m s t engineering global sdn bhdmstengglobal.com/...mst-engineering...new-03.07.19.pdf · it is the...

52
Main Office: NO, 15-1, JALAN DAMAI MEWAH 2, TAMAN DAMAI MEWAH, 43000 KAJANG, SELANGOR MALAYSIA. TEL: 03-87366006 / H/P 017-3110006 FAX: 03-87365006 E-Mail : [email protected] Webpage : www.mstengglobal.com M S T ENGINEERING GLOBAL SDN BHD (Company No : 1098675-U) COMPANY PROFILE

Upload: others

Post on 17-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Main Office:

NO, 15-1, JALAN DAMAI MEWAH 2,

TAMAN DAMAI MEWAH,

43000 KAJANG, SELANGOR MALAYSIA.

TEL: 03-87366006 / H/P 017-3110006

FAX: 03-87365006

E-Mail :

[email protected]

Webpage :

www.mstengglobal.com

M S T ENGINEERING

GLOBAL SDN BHD

(Company No : 1098675-U)

COMPANY PROFILE

Page 2: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Table of Contents

Corporate Information

Registration With Authorities

Organization Chart

Management Team

List of Projects

List of Machineries & Equipment

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

MST Provided Services

MST Facilities

MST Project Photographs

Page 3: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

CORPORATE INFORMATION

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 4: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Name of Company MST ENGINEERING GLOBAL SDN BHD

Date of Incorporation 12th April 2006 (MST ENGINEERING)

Telephone No 03-8736 6006 / 017-3110006 / 019-2198001

Fax No 03-8736 5006

Registration with Authority CIDB

• Registration No : 0120151102-SL-167124

• Registration Type : G5 ME M15

: G3 B B04

: G3 CE CE21

: G3 ME M15 E11

• Expiry Date : 31-10-2019

SPAN

• Registration No : SPAN/EKS/(PT)/800-2D/2/08/10

• Registration Type : IPA JENIS D(Pembetungan)

• Expiry Date : 04-09-2019

KEMENTERIAN KEWANGAN

• Registration No : 357-02249472

• Expiry Date : 04-09-2019

INDAH WATER KONSORTIUM • Registration No : 105313 SURUHANJAYA TENAGA • Registration No : SK(TKL)SGR/C/KE/02687/2015 • Expiry Date : 19-05-2021

Business Reg. No 1098675-U

Registered Office No. 15-1, Jalan Damai Mewah 2,

Taman Damai Mewah,

43000 Kajang,

Selangor Malaysia.

Bankers PUBLIC BANK BERHAD

PUBLIC BANK BERHAD

No 10 & 11 Jalan Raja Haroun

43000 Kajang

Date of Incorporation 23rd June 2014 (MST ENGINEERING GLOBAL SDN BHD )

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 5: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

VISION

To keep and create customers profitably by serving people and improving lives

MISSION

The philosophy of a company is at the core its business. It defines the way customers are served and people are treated. It is the foundation upon which all else is built.

The MST Engineering’s philosophy is expressed in four objectives :-

i) To Honor God in All We Do

ii) To Help People Develop

iii) To Pursue Excellence

iv) To Grow Profitability

v) To enhance Green Technology

i) To Honor God in All We Do

As the foundation of our company, we embrace this objective, believing in an absolute standard for right and wrong. It requires of us unwavering commitment to values and ethics. The objective particularly addresses how we treat people, who have all been created in the image and likeness of God and it mandates inclusion and respect for all people.

ii) To Help people Develop

A natural extension of our first objective, this statement reflects our belief in the worth of each individual. We strive to empower people and enable them to succeed. To do this, our training not only helps people develop work skills for the jobs they do, but also life skills for the people they are becoming. We view this objective as a daily responsibility and privilege.

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 6: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

iii) To Pursue Excellence

This tenet is never ending process of change and growth, It permeated every facet of our business, and dovetails precisely with our three objective by facilitating customer loyalty and helping people develop as they seek ways to improve.

iv) To Grow Profitably

We see profit as a measure of our business performance. Profit is not end, but a means of accomplishing our other objectives. Profitably enables us to fulfill our obligations to our shareholders and provides the means for people to work, to grow and to serve. Our challenge is to use profit wisely for the benefit of our people, our customers and our communities.

v) To enhance Green Technology

We are continuously striving to enhance Green Technology. We are committed to improve the quality of works by empowering Green Technology for a better environment.

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 7: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

REGISTRATION WITH

AUTHORITIES

KEMENTERIAN KEWANGAN MALAYSIA

SPAN D

CIDB

INDAH WATER KONSORTIUM

SURUHANJAYA TENAGA

Indah Water Konsortium

Air Selangor

CITI Bank

RHB Bank

Sunway Group

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 8: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 9: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 10: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 11: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 12: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 13: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 14: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

ORGANIZATION CHART

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 15: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 16: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MANAGEMENT TEAM

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 17: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Ir. Mohd Mazri Bin Zahari

(Chairman)

Chairman of the company. He was graduated from

University Sains Malaysia. He has more than 10

years experience in the Engineering Sector. He

holds a Degree in Civil Engineering.

Thinagaran A/L Munusamy

(Director)

Director of the company. He was graduated from

Federal Institute of Technology in 2002. He has

more than 15 years experience in the Engineering

Sector. He holds a Diploma in Mechanical

Engineering. Master’s in Business Administration.

Sivabalan A/L Munusamy

(Director)

Director at MST Engineering and holds a degree in

Engineering from KDU College. Former General

Manager of MSST Marketing. He has more than

15 years experience.

Datuk Parameswaran

(Company Advisor)

An Oil and Gas Construction, Water & Waste

Water treatment and construction professional

having an experience of over 4 decades with multi-

dimensional capabilities in the fields of

Hydrocarbons (Upstream, Midstream,

Downstream), Water & Waste Water, highways

construction and Monorail construction.

Vijaya A/P Munisamy

(Finance & Account)

She is an Manager at MST Engineering. Holds

BBA from Open University Malaysia. Experience in

accounting fields for more than 10 years.

Muhammad Surya Bin

Abdullah

(General Manager)

General Manager of the Company. He is taking

care of overall tasks in the management and site

works, including overseas procurement activities.

Having in an experience of over 15 years, he holds

Diploma in Electrical Engineering.

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

IR Abdul Jalil Bin

(Chairman)

Chairman of the company. He has an ex employee

of JKR with more than 30 years of experience in

the Civil, Construction and water related projects.

He is a professional Engineer and holds a Degree

in Civil Engineering. He was graduated from

University Malaya, Kuala Lumpur.

Thinagaran A/L Munusamy

(Director)

Director of the company. He was graduated from

Federal Institute of Technology in 2002. He has

more than 15 years experience in the Engineering

Sector. He holds a Diploma in Mechanical

Engineering. Master’s in Business Administration.

Sivabalan A/L Munusamy

(Director)

Director at MST Engineering and holds a degree in

Engineering from KDU College. Former General

Manager of MSST Marketing. He has more than

15 years experience.

Ir. Mohd Mazri Bin Zahari

(Director)

Chairman of the company. He was graduated from

University Sains Malaysia. He has more than 10

years experience in the Engineering Sector. He

holds a Degree in Civil Engineering.

Datuk Parameswaran

(Company Advisor)

An Oil and Gas Construction, Water & Waste

Water treatment and construction professional

having an experience of over 4 decades with multi-

dimensional capabilities in the fields of

Hydrocarbons (Upstream, Midstream,

Downstream), Water & Waste Water, highways

construction and Monorail construction.

Vijaya A/P Munisamy

(Finance & Account)

She is an Manager at MST Engineering. Holds

BBA from Open University Malaysia. Experience in

accounting fields for more than 10 years.

Muhammad Surya Bin

Abdullah

(General Manager)

General Manager of the Company. He is taking

care of overall tasks in the management and site

works, including overseas procurement activities.

Having in an experience of over 15 years, he holds

Diploma in Electrical Engineering.

Page 18: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Surendharan Menon Sasitharan

(Safety Officer)

Ensured workplace safety by conducting training,

inspections, and investigations and by

maintaining documentation and equipment.

Advised on safety issues. Instructed CPR and

First Aid courses

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Mr Saraavanabalan

(Project Manager - Electrical)

He Monitor and manage the project until done.

He also involve in technical meeting and monthly

meeting and prepares for weekly and monthly

report and also attend for safety and healthy

meeting. Holds a Degree in Electrical

Engineering.

Murali Krishna METTA

(Manager - Business

Development & Tendering)

He is a talented professional with experience in o

Business Development & Tendering activities.

He has an experience of 10 years in oil & gas,

petrochemical & power sector. He hold

Mechanical Engineering Degree and Masters in

Business Administration.

Kiran Singh

(Project Manager – Civil &

Mechanical)

A highly talented Project Management and hand

on experiences over 20 years of solid experience

in Implementation and Development, Planning,

Safety/ Operations, Quality Control of various

types of Civil and structure works such as power

plants, petrochemical refinery, factories

,renewable energy, High rise buildings, major

earthworks

Projects have involved the supervision and

management of various areas of construction,

quality control, scheduling, safety and health,

design review and material take offs for various

projects .

Page 19: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

LIST OF PROJECTS

Completed Projects

On-going Projects

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 20: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

COMPLETED PROJECTS

MST ENGINEERING

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

No Job Awarded By Project Title Project Value

(RM) Date

Commence

Expected

Date of

Completion

CIVIL

1 Indah Water

Konsortium D-Comm

612,200.00 Mar-11 Jul-12

2 Indah Water

Konsortium D-Comm

686,500.00 Apr-12 Jul-12

3 Indah Water

Konsortium D-Comm

710,350.00 Feb-13 Jun-13

4 Indah Water

Konsortium D-Comm

1,880,000.00 May-13 Dec-13

5 Jutabina Sempurna

Sdn Bhd D-Comm

510,700.00 Feb-14 Apr-14

6 Indah Water

Konsortium

Proposed refurbisment 3 STP

Sepang areas for GSG053,

GSG102 and GSG104

275,670.00 Feb-14 Jun-14

7 Indah Water

Konsortium D-Comm

975,670.00 Mar-14 Sep-15

8 Indah Water

Konsortium D-Comm

1,226,300.00 Nov-15 Jul-16

9 Sime Darby To do design & build STP at

Ampang Tenang

5,243,000.00 Feb-16 Feb-17

Page 21: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

COMPLETED PROJECTS

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

MST ENGINEERING

MECHANICAL

10 Indah Water

Konsortium

KLR212 - Taman Jinjang Baru -

Disludging and Sump Cleaning

works

65,014.00 May-11 Jun-11

11 Indah Water

Konsortium Sump Cleaning works

36,000.00 Jul-11 Aug-11

12 Indah Water

Konsortium Health and safety requirement -

Sump Cleaning works

41,450.00 Oct-11 Nov-11

13 MKTL To do Repair Works at SAM067 -

Bukit Rahman Putra

174,020.00 Oct-13 Apr-14

14 UTT Engineering Sdn

Bhd PJA211 – Mechanical Works, Kota

Damansara

59,000.00 Nov-13 May-14

15 Sime Darby To carry out sump cleaning works

88,450.00 Oct-13 Dec-13

16 Jutabina Sempurna

Sdn Bhd Dewatering and Desludging Works

117,900.00 Feb-14 Feb-15

17 Jutabina Sempurna

Sdn Bhd

To do mechanical works at

HLT182, PJA221, PJA238,

SAM036 & PTG105

1,239,640.00 Jan-15 May-15

18 Sime Darby Sludge Wasting at HLT217

54,320.00 Nov-14 Jan-15

19 Sime Darby To replace pipe leaking, construct

brickwall, wall leaking, lighting,

chain for KLR108

103,240.00 Nov-14 Feb-15

20 Jutabina Sempurna

Sdn Bhd To upgrade sub station works

under JPP Project at HLT182

1,853,533.00 Sep-15 Sep-16

Page 22: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

COMPLETED PROJECTS

MST ENGINEERING

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

ELECTRICAL&INSTRUMENTATION

21 Indah Water

Konsortium

To replace the existing stolen and

damaged electrical parts and

fittings at Bandar Behrang 2020

28,680.00 Dec-10 Jan-11

22 Indah Water

Konsortium

GBK134 - To supply and install

new switchboard as per IWK

SPECIFICATIONS FOR THE 150

Amps incoming

34,690.00 Feb-11 Mar-11

23 Indah Water

Konsortium

HLT115 - Bandar Teknologi

Kajang, General and safety

requirement

40,450.00 Mar-11 Apr-11

24 Indah Water

Konsortium

GUS107 - To supply and install

new swtchboard as per IWK

specification for the 63Amps

32,260.00 Jul-11 Sep-11

25 Sime Darby KLR261 - Alam Damai - Electrical

Works - Control panel

51,612.00 Jun-13 Jul-13

26 UTT Engineering Sdn

Bhd

AMA047 - To supply and install

floor standing TNB CT meter

panel

49,740.00 Jun-13 Oct-13

27 Jutabina Sempurna

Sdn Bhd Replacement Electrical Panel at

HLT210

29,050.00 Dec-14 Mar-15

28 Indah Water

Konsortium GUS110 - To supply and rewire

switchboard 200A incoming

44,500.00 Nov-14 Jan-15

29 Jutabina Sempurna

Sdn Bhd

To do electrical works at HLT182,

PJA221, PJA238, SAM036,

PTG105

1,521,361.00 Mar-14 Jul-15

30 Samudra

Communications Sdn

Bhd

Electrical works for

Telecommunication towers – 250

Nos

2,000,000.00 Nov-14 Apr-16

31 Jutabina Sempurna

Sdn Bhd To upgrade sub station works

under JPP Project at PTG105

1,600,850.00 Oct-15 Dec-17

32 Sime Darby AMA052 - Electrical works AR

D44 Bunus Kuala Lumpur

150,000.00 Nov-17 Jul-18

33 Indah Water

Konsortium

PTG156 - To supply and install

new raw sewage pump, electrical

works and piping works

107,750.00 Aug-17 Nov-17

34 Indah Water

Konsortium Voltage Power Optimizer (VPO) -

6 Plants

850,000.00 Nov-17 May-18

Page 23: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

COMPLETED PROJECTS

MST ENGINEERING

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

O&M

35 Lestari Nilam Sdn

Bhd To do Operation & Maintanence

(Package 23,26,24,28,10B)

102,453.15 May-06 Dec-06

36 Lestari Nilam Sdn

Bhd To do Operation & Maintanence

(Package 23,26,24,28,10B)

150,940.00 Jan-07 Sep-07

37 Indah Water

Konsortium Operation & Maintainence

(Package 6)

104,150.00 Jun-11 May-12

38 Lestari Nilam Sdn

Bhd

O&M STP Maintenance MPAJ

Package 19 (AMA020 - Taman

Cahaya)

52,168.00 Jan-13 Mar-13

39 Indah Water

Konsortium

To supply labour and tools to

carry out O&M works Package

17R in KL region

74,283.00 Feb-13 Apr-13

40 Sime Darby To carry out O&M for Package

10B at Kajang & Bangi area

105,096.00 Nov-13 Oct-17

41 Indah Water

Konsortium Operation & Maintainence

(Package 6)

100,560.00 Jun-13 May-17

42 Indah Water

Konsortium Operation & Maintainence

(Package 13)

129,840.00 Dec-13 Jun-18

43 Indah Water

Konsortium Operation & Maintainence

(Package 19)

140,256.00 Jun-13 Jun-18

44 Lestari Nilam Sdn

Bhd Operation & Maintenance

(Package 24)

101,520.00 May-13 Apr-17

45 First Power

Engineering Operation & Maintenance

(Package 26)

101,520.00 May-13 Apr-17

46 First Power

Engineering Operation & Maintenance

(Package 28)

100,800.00 Jan-14 Dec-17

47 Indah Water

Konsortium Operation & Maintenance

(Package 17)

89,251.20 Jan-14 Dec-17

48 Indah Water

Konsortium Operation & Maintenance

(Package 2S)

123,408.00 Oct-13 Dec-17

49 Indah Water

Konsortium Operation & Maintenance

(Package 4S)

122,256.00 May-13 Dec-17

50 Indah Water

Konsortium Operation & Maintenance

(AMA175)

96,720.00 Jul-13 Dec-17

51 First Power

Engineering Operation & Maintenance

(Package 17)

89,251.20 Jan-14 Dec-17

52 Lestari Nilam Sdn

Bhd Operation & Maintenance

(Package 2S)

123,408.00 Oct-13 Sep-17

53 Indah Water

Konsortium Operation & Maintenance

(Package 4S)

122,256.00 May-13 Apr-17

54 Indah Water

Konsortium Operation & Maintenance

(Package Main Plant) - AMA175

96,720.00 Jul-13 Jun-14

Page 24: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

ON-GOING PROJECTS

MST ENGINEERING

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

ONGOING

1 Indah Water

Konsortium Operation & Maintenance (Pantai 2 -

KLR399) - 1 year Jul-17 Present

2 Puncak Niaga Operation & Maintenance (STP

KLR289) - 1 year Jul-17 Present

3 RZH Setiajaya Sdn

Bhd Projek Pengindahan & Pembersihan Sg.

Melaka Jul-17 Present

4 Indah Water

Konsortium Voltage Power Optimizer (VPO) - 6

Plants May-18 Present

Page 25: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

LIST OF MACHINERIES & EQUIPMENT

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 26: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MACHINERIES & EQUIPMENT LIST

No List of Machineries / Equipment Unit

1 Van 8

2 Grass Cutting Machine 36

3 Lorry (1 ton) 3

4 Welding Machine 3

5 Generator Set 3

6 Cutter Machine 2

7 Drill Machine 4

8 Grinder Machine 5

9 Pump (22kv) 1

10 Pump (16kv) 2

11 Pump (12kv) 1

12 Pump (6kv) 4

13 Electrical Tools 4 set

14 Concrete Mixer 2 set

15 Cleaning Equipment include scoops, brooms and etc) 10 set

16 Road Roller 1

17 Paving Machine 1

18 Road Milling Machine 1

19 Paver Finisher 1

20 Road Cutter 1

21 Compactor 1

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 27: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 28: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 29: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 30: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 31: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 32: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST SERVICES PROVIDES

Electrical & Instrumentation Works

Mechanical & Piping Works

Civil structural & Intra works

Engineering & Design works

Project Management & Logistics Management services

Operation & Maintenance

ICT and Telecommunications

ELV/Security & Guarding System

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 33: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Electrical & Instrumentation Works

Our E & I division offers a full spectrum of Electrical & Instrumentation services through our experienced and professional project teams. Our experienced team, established procedures and proven construction management systems ensure a safe, efficient and reliable construction on all our projects. We possesses all the necessary plant, equipment, tools and test equipment to safely assemble, install and test the electrical and instrumentation systems

• Equipment:

Installation of Electrical Sub Stations equipment/Switchboards and associated SCADA, SCMS/PMS Systems

Installation / assembly of Transformers and its oil filling / filtering and testing

Installation of above ground and underground H.V and L.V Cables and its testing

H.V & L.V Cable Jointing and Termination and its Hipot testing

Installation and testing of Lighting systems

Installation of Cable Tray, Cable Ladder, Cable trunking and Conduits

Installation and testing of UPS system and batteries

Installation and testing of Cathodic Protection systems

Testing of electrical Protection relays and it settings

Manage interface between E & I and other disciplines

Calibrations services

Panel fabrication works

Supply of electrical hardware (cable, switchgear, control etc)

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 34: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Mechanical & Piping Work

Our Mechanical & Piping division offers full range of Equipment, Piping & structure steel erection services. We ensure strict compliance to approved method statements, inspection plans, procedures, while executing the project. Our experienced team, established procedures and proven construction management systems ensure a safe, efficient and reliable construction on all our projects.

• Equipment:

Installation of Process Equipment

Installation of Columns & Reactors

Installation of Vessel Internals

Installation of chimneys

Installation of rotary equipment

Commissioning assistance

• Piping:

Mechanical Erection of Piping

Field welding

NDT & Hydro Test

Air blowing, Chemical flushing & degreasing

• Structural:

Mechanical erection of steel structural

Mechanical erection of Pipe Racks & Supports

Mechanical erection of Equipment support structural

Mechanical erection ware houses & industrial structural

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 35: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Civil Structural & Intra works

• Site cleaning

• Earth works

• Foundations

• Substructure, Super structure

• Architecture finishing

• Road & intra works

• Decommissioning & Demolition works

Engineering & Design works

• Detail engineering, designing & drafting

• Detail & field engineering

• 3D modeling by PDS/PDMS

• MTO preparation for all disciplines

• Structure steel designing & detailing

• Electrical & instrumentation detail engineering

• Test pack preparation and control

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 36: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Project Management & Logistics Management

Services • Supply of PMT manpower

• Supply of skilled, semiskilled & unskilled manpower

• Machinery & equipment rental

• Inventory & warehouse management services

• Transportation management services

Operation & Maintenance

• Building maintenance

• Plant maintenance

• Process management

• Static & rotating equipment maintenance

• Shutdown & turn around works

• High prevue & vacuum cleaning services

• Chemical cleaning services

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 37: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

ICT & Telecommunications

• Data Services / Networking

• Software Programming

• Fiber Optic works

• Construction of Passive and Active infrastructure of towers

ELV/Security Guarding System

• Bio Metric System

• CCTV Works

• Safety alarm system

• Card access system

• Inter locking system

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 38: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST FACILITIES

We have Two fully equipped workshop facilities to cater our

fabrication works.

• Workshop 1 : NO, 15-1, JALAN DAMAI MEWAH 2,TAMAN DAMAI MEWAH, 43000 KAJANG, SELANGOR MALAYSIA

• Workshop 2 : 2-20 JALAN SEMENYIH SENTRAL 2 TAMAN SEMENYIH SENTRAL, 43500 SEMENYIH SELANGOR.

Page 39: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

PROJECT PHOTOGRAPHS Electrical Works

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 40: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Electrical Works- Under ground Cable Laying

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 41: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Mechanical & Engineering Works

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 42: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Civil Works

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 43: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Operations & Maintenance at IWK Pantai -2 (Largest STP in Malaysia)

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 44: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Operations & Maintenance at IWK Pantai -2 (Largest STP in Malaysia)

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 45: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Road Works

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 46: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Plant demolition work & divert incoming TNB, Water supply and incoming sewerage water

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 47: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

Design & Build 235,000 PE SBR Plant at Pagoh

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Page 48: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

High Pressure and Vaccum Lorry and Tanker

Page 49: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Fiber Optic works

Page 50: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Networking works

Page 51: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

Telecommunication Works

Page 52: M S T ENGINEERING GLOBAL SDN BHDmstengglobal.com/...MST-ENGINEERING...NEW-03.07.19.pdf · It is the foundation upon which all else is built. The MST Engineering’s philosophy is

MST ENGINEERING GLOBAL SDN BHD

Integrated Facility Management

“The Promise of Value”

THANK YOU

CONTACT US AT

Main Office:

NO, 15-1, JALAN DAMAI MEWAH 2,

TAMAN DAMAI MEWAH,

43000 KAJANG, SELANGOR MALAYSIA.

TEL: 03-87366006 / H/P 017-3110006

FAX: 03-87365006

E-Mail :

[email protected]

Webpage :

www.mstengglobal.com