CAMPAMENTO 18 M2 UN 1,713,231 1,693,994 1,695,420 1,701,120 1,698,982 1,681,170 1,691,858
CAMPAMENTO 9 M2 UN 992,373 982,755 983,468 986,318 985,249 976,343 981,687
CERCA EN ALAMBRE DE PUA 4 HILOS ML 11,639 11,639 11,639 11,639 11,639 11,639 11,639
CERCA EN ALAMBRE DE PUA 5 HILOS ML 13,053 13,053 13,053 13,053 13,053 13,053 13,053
CERCA EN ALAMBRE DE PUA 6 HILOS ML 15,069 15,069 15,069 15,069 15,069 15,069 15,069
CERCA EN TABLA H=2.30 M ML 55,662 55,662 55,662 55,662 55,662 55,662 55,662
CERCA EN TEJA DE ZINC H=1.80 M ML 39,407 39,200 39,215 39,277 39,253 39,061 39,177
CERCA EN TELA VERDE H = 2.10 M ML 18,319 18,111 18,127 18,188 18,165 17,973 18,088
DEMOLICIN ESCALERAS EN CONCRETO M2 63,831 63,831 63,831 63,831 63,831 63,831 63,831
DEMOLICIN BALDOSA DE PISO H=0.02 M M2 4,960 4,960 4,960 4,960 4,960 4,960 4,960
DEMOLICIN BALDOSA DE PISO H=0.04 M M2 7,048 7,048 7,048 7,048 7,048 7,048 7,048
DEMOLICIN ENCHAPE MURO M2 5,417 5,417 5,417 5,417 5,417 5,417 5,417
DEMOLICIN PAETE MURO M2 5,940 5,940 5,940 5,940 5,940 5,940 5,940
DEMOLICIN CIELO RASO FALSO M2 7,180 7,180 7,180 7,180 7,180 7,180 7,180
DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 7,427 7,427 7,427 7,427 7,427 7,427 7,427
DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 10,907 10,907 10,907 10,907 10,907 10,907 10,907
DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 15,018 15,018 15,018 15,018 15,018 15,018 15,018
DEMOLICIN PLACA ALIGERADA 0.30 M M2 22,198 22,198 22,198 22,198 22,198 22,198 22,198
DEMOLICIN PLACA ALIGERADA 0.40 M M2 32,207 32,207 32,207 32,207 32,207 32,207 32,207
DEMOLICIN PLACA ALIGERADA 0.50 M M2 39,823 39,823 39,823 39,823 39,823 39,823 39,823
DEMOLICIN PLACA MACIZA 0.15 M M2 32,439 32,439 32,439 32,439 32,439 32,439 32,439
DEMOLICIN PLACA MACIZA 0.20 M M2 45,569 45,569 45,569 45,569 45,569 45,569 45,569
DEMOLICIN PLACA MACIZA 0.25 M M2 53,965 53,965 53,965 53,965 53,965 53,965 53,965
DEMOLICIN PLACA MACIZA 0.30 M M2 66,158 66,158 66,158 66,158 66,158 66,158 66,158
DEMOLICIN PLACA PISO 0.05 M M2 7,271 7,271 7,271 7,271 7,271 7,271 7,271
DEMOLICIN PLACA PISO 0.10 M M2 11,806 11,806 11,806 11,806 11,806 11,806 11,806
DEMOLICIN PLACA PISO 0.15 M M2 17,944 17,944 17,944 17,944 17,944 17,944 17,944
DEMOLICIN PLACA PISO 0.20 M M2 29,348 29,348 29,348 29,348 29,348 29,348 29,348
DESCAPOTE A MAQUINA E=0.20 M M2 1,285 1,285 1,285 1,285 1,285 1,285 1,285
DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,635 4,635 4,635 4,635 4,635 4,635 4,635
DESMONTE APARATOS SANITARIOS UN 16,975 16,975 16,975 16,975 16,975 16,975 16,975
DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 9,359 9,359 9,359 9,359 9,359 9,359 9,359
DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 9,140 9,140 9,140 9,140 9,140 9,140 9,140
DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 8,488 8,488 8,488 8,488 8,488 8,488 8,488
DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,954 7,954 7,954 7,954 7,954 7,954 7,954
DESMONTE MUROS SECOS M2 12,369 12,369 12,369 12,369 12,369 12,369 12,369
DESMONTE MARCOS Y PUERTAS UN 11,103 11,103 11,103 11,103 11,103 11,103 11,103
DESMONTE VENTANAS M2 9,359 9,359 9,359 9,359 9,359 9,359 9,359
LETRINA DE 2.0x1.0 UN 773,747 769,728 777,229 770,350 772,209 768,097 768,454LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE
PRESICINM2 9,086 9,086 9,086 9,086 9,086 9,086 9,086
REPLANTEO MANUAL DE CIMIENTOS M2 3,181 3,181 3,181 3,181 3,181 3,181 3,181
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCIN1
1.7
1.8
1.9
1.10
1.11
1.12
1.1
1.2
1.3
1.4
1.5
1.6
1.19
1.20
1.21
1.22
1.23
1.24
1.13
1.14
1.15
1.16
1.17
1.18
1.31
1.32
1.33
1.34
1.35
1.36
1.25
1.26
1.27
1.28
1.30
1.37
1.38
1.39
1.40
1.41
1.42
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINRED ELCTRICA PROVISIONAL L=50M UN 2,290,713 2,290,713 2,290,713 2,290,713 2,290,713 2,290,713 2,290,713RED TELEFNICA PROVISIONAL UN 210,243 210,243 210,243 210,243 210,243 210,243 210,243
RETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 7,755 7,755 7,755 7,755 7,755 7,755 7,755
CIMIENTOS
BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 100,323 69,513 77,274 73,159 100,323 71,866 61,518
BASE ARENA CEMENTO 1:20 M3 203,402 183,546 185,017 190,900 188,694 170,308 181,340
DEMOLICIN CABEZAS DE PILOTES M3 237,827 237,827 237,827 237,827 237,827 237,827 237,827
DEMOLICIN CIMIENTO ENTERRADO M3 165,649 165,649 165,649 165,649 165,649 165,649 165,649
IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 18,774 18,774 18,774 18,774 18,774 18,774 18,774
SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 578,563 558,137 559,650 565,703 563,433 544,521 555,868
VIGA DE AMARRE EN CONCRETO 3500 PSI M3 583,571 562,457 564,021 570,277 567,932 548,383 560,112
ZAPATAS EN CONCRETO 3500 PSI M3 542,730 522,960 524,425 530,282 528,086 509,781 520,764
PILOTE DE MADERA D=20 CM ML 40,618 40,618 40,618 40,618 40,618 40,618 40,618PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A UNA
DISTANCIA MENOR DE 5 KM)ML 125,220 125,220 125,220 125,220 125,220 125,220 125,220
PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A UNA
DISTANCIA MENOR DE 5 KM)ML 157,830 157,830 157,830 157,830 157,830 157,830 157,830
PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A UNA
DISTANCIA MENOR DE 5 KM)ML 197,265 197,265 197,265 197,265 197,265 197,265 197,265
PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A UNA
DISTANCIA MENOR DE 5 KM)ML 250,352 250,352 250,352 250,352 250,352 250,352 250,352
PILOTE HINCADO 25X25 ML 89,488 88,055 88,161 88,586 88,426 87,099 87,896
PILOTE HINCADO 30X30 ML 111,520 109,442 109,596 110,212 109,981 108,057 109,211
DADOS EN CONCRETO 3500PSI M3 531,573 511,803 513,268 519,126 516,930 498,625 509,607MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA
MENOR DE 5 KM)ML 74,932 74,932 74,932 74,932 74,932 74,932 74,932
DESAGES E INSTALACIONES SUBTERRNEAS
SIFN PARA DRENAJE EN PVC DE 4" UN 32,378 32,255 32,264 32,301 32,287 32,173 32,241
SIFN EN PVC 6" UN 169,621 169,497 169,506 169,543 169,529 169,415 169,484
CAJA DE INSPECCIN DE 100X100 UN 410,984 386,601 448,193 388,441 404,866 379,049 377,031
CAJA DE INSPECCIN DE 40X40 UN 197,328 193,303 198,643 194,187 195,354 191,354 192,277
CAJA DE INSPECCIN DE 60X60 UN 224,626 218,101 226,508 219,565 221,376 214,904 216,467
CAJA DE INSPECCIN DE 80X80 UN 299,473 289,880 298,514 292,480 293,950 284,639 287,905
DUCTO ELCTRICO PVC 4" ML 84,891 84,697 85,432 84,682 84,891 84,672 84,593
POZO SPTICO ETERNIT 1000 LT UN 1,100,622 1,098,679 1,106,026 1,098,532 1,100,622 1,098,433 1,097,637
TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 99,347 97,984 98,085 98,489 98,338 97,076 97,833
TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 62,963 62,244 62,297 62,510 62,430 61,764 62,164
TUBERA DRENAJE PVC 110 ML 23,783 23,416 23,443 23,552 23,511 23,172 23,376
TUBERA DRENAJE PVC 160 ML 38,366 37,999 38,027 38,135 38,095 37,755 37,959
TUBERA DRENAJE PVC 200 ML 50,517 50,003 50,041 50,193 50,136 49,661 49,946
TUBERA DRENAJE PVC 250 ML 69,244 68,657 68,701 68,875 68,810 68,266 68,592
TUBERA DRENAJE PVC 315 ML 95,780 95,267 95,305 95,457 95,400 94,925 95,210
SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL
FILTRANTE)UN 825,008 819,140 819,574 821,313 820,661 815,227 818,488
1.43
1.44
1.45
2
2.1
2.8
2.9
2.10
2.11
2.12
2.13
2.2
2.3
2.4
2.5
2.6
2.7
3.1
3.2
3.3
3.4
3.5
3.6
2.14
2.15
2.16
2.17
3
3.13
3.14
3.15
3.16
3.7
3.8
3.9
3.10
3.11
3.12
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINSISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL FILTRANTE)
UN 1,173,014 1,161,277 1,162,147 1,165,624 1,164,320 1,153,452 1,159,973
SISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL
FILTRANTE)UN 1,539,530 1,516,056 1,517,796 1,524,751 1,522,143 1,500,407 1,513,448
ESTRUCTURAS EN CONCRETO
CASETN DE LONA 0.8 X 0.35 M2 35,723 35,723 35,723 35,723 35,723 35,723 35,723
CASETN DE LONA 0.80X0.70 M2 47,367 47,367 47,367 47,367 47,367 47,367 47,367
COLUMNAS 3500 PSI M3 712,555 692,785 694,249 700,107 697,911 679,606 690,589
CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 237,599 224,629 226,008 229,015 236,768 216,819 223,188ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA DE
REFUERZO, CONCRETO DE 3500 PSIM2 87,444 85,524 85,666 86,235 86,022 84,245 85,311
ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA DE
REFUERZO, CONCRETO DE 3500 PSIM2 103,395 101,092 101,262 101,945 101,689 99,556 100,836
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 114,504 111,433 111,660 112,570 112,229 109,386 111,092
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 120,890 117,627 117,869 118,836 118,474 115,452 117,265
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 139,389 135,358 135,656 136,851 136,403 132,671 134,910
ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 155,403 150,797 151,138 152,503 151,991 147,726 150,285
ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 172,619 167,437 167,821 169,356 168,780 163,982 166,861
ENTREPISO VIGUETA PLACA M2 84,519 84,187 84,211 84,310 84,273 83,965 84,150
ESCALERA MACIZA 3500 PSI M3 837,811 818,042 819,506 825,364 823,168 804,863 815,846
MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 81,857 81,589 81,609 81,688 81,659 81,410 81,559
ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 70,525 68,548 68,694 69,280 69,060 67,230 68,328
ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 79,842 77,424 77,603 78,319 78,051 75,811 77,155
ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 93,613 90,581 90,805 91,704 91,367 88,559 90,244
MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 628,099 608,329 609,794 615,651 613,455 595,150 606,133
PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 41,073 40,466 40,511 40,691 40,623 40,062 40,399
PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 253,583 244,754 245,408 248,024 247,043 238,868 243,773
ACERO FIGURADO 37000 PSI KG 3,413 3,413 3,413 3,413 3,413 3,413 3,413
ACERO FIGURADO 60000 PSI KG 3,584 3,584 3,584 3,584 3,584 3,584 3,584
REFUERZO MALLA ELECTROSOLDADA KG 5,148 5,148 5,148 5,148 5,148 5,148 5,148
TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 745,811 726,042 727,506 733,364 731,168 712,863 723,846
TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 689,194 667,555 669,158 675,570 673,166 653,130 665,152
VIGA AREA 3500 PSI M3 743,263 723,493 724,958 730,816 728,620 710,315 721,297
VIGA CINTA 3500 PSI M3 727,463 707,693 709,158 715,015 712,819 694,514 705,497
VIGA CANAL EN CONCRETO 3500 PSI M3 894,159 874,389 875,853 881,711 879,515 861,210 872,193
BASE EN CONCRETO POBRE 1500 PSI M3 306,061 284,046 285,677 292,200 289,754 269,369 281,601
MAMPOSTERA
ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 25,065 24,537 24,577 24,733 24,674 24,186 24,479
ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 41,215 40,687 40,726 40,883 40,824 40,336 40,629
ALFAJA EN LADRILLO PRENSADO MACIZO ML 29,111 28,988 28,997 29,034 29,020 28,906 28,974
ARCOS EN LADRILLO PRENSADO ML 135,434 135,188 135,206 135,279 135,252 135,023 135,160
DINTELES CONCRETO DE 2500 PSI 15x20 ML 36,925 36,319 36,364 36,544 36,476 35,915 36,252
DINTELES EN BLOQUE 0.15 M ML 22,671 22,402 22,422 22,502 22,472 22,224 22,373
3.17
3.18
4.5
4.6
4.7
4.8
4.9
4.10
4
4.1
4.2
4.3
4.4
4.17
4.18
4.19
4.20
4.21
4.22
4.11
4.12
4.13
4.14
4.15
4.16
4.29
5
5.1
5.2
5.3
4.23
4.24
4.25
4.26
4.27
4.28
5.4
5.5
5.6
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINENCHAPES LADRILLO PRENSADO M2 85,265 84,772 84,808 84,954 84,900 84,443 84,717MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 78,795 76,774 76,923 77,522 77,298 75,426 76,549
MURO DRYWALL DOBLE CARA 0.12 M M2 76,495 76,495 76,495 76,495 76,495 76,495 76,495
MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 44,495 44,495 44,495 44,495 44,495 44,495 44,495
MURO DRYWALL DOBLE CARA 0.10 M M2 73,578 73,578 73,578 73,578 73,578 73,578 73,578
MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 43,037 43,037 43,037 43,037 43,037 43,037 43,037
MURO SUPERBOARD DOBLE CARA 0.10 M M2 85,922 85,922 85,922 85,922 85,922 85,922 85,922
MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 50,250 50,250 50,250 50,250 50,250 50,250 50,250
MURO SUPERBOARD DOBLE CARA 0.12 M M2 95,816 95,816 95,816 95,816 95,816 95,816 95,816
MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 55,197 55,197 55,197 55,197 55,197 55,197 55,197
MURO EN BLOQUE N 5 E=0.12 M M2 34,815 34,567 34,585 34,659 34,631 34,402 34,539
MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 20,809 20,685 20,694 20,731 20,717 20,602 20,671
MURO EN BLOQUE DE CONCRETO 0.10 M M2 45,300 45,135 45,147 45,196 45,178 45,025 45,116
MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 26,892 26,809 26,815 26,839 26,830 26,754 26,800
MURO EN BLOQUE DE CONCRETO 0.12 M M2 50,862 50,696 50,709 50,758 50,739 50,586 50,678
MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 30,203 30,121 30,127 30,151 30,142 30,066 30,111
MURO EN BLOQUE DE CONCRETO 0.20 M M2 86,140 85,314 85,375 85,620 85,528 84,763 85,222
MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 50,229 49,816 49,846 49,969 49,923 49,540 49,770
MURO EN BLOQUE N 4 E= 0.10 M M2 31,667 31,502 31,514 31,563 31,545 31,392 31,484
MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 18,972 18,890 18,896 18,920 18,911 18,835 18,881
MURO EN BLOQUE N 5 E=0.23 M M2 63,332 63,001 63,026 63,124 63,087 62,781 62,964
MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 37,707 37,541 37,554 37,603 37,584 37,431 37,523
MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 75,572 75,303 75,323 75,403 75,373 75,125 75,274
MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 45,149 45,015 45,025 45,065 45,050 44,926 45,000
MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 158,056 156,899 156,985 157,327 157,199 156,128 156,770
MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 93,531 92,953 92,996 93,167 93,103 92,567 92,889
MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 77,529 76,970 77,011 77,177 77,115 76,597 76,908
MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 46,128 45,848 45,869 45,952 45,921 45,662 45,817
MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 40,440 40,070 40,097 40,207 40,166 39,823 40,029
MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 24,240 24,055 24,069 24,124 24,103 23,932 24,035
MURO TOLETE COMN 0.06 M M2 28,663 28,498 28,510 28,559 28,541 28,388 28,480
MURO TOLETE COMN 0.06 M (LINEAL) ML 17,254 17,171 17,177 17,202 17,192 17,116 17,162
MURO TOLETE COMN 0.12 M M2 44,005 43,675 43,699 43,797 43,760 43,454 43,638
MURO TOLETE COMN 0.12 M (LINEAL) ML 26,561 26,396 26,408 26,457 26,438 26,285 26,377
MURO TOLETE COMN 0.25 M M2 84,683 84,188 84,224 84,371 84,316 83,857 84,133
MURO TOLETE COMN 0.25 M (LINEAL) ML 50,817 50,569 50,587 50,660 50,633 50,403 50,541
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 61,635 61,305 61,329 61,427 61,390 61,084 61,268
MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 36,762 36,597 36,609 36,658 36,640 36,487 36,579
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 131,381 130,224 130,310 130,652 130,524 129,453 130,095
MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 78,680 78,102 78,145 78,316 78,252 77,716 78,037
REMATES LADRILLO PRENSADO ML 26,843 26,720 26,729 26,765 26,752 26,637 26,706
SOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 31,802 31,400 31,430 31,549 31,504 31,132 31,355
SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 53,333 52,797 52,837 52,995 52,936 52,439 52,737
LAVADA DE FACHADA M2 4,182 4,182 4,182 4,182 4,182 4,182 4,182
5.10
5.11
5.12
5.13
5.14
5.15
5.7
5.8
5.9
5.22
5.23
5.24
5.25
5.26
5.27
5.16
5.17
5.18
5.19
5.20
5.21
5.34
5.35
5.36
5.37
5.38
5.39
5.28
5.29
5.30
5.31
5.32
5.33
5.46
5.47
5.48
5.49
5.50
5.40
5.41
5.42
5.43
5.44
5.45
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINPASAMANOS EN CONCRETO 2500 PSI ML 41,511 40,983 41,022 41,178 41,120 40,631 40,924DOVELA, GROUTING 3000 PSI ML 8,453 8,453 8,453 8,453 8,453 8,453 8,453
ANCLAJE 3/8" L=30CM UN 11,244 11,244 11,244 11,244 11,244 11,244 11,244
ANCLAJE 1/2" L=50CM UN 14,659 14,659 14,659 14,659 14,659 14,659 14,659
ANCLAJE 5/8" L=70CM UN 20,713 20,713 20,713 20,713 20,713 20,713 20,713
ANCLAJE 3/4" L=70CM UN 31,086 31,086 31,086 31,086 31,086 31,086 31,086
ANCLAJE 1" L= 70CM UN 4,370 4,222 4,233 4,276 4,260 4,123 4,205
PAETES, REVOQUES Y REPELLOS
ENTRAMADO MADERA CIELO RASO M2 12,986 12,986 12,986 12,986 12,986 12,986 12,986
FILOS O DILATACIONES B/PLACA ML 4,925 4,802 4,811 4,847 4,834 4,719 4,788
FILOS O DILATACIONES S/MURO ML 5,860 5,737 5,746 5,782 5,769 5,654 5,723
GOTERA EN MORTERO 1:4 ML 7,034 6,910 6,919 6,956 6,942 6,828 6,897
IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 5,730 5,730 5,730 5,730 5,730 5,730 5,730
MALLA BAJO ENTRAMADO M2 11,132 11,132 11,132 11,132 11,132 11,132 11,132
PAETE BAJO GUADUA 1:5, E=2 CM M2 20,674 20,283 20,312 20,428 20,384 20,022 20,240
PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 12,383 12,187 12,201 12,259 12,238 12,056 12,165
PAETE BAJO MALLA 1:4, E=2 CM M2 18,262 17,914 17,940 18,043 18,004 17,683 17,876
PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,932 10,758 10,771 10,822 10,803 10,642 10,739
PAETE BAJO MALLA 1:5, E=2 CM M2 17,606 17,215 17,244 17,360 17,316 16,954 17,171
PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,604 10,408 10,423 10,481 10,459 10,278 10,387
PAETE CULATAS 1:4, E=2 CM M2 18,262 17,914 17,940 18,043 18,004 17,683 17,876
PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,932 10,758 10,771 10,822 10,803 10,642 10,739
PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 18,612 18,333 18,354 18,437 18,406 18,147 18,302
PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 11,106 10,967 10,977 11,018 11,003 10,874 10,951
PAETE LISO MUROS 1:4, E=1.5 CM M2 15,082 14,818 14,837 14,916 14,886 14,642 14,789
PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 9,115 8,982 8,992 9,031 9,017 8,894 8,968
PAETE LISO MUROS 1:5, E=1.5 CM M2 14,583 14,285 14,307 14,395 14,362 14,086 14,252
PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,865 8,716 8,727 8,771 8,754 8,616 8,699
PAETE LISO PLACAS 1:4, E=2 CM M2 18,875 18,528 18,554 18,657 18,618 18,297 18,490
PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 11,223 11,049 11,062 11,113 11,094 10,933 11,030
PAETE LISO PLACAS 1:5, E=2 CM M2 18,220 17,829 17,858 17,973 17,930 17,568 17,785
PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,895 10,699 10,714 10,772 10,750 10,569 10,678
PAETE RSTICO MUROS 1:5, E=1.5 CM M2 15,064 14,766 14,788 14,877 14,843 14,567 14,733
PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 9,091 8,942 8,953 8,998 8,981 8,843 8,926
PAETE RSTICO PLACAS 1:5, E=2 CM M2 18,921 18,530 18,559 18,675 18,631 18,269 18,486
PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,564 11,369 11,383 11,441 11,419 11,238 11,347
CUBIERTAS
AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 23,458 22,962 22,999 23,146 23,091 22,632 22,907AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO (INCLUYE
TELA IMPERMEABLE)M2 72,007 70,996 71,071 71,370 71,258 70,322 70,884
BAJANTE PVC (AMAZONAS, RAINGO) ML 47,019 47,019 47,019 47,019 47,019 47,019 47,019
BAJANTE PVC AGUAS LLUVIAS D=3" ML 18,502 18,502 18,502 18,502 18,502 18,502 18,502
BAJANTE PVC AGUAS LLUVIAS D=4" ML 29,140 29,140 29,140 29,140 29,140 29,140 29,140
5.51
6
6.1
6.2
6.3
6.4
5.52
5.53
5.54
5.55
5.56
5.57
6.11
6.12
6.13
6.14
6.15
6.16
6.5
6.6
6.7
6.8
6.9
6.10
6.23
6.24
6.25
6.26
6.27
6.28
6.17
6.18
6.19
6.20
6.21
6.22
7.5
7
7.1
7.2
7.3
7.4
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINCABALLETE ARTICULADO TEJA FIBROCEMENTO ML 68,906 68,906 68,906 68,906 68,906 68,906 68,906CABALLETE FIJO TEJA FIBROCEMENTO ML 53,812 53,812 53,812 53,812 53,812 53,812 53,812
CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 31,019 31,019 31,019 31,019 31,019 31,019 31,019
CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 72,247 72,247 72,247 72,247 72,247 72,247 72,247
CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 86,399 86,399 86,399 86,399 86,399 86,399 86,399
CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 127,285 127,285 127,285 127,285 127,285 127,285 127,285
CABALLETE CUBIERTA TERMOACSTICA ML 49,785 49,785 49,785 49,785 49,785 49,785 49,785
CANAL PVC AMAZONAS ML 68,899 68,899 68,899 68,899 68,899 68,899 68,899
CANAL PVC RAINGO ML 62,518 62,518 62,518 62,518 62,518 62,518 62,518
TEJA CANALETA 43 FIBROCEMENTO L=6M M2 112,145 112,145 112,145 112,145 112,145 112,145 112,145
TEJA CANALETA 90 FIBROCEMENTO L=6M M2 65,654 65,654 65,654 65,654 65,654 65,654 65,654
TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 48,088 48,088 48,088 48,088 48,088 48,088 48,088
CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 26,847 26,847 26,847 26,847 26,847 26,847 26,847
TEJA DE BARRO M2 50,778 50,161 50,207 50,389 50,321 49,750 50,093
TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 40,106 40,106 40,106 40,106 40,106 40,106 40,106
TEJA EN LMINA GALVANIZADA CAL 26 M2 36,732 36,732 36,732 36,732 36,732 36,732 36,732
TEJA FIBROCEMENTO N4 M2 30,590 30,590 30,590 30,590 30,590 30,590 30,590
TEJA FIBROCEMENTO No. 6 M2 29,986 29,986 29,986 29,986 29,986 29,986 29,986
TEJA FIBROCEMENTO No. 8 M2 30,217 30,217 30,217 30,217 30,217 30,217 30,217
TEJA TERMOACSTICA M2 42,860 42,860 42,860 42,860 42,860 42,860 42,860
TEJA PLSTICA No.6 M2 37,603 37,603 37,603 37,603 37,603 37,603 37,603
TEJA ESPAOLA ETERNIT M2 69,265 69,265 69,265 69,265 69,265 69,265 69,265
TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 128,464 128,464 128,464 128,464 128,464 128,464 128,464
TEJA SIN TRASLAPO M2 57,540 57,540 57,540 57,540 57,540 57,540 57,540
ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 35,122 35,122 35,122 35,122 35,122 35,122 35,122
ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 27,674 27,674 27,674 27,674 27,674 27,674 27,674ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO ESTRUCTURAL
ABIERTO 4"x2", 15 MM)M2 48,915 48,915 48,915 48,915 48,915 48,915 48,915
FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 16,465 16,465 16,465 16,465 16,465 16,465 16,465
FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 19,944 19,944 19,944 19,944 19,944 19,944 19,944
MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 21,713 21,713 21,713 21,713 21,713 21,713 21,713
MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 28,136 28,136 28,136 28,136 28,136 28,136 28,136
BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 18,407 18,407 18,407 18,407 18,407 18,407 18,407
CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 43,425 43,425 43,425 43,425 43,425 43,425 43,425
DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 305,635 305,635 305,635 305,635 305,635 305,635 305,635
CUBIERTA EN POLICARBONATO ALVEOLAR M2 337,911 337,911 337,911 337,911 337,911 337,911 337,911
CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 229,775 229,775 229,775 229,775 229,775 229,775 229,775
CORTASOL CELOSIA C-23 EN ALUZINC M2 246,201 246,201 246,201 246,201 246,201 246,201 246,201
MORTEROS Y CONCRETOS
CONCRETO 4000 PSI M3 433,405 412,628 414,167 420,323 418,015 398,777 410,320
CONCRETO 3500 PSI M3 378,546 359,352 360,774 366,461 364,329 346,557 357,220
CONCRETO 3000 PSI M3 375,419 355,588 357,057 362,933 360,730 342,368 353,385
CONCRETO 2500 PSI M3 334,453 314,238 315,736 321,725 319,480 300,761 311,992
CONCRETO 2000 PSI M3 312,777 292,007 293,546 299,700 297,393 278,161 289,700
7.6
7.7
7.8
7.9
7.10
7.17
7.18
7.19
7.20
7.21
7.22
7.11
7.12
7.13
7.14
7.15
7.16
7.29
7.30
7.31
7.32
7.33
7.34
7.23
7.24
7.25
7.26
7.27
7.28
7.41
7.42
8
8.1
8.2
7.35
7.36
7.37
7.38
7.39
7.40
8.3
8.4
8.5
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINCONCRETO 1500 PSI M3 285,232 263,858 265,442 271,775 269,400 249,609 261,484MORTERO SECO 1:10 M3 238,794 221,774 223,036 228,078 226,188 210,428 219,884
MORTERO 1:4 ARENA LAVADA DE PEA M3 431,305 414,779 416,004 420,900 419,064 403,761 412,943
MORTERO 1:5 ARENA LAVADA DE PEA M3 400,103 381,469 382,849 388,370 386,300 369,046 379,399
MORTERO 1:3 ARENA LAVADA DE PEA M3 457,480 440,052 441,343 446,507 444,571 428,434 438,116
MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 651,920 634,492 635,783 640,947 639,011 622,874 632,556
CARPINTERA EN MADERA
BARANDA EN MADERA CEDRO MACHO ML 104,021 104,021 104,021 104,021 104,021 104,021 104,021
CHAZOS PARA CARPINTERA EN MADERA UN 3,503 3,380 3,389 3,425 3,412 3,297 3,366
DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 115,877 115,877 115,877 115,877 115,877 115,877 115,877
DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 142,494 142,494 142,494 142,494 142,494 142,494 142,494
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 209,375 209,375 209,375 209,375 209,375 209,375 209,375
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 233,178 233,178 233,178 233,178 233,178 233,178 233,178
MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 257,007 257,007 257,007 257,007 257,007 257,007 257,007
HOJA PUERTA FORTEC 0.81 UN 171,010 171,010 171,010 171,010 171,010 171,010 171,010
HOJA PUERTA FORTEC 0.91 UN 193,972 193,972 193,972 193,972 193,972 193,972 193,972
HOJA PUERTA FORTEC 1.50 UN 285,820 285,820 285,820 285,820 285,820 285,820 285,820
HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 107,865 107,865 107,865 107,865 107,865 107,865 107,865
HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 143,456 143,456 143,456 143,456 143,456 143,456 143,456
HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 159,529 159,529 159,529 159,529 159,529 159,529 159,529
HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 407,519 407,519 407,519 407,519 407,519 407,519 407,519
PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 35,363 35,363 35,363 35,363 35,363 35,363 35,363
PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 21,716 21,716 21,716 21,716 21,716 21,716 21,716
VENTANERA EN MADERA CEDRO MACHO M2 83,554 83,554 83,554 83,554 83,554 83,554 83,554
CERRADURA DE ENTRADA PRINCIPAL UN 104,046 104,046 104,046 104,046 104,046 104,046 104,046
SUMINISTRO E INSTALACIN CERROJO DOBLE UN 80,739 80,739 80,739 80,739 80,739 80,739 80,739
SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 24,758 24,758 24,758 24,758 24,758 24,758 24,758
SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 24,758 24,758 24,758 24,758 24,758 24,758 24,758
SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 23,449 23,449 23,449 23,449 23,449 23,449 23,449
ESPEJO INCOLORO 3 MM SIN BISELAR M2 35,755 35,755 35,755 35,755 35,755 35,755 35,755
ESPEJO BISELADO INCOLORO 4 MM M2 44,452 44,452 44,452 44,452 44,452 44,452 44,452
VIDRIO ESMERILADO INCOLORO 4 MM M2 53,729 53,729 53,729 53,729 53,729 53,729 53,729
VIDRIO ESMERILADO INCOLORO 5 MM M2 64,745 64,745 64,745 64,745 64,745 64,745 64,745
VIDRIO TEMPLADO PULIDO 10 MM M2 307,076 307,076 307,076 307,076 307,076 307,076 307,076
VIDRIO TEMPLADO PULIDO 8 MM M2 214,310 214,310 214,310 214,310 214,310 214,310 214,310
VIDRIO TRANSPARENTE 3 MM M2 28,218 28,218 28,218 28,218 28,218 28,218 28,218
VIDRIO TRANSPARENTE 4 MM M2 36,334 36,334 36,334 36,334 36,334 36,334 36,334
VIDRIO TRANSPARENTE 5 MM M2 44,452 44,452 44,452 44,452 44,452 44,452 44,452
VIDRIO TRANSPARENTE 6 MM M2 56,048 56,048 56,048 56,048 56,048 56,048 56,048
CARPINTERA METLICA
CAJA CONTADOR DE AGUA UN 64,096 64,096 64,096 64,096 64,096 64,096 64,096
CELOSA ALUMINIO 100CM X 60 CM M2 180,702 180,702 180,702 180,702 180,702 180,702 180,702
8.9
8.10
8.11
9
9.1
8.6
8.7
8.8
9.8
9.9
9.10
9.11
9.12
9.13
9.2
9.3
9.4
9.5
9.6
9.7
9.20
9.21
9.22
9.23
9.24
9.25
9.14
9.15
9.16
9.17
9.18
9.19
9.32
10
10.1
10.2
9.26
9.27
9.28
9.29
9.30
9.31
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1" (INCLUYE ANTICORROSIVO)
ML 67,488 67,488 67,488 67,488 67,488 67,488 67,488
MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 119,513 119,513 119,513 119,513 119,513 119,513 119,513
MARCO TAPA CAJA DE INSPECCIN UN 113,496 113,496 113,496 113,496 113,496 113,496 113,496
MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 75,317 75,317 75,317 75,317 75,317 75,317 75,317
PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 178,192 178,192 178,192 178,192 178,192 178,192 178,192
PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 92,424 92,424 92,424 92,424 92,424 92,424 92,424
CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 5,521 5,521 5,521 5,521 5,521 5,521 5,521CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN TUBO
ESTRUCTURAL GALVANIZADO 2")M2 82,138 82,138 82,138 82,138 82,138 82,138 82,138
CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 33,859 33,859 33,859 33,859 33,859 33,859 33,859
DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 461,749 461,749 461,749 461,749 461,749 461,749 461,749
DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 165,258 165,258 165,258 165,258 165,258 165,258 165,258
PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA ELECTROSTTICA M2 183,973 183,973 183,973 183,973 183,973 183,973 183,973
DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE PUERTAS Y
ACCESORIOS)M2 420,107 420,107 420,107 420,107 420,107 420,107 420,107
REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 106,507 106,507 106,507 106,507 106,507 106,507 106,507
PUERTA CORTINA INCLUYE ESMALTE M2 337,181 337,181 337,181 337,181 337,181 337,181 337,181
SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 5,055 5,055 5,055 5,055 5,055 5,055 5,055
VENTANA EN ALUMINIO CORREDIZA M2 236,151 236,151 236,151 236,151 236,151 236,151 236,151
VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 101,690 101,690 101,690 101,690 101,690 101,690 101,690
REJILLA PISO 0.30 M M2 71,159 71,159 71,159 71,159 71,159 71,159 71,159
TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 74,888 74,888 74,888 74,888 74,888 74,888 74,888CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,
CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE, ANCLAJES,
TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA TAMBIN:FABRICACIN,
SUMINISTRO Y MONTAJE
KG 8,785 8,785 8,785 8,785 8,785 8,785 8,785
CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,
INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE
AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA
TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE
KG 9,779 9,779 9,779 9,779 9,779 9,779 9,779
ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA
POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS,
VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.
CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE
KG 7,713 7,713 7,713 7,713 7,713 7,713 7,713
INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO
ACOMETIDA EN PVC 1/2" 5M UN 183,495 183,495 183,495 183,495 183,495 183,495 183,495
ACOMETIDA EN PVC 3/4" 5M UN 222,671 222,671 222,671 222,671 222,671 222,671 222,671
BAJANTE AGUAS LLUVIAS PVC 3" ML 18,502 18,502 18,502 18,502 18,502 18,502 18,502
BAJANTE AGUAS LLUVIAS PVC 4" ML 29,140 29,140 29,140 29,140 29,140 29,140 29,140
BAJANTE AGUAS RESIDUALES PVC 3" ML 27,802 27,802 27,802 27,802 27,802 27,802 27,802
BAJANTE AGUAS RESIDUALES PVC 4" ML 35,790 35,790 35,790 35,790 35,790 35,790 35,790
BAJANTE AGUAS RESIDUALES PVC 6" ML 74,195 74,195 74,195 74,195 74,195 74,195 74,195
CONEXIN TANQUE ELEVADO PVC UN 184,665 184,665 184,665 184,665 184,665 184,665 184,665
INSTALACIN APARATO SANITARIO UN 35,003 35,003 35,003 35,003 35,003 35,003 35,003
10.3
10.10
10.11
10.12
10.13
10.14
10.15
10.4
10.5
10.6
10.7
10.8
10.9
10.22
10.23
10.24
10.25
11
10.16
10.17
10.18
10.19
10.20
10.21
11.7
11.8
11.9
11.1
11.2
11.3
11.4
11.5
11.6
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCININSTALACIN BOMBAS AGUA UN 485,978 485,978 485,978 485,978 485,978 485,978 485,978INSTALACIN EQUIPO HIDRONEUMTICO UN 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543 1,000,543
LLAVE MANGUERA UN 29,042 29,042 29,042 29,042 29,042 29,042 29,042
NIPLE PASAMURO 2" UN 54,684 54,684 54,684 54,684 54,684 54,684 54,684
NIPLE PASAMURO 4" UN 81,893 81,893 81,893 81,893 81,893 81,893 81,893
PUNTO AGUA CALIENTE CPVC UN 69,663 69,663 69,663 69,663 69,663 69,663 69,663
PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 50,102 50,102 50,102 50,102 50,102 50,102 50,102
PUNTO HIDULICO PVC-P/PARAL 3/4" UN 53,462 53,462 53,462 53,462 53,462 53,462 53,462
PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 67,591 67,591 67,591 67,591 67,591 67,591 67,591
SALIDA SANITARIA PVC-S/PARAL 2" UN 54,937 54,937 54,937 54,937 54,937 54,937 54,937
SALIDA SANITARIA PVC-S/PARAL 3" UN 69,281 69,281 69,281 69,281 69,281 69,281 69,281
SALIDA SANITARIA PVC-S/PARAL 4" UN 74,253 74,253 74,253 74,253 74,253 74,253 74,253
SALIDA SANITARIA PVC-S/SIFON 3" UN 62,159 62,159 62,159 62,159 62,159 62,159 62,159
RED SUMINISTRO CPVC 1/2" ML 10,475 10,475 10,475 10,475 10,475 10,475 10,475
RED SUMINISTRO CPVC 3/4" ML 14,852 14,852 14,852 14,852 14,852 14,852 14,852
RED SUMINISTRO PVC 1 1/2" ML 19,371 19,371 19,371 19,371 19,371 19,371 19,371
RED SUMINISTRO PVC 1" ML 11,900 11,900 11,900 11,900 11,900 11,900 11,900
RED SUMINISTRO PVC 1/2" ML 7,066 7,066 7,066 7,066 7,066 7,066 7,066
RED SUMINISTRO PVC 2 1/2" ML 43,407 43,407 43,407 43,407 43,407 43,407 43,407
RED SUMINISTRO PVC 2" ML 27,682 27,682 27,682 27,682 27,682 27,682 27,682
RED SUMINISTRO PVC 3/4" ML 8,878 8,878 8,878 8,878 8,878 8,878 8,878
RED SANITARIA PVC-S 2" ML 21,284 21,284 21,284 21,284 21,284 21,284 21,284
RED SANITARIA PVC-S 3" ML 29,610 29,610 29,610 29,610 29,610 29,610 29,610
RED SANITARIA PVC-S 4" ML 40,238 40,238 40,238 40,238 40,238 40,238 40,238
RED SANITARIA PVC-S 6" ML 75,779 75,779 75,779 75,779 75,779 75,779 75,779
REGISTRO 1" UN 91,521 91,521 91,521 91,521 91,521 91,521 91,521
REGISTRO 1/2" UN 50,933 50,933 50,933 50,933 50,933 50,933 50,933
REGISTRO 3/4" UN 65,078 65,078 65,078 65,078 65,078 65,078 65,078
REGISTRO 1 1/2" UN 157,881 157,881 157,881 157,881 157,881 157,881 157,881
REGISTRO 2 1/2" UN 326,657 326,657 326,657 326,657 326,657 326,657 326,657
REGISTRO 2" UN 240,912 240,912 240,912 240,912 240,912 240,912 240,912
REVENTILACIN 2" ML 14,780 14,780 14,780 14,780 14,780 14,780 14,780
REVENTILACIN 3" ML 18,676 18,676 18,676 18,676 18,676 18,676 18,676
TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 145,393 145,393 145,393 145,393 145,393 145,393 145,393
TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E ISNTALACIN) UN 237,638 237,638 237,638 237,638 237,638 237,638 237,638
TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E INSTALACIN) UN 396,181 396,181 396,181 396,181 396,181 396,181 396,181
TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 34,523 34,523 34,523 34,523 34,523 34,523 34,523
TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 40,704 40,704 40,704 40,704 40,704 40,704 40,704
11.10
11.11
11.12
11.19
11.20
11.21
11.22
11.23
11.24
11.13
11.14
11.15
11.16
11.17
11.18
11.31
11.32
11.33
11.34
11.35
11.36
11.25
11.26
11.27
11.28
11.29
11.30
11.43
11.44
11.45
11.46
11.47
11.37
11.38
11.39
11.40
11.41
11.42
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINTUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)
ML 52,040 52,040 52,040 52,040 52,040 52,040 52,040
TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 59,263 59,263 59,263 59,263 59,263 59,263 59,263
TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 76,303 76,303 76,303 76,303 76,303 76,303 76,303
TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 88,285 88,285 88,285 88,285 88,285 88,285 88,285
TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y
SOPORTES)ML 129,852 129,852 129,852 129,852 129,852 129,852 129,852
PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 51,990 51,990 51,990 51,990 51,990 51,990 51,990
PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 52,207 52,207 52,207 52,207 52,207 52,207 52,207
ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 34,157 34,157 34,157 34,157 34,157 34,157 34,157
ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 42,147 42,147 42,147 42,147 42,147 42,147 42,147
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA 2" ML 3,611 3,611 3,611 3,611 3,611 3,611 3,611
PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A 2" ML 5,682 5,682 5,682 5,682 5,682 5,682 5,682
GABINETE TIPO III UN 874,908 874,908 874,908 874,908 874,908 874,908 874,908
GABINETE TIPO I UN 668,480 668,480 668,480 668,480 668,480 668,480 668,480
SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 2,238,108 2,238,108 2,238,108 2,238,108 2,238,108 2,238,108 2,238,108
SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 1,864,673 1,864,673 1,864,673 1,864,673 1,864,673 1,864,673 1,864,673
VLVULA MARIPOSA 3" UN 537,953 537,953 537,953 537,953 537,953 537,953 537,953
VLVULA MARIPOSA 4" UN 697,768 697,768 697,768 697,768 697,768 697,768 697,768
VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 270,382 270,382 270,382 270,382 270,382 270,382 270,382
INSTALACIONES ELCTRICAS
ACOMETIDA AREA 10 M. PVC UN 309,061 309,061 309,061 309,061 309,061 309,061 309,061
SALIDA LMPARA TOMA PVC COMPLETA UN 49,120 49,120 49,120 49,120 49,120 49,120 49,120
SALIDA LMPARA TOMA EMT COMPLETA UN 58,261 58,261 58,261 58,261 58,261 58,261 58,261
SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 64,551 64,551 64,551 64,551 64,551 64,551 64,551
SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 76,172 76,172 76,172 76,172 76,172 76,172 76,172
SALIDA TELFONO PVC COMPLETA UN 46,110 46,110 46,110 46,110 46,110 46,110 46,110
SALIDA TIMBRE PVC COMPLETA UN 52,617 52,617 52,617 52,617 52,617 52,617 52,617
STRIP TELEFNICO 10 PARES UN 120,727 120,727 120,727 120,727 120,727 120,727 120,727
SALIDA TOMA DOBLE PVC COMPLETA UN 47,398 47,398 47,398 47,398 47,398 47,398 47,398
SALIDA TRIFSICA PVC COMPLETA UN 109,089 109,089 109,089 109,089 109,089 109,089 109,089
SALIDA T.V PVC COMPLETA. UN 65,101 65,101 65,101 65,101 65,101 65,101 65,101
SALIDA BIFSICA C.N. UN 38,627 38,627 38,627 38,627 38,627 38,627 38,627
TABLERO PARCIAL 4 CIRCUITOS UN 81,083 81,083 81,083 81,083 81,083 81,083 81,083
TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 345,873 345,873 345,873 345,873 345,873 345,873 345,873
TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 461,404 461,404 461,404 461,404 461,404 461,404 461,404
TUBERA PVC CONDUIT 1/2" ML 2,989 2,989 2,989 2,989 2,989 2,989 2,989
TUBERA PVC CONDUIT 3/4" ML 3,944 3,944 3,944 3,944 3,944 3,944 3,944
TUBERA PVC CONDUIT 1" ML 6,149 6,149 6,149 6,149 6,149 6,149 6,149
TUBERA PVC CONDUIT 1 1/2" ML 10,988 10,988 10,988 10,988 10,988 10,988 10,988
11.48
11.55
11.56
11.57
11.58
11.59
11.60
11.49
11.50
11.51
11.52
11.53
11.54
12
12.1
12.2
12.3
12.4
12.5
11.61
11.62
11.63
11.64
11.65
12.12
12.13
12.14
12.15
12.16
12.17
12.6
12.7
12.8
12.9
12.10
12.11
12.18
12.19
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINLNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 231,243 231,243 231,243 231,243 231,243 231,243 231,243LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 65,095 65,095 65,095 65,095 65,095 65,095 65,095
LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 88,537 88,537 88,537 88,537 88,537 88,537 88,537
LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 35,438 35,438 35,438 35,438 35,438 35,438 35,438
POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,180,241 1,180,241 1,180,241 1,180,241 1,180,241 1,180,241 1,180,241
POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 874,478 874,478 874,478 874,478 874,478 874,478 874,478
POSTE METLICO 6M UN 1,108,380 1,108,380 1,108,380 1,108,380 1,108,380 1,108,380 1,108,380
FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 516,292 516,292 516,292 516,292 516,292 516,292 516,292
APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 93,358 93,358 93,358 93,358 93,358 93,358 93,358
LUMINARIA 70W SODIO UN 433,441 433,441 433,441 433,441 433,441 433,441 433,441
LUMINARIA 150W SODIO UN 542,655 542,655 542,655 542,655 542,655 542,655 542,655
REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,435,722 1,435,722 1,435,722 1,435,722 1,435,722 1,435,722 1,435,722
REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 1,056,850 1,056,850 1,056,850 1,056,850 1,056,850 1,056,850 1,056,850
PISOS BASES
ALISTADO ENDURECIDO 1:3, E=0.04 M2 35,363 34,693 34,743 34,941 34,867 34,246 34,619
ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 35,480 34,810 34,860 35,058 34,984 34,363 34,736
ALISTADO PARA LISTN M2 12,342 12,208 12,218 12,258 12,243 12,119 12,193
ALISTADO PISOS 1:3, E=0.04 M2 26,689 25,348 25,447 25,844 25,696 24,454 25,199
ALISTADO TERRAZAS 1:3, E= 0.08 M2 76,698 75,358 75,457 75,854 75,705 74,464 75,209
CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 22,346 21,931 21,961 22,084 22,038 21,654 21,884
CONCRETO BASE GRADAS 2500 PSI M2 51,542 49,520 49,670 50,269 50,044 48,173 49,296
CONCRETO ESTRIADO RAMPAS 2500 PSI M2 72,663 69,428 69,668 70,626 70,267 67,272 69,069
MANTO FIBERGLASS 600X1 M2 25,689 25,689 25,689 25,689 25,689 25,689 25,689
PEGANTE MORTERO-CONCRETO M2 19,164 19,164 19,164 19,164 19,164 19,164 19,164
PERMA PLY 2 CAPAS M2 22,312 22,312 22,312 22,312 22,312 22,312 22,312
PLACA BASE CONCRETO 0.08 2500 PSI M2 42,378 40,558 40,693 41,232 41,030 39,345 40,356
PLACA BASE CONCRETO 0.10 2500 PSI M2 49,888 47,664 47,829 48,488 48,241 46,182 47,417
PLACA BASE CONCRETO 0.15 2500 PSI M2 72,929 69,492 69,747 70,765 70,383 67,201 69,110
TRITURADO FINO 1/2 M3 98,326 83,215 84,335 88,812 87,133 73,141 81,536
TRITURADO GRUESO 3/4 M3 107,226 86,546 116,890 90,740 97,663 76,953 80,942
PISOS,ACABADOS,ENCHAPES Y ACCESORIOS
BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 48,984 48,716 48,736 48,815 48,786 48,537 48,686
BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 28,967 28,833 28,843 28,883 28,868 28,744 28,818
ADOQUN CONCRETO 6CM M2 55,989 55,319 55,368 55,567 55,492 54,872 55,244
ADOQUN CONCRETO 8CM M2 58,889 58,219 58,268 58,467 58,392 57,772 58,144
ADOQUN GRES PEATONAL M2 62,495 61,824 61,874 62,073 61,998 61,377 61,750BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO BLANCO.
INCLUYE ALISTADOM2 64,806 64,537 64,557 64,637 64,607 64,359 64,508
GRAVILLA PARA GRADAS ML 30,561 30,270 30,291 30,377 30,345 30,076 30,237
ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 142,608 141,402 141,491 141,849 141,715 140,598 141,268
ACABADO EN GRAVILLA LAVADA M2 39,109 38,393 38,446 38,658 38,578 37,915 38,313
GUARDAESCOBA EN GRANITO ML 36,142 36,142 36,142 36,142 36,142 36,142 36,142
GUARDAESCOBA EN GRAVILLA ML 8,701 8,410 8,432 8,518 8,486 8,216 8,378
12.24
12.25
12.26
12.27
12.28
12.29
12.20
12.21
12.22
12.23
13.2
13.3
13.4
13.5
13.6
13.7
12.30
12.31
12.32
13
13.1
13.14
13.15
13.16
14
14.1
13.8
13.9
13.10
13.11
13.12
13.13
14.8
14.9
14.10
14.11
14.2
14.3
14.4
14.5
14.6
14.7
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINGUARDAESCOBA PVC CARAMELO ML 8,072 8,072 8,072 8,072 8,072 8,072 8,072GUARDAESCOBA PVC CEDRO ML 10,854 10,854 10,854 10,854 10,854 10,854 10,854
GUARDAESCOBA PINO CARIBE ML 8,820 8,820 8,820 8,820 8,820 8,820 8,820
GUARDAESCOBA CEDRO BLANCO ML 14,968 14,968 14,968 14,968 14,968 14,968 14,968
GUARDAESCOBA EN MADERA SAPAN ML 29,434 29,434 29,434 29,434 29,434 29,434 29,434
GUARDAESCOBA GRES Y CERMICA ML 7,534 7,534 7,534 7,534 7,534 7,534 7,534
LISTN M.H. AMARILLO M2 62,650 62,650 62,650 62,650 62,650 62,650 62,650
PASO ESCALERA GRANITO ML 101,447 100,509 100,578 100,856 100,752 99,883 100,405
PIRLANES ALUMINIO ML 6,081 6,081 6,081 6,081 6,081 6,081 6,081
PIRLANES LADRILLO ML 27,022 26,775 26,793 26,866 26,839 26,610 26,747
PISO VINILO TRFICO RESIDENCIAL M2 39,109 39,109 39,109 39,109 39,109 39,109 39,109
PISO VINILO TRFICO PESADO M2 45,584 45,584 45,584 45,584 45,584 45,584 45,584
PULIDA LACADA PISO MADERA M2 41,164 41,164 41,164 41,164 41,164 41,164 41,164
TABLETA DE GRES 25X25 M2 42,524 42,255 42,275 42,355 42,325 42,077 42,226
TABLN DE GRES LISO O RSTICO 33X 33 M2 47,773 47,505 47,525 47,605 47,575 47,327 47,476
GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 9,029 9,029 9,029 9,029 9,029 9,029 9,029
ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 42,668 42,298 42,325 42,435 42,394 42,051 42,257
JABONERA PORCELANA ACUARIO UN 17,524 17,524 17,524 17,524 17,524 17,524 17,524JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO, JABONERA,CEPILLERA
Y PERCHA SIMPLE)UN 105,400 105,400 105,400 105,400 105,400 105,400 105,400
REJILLA PLSTICA SOSCO 3X2 UN 8,170 8,170 8,170 8,170 8,170 8,170 8,170
REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 19,094 19,094 19,094 19,094 19,094 19,094 19,094
REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 12,086 12,086 12,086 12,086 12,086 12,086 12,086
REJILLA PLSTICA VENTILACIN 20X20 UN 11,730 11,730 11,730 11,730 11,730 11,730 11,730
REMATES BOCEL ALUMINIO ML 6,980 6,980 6,980 6,980 6,980 6,980 6,980
REMATES BOCEL PORCELANA ML 7,110 7,110 7,110 7,110 7,110 7,110 7,110
TAPA REGISTRO 20X20 UN 16,093 16,093 16,093 16,093 16,093 16,093 16,093
TAPA REGISTRO 6X6 UN 14,628 14,628 14,628 14,628 14,628 14,628 14,628
DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 16,188 16,188 16,188 16,188 16,188 16,188 16,188
DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL FUNDIDO EN
SITIOM2 18,714 18,714 18,714 18,714 18,714 18,714 18,714
CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 56,351 56,083 56,103 56,183 56,153 55,905 56,054
MEDIA CAA EN GRANITO ML 66,724 66,724 66,724 66,724 66,724 66,724 66,724
PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 27,560 27,560 27,560 27,560 27,560 27,560 27,560
PINTURA ACRLICA PARA PISOS M2 11,155 11,155 11,155 11,155 11,155 11,155 11,155
PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 88,036 88,036 88,036 88,036 88,036 88,036 88,036
GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 106,152 106,152 106,152 106,152 106,152 106,152 106,152
CIELO RASO
APLIQUE YESO ML 62,581 62,581 62,581 62,581 62,581 62,581 62,581
ARMADURA MADERA Y MALLA M2 29,482 29,482 29,482 29,482 29,482 29,482 29,482
CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 46,587 46,587 46,587 46,587 46,587 46,587 46,587
CIELO RASO DURACUSTIC M2 57,484 57,484 57,484 57,484 57,484 57,484 57,484
CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 42,780 42,780 42,780 42,780 42,780 42,780 42,780
CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 79,912 79,912 79,912 79,912 79,912 79,912 79,912
14.12
14.13
14.20
14.21
14.22
14.23
14.24
14.25
14.14
14.15
14.16
14.17
14.18
14.19
14.32
14.33
14.34
14.35
14.36
14.37
14.26
14.27
14.28
14.29
14.30
14.31
14.44
14.45
14.46
15
15.1
14.38
14.39
14.40
14.41
14.42
14.43
15.2
15.3
15.4
15.5
15.6
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINCORNISAS YESO ML 42,091 42,091 42,091 42,091 42,091 42,091 42,091LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 88,633 88,633 88,633 88,633 88,633 88,633 88,633
MALLA CON VENA M2 11,050 11,050 11,050 11,050 11,050 11,050 11,050
EXCAVACIONES Y RELLENOS
EXPLANACIN Y EXTENDIDA M3 4,547 4,547 4,547 4,547 4,547 4,547 4,547EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 17,474 17,474 17,474 17,474 17,474 17,474 17,474
EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 20,426 20,426 20,426 20,426 20,426 20,426 20,426EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 35,830 35,830 35,830 35,830 35,830 35,830 35,830
EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE
RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 40,782 40,782 40,782 40,782 40,782 40,782 40,782
EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 67,329 67,329 67,329 67,329 67,329 67,329 67,329
RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 15,227 15,227 15,227 15,227 15,227 15,227 15,227
RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 85,503 60,250 155,761 58,339 85,503 57,046 46,698
RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 110,898 93,630 94,910 100,026 98,107 82,119 91,712RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO
MECNICAMENTEM3 134,023 134,023 135,316 132,729 161,186 154,719 134,023
AFRIMADO (NORMA INVIAS 311) M3 94,357 63,547 71,308 67,193 94,357 65,900 55,552
SUBBASE GRANULAR (NORMA INVIAS 320) M3 124,117 124,117 125,411 122,824 151,281 144,813 124,117
BASE GRANULAR (NORMA INVIAS 330) M3 134,700 134,700 135,994 133,407 161,864 155,396 134,700
APARATOS SANITARIOS
SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 258,883 258,883 258,883 258,883 258,883 258,883 258,883
SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE GRIFERA) UN 767,988 767,988 767,988 767,988 767,988 767,988 767,988
SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 415,072 415,072 415,072 415,072 415,072 415,072 415,072
SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 118,165 118,165 118,165 118,165 118,165 118,165 118,165
SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE GRIFERA) UN 166,920 166,920 166,920 166,920 166,920 166,920 166,920
SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE GRIFERA) UN 154,830 154,830 154,830 154,830 154,830 154,830 154,830
SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 344,005 344,005 344,005 344,005 344,005 344,005 344,005
SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE GRIFERA) UN 883,649 883,649 883,649 883,649 883,649 883,649 883,649
SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 249,172 249,172 249,172 249,172 249,172 249,172 249,172
SUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA UN 175,455 175,455 175,455 175,455 175,455 175,455 175,455
SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 68,346 68,346 68,346 68,346 68,346 68,346 68,346SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO
INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)UN 213,352 213,352 213,352 213,352 213,352 213,352 213,352
SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO
INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)UN 315,533 315,533 315,533 315,533 315,533 315,533 315,533
PINTURAS
15.8
15.9
16
16.1
16.2
15.7
16.9
16.10
16.11
16.12
16.13
16.3
16.4
16.5
16.6
16.7
16.8
17.6
17.7
17.8
17.9
17.10
17.11
17
17.1
17.2
17.3
17.4
17.5
17.12
17.13
18
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINIMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 6,907 6,907 6,907 6,907 6,907 6,907 6,907ANTICORROSIVO SOBRE LMINA LINEAL ML 2,582 2,582 2,582 2,582 2,582 2,582 2,582
ANTICORROSIVO SOBRE LMINA LLENA M2 9,089 9,089 9,089 9,089 9,089 9,089 9,089
BARNIZ SOBRE MUEBLES M2 35,239 35,239 35,239 35,239 35,239 35,239 35,239
CARBURO SOBRE PAETES M2 4,772 4,772 4,772 4,772 4,772 4,772 4,772
COLORPLAST FACHADA SOBRE FACHADA M2 56,518 56,518 56,518 56,518 56,518 56,518 56,518
DEMARCACIN CON MARMOLINA ML 2,821 2,821 2,821 2,821 2,821 2,821 2,821
ESMALTE SOBRE LMINA LINEAL ML 2,307 2,307 2,307 2,307 2,307 2,307 2,307
ESMALTE SOBRE LMINA LLENA M2 11,500 11,500 11,500 11,500 11,500 11,500 11,500
ESMALTE SOBRE MADERA LINEAL ML 3,347 3,347 3,347 3,347 3,347 3,347 3,347
ESMALTE SOBRE MADERA LLENA M2 12,133 12,133 12,133 12,133 12,133 12,133 12,133
ESMALTE SOBRE MARCOS LMINA M2 4,850 4,850 4,850 4,850 4,850 4,850 4,850
ESMALTE SOBRE MARCOS MADERA M2 5,496 5,496 5,496 5,496 5,496 5,496 5,496
ESTUCO M2 5,723 5,723 5,723 5,723 5,723 5,723 5,723
ESTUCO (LINEAL) ML 3,567 3,567 3,567 3,567 3,567 3,567 3,567
ESTUCO Y VINILO 3 MANOS M2 12,786 12,786 12,786 12,786 12,786 12,786 12,786
ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,874 7,874 7,874 7,874 7,874 7,874 7,874
LACA PISOS MADERA M2 18,525 18,525 18,525 18,525 18,525 18,525 18,525
LNEAS TRFICO 0.10 ML 2,202 2,202 2,202 2,202 2,202 2,202 2,202
MARMOLINA SOBRE PAETE M2 10,244 10,244 10,244 10,244 10,244 10,244 10,244
TINTILLA SOBRE MADERA LINEAL ML 2,756 2,756 2,756 2,756 2,756 2,756 2,756
TINTILLA SOBRE MADERA LLENA M2 10,412 10,412 10,412 10,412 10,412 10,412 10,412
VINILO SOBRE PAETE 2 MANOS M2 5,837 5,837 5,837 5,837 5,837 5,837 5,837
VINILO SOBRE PAETE 2 MANOS (LINEAL) ML 3,644 3,644 3,644 3,644 3,644 3,644 3,644
WASH-PRIMER SOBRE ALUMNIO M2 18,289 18,289 18,289 18,289 18,289 18,289 18,289
PINTURA EPXICA M2 10,387 10,387 10,387 10,387 10,387 10,387 10,387
PINTURA EPXICA (LINEAL) ML 6,383 6,383 6,383 6,383 6,383 6,383 6,383
DOTACIONES DEPORTIVAS
CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 5,246,141 5,246,141 5,246,141 5,246,141 5,246,141 5,246,141 5,246,141CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON RODACHINES Y
CILINDRO PARA MOVILIZAR (PAR)UN 9,269,049 9,269,049 9,269,049 9,269,049 9,269,049 9,269,049 9,269,049
CANCHA PARA MICROFTBOL (PAR) UN 2,425,418 2,425,418 2,425,418 2,425,418 2,425,418 2,425,418 2,425,418
CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 7,927,142 7,927,142 7,927,142 7,927,142 7,927,142 7,927,142 7,927,142
CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 7,425,140 7,425,140 7,425,140 7,425,140 7,425,140 7,425,140 7,425,140
DEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2,202 2,202 2,202 2,202 2,202 2,202 2,202
TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 742,739 742,739 742,739 742,739 742,739 742,739 742,739
MALLA NYLON PETROLIZADA VOLEIBOL UN 74,447 74,447 74,447 74,447 74,447 74,447 74,447
SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,347,181 1,346,973 1,346,989 1,347,050 1,347,027 1,346,835 1,346,950
CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 583,786 578,828 579,195 580,664 580,114 575,523 578,277
INSTALACIONES RED GASES
TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 25,115 25,115 25,115 25,115 25,115 25,115 25,115
TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 37,391 37,391 37,391 37,391 37,391 37,391 37,391
TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 46,353 46,353 46,353 46,353 46,353 46,353 46,353
18.3
18.4
18.5
18.6
18.7
18.8
18.1
18.2
18.15
18.16
18.17
18.18
18.19
18.20
18.9
18.10
18.11
18.12
18.13
18.14
18.27
19
19.1
19.2
19.3
18.21
18.22
18.23
18.24
18.25
18.26
19.10
20
20.1
20.2
20.3
19.4
19.5
19.6
19.7
19.8
19.9
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINTUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 15,140 15,140 15,140 15,140 15,140 15,140 15,140TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 18,326 18,326 18,326 18,326 18,326 18,326 18,326
TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 24,943 24,943 24,943 24,943 24,943 24,943 24,943
TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 22,050 22,050 22,050 22,050 22,050 22,050 22,050
TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 23,233 23,233 23,233 23,233 23,233 23,233 23,233
TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 29,045 29,045 29,045 29,045 29,045 29,045 29,045
VLVULA DE BOLA GAS 1/2" UN 15,031 15,031 15,031 15,031 15,031 15,031 15,031
VLVULA DE BOLA GAS 3/4" UN 19,754 19,754 19,754 19,754 19,754 19,754 19,754
VLVULA DE BOLA GAS 1" UN 30,496 30,496 30,496 30,496 30,496 30,496 30,496
VLVULA POLIETILENO GAS 1/2" UN 235,059 235,059 235,059 235,059 235,059 235,059 235,059
VLVULA POLIETILENO GAS 3/4" UN 270,664 270,664 270,664 270,664 270,664 270,664 270,664
VLVULA POLIETILENO GAS 1" UN 282,092 282,092 282,092 282,092 282,092 282,092 282,092
ACOMETIDA GAS 1/2" ML 261,529 261,529 261,529 261,529 261,529 261,529 261,529
INSTALACIONES RED VOZ Y DATOS
SENSOR DE HUMO FOTOELCTRICO UN 190,403 190,403 190,403 190,403 190,403 190,403 190,403
CABLE DETECTOR LINEAL DE CALOR ML 29,341 29,341 29,341 29,341 29,341 29,341 29,341
SIRENA DE 110 V UN 88,383 88,383 88,383 88,383 88,383 88,383 88,383
CMARA CCTV UN 220,474 220,474 220,474 220,474 220,474 220,474 220,474
PARLANTE-CIELO FALSO UN 43,826 43,826 43,826 43,826 43,826 43,826 43,826
AMPLIFICADOR 100W UN 490,080 490,080 490,080 490,080 490,080 490,080 490,080
AMPLIFICADOR 300W UN 1,224,046 1,224,046 1,224,046 1,224,046 1,224,046 1,224,046 1,224,046
ACOMETIDA CABLE RG-6 PARA MICRFONO ML 36,036 36,036 36,036 36,036 36,036 36,036 36,036
MICRFONO PG 48LC (INCLUYE BASE) UN 190,966 190,966 190,966 190,966 190,966 190,966 190,966
TOMA PARA MICRFONO UN 36,709 36,709 36,709 36,709 36,709 36,709 36,709
CABLE BLINDADO STEREO PARA MICRFONO ML 3,196 3,196 3,196 3,196 3,196 3,196 3,196
SPLITERS UN 5,431 5,431 5,431 5,431 5,431 5,431 5,431
TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 15,233 15,233 15,233 15,233 15,233 15,233 15,233
TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 20,124 20,124 20,124 20,124 20,124 20,124 20,124
TUBERA CONDUIT EMT GALVANIZADA 1". ML 26,106 26,106 26,106 26,106 26,106 26,106 26,106
BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 105,209 105,209 105,209 105,209 105,209 105,209 105,209
TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 27,427 27,427 27,427 27,427 27,427 27,427 27,427
BANDEJA PORTACABLES PARA RACK UN 90,128 90,128 90,128 90,128 90,128 90,128 90,128
RACK 2' X 24" UN 153,113 153,113 153,113 153,113 153,113 153,113 153,113
RACK 3' X 24" UN 243,812 243,812 243,812 243,812 243,812 243,812 243,812
RACK 5' X 24" UN 301,426 301,426 301,426 301,426 301,426 301,426 301,426
RACK 7' X 24" UN 330,128 330,128 330,128 330,128 330,128 330,128 330,128
PATCH PANEL 48 PUERTOS CATEGORA 6A UN 478,971 478,971 478,971 478,971 478,971 478,971 478,971
PATCH PANEL 24 PUERTOS CATEGORA 6A UN 280,853 280,853 280,853 280,853 280,853 280,853 280,853
SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 89,119 89,119 89,119 89,119 89,119 89,119 89,119
PATCH CORD 2M CATEGORA 6A UN 11,940 11,940 11,940 11,940 11,940 11,940 11,940
PATCH CORD 5M CATEGORA 6A UN 24,454 24,454 24,454 24,454 24,454 24,454 24,454
CABLE UTP CATEGORA 6A ML 4,210 4,210 4,210 4,210 4,210 4,210 4,210
CANALETA METLICA 4X6 CMS ML 29,455 29,455 29,455 29,455 29,455 29,455 29,455
20.10
20.11
20.12
20.13
20.14
20.15
20.4
20.5
20.6
20.7
20.8
20.9
21.4
21.5
21.6
21.7
21.8
21.9
20.16
21.1
21.1
21.2
21.3
21.16
21.17
21.18
21.19
21.20
21.21
21.10
21.11
21.12
21.13
21.14
21.15
21.28
21.29
21.22
21.23
21.24
21.25
21.26
21.27
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINCANALETA METLICA 4X10 CMS ML 30,823 30,823 30,823 30,823 30,823 30,823 30,823CANALETA METLICA 6X10 CMS ML 31,506 31,506 31,506 31,506 31,506 31,506 31,506
CANALETA PLSTICA 13X7 MM ML 20,531 20,531 20,531 20,531 20,531 20,531 20,531
CANALETA PLSTICA 20X12 MM ML 22,781 22,781 22,781 22,781 22,781 22,781 22,781
CANALETA PLSTICA 32X12 MM ML 23,727 23,727 23,727 23,727 23,727 23,727 23,727
CANALETA PLSTICA 40X60 MM ML 40,347 40,347 40,347 40,347 40,347 40,347 40,347
SWITCH 10/100/1000 24 PUERTOS UN 525,097 525,097 525,097 525,097 525,097 525,097 525,097
SWITCH 10/100/1000 16 PUERTOS UN 268,393 268,393 268,393 268,393 268,393 268,393 268,393
SWITCH 10/100/1000 8 PUERTOS UN 73,687 73,687 73,687 73,687 73,687 73,687 73,687
CABLE TELEFNICO 2 PARES ML 1,538 1,538 1,538 1,538 1,538 1,538 1,538
CABLE TELEFNICO 10 PARES ML 7,128 7,128 7,128 7,128 7,128 7,128 7,128
CABLE TELEFNICO 20 PARES ML 10,716 10,716 10,716 10,716 10,716 10,716 10,716
CABLE TELEFNICO 40 PARES ML 17,956 17,956 17,956 17,956 17,956 17,956 17,956
CABLE TELEVISIN RG6 ML 3,295 3,295 3,295 3,295 3,295 3,295 3,295
ACOMETIDA TELEFNICA 1/2" ML 18,145 18,145 18,145 18,145 18,145 18,145 18,145
ACOMETIDA TELEFNICA 1" ML 26,629 26,629 26,629 26,629 26,629 26,629 26,629
ACOMETIDA TELEVISIN 1" RG6" ML 16,044 16,044 16,044 16,044 16,044 16,044 16,044
CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 12,950 12,950 12,950 12,950 12,950 12,950 12,950
BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 533,192 533,192 533,192 533,192 533,192 533,192 533,192
21.30
21.31
21.32
21.33
21.40
21.41
21.42
21.43
21.44
21.45
21.34
21.35
21.36
21.37
21.38
21.39
21.46
21.47
21.48
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINURBANISMOACUEDUCTO
CODO 45 PVC UNIN MECNICA 2" UN 7,658 7,658 7,658 7,658 7,658 7,658 7,658
CODO 45 PVC UNIN MECNICA 4" UN 77,962 77,962 77,962 77,962 77,962 77,962 77,962
CODO 45 PVC UNIN MECNICA 8" UN 440,544 440,544 440,544 440,544 440,544 440,544 440,544
CODO 45 PVC UNIN MECNICA 10" UN 940,404 940,404 940,404 940,404 940,404 940,404 940,404
CODO 90 PVC UNIN MECNICA 4" UN 107,587 107,587 107,587 107,587 107,587 107,587 107,587
CODO 90 PVC UNIN MECNICA 8" UN 657,012 657,012 657,012 657,012 657,012 657,012 657,012
CODO 90 PVC UNIN MECNICA 10" UN 1,414,879 1,414,879 1,414,879 1,414,879 1,414,879 1,414,879 1,414,879
COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 10,969 10,969 10,969 10,969 10,969 10,969 10,969
COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 13,606 13,606 13,606 13,606 13,606 13,606 13,606
COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 17,168 17,168 17,168 17,168 17,168 17,168 17,168
COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 18,822 18,822 18,822 18,822 18,822 18,822 18,822
COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 22,630 22,630 22,630 22,630 22,630 22,630 22,630
COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 22,630 22,630 22,630 22,630 22,630 22,630 22,630
TAPN PVC UNIN MECNICA 3" UN 92,053 92,053 92,053 92,053 92,053 92,053 92,053
TAPN PVC UNIN MECNICA 4" UN 106,582 106,582 106,582 106,582 106,582 106,582 106,582
TAPN PVC UNIN MECNICA 8" UN 330,033 330,033 330,033 330,033 330,033 330,033 330,033
TEE PVC UNIN MECNICA 2" UN 123,993 123,993 123,993 123,993 123,993 123,993 123,993
TEE PVC UNIN MECNICA 4" UN 204,397 204,397 204,397 204,397 204,397 204,397 204,397
TEE PVC UNIN MECNICA 8" UN 905,460 905,460 905,460 905,460 905,460 905,460 905,460
TEE PVC UNIN MECNICA 10" UN 1,043,347 1,043,347 1,043,347 1,043,347 1,043,347 1,043,347 1,043,347
TUBERA PVC UNIN MECNICA RDE 21 2" ML 12,008 12,008 12,008 12,008 12,008 12,008 12,008
TUBERA PVC UNIN MECNICA RDE 26 2" ML 10,567 10,567 10,567 10,567 10,567 10,567 10,567
TUBERA PVC UNIN MECNICA RDE 26 4" ML 26,661 26,661 26,661 26,661 26,661 26,661 26,661
TUBERA PVC UNIN MECNICA RDE 26 8" ML 105,097 105,097 105,097 105,097 105,097 105,097 105,097
TUBERA PVC UNIN MECNICA RDE 26 10" ML 156,897 156,897 156,897 156,897 156,897 156,897 156,897
TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 25,452 25,452 25,452 25,452 25,452 25,452 25,452
TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 87,976 87,976 87,976 87,976 87,976 87,976 87,976
TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 130,755 130,755 130,755 130,755 130,755 130,755 130,755
UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 0 0 0 0 0 0 0
UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 53,306 53,306 53,306 53,306 53,306 53,306 53,306
UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 215,510 215,510 215,510 215,510 215,510 215,510 215,510
UNIN REPARACION PVC 4" UN 62,262 62,262 62,262 62,262 62,262 62,262 62,262
UNIN REPARACIN PVC 8" UN 250,871 250,871 250,871 250,871 250,871 250,871 250,871
UNIN REPARACIN UNIN Z PVC 6" UN 149,444 149,444 149,444 149,444 149,444 149,444 149,444
UNIN REPARACIN UNIN Z PVC 10" UN 428,059 428,059 428,059 428,059 428,059 428,059 428,059
VLVULA COMPUERTA ELSTICA 6" UN 1,149,967 1,149,967 1,149,967 1,149,967 1,149,967 1,149,967 1,149,967
VLVULA COMPUERTA ELSTICA 8" UN 1,699,356 1,699,356 1,699,356 1,699,356 1,699,356 1,699,356 1,699,356
ALCANTARILLADO - EXCAVACIONES
ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,804 8,804 8,804 8,804 8,804 8,804 8,804
ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 20,053 20,053 20,053 20,053 20,053 20,053 20,053
RELLENO CON MATERIAL DE EXCAVACIN M3 15,227 15,227 15,227 15,227 15,227 15,227 15,227
1.1
1.2
1.3
1.4
1.5
1.6
1
1.13
1.14
1.15
1.16
1.17
1.18
1.7
1.8
1.9
1.10
1.11
1.12
1.25
1.26
1.27
1.28
1.29
1.30
1.19
1.20
1.21
1.22
1.23
1.24
1.37
2
2.1
2.2
2.3
1.31
1.32
1.33
1.34
1.35
1.36
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINRELLENO TIPO 1 "GRAVILLA" M3 94,393 77,910 79,131 84,015 82,183 66,922 76,079RELLENO TIPO 2 "RECEBO" M3 81,508 56,255 151,766 54,344 81,508 53,051 42,703
RELLENO TIPO 4 "SUBBASE B-200" M3 96,328 65,518 73,279 69,164 96,328 67,871 57,523
RELLENO TIPO 5 "TRITURADO GRUESO" M3 56,652 56,652 57,676 55,627 78,173 58,701 56,652
RELLENO TIPO 6 "RAJN-PIEDRA" M3 57,638 57,638 58,682 56,593 79,577 59,727 57,638
RELLENO TIPO 7 "ARENA DE PEA" M3 100,271 84,238 85,426 90,176 88,395 73,549 82,457
ALCANTARILLADO - TUBERA
CODO 45 PVC ALCANTARILLADO 8" UN 98,420 98,420 98,420 98,420 98,420 98,420 98,420
CODO 45 PVC ALCANTARILLADO 16" UN 1,028,394 1,028,394 1,028,394 1,028,394 1,028,394 1,028,394 1,028,394
CODO 90 PVC ALCANTARILLADO 8" UN 128,695 128,695 128,695 128,695 128,695 128,695 128,695
CODO 90 PVC ALCANTARILLADO 16" UN 1,191,195 1,191,195 1,191,195 1,191,195 1,191,195 1,191,195 1,191,195
CODO 90 PVC ALCANTARILLADO 24" UN 830,069 830,069 830,069 830,069 830,069 830,069 830,069
SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 60,007 60,007 60,007 60,007 60,007 60,007 60,007
SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 97,698 97,698 97,698 97,698 97,698 97,698 97,698
SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 230,951 230,951 230,951 230,951 230,951 230,951 230,951
SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 230,945 230,945 230,945 230,945 230,945 230,945 230,945
SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 370,895 370,895 370,895 370,895 370,895 370,895 370,895
SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 97,739 97,739 97,739 97,739 97,739 97,739 97,739
SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 97,739 97,739 97,739 97,739 97,739 97,739 97,739
SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 230,951 230,951 230,951 230,951 230,951 230,951 230,951
SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 230,951 230,951 230,951 230,951 230,951 230,951 230,951
SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 370,895 370,895 370,895 370,895 370,895 370,895 370,895
TUBERA CONCRETO CLASE II REFORZADO 24" ML 372,610 372,610 372,610 372,610 372,610 372,610 372,610
TUBERA CONCRETO CLASE II REFORZADO 30" ML 605,168 605,168 605,168 605,168 605,168 605,168 605,168
TUBERA CONCRETO CLASE II REFORZADO 44" ML 971,216 971,216 971,216 971,216 971,216 971,216 971,216
TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 59,787 59,787 59,787 59,787 59,787 59,787 59,787
TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 311,761 311,761 311,761 311,761 311,761 311,761 311,761
TUBERA CONCRETO CLASE III REFORZADO 24" ML 348,977 348,977 348,977 348,977 348,977 348,977 348,977
TUBERA CONCRETO CLASE III REFORZADO 44" ML 967,920 967,920 967,920 967,920 967,920 967,920 967,920
TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 56,783 56,618 56,630 56,679 56,661 56,508 56,600
TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 282,601 282,601 282,601 282,601 282,601 282,601 282,601
TUBERA PVC ALCANTARILLADO 8" ML 42,804 42,804 42,804 42,804 42,804 42,804 42,804
TUBERA PVC ALCANTARILLADO 10" ML 60,631 60,631 60,631 60,631 60,631 60,631 60,631
TUBERA PVC ALCANTARILLADO 12" ML 87,601 87,601 87,601 87,601 87,601 87,601 87,601
TUBERA PVC ALCANTARILLADO 16" ML 134,519 134,519 134,519 134,519 134,519 134,519 134,519
TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 216,392 216,392 216,392 216,392 216,392 216,392 216,392
TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 314,361 314,361 314,361 314,361 314,361 314,361 314,361
TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 397,757 397,757 397,757 397,757 397,757 397,757 397,757
TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 522,942 522,942 522,942 522,942 522,942 522,942 522,942
TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 719,418 719,418 719,418 719,418 719,418 719,418 719,418
ALCANTARILLADO - SUMIDEROS Y POZOS
PLACA DE FONDO POZO D=1.7M, E=0.25M (CONCRETO 3000 PSI CON
REFUERZO)UN 573,470 561,571 562,452 565,978 564,656 553,639 560,249
3
3.1
3.2
3.3
3.4
2.4
2.5
2.6
2.7
2.8
2.9
3.11
3.12
3.13
3.14
3.15
3.16
3.5
3.6
3.7
3.8
3.9
3.10
3.23
3.24
3.25
3.26
3.27
3.28
3.17
3.18
3.19
3.20
3.21
3.22
4
4.1
3.29
3.30
3.31
3.32
3.33
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINCILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.25M (INC. PAETE INTERNO E=1.5CM Y CAUELA)
ML 570,816 562,276 562,909 565,439 564,491 556,583 561,328
CUBIERTA POZO D= 1.7M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
(INCLUYE ARO Y TAPA HF)UN 611,138 603,205 603,793 606,143 605,262 597,917 602,324
PLACA DE FONDO POZO D=1.96M, E=0.25M (CONCRETO 3000 PSI CON
REFUERZO)UN 683,543 668,669 669,771 674,178 672,526 658,754 667,017
CILINDRO POZO EN LADRILLO TOLETE, Di=1.20M, E=0.38M (INC. PAETE
INTERNO E=1.5CM Y CAUELA)ML 814,310 802,285 803,175 806,739 805,403 794,268 800,949
CUBIERTA POZO D= 1.96M, E=0.20M C0NCRETO 3000 PSI CON REFUERZO
(INCLUYE ARO Y TAPA HF)UN 708,666 697,759 698,567 701,799 700,587 690,488 696,548
SUMIDERO EN LADRILLO SL-100 UN 824,996 819,186 819,615 821,337 820,690 815,309 818,539
SUMIDERO EN LADRILLO SL-250 UN 1,215,620 1,198,795 1,200,039 1,205,025 1,203,154 1,187,572 1,196,924
SUMIDERO FUNDIDO EN SITIO REFORZADO SL-100 UN 1,695,889 1,664,398 1,666,731 1,676,061 1,672,563 1,643,405 1,660,900
SUMIDERO FUNDIDO EN SITIO SL-250 UN 2,280,125 2,227,778 2,231,656 2,247,166 2,241,352 2,192,883 2,221,964
SUMIDERO PREFABRICADO SL-100 UN 1,560,402 1,560,402 1,560,402 1,560,402 1,560,402 1,560,402 1,560,402
SUMIDERO PREFABRICADO SL-250 UN 3,312,171 3,312,171 3,312,171 3,312,171 3,312,171 3,312,171 3,312,171NIVELACIN DE POZOS DE INSPECCIN Di=1.20M, E=0.25M, H=0,21M(INCLUYE
PAETE INTERNO Y DEMOLICIN)UN 115,667 115,318 115,344 115,447 115,409 115,086 115,280
ANDENES Y SARDINELES
ADOQUN DE ARCILLA 20X10X6CM M2 62,644 61,780 61,844 62,100 62,004 61,205 61,684
ADOQUN DE ARCILLA 20X10X8CM M2 74,240 73,376 73,440 73,696 73,600 72,801 73,280
ANDN CONCRETO 2500 PSI EN SITIO E=0.1M M2 50,341 48,218 48,375 49,004 48,768 46,803 47,982
ANDN CONCRETO 3000 PSI EN SITIO E=0.1M M2 54,642 52,560 52,714 53,331 53,100 51,172 52,328
ANDN CONCRETO 3500 PSI EN SITIO E=0.1M M2 54,970 52,955 53,104 53,701 53,478 51,611 52,731
BORDE SEPARADOR VERDE A-170 ML 218,017 217,668 217,694 217,797 217,759 217,436 217,629
BORDILLO DE 8X15 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 15,362 15,107 15,126 15,201 15,173 14,937 15,079
BORDILLO DE 20X35 CM FUNDIDO EN CONCRETO DE 2500 PSI ML 35,897 34,401 34,512 34,955 34,789 33,404 34,235
CAUELA PREFABRICADA TIPO A-120 ML 70,741 70,555 70,569 70,624 70,603 70,431 70,534
CONTENEDOR DE RACES TIPO A B-20 UN 474,836 469,955 470,316 471,762 471,220 466,701 469,412
LOSETA PREFABRICADA A-40 M2 53,746 52,948 53,007 53,243 53,155 52,416 52,859
LOSETA PREFABRICADA A-60 M2 78,294 77,496 77,555 77,792 77,703 76,964 77,408
SARDINEL FUNDIDO IN-SITU H=0.2M, E=0.2M,CONCRETO DE 3000 PSI ML 29,222 28,389 28,450 28,697 28,605 27,833 28,296
SARDINEL FUNDIDO IN-SITU H=0.4 M, E=0.2M,CONCRETO 3000 PSI ML 47,942 46,256 46,381 46,880 46,693 45,132 46,069
SARDINEL PREFABRICADO A-10 ML 87,362 87,176 87,389 87,046 91,403 90,236 87,155
TABLETA PREFABRICADA A-20 (20X20CM ) M2 51,664 51,182 51,217 51,360 51,307 50,860 51,128
MOBILIARIO URBANO
BANCA EN CONCRETO M-40 UN 173,831 172,840 172,913 173,207 173,097 172,179 172,730
BANCA EN CONCRETO M-30 UN 571,019 569,630 569,733 570,145 569,990 568,705 569,476
BOLARDO M-63 ALTO/HIERRO UN 182,048 181,840 181,856 181,917 181,894 181,702 181,817
BOLARDO M-60 CONCRETO UN 138,545 137,355 137,444 137,796 137,664 136,562 137,223
BOLARDO M-61 BAJO/CONCRETO UN 140,018 138,828 138,916 139,269 139,137 138,035 138,696
BOLARDO M-62 BAJO/HIERRO UN 164,086 162,840 162,932 163,301 163,163 162,009 162,701
BORDE CONTENEDOR DE RAICES A-70 ML 50,490 49,829 49,878 50,074 50,001 49,389 49,756
4.2
4.3
4.4
4.5
4.12
4.13
5
5.1
5.2
4.6
4.7
4.8
4.9
4.10
4.11
5.9
5.10
5.11
5.12
5.13
5.14
5.3
5.4
5.5
5.6
5.7
5.8
6.3
6.4
6.5
6.6
6.7
5.15
5.16
6
6.1
6.2
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINBORDILLO PREFABRICADO A-80 ML 58,897 58,157 58,212 58,431 58,349 57,663 58,074CANECA M-120 UN 266,526 266,361 266,373 266,422 266,404 266,251 266,343
CANECA EN ACERO INOXIDABLE TIPO BARCELONA UN 702,068 701,473 701,517 701,693 701,627 701,076 701,407
HIDRANTE EXTREMO BRIDA D=4" TIPO POSTE UN 2,889,365 2,888,968 2,888,997 2,889,115 2,889,071 2,888,704 2,888,924
HIDRANTE EXTREMO BRIDA D=4" TIPO TRFICO UN 2,972,469 2,972,072 2,972,101 2,972,219 2,972,175 2,971,808 2,972,028
CICLOPARQUEADERO M100 TIPO 1 UN 415,498 415,083 415,114 415,237 415,191 414,806 415,037
CICLOPARQUEADERO M101 TIPO 2 UN 552,142 550,481 550,604 551,096 550,911 549,373 550,296
BANCA EN MADERA M-50 UN 455,900 455,900 455,900 455,900 455,900 455,900 455,900
PROTECTOR DE RBOL DE 2 TUBOS M-91 UN 210,233 209,638 209,683 209,859 209,793 209,242 209,572
PROTECTOR DE RBOL CIRCULAR M-90 UN 492,747 492,334 492,364 492,487 492,441 492,058 492,288
POSTE HISTRICO M-131 UN 5,497,993 5,495,018 5,495,239 5,496,120 5,495,790 5,493,035 5,494,688
SEALIZACIN
LNEAS DE DEMARCACIN CON PINTURA EN FRO ML 3,451 3,451 3,451 3,451 3,451 3,451 3,451
MARCA VIAL CON PINTURA EN FRO M2 36,583 36,583 36,583 36,583 36,583 36,583 36,583
SEAL DOBLE DE CICLORUTA UN 386,471 386,297 386,310 386,361 386,342 386,181 386,278
SEALES DE TRNSITO INFORMATIVAS (1.4 X 0.95 M) UN 421,031 420,200 420,262 420,508 420,416 419,647 420,108
SEAL VERTICAL GRUPO I 0.60x0.60M POSTE 3.5M UN 271,382 271,208 271,221 271,272 271,253 271,092 271,189
SEAL DE TRNSITO GRUPO I 0.75X0.75M, POSTE 3.5M UN 317,329 317,155 317,168 317,219 317,200 317,039 317,136
SEAL DE TRNSITO GRUPO I 0.90X0.90M, POSTE 3.5M UN 431,198 431,024 431,037 431,088 431,069 430,908 431,005
TACHAS REFLECTIVAS UN 11,492 11,492 11,492 11,492 11,492 11,492 11,492
SUMINISTRO E INSTALACIN DE ESTOPEROLES DE 10x3.0 CM UN 12,282 12,282 12,282 12,282 12,282 12,282 12,282TACHON EN CONCRETO L = 0,4 X HI = 0,15 X HS = 0.08 M (INCLUYE
SUMINISTRO E INSTALACIN)UN 100,387 100,387 100,387 100,387 100,387 100,387 100,387
6.8
6.15
6.16
6.17
6.18
7
6.9
6.10
6.11
6.12
6.13
6.14
7.7
7.8
7.9
7.10
7.1
7.2
7.3
7.4
7.5
7.6
-
DESCRIPCIN UNIDAD Beltrn Bituima Chaguan Guayabal_de_Squima Pul San_Juan_de_Rioseco Vian
GOBERNACIN DE CUNDINAMARCA
LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2014)
PROVINCIA: MAGDALENA CENTRO
ESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE
TEM
CONSTRUCCINVAS (SEGN ESPECIFICACIONES TCNICAS INVIAS 2007)1 NORMA INV PRELIMILARES
1.1 201 PDEMOLICIN CONCRETO ESTRUCTURAL (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)M3 127,138 127,138 127,138 127,138 127,138 127,138 127,138
1.2 201 PDEMOLICIN CONCRETO SIMPLE (INCLUYE CARGUE Y RETIRO DE SOBRANTES
A UNA DISTANCIA DE 5KM)M3 44,161 44,161 44,161 44,161 44,161 44,161 44,161
1.3 200.1DESMONTE Y LIMPIEZA EN BOSQUE (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)HA 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096 2,200,096
1.4 200.2DESMONTE Y LIMPIEZA EN ZONA NO BOSCOSA (INCLUYE CARGUE Y RETIRO DE
SOBRANTES A UNA DISTANCIA DE 5KM)HA 784,698 784,698 784,698 784,698 784,698 784,698 784,698
1.5 201.7DEMOLICIN DE ESTRUCTURAS (INCLUYE CARGUE Y RETIRO DE SOBRANTES A
UNA DISTANCIA DE 5KM)M3 74,038 74,038 74,038 74,038 74,038 74,038 74,038
1.6 ***TRANSPORTE DE MATERIALES PROV. DE EXLANACIN, CANALES, PRESTAMOS,
SOBREACARREOS Y DERRUMBESM3-KM 1,210 1,210 1,210 1,210 1,210 1,210 1,210
2 NORMA INV EXPLANACIN Y EXCAVACIONES
2.1 210.1.1 EXCAVACIN SIN CLASIFICAR DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 7,328 7,328 7,328 7,328 7,328 7,328 7,328
2.2 210.2.1 EXCAVACIN EN ROCA DE LA EXPLANACIN, CANALES Y PRSTAMOS M3 30,593 30,593 30,593 30,593 30,593 30,593 30,593
2.3 210.2.2EXCAVACIN EN MATERIAL COMN DE LA EXPLANACIN, CANALES Y
PRSTAMOSM3 6,603 6,603 6,603 6,603 6,603 6,603 6,603
2.4 220.1 TERRAPLENES M3 13,237 13,237 13,237 13,237 13,237 13,237 13,237
2.5 221.1 PEDRAPLN COMPACTO M3 10,551 10,551 10,551 10,551 10,551 10,551 10,551
2.6 221.2 PEDRAPLN SUELTO M3 6,051 6,051 6,051 6,051 6,051 6,051 6,051
2.7 230.1 MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO EL SUELO EXISTENTE M2 460 460 460 460 460 460 460
2.8 230.2MEJORAMIENTO DE LA SUBRASANTE INVOLUCRANDO NICAMENTE
MATERIAL ADICIONADOM3 12,267 12,267 12,267 12,267 12,267 12,267 12,267
2.9 600.1EXCAVACIONES VARIAS SIN CLASIFICAR (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)M3 18,871 18,871 18,871 18,871 18,871 18,871 18,871
2.10 600.2EXCAVACIONES VARIAS EN ROCA EN SECO (INCLUYE RETIRO DE SOBRANTES A
UNA DISTANCIA MENOR DE 5 KM)M3 53,082 53,082 53,082 53,082 53,082 53,082 53,082
2.11 600.3EXCAVACIONES VARIAS EN ROCA BAJO AGUA (INCLUYE RETIRO DE SOBRANTES
A UNA DISTANCIA MENOR DE 5 KM)M3 65,961 65,961 65,961 65,961 65,961 65,961 65,961
2.12 600.4EXCAVACIONES VARIAS EN MATERIAL COMN SECO (INCLUYE RETIRO DE
SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 12,018 12,018 12,018 12,018 12,018 12,018 12,018
2.13 600.4 PEXCAVACIONES VARIAS EN MATERIAL COMN SECO A MANO (INCLUYE RETIRO
DE SOBRANTE