
authority was extended on 07.02.2018. They have also
made the presentation about compliance made before
CAC and based on the presentation made by WCL
authority they have agreed to comply the following
points in time bound manner.
Considering the commitment made by the industry, it
was decided to grant 1st Consent to Operate for
expansion of Mine - 0.4 MTPA (from 0.8 to 1.2 MTPA)
with amalgamation and overriding effect on earlier
Consent to Operate by imposing following conditions;
1. PP shall provide dry deshelling / manual picking of
stray material arrangement by 31st August 2018 also
submit a plan for installation of Coal washery within
a month.
2. PP shall install CAAQMS arrangement by 31st May
2018.
3. PP shall install STP within 03 months period.
4. PP shall convert existing water sprinkling
arrangement into chemical fogging arrangement
(MgCl2) within 03 months period.
5. PP shall submit Bank Guarantee as per BG regime
within 15 days period.
6. PP shall install real-time coal ash analyser on pilot
basis by 31st May 2018.
7. PP shall provide tar road in remaining area by 31st
March 2018.
8. PP shall carry out over burden dump management as
per CPCB guidelines.
9. PP shall carry out plantation as per EC condition
before ensuing monsoon.
10. PP shall provide treatment plant for mine water
discharge and submit sedimentation tank design
details.
11. PP shall obtain NOC/clarification from CGWA
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 10 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
within 03 months.
Consent shall be issued after verification of consent fees
payment, after receipt of latest compliance report from
SRO and forfeiture of proportionate BG.
10. MPCB-
CONSENT-
0000002745
Singhori Opencast
Coal Mine, WCL, at
Silewara, Saoner, Dist.
Nagpur
APPROVED
1st Consent to Operate
31.03.2019 Committee noted that CAC has refused the 1st consent to
operate in its CAC meeting dated 27.09.2017 due to
various non-compliances. It is also noted that PP has
obtained Environmental Clearance vide letter dated
17.05.2007.
Industry has submitted their reply and also received
verification report from concerned SRO dated
16.01.2018 and noted that now the industry has provided
adequate pollution control arrangement. JVS (treated
trade effluent) sample results are within consented
standards.
As decided in earlier CAC meeting, hearing to the WCL
authority was extended on 07.02.2018. They have also
made the presentation about compliance made before
CAC and based on the presentation made by WCL
authority they have agreed to comply the following
points in time bound manner.
Considering the assurance given by the industry and
verification report received from SRO, it was decided to
grant 1st Consent to Operate for Opencast Coal Mining
Activity of 0.8 MTPA capacity by imposing following
conditions.
1. PP shall provide dry deshelling / manual picking of
stray material arrangement by 31st August 2018 also
submit a plan for installation of Coal washery within
a month.
2. PP shall install CAAQMS arrangement by 31st May
2018.
3. PP shall install STP within 03 months period.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 11 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
4. PP shall convert existing water sprinkling
arrangement into chemical fogging arrangement
(MgCl2) within 03 months period.
5. PP shall submit Bank Guarantee as per BG regime
within 15 days period.
6. PP shall install real-time coal ash analyzer on pilot
basis by 31st May 2018.
7. PP shall provide tar road in remaining area by 31st
March 2018.
8. PP shall carry out over burden dump management as
per CPCB guidelines.
9. PP shall carry out plantation as per EC condition
before ensuing monsoon.
10. PP shall provide treatment plant for mine water
discharge and submit sedimentation tank design
details.
11. PP shall obtain NOC/clarification from CGWA
within 03 months.
Consent shall be issued after obtaining requisite consent
fees, if required.
11. MPCB-
CONSENT-
0000030612
Danfoss Power
Solutions India Pvt.
Ltd. Plot No. 40, Gat
No. 94 & 100 Hi-Cliff
Industrial Estate
Haveli, Dist. Pune
APPROVED
1st Consent to Operate
for expansion (part)
and amalgamation with
existing consent
31.05.2018 It was decided to grant 1st Consent to Operate for
expansion (Part) and amalgamation with existing
consent under Orange category by imposing following
conditions.
1. Industry shall extend the existing BG of Rs. 7.5 lakh
submitted towards O&M of pollution control system.
Consent shall be issued after submission of requisite
consent fee.
12. MPCB-
CONSENT-
0000032082
Suranjan Holdings and
Estate Developers Pvt.
Ltd, CTS No. G-626 &
G/164 A (part), CTS
No. G-626 & G/164 A
(part), Village -
APPROVED
1st Consent to Operate
(Part)
31.10.2019 Committee noted that PP has obtained Environmental
Clearance dated 03.12.2016 for total plot area 14184.10
Sq. Mtrs. and total BUA 89280.26 Sq. Mtrs under SRA
scheme under regulation 33(10) & 33 (14).
In view of above, it was decided to grant 1st Consent to
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 12 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Bandra, 18th Road,
Khar (W), Mumbai.
Operate (part) for Residential Building Project under
SRA scheme on Total Plot Area 14,184.10 sq. mtrs. and
part construction BUA of 27,154.10 sq. mtrs. (Out of
Total Construction BUA of entire project as 89,280.26
sq. mtrs. as per EC dated 03.12.2016) by imposing
following conditions ;-
1. PP shall submit affidavit shall submit an affidavit in
Board’s prescribed format within 15 days regarding
compliance of conditions of Environmental Clearance
(EC) and Consent to Establish.
2. PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st Consent to
Operate (Part) is made and that the same is included
in the Environmental Clearance accorded.
3. Project Proponent shall submit the BG of Rs. 25 lakhs
towards Operation & Maintenance of pollution
control system.
4. PP shall achieve the treated domestic effluent standard
for the parameter BOD- 10 mg/lit.
5. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up,
firefighting etc. and remaining shall be connected to
the sewerage system provided by local body.
Consent shall be issued after;-
i. Obtaining Certificate from Architect regarding BUA
completed for which they have applied for 1st
Consent to Operate.
ii. After obtaining additional fees i.e. in C to E capital
investment was 140 Cr. which is increased in C to O
(part) as 318.25 Cr. requisite fees due to increase in
investment.
iii. After receipt of verification report from SRO
regarding installation of Organic Waste Converter
/digester/composting system for the treatment of
bio-degradable municipal solid waste.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 13 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
13. MPCB-
CONSENT-
0000031149
Cargill India Pvt. Ltd.
E 45, MIDC
Kurkumbh, Tal.
Daund, Dist. Pune.
APPROVED
Amendment in existing
consent for two Nos. of
DG sets
31.03.2021 It was decided to grant amendment in existing consent to
operate which was valid upto 31.03.2021 for two Nos. of
D.G. sets having capacity 500 KVA each.
14. MPCB-
CONSENT-
0000032035
Karanja Terminals &
Logistics Pvt. Ltd.,
Karanja Creek Uran,
Dist. Raigad
NOT APPROVED
1st Consent to Operate
(part)
--- Committee noted that PP has obtained Environmental
Clearance vide letter dated 21.08.2013 which is valid
upto 20.08.2020. It is noted that PP has applied for part
consent to operate for 3 berths out of total 10 berths.
However, construction work of these 3 berths is not
completed it date.
In view of above, it was decided to defer the case and
revert back in next CAC meeting along with Sub
Regional Officer’s latest verification report in respect of
application No. 30 of 2017 filed by Karanja Machimar
Vividha Kalyankari Society Ltd., compliance report
according to Environmental Clearance and Consent
conditions and present status report along with JVS
sampling results of water and air.
15. MPCB-
CONSENT-
0000032194
KSH Distriparks Pvt.
Ltd., P-5 Chakan
Industrial Area Phase
II, Village Khalumbare
Khed, Dist. Pune
APPROVED
1st Consent to Operate
(Part-II) and renewal of
(Part-I) and its
amalgamation
31.03.2019 Committee noted that PP has obtained Environmental
Clearance vide letter dated 26.12.2014 for Total Plot
Area of 1,52,000 Sq. Mtrs. and Total construction BUA-
1,05,641.95 Sq. Mtrs. Earlier, PP has obtained Consent
to Operate (Part-I) for Total construction BUA –
27,578.015 Sq. Mtrs. Which was valid upto 30.09.2017.
Now, PP has applied for 1st Operate (Part-II) for Total
BUA of 37,280.175 sq.mtrs & amalgamation with
renewal of Consent (Part-I) for construction BUA –
27,578.015 Sq. Mtrs i.e. (Part - I + Part - II) Total
construction BUA of 64,858.19 Sq. Mtrs.
In view of above, It was decided to grant amalgamation
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 14 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
of Consents having Total construction BUA of
64,858.19 Sq. Mtrs. (i.e. existing part area 27,578.015
Sq. Mtrs + Presently applied 37,280.175 Sq. Mtrs) for
Multi modal Logistic & Industrial Park for Green &
Orange categories of Industries by imposing following
conditions;-
1. PP shall not allocate the area/ plot to the trade effluent
generating industry.
2. PP shall submit an affidavit in Board’s prescribed
format within 15 days regarding compliance of
conditions of Environmental Clearance (EC) and
Consent to Establish.
3. PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st Consent to
Operate (Part) is made and that the same is included
in the Environmental Clearance accorded.
4. Project Proponent shall submit the BG of Rs. 15 lakhs
towards O & M of pollution control system.
5. Individual industry in the park in existing and
proposed building will be responsible for obtaining
their Consent to Establish and Operate separately
from MPCB.
6. Applicant shall operate common pollution control
infrastructure facility and ensure that the individual
industries/units shall enter in to MOU with Industrial
park to ensure operation and maintenance of the
common STP, composting system for wet garbage.
7. PP shall achieve the treated domestic effluent standard
for the parameter BOD- 10 mg/lit.
8. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up,
firefighting etc. and remaining shall be used on own
land for gardening/irrigation purpose within premises.
Consent copy shall be issued after –
i. Obtaining SRO report regarding adequacy of
Pollution Control measures i.e. STP, Organic Waste
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 15 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Converter /digester/composting system for the
treatment of bio-degradable municipal solid waste.
ii. After obtaining additional fees (as per sectoral
approach), if applicable.
16. MPCB-
CONSENT-
0000032442
Excel Industries
Limited, Plot No. D-9
MIDC Lote Parshuram,
Chiplun, Dist.
Ratnagiri.
APPROVED
Amendment in existing
consent to operate for
addition of capacity of
boiler (12 TPH)
31.01.2019 It was decided to grant amendment in existing consent to
operate for addition of capacity of boiler (12 TPH) and
DG set 1010 KVA, deletion of hazardous waste -flue gas
residue ( Boiler soot) and oil fired boiler and addition of
oily cotton waste with CHWTSDF as disposal path
without any change in production quantity with
overriding effect.
17. MPCB-
CONSENT-
0000031535
Reliable Sugar &
Distillery Power Ltd.
(Formerly Known As
Mahadik Sugar & Agro
Products Ltd) 29 A/p
Panori, Vill. Farale,
Tal. Radhanagari, Dist.
Kolhapur
APPROVED
1st Consent to Operate
for expansion with
name change
31.07.2019 It was decided to grant 1st Consent to Operate for
expansion of Sugar unit- 2250 TCD and 8.5 MW Cogen
unit with change of name from M/s. Mahadik Sugar and
Agro Products Ltd., to M/s. Reliable Sugar and
Distillery Power Ltd., by imposing following conditions:
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
Consent shall be issued after
i. Installation of online monitoring system within 3
months and submit Bank Guarantee of Rs. 5 lakh
towards compliance of same.
ii. Submission of NOC from CGWB/Irrigation
department for consumption of ground
water/Surface water and requisite consent fee.
18. MPCB-
CONSENT-
0000031443
DDPL Global
Infrastructures Pvt.
Ltd. (Phase-II - Pavitra
Gruh Sahay LLP) S.
NO. 23 & 24, Hissa no
1,2,4 Tal. Vasai, Dist.
Palghar
APPROVED
1st Operate
(Part-II) & revalidation
of CtoE for remaining
part
30.11.2019 Committee noted that PP has obtained consent to
establish for total plot area 1,82,870 sq. mtrs and total
BUA 4,82,354.90 Sq. mtrs vide consent dated
09.12.2011. Also obtained EC dated 20.11.2010 for total
plot area 1,82,870 sq. mtrs and total BUA 4,82,354.90
Sq. mtrs. Which was revalidated on 20.01.2017 for total
plot area 6,02,500 sq. mtrs and total BUA 4,01,763.63
Sq. mtrs.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 16 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Committee also noted that PP has obtained consent to
operate (Part-I) for total plot area 1,82,870 sq. mtrs and
total BUA 37,206.34 Sq. mtrs which was valid upto
31.12.2017.
Now, PP has applied for consent to operate (part-II) for
Total Construction BUA – 29,198.46 sq. mtrs.
In view of above, it was decided to grant Consent to
Operate (Part-II) by imposing following conditions;-
1. PP shall submit affidavit in Board’s prescribed
format within 15 days regarding compliance of
conditions of revised Environmental Clearance (EC)
and Consent to Establish.
2. PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st Consent
to Operate (Part) is made and that the same is
included in the Environmental Clearance accorded.
3. Project Proponent shall submit the extend/fresh BG
of Rs. 25 lakhs towards O & M of pollution control
system.
4. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
5. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be connected to the
sewerage system provided by local body.
It was also decided to revalidate consent to establish for
remaining part as per revalidated EC and by imposing
standard conditions.
It was also decided to amalgamate the consent to operate
part-I & part II after obtaining requisite consent fee of
renewal of consent (part-I).
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 17 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Consent shall be issued after:
i. Obtaining Certificate from Architect regarding
completion of construction of BUA for which they
have applied for 1st Consent to Operate (part).
ii. Obtaining undertaking regarding they have
constructed Construction BUA area as per revised
Environment Clearance (dtd 20.01.2017).
iii. Installation of online monitoring system for the
parameters flow, BOD, TSS at the outlet of STP and
verification of SRO of the same.
iv. After obtaining additional fees for re-validation of
Consent to Establish as per revised EC Built Up
Area, if required.
19. MPCB-
CONSENT-
0000031854
Pioneer Distilleries
Limited Gut No. 285
Gut No. 285, Vill.
Balapur, Dist.
Dharmabad, Dist.
Nanded.
APPROVED
1st Consent to Operate
for 52 TPH boiler
31.08.2019 Committee noted that Industry has applied for 52 TPH
boiler and also installed online monitoring system.
In view of above, it was decided to grant 1st Consent to
1st operate for 52 TPH Boiler
20. MPCB-
CONSENT-
0000032917
Shirpur Power Private
Limited, Plot No.1
Nardana (Phase-I)
Industrial area
Shindkheda, Dist.
Dhule
APPROVED
1st Consent to Operate
31.08.2019 Committee noted that earlier CAC has returned the
application due to incomplete work of laying of Railway
track for transportation of Coal by Rail as per the
condition of Environmental Clearance as per CAC
meeting dated 24 & 25.01.2017.
Committee also referred the minutes of SEAC in its
139th meeting has recommend the proposal to SEIAA
for amendment in EC for in transportation mode of coal
by Rail and or road to be allowed till rail facility is made
operative. However, the amended Environment
Clearance is not issued.
In view of above, it was in principle decided to grant
consent to Operate with condition to achieve the
standards of Particulate Matter - 30mg/Nm3 and thermal
power BG regime and standard conditions.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 18 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Consent shall be issued after;-
Submission of revised Environment Clearance copy and
additional requisite consent fee.
21 MPCB-
CONSENT-
0000033557
Lucina Land
Development Limited
S. No. 80A, 83/2A,
83/3, 83/7+4B+5B,
85/0,86/1, 90/1A,
90/3B, 90/4, 90/8 to
90/11 & 91/5 Survey
no.80A to 92/5, Village
Kon and Arivalli,
Taluka-Panvel,
District-Raigad
APPROVED
1st Consent to Operate
(part)
30.09.2019 Committee noted that PP has obtained environmental
Clearance vide letter dated 22.11.2010 for total plot area
95,570 Sq. Mtrs and Total BUA 6,03,339.07 Sq. Mtrs.
and further amended EC for total BUA- 5,99,875 Sq.
Mtrs.
PP has also obtained revalidated consent to establish
vide consent dated 18.01.2017 for total plot area 95,570
Sq. Mtrs. and total BUA- 5,99,875 Sq. Mtrs.
Now, PP has applied for 1st Consent to Operate (Part)
on Total Plot Area 10,675 Sq. Mtrs. (Out of Total plot
area of 95,570 Sq.Mtrs) and Total construction BUA
(FSI+Non-FSI) of 91,475.17 Sq. Mtrs. (Out of Total
Construction BUA of 5,99,875 Sq. Mtrs as per EC dated
9.08.2012) by imposing following condition(s);-
1. PP shall revalidate EC within 3 months of date of
issuance of C to O 1st Operate.
2. PP shall submit affidavit in Board’s prescribed
format within 15 days regarding compliance of
conditions of Environmental Clearance (EC) and
Consent to Establish.
3. PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st Consent
to Operate (Part) is made and that the same is
included in the Environmental Clearance accorded.
4. Project Proponent shall submit the extend/fresh BG
of Rs. 25 lakhs towards O & M of pollution control
system.
5. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
6. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 19 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
conditioning, cooling tower make up, firefighting
etc. and remaining shall be connected to the
sewerage system provided by local body.
7. PP shall downsize the STP to treat the sewage of
345 m3/day so as to meet the consented standard.
Consent shall be issued after:
i. Obtaining Certificate from Architect regarding
completion of construction of BUA for which they
have applied for 1st Consent to Operate (part).
ii. Installation of online monitoring system for the
parameters flow, BOD, TSS at the outlet of STP and
verification of SRO of the same.
22 MPCB-
CONSENT-
0000032964
Dinesh Opencast
Project (MKD - III),
Makardhokra – III,
(Western Coalfields
Limited) near Hevati
Vill. Tal Umred, Dist
Nagpur.
APPROVED
1st Consent to Operate
31.03.2020 Committee noted that PP has obtained Environmental
Clearance vide letter dated 21.06.2011 for Opencast
Coal Mining activity- 3.0 MTPA on total mining area
1636.97 Ha. PP has also obtained Consent to establish
for the same vide consent dated 27.07.2015.
PP has provided Sedimentation Tank for mine water
discharge, Sewage Treatment Plant for domestic effluent
and 01 CAAQMS installation out of 03 is at final stage.
In view of above, it was decided to grant 1st Consent to
operate for Opencast Coal Mining activity- 3.0 MTPA
on total mining area 1636.97 Ha. by imposing coal mine
BG regime and following standard conditions;
1. PP shall provide dry deshelling / manual picking of
stray material arrangement by 31st August 2018 also
submit a plan for installation of Coal washery within
a month.
2. PP shall install CAAQMS arrangement by 31st May
2018.
3. PP shall install STP within 03 months period.
4. PP shall convert existing water sprinkling
arrangement into chemical fogging arrangement
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 20 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
(MgCl2) within 03 months period.
5. PP shall submit Bank Guarantee as per BG regime
within 15 days period.
6. PP shall install real-time coal ash analyser on pilot
basis by 31st May 2018.
7. PP shall provide tar road in remaining area by 31st
March 2018.
8. PP shall carry out over burden dump management as
per CPCB guidelines.
9. PP shall carry out plantation as per EC condition
before ensuing monsoon.
10. PP shall provide treatment plant for mine water
discharge and submit sedimentation tank design
details.
11. PP shall obtain NOC/clarification from CGWA
within 03 months.
Consent shall be issued after obtaining requisite consent
fees, if required.
23 MPCB-
CONSENT-
0000033805
Krantiagrani Dr. G. D.
Bapu Lad Sahakari
Sakhar Karkhana Ltd.,
Kundal 2955 Vita
Road Palus, Sangli
APPROVED
1st Consent to Operate
31.08.2019 Committee noted that industry has obtained
Environmental Clearance vide letter dated 20.07.2017
for Distillery of capacity 60 KLPD
It was decided to grant 1st Consent to Operate for 60
KLPD Distillery unit, by imposing standard and
following conditions:
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after submission of NOC from
CGWB/Irrigation department for consumption of ground
water/Surface water.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 21 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
24 MPCB-
CONSENT-
0000033401
Bedmutha Industries
Ltd. Plant-6 E-1
Nardana MIDC, Phase
I Shindkheda, Dist.
Dhule
APPROVED
1st Consent to Operate
for expansion and
amalgamation with
existing consent
28.02.2022 Committee noted that industry has provided RO & MEE
to achieve ZLD. The unit consists of Multi drawing
machine & extruder. Industry is not generating any trade
effluent from expansion project and domestic effluent is
0.2 CMD.
In view of above, it was decided to grant 1st Consent to
Operate for expansion and amalgamation with existing
consent to manufacture Copper Wire& wire products,
tinned wire, PVC insulated & Sheathed Copper Flexible
Cable- 2000 MT/M.
25 MPCB-
CONSENT-
0000032989
Evonik Catalyst India
Pvt. Ltd. Plot No. F-1/1
& F-1/2 Dombivali
MIDC, Phase- I,
Kalyan
APPROVED
Consent to Establish
for relocation of
Activated Metal
Catalyst(AMC) Plant
Commissioni
ng of unit or
5 years
whichever is
earlier
Committee noted that industry has obtained consent to
operate which is valid upto 30.04.2020. They have
applied for consent to establish for relocating the
Activated Metal Catalyst (AMC) Plant within the
existing premises due to old structure. Also noted that
JVS results of the existing unit are exceeding the
consented limit.
In view of above, it was decided to consider CtoE for
relocation and SCN for exceeding the JVS results of
existing unit.
26. MPCB-
CONSENT-
0000034035
Jawaharlal Nehru Port
Trust NA Sheva, Ulwe
Uran, Dist. Raigad
APPROVED
1st Consent to Operate
30.9.2019 Industry has applied for 1st consent to operate for phase-
I of 4th Container Terminal and Marine Chemical
Terminal at JN Port. Industry has obtained consent to
establish on 26.10.2007. Industry has applied for
revalidation of consent to establish. The same was
approved in CAC meeting held on 25.01.2017 and it was
decided to grant Revalidation of consent to establish for
Development of 4th Container Terminal and Marine
Container Terminal (as per Reviewed scope) in
accordance with the EC-CRZ clearance obtained dated
29.07.2008 and further EC-CRZ validity extended vide
dated 26.02.2014.
Committee also noted that Environment Clearance is
revalidated upto 28.07.2018 and applied for amendment
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 22 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
in EC for use of stone metal instead of dredged material.
In view of above, it was decided to grant in principle, 1st
consent to operate for phase-I of 4th Container Terminal
and Marine Chemical Terminal at JN Port by imposing
following conditions;
1. The applicant shall comply with the conditions
stipulated in EC-CRZ clearance.
2. PP shall submit BG of Rs 10 lakhs for compliance of
EC-CRZ Clearance and consent of Establish
conditions.
3. PP shall submit an affidavit in prescribed format
regarding compliance of conditions of ECCRZ
clearance.
4. PP shall get necessary amendment in EC within 03
months.
Consnet shall be issued after submission of requisite
consent fee.
27. MPCB-
CONSENT-
0000034202
Lloyds Line Pipes Ltd.
Plot No. M-1 Plot No.
M-1, MIDC, Village
Kudavli, Murbad,
Thane Murbad, Thane.
APPROVED
1st Consent to Operate
for expansion (Part)
with increased
production quantity and
amalgamation with
existing consent
28.02.2019 It was decided to grant 1st Consent to Operate for
expansion (Part) without increase in production quantity
to manufacture HR/CH Sheet Galvanizing-36,000 MT/A
as per consent to establish quantity by imposing
following conditions:-
1. Industry shall 100% reuse/recycle the treated trade
effluent into the process and shall not dispose on
land for gardening and submit the BG of Rs. 5 lakh
towards compliance of the same.
2. BG of Rs. 5 lakh forfeited obtained towards O&M
of pollution control system as JVS results are
exceeding the consented standards and obtain top up
BG towards compliance of the same.
It was also decided that if industry not complied the
conditional restart direction issued by the Board dated
09.10.2017 proportionate BG shall be forfeited from BG
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 23 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
of Rs. 25 lakh obtained towards compliance of
conditional direction after receipt of verification report
from SRO.
Consent shall be issued after ;-
1] Confirmation regarding 100% recycle of effluent.
2] Submission of consent fee towards re-validation of
consent to establish as it was expired 2 months before
the application for 1st CtoO.
28. MPCB-
CONSENT-
0000033438
Technocraft Industries
(India) Limited C-5, C-
2/1-2 MIDC, Murbad,
Dist. Thane.
APPROVED
1st consent to Operate
for expansion with
increase in water
consumption, effluent
quantity and
amalgamation with
existing consent
31.12.2020 It was decided to grant 1st consent to Operate for
expansion with increase in water consumption, effluent
quantity and amalgamation with existing consent to
manufacture RUBBER GASKETS / WASHER-
10,00,000 No/D (31.5 MT/M)
1. This consent is issued with the overriding effect of
the earlier consent granted by the Board vide
consent dated 31.05.2016.
We may impose the condition that industry shall not be
allowed to treat the RO reject in the MEE at sister
concern industry located in Murbad MIDC, plot no A-
4/1.
It was also decided to return the BG of Rs. 5 lakh & BG
of Rs. 2 lakh obtained towards compliance of CtoE
condition and installation of STP as industry has
complied the same.
Consent shall be issued after –Verification report about
installation of dedicated MEE at plot no. C-5, C-2/1-2
MIDC, Murbad, Dist. Thane.
29. MPCB-
CONSENT-
0000034874
Gangamai Industries
and Constructions Ltd.
(GIACL) 222,223,224
Najik Babhulagaon
Shevgaon, Dist.
APPROVED
1st Consent to Operate
for expansion and
amalgamation with
31.08.2019 Committee noted that industry has obtained
Environmental Clearance for 30 KLPD vide letter dated
18.10.2017. Industry has provided bio-metanizaton plant
followed by MEE to achieve zero liquid discharge.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 24 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
Ahmednagar existing consent in view of above it was decided to grant 1st consent to
operate for 30 KLPD distillery and amalgamation with
existing 30 KLPD distillery and 120 KLPD ethanol unit,
by imposing following conditions;
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent will be issued after submission of NOC of
CGWA/Irrigation department for water uses.
30. MPCB-
CONSENT-
0000035295
Indiabulls Real Estate
Company Pvt. Ltd C.S
No 613 & 612 Lower
Parel Division,
Elphinstone Mill
Mumbai
APPROVED
1st Consent to Operate
for MCGM car parking
30.09.2022 It was decided to grant 1st Consent to Operate (Part) for
MCGM Parking on Total Plot Area 34,383 sq. mtrs. and
construction BUA of 91,195 sq. mtrs. (Out of Total
Construction BUA of 3,60,099 sq. mtrs. of entire project
as per amended EC dated 3.07.2017) by imposing
following condition(s);
1. PP shall re-valid and amend Consent to Establish as
per amended EC dated 3.7.2017.
2. PP shall submit affidavit in Board’s prescribed
format within 15 days regarding compliance of
conditions of Environmental Clearance (EC) and
Consent to Establish.
3. PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st Consent
to Operate (Part) is made and that the same is
included in the Environmental Clearance accorded.
4. Project Proponent shall submit the BG of Rs. 25
lakhs towards O & M of pollution control system.
5. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
6. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be connected to the
sewerage system provided by local body.
Consent shall be issued after:
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 25 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
i. Obtaining Certificate from Architect regarding
completion of construction of BUA for which they
have applied for 1st Consent to Operate (part).
ii. Installation of online monitoring system for the
parameters flow, BOD, TSS at the outlet of
Centralised STP and verification of SRO of the same
31. MPCB-
CONSENT-
0000034848
Gharda Chemicals
Limited D-1/2 & B-1/7
(Unit No: 1), MIDC,
Lote Parshuram, Khed,
Dist. Ratnagiri
APPROVED
1st Consent to Operate
for expansion and
amalgamation with
existing consent
31.07.2020 It was decided to grant 1st Consent to Operate for Two
Nos. of Multiple Effect Evaporator of capacities 10,600
kg/hr and 20,000 kg/hr and Reverse Osmosis plant of
50KL/Hr, Erection of chemical treatment/recovery
systems together at common plant building such as
a) Wet air Oxidation and Chlorination,
b) Spent Acid Recovery,
c) Potassium Recovery,
d) SO2 recovery which at present exist at various
location in the premises of the plant, Vapour Absorption
Machine (VAM) of capacity 2 Nos. * 600TR each to
avoid /restrict use of CFCs with amendment in existing
consent for re-arranging the by-products without
increase in production) by imposing standard conditions.
32. MPCB-
CONSENT-
0000033145
P One Infrastructure
Pvt. Ltd., (Bldg. -
WTC IV) S. No. 1,
Hissa No.1B, 2B, 1A,
2A, Kharadi, Pune
APPROVED
1st Consent to Operate
(part)
30.06.2019 Committed noted that PP has obtained Environmental
Clearance vide letter dated 06.02.2015 for total plot area
7,74,36.43 Sq. Mtrs. and total BUA -2,01,223.92 Sq.
Mtrs.
In view of above, it was decided to grant 1st Consent to
Operate (Part) on Total Plot Area 77,436.43 sq. mtrs and
Total construction BUA(FSI+Non-FSI) of 35,182.99 sq.
mtrs. (Out of Total Construction BUA of 2,01,223.92 sq.
mtrs. of entire project as per EC dated 6.02.2015) by
imposing following condition(s)
1. PP shall submit affidavit in Board’s prescribed
format within 15 days regarding compliance of
conditions of Environmental Clearance (EC) and
Consent to Establish.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 26 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
2. PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st Consent
to Operate (Part) is made and that the same is
included in the Environmental Clearance accorded.
3. Project Proponent shall submit the extend/fresh BG
of Rs. 25 lakhs towards O & M of pollution control
system.
4. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
5. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be connected to the
sewerage system provided by local body.
Consent shall be issued after:
i. Obtaining Certificate from Architect regarding
completion of construction of BUA for which they
have applied for 1st Consent to Operate (part).
ii. Installation of online monitoring system for the
parameters flow, BOD, TSS at the outlet of STP and
verification of SRO of the same.
33. MPCB-
CONSENT-
0000035688
Shri Dnyaneshwar
Sahakari Sakhar
Karkhana ltd, 320,334,
Bhende Bk Newasa,
Dist. Ahmednagar.
APPROVED
1st Consent to Operate
(Expansion) and
amalgamation with
existing renewal
31.07.2018 It was decided to grant 1st consent to operate for
expansion and amalgamation with existing renewal of
consent for Sugar unit- 6000 TCD & 21 MW co-
generation plant (Existing) & 1000 TCD & 10.5 MW
Co-generation unit (Proposed), by imposing following
conditions:
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
Consent shall be issued after;-
Submission of NOC from Irrigation Dept./CGWA
for use of surface/ground water.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 27 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
34. MPCB-
CONSENT-
0000035235
Gujrat Ambuja Exports
Ltd., A-04 MIDC
Chalisgaon,
Chalisgaon, Dist.
Dhule
NOT APPROVED
1st Consent to Operate
--- It was decided to defer the case and revert back to next
CAC along with applicability of Environmental
Clearance from TAC.
35. MPCB-
CONSENT-
0000033076
Mahindra & Mahindra
Ltd. 119, 177, 910, 84
& 86 part Akurli Road,
Kandivali (East)
Borivali
APPROVED
Amendment in product
in existing consent to
operate for change in
product, water budget
and stack details with
decrease in CI
30.09.2020 It was decided to grant amendment in existing product in
existing consent to operate with change in water budget,
stack details, HW details etc with decrease in CI as there
is reduction in water and effluent generation, fuel and
stack and HW generation and by downsizing of existing
ETP & STP.
36. MPCB-
CONSENT-
0000035280
Akzonobel India Pvt.
Ltd. Plot No. 1/1
MIDC TTC,
Koperkhairane, Thane-
Belapur road, Navi
Mumbai Thane
APPROVED
1st Consent to Operate
31.12.2022 It was decided to grant consent to 1st operate for Powder
coating paints & metallic paint by mixing & blending
only and amalgamation with existing consent to operate.
37. MPCB-
CONSENT-
0000036121
Jindal Poly Films
Limited396, 401, 405,
406, 408, 411, 413 28
Km stone, Nasik
Igatpuri Road, NH-3
Igatpuri, Dist. Nasik
APPROVED
1st operate for
expansion and
amalgamation with
existing consent to
operate
30.09.2020 It was decided to grant 1st Consent to Operate for
expansion to manufacture- Extrusion Thermal
Lamination Coated Films (BOPP & BOPET)/
Metallized Film = 600 MT/M and amalgamation with
existing consent to operate with overriding effect.
Consent will be issued after submission of NOC of
CGWA/Irrigation department for water uses.
38. MPCB-
CONSENT-
0000035761
Avery Dennison India
Pvt Ltd, Plot No G 5
Ranjangaon Industrial
Area. Shirur, Dist.
Pune
APPROVED
1st Consent to Operate
30.06.2019 Committee noted that industry has existing consent for
manufacturing of Paper & film Laminates – 607.00
Millions sq. meters /year which is valid up to
30.06.2019. Industry has applied for 1st operate
(expansion) for the proposed construction of ware
House, scrap Yard shed , canteen , occupational health
centre & expansion of Combined ETP + STP Plant of
capacity 20 CMD to 56 CMD and installation of RO
Plant for drinking water having total BUA 5800 Sq.
meter area. Industry has complied with the conditions of
consent to establish for expansion.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 28 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
In view of above, it was decided to grant consent to 1st
operate for expansion with overriding effect to earlier
consent.
Consent shall be issued after- Obtaining consent fees, if
required.
39. MPCB-
CONSENT-
0000036122
Asian Paints Limited
Plot No C3-B/1 TTC
MIDC , Pawane, Thane
Belapur Road Thane
APPROVED
1st Consent to Operate
and amalgamation
with existing consent to
operate
31.07.2018 It was decided to grant 1st Consent to Operate for Office
building for R & D purpose without any change in
existing production capacity and with overriding effect.
Consent shall be issued after;-
Submission of undertaking from the PP that it is not
integrated plant and therefore EIA Notification, 2006 is
not applicable.
40. MPCB-
CONSENT-
0000028756
Sahakar Maharshi
Shankarrao Mohite
Patil Sahakari Sakhar
Karkhana Ltd,
Shankarnagar
Malshiras, Dist.
Solapur
APPROVED
1st Consent to Operate
31.08.2019 It was decided to grant renewal of consent to operate for
60 KLPD molasses based distillery, by imposing
following conditions:
1. Industry shall extend existing Bank Guarantee of Rs.
5 lakh towards O & M of pollution control
systems.
Consent shall be issued after submission of NOC from
CGWB/Irrigation department for consumption of
ground water/Surface water and additional requisite
consent fee.
41. MPCB-
CONSENT-
0000035213
L G Electronics India
Pvt Ltd Plot No A-5
Ranjangaon Shirur,
Dist. Pune.
NOT APPROVED
1st Consent to Operate
for expansion and
amalgamation with
existing consent
--- It was decided to issue SCN for refusal of 1st C to O as
industry has directly applied for 1st consent to operate
without obtaining consent to establish from the Board.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 29 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
42. MPCB-
CONSENT-
0000038435
India Bulls Properties
Pvt. Ltd., 841 India
Bulls Properties Pvt.
Ltd., "841" Indiabulls ,
C.S No.841 of Lower
Parel (G-South Ward),
Elphis Mumbai
APPROVED
Renewal of Consent
(part-II) for MCGM
Car Parking
30.09.2022 It was decided to grant of Renewal of Consent to operate
(Part-II) for MCGM Car parking for Total plot area -
39,086.43 sq.m., and Total Construction BUA;
1,08,383.93 sq,m.,(Out of Total constriction BUA of
4,88,855.71 Sq Mtrs)as per amended EC dated
11.12.2015 by imposing following conditions;
1. PP shall extend/top-up the BG of Rs. 25 lakhs
obtained towards O & M of Pollution control
system.
2. PP shall install online monitoring system within 3
months for the parameters BOD, SS and flow at the
outlet of STP and submit BG of Rs 5 lakh for the
compliance of the same.
3. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be utilized on land for
gardening and connected to the sewerage system
provided by local body.
5. PP shall downsize the STP capacity to treat the
sewage of 34.63 CMD so as to meet the consented
standard.
43. MPCB-
CONSENT-
0000037842
Kisan Veer Satara
Sahakari Sakhar
Karkhana Ltd., Survey
No. 630, Gat
APPROVED
1st Consent to Operate
31.08.2019 It was decided to grant 1st Consent to Operate for 40
KLPD distillery unit and amalgamation with existing 60
KLPD distillery unit, by imposing following conditions:
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 30 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
No.1526/1 & 2 of
village Bhuinj, Tal:
Wai; Dist: Satara
1. Industry shall submit Bank Guarantee of Rs. 5 lakh
towards O & M of pollution control systems.
Consent shall be issued after :-
Submission of NOC of CGWB/Irrigation department for
consumption of ground water/Surface water.
44 Kapstone Construction Pvt. Ltd., Sub Plot 4, 6A, S. No. 14(pt), 15(pt) 16(pt) & 17(pt) Rustomjee 100 acres, Village Majiwade. District – Thane
As per the decision in Earlier CAC meeting dated
11.12.2017 Project Proponent was called for
presentation / Technical discussion before Consent
Appraisal Committee members.
It was noted during the presentation that PP has applied
for re-validation of Consent to Establish with expansion
and Consent to Operate (i.e. for Part-I, II, III & IV).
Also, noted that Consent to establish was issued on
10.11.2006.
Also, noted that PP has obtained amended
Commencement Certificate from Thane Municipal
Corporation including Occupancy Certificate for the
completed part as above. Also, PP reported that the
construction activity completed in NON CRZ Area, and
Architect certificate mentioning that construction is
completed in accordance with the approved CC and plan
by the planning authority. Also provided pollution
control facilities including online monitoring system.
PP has obtained Environment & CRZ Clearance dated
15.05.2012 for plot Area of 2,01,436.62 Sq. Mtr. & CRZ
affected area 1,45,834 sq. Mtrs. & outside CRZ Area of
55,602.43 sq. Mtrs. Total BUA of the Project including
CRZ Area 1,63,446 Sq. Mtrs.
44
(A) MPCB-CONSENT- 0000033944
APPROVED
Revalidation of
Consent to Establish
with expansion
5 years/EC
validity
whichever is
earlier
Revalidation of C to E with expansion:
It was decided to grant revalidation of Consent to
Establish with expansion for construction for residential
cum commercial project for Total Plot Area for
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 31 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
5,10,613.02 sq. mtrs and total Construction BUA for
9,31,501.46 as per Environmental Clearance from GoM
dated 25.3.2014 & EC and CRZ Clearance from MoEF
dated 15.5.2012 sq. mtrs. by imposing following
conditions:
1. PP shall submit BG of Rs. 25 Lakh towards
compliance of Environment Clearance and
Consent to Establish conditions.
2. PP shall submit an affidavit in prescribed format
regarding compliance of conditions of EC and
Consent to Establish conditions.
3. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
4. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be used on land for
gardening and connected to the sewerage system
provided by local body.
5. PP shall install online monitoring system for
parameters BOD, TSS and flow at outlet of STP.
44
(b)
C to O for
(Part-I, II, III
& IV)
A. For Part-
I
File No.
130514FT22
8
App. No.
CO13030001
34,
B. For Part-
II
File No.
APPROVED
1st Consent to Operate (part)
30.11.2019 B. Regarding C to O(Part-I, Part-II, Part-III & Part-
IV
Committee noted that, PP has obtained amended
Commencement Certificate from Thane Municipal
Corporation including Occupancy Certificate for the
completed part. Also, noted that the construction activity
completed in NON CRZ Area, and Architect certificate
mentioning that construction is completed in accordance
with the approved CC and plan by the planning
authority. Also noted provision of pollution control
facilities including online monitoring system.
In view of above, it was decided to grant C to O(Part-I,
Part-II, Part-III & Part-IV) for construction for
residential cum commercial project as mentioned below
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 32 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
150202FT03
40/01502300
0193
EIC No. TN-
5761-15
C. UAN No.
00000019120
, (Part-III)
D. UAN No.
0000018862
(Part-IV)
1) C to O (Part-I) for Total Plot Area of 4,39,437 Sq.
Mtrs and Construction BUA of 63,677.89 Sq.Mtrs
out of Total Construction BUA of 9,31,501.46
Sq.Mtrs
2) C to O (Part-II) for Total Plot Area of 3,09,176.4
Sq. Mtrs and Construction BUA of 82,002.78 Sq.
Mtrs out of Total Construction BUA of
9,31,501.46 Sq.Mtrs
3) C to O (Part-III) for Total Plot Area of 3,09,176.40
Sq. Mtrs and Construction BUA of 5,589.07
Sq.Mtrs out of Total Construction BUA of
9,31,501.46 Sq.Mtrs
4) C to O (Part-IV) for Total Plot Area of 3,09,176.40
Sq. Mtrs and Construction BUA of 62,202.47
Sq.Mtrs out of Total Construction BUA of
9,31,501.46 Sq.Mtrs.
Therefore, it was decided to grant 1st Consent to
Operate (Part) by imposing following condition(s);
1. PP shall submit affidavit in Board’s prescribed
format within 15 days regarding compliance of
conditions of Environmental Clearance (EC) and
Consent to Establish.
2 PP shall submit the affidavit within 15 days in the
prescribed format regarding the part of the built up
area/ building for which application for 1st
Consent to Operate (Part) is made and that the
same is included in the Environmental
Clearance/CRZ Clearance accorded.
3. Project Proponent shall submit the BG of Rs. 25
lakhs towards O & M of pollution control system.
4. PP shall achieve the treated domestic effluent
standard for the parameter BOD- 10 mg/lit.
8th CAC meeting of 2017-2018 (Book-let no 13 of Consent to operate cases) dated 09.02.2018 Page 33 of 33
Sr.
No.
Application
unique
number
Name of Industry Decision on grant of
consent
Consent
granted up
to
Remarks/Discussion (1)
5. The treated effluent shall be 60% recycled for
secondary purposes such as toilet flushing, air
conditioning, cooling tower make up, firefighting
etc. and remaining shall be connected to the
sewerage system provided by local body.
6. PP shall not take further effective steps for
remaining BUA without obtaining revalidation of
consent to establish.
Consent shall be issued after:
i. Obtaining Certificate from Architect regarding
completion of construction of BUA for which they
have applied for 1st Consent to Operate (part).
ii. Installation of online monitoring system for the
parameters flow, BOD, TSS at the outlet of STP and
verification of SRO of the same