ffiCrq tr{ir fiI{cT flSrR Government of lndia Fr{gr drrtrq Ministry of Power 3'itfiqtftqPfqilsftfr Northern Regional Power Committee +i, : s,q+,ft.s,/rErrrcr/ 01 I 1 0612020 I karm': '18 06 zozo frtrry: qtllarr wliFirzT Jq rftfr fi flzfr }cfi tf Fftfd 3Trsfu rrd5rr fi q61l subject: outage programme approved in 1 Tznd occ Meeting. Effi sFqltn Eiqmt q qrtwuT angdv trrdt eFRr 3rqrE-,T n+rFqt d wtq"I dT t e-€f,rf{f, 3f,TTesT ffi-ffit qt frHitr 15.06. ZOZO dl 3ilq)Gd yariln HflaTq 3q-Hfrfr fi flzn *dq- fr ilqt E, fr *. qqilil 3{rgb +Td-mq fi F-fr:"fid qP +t s.ql,B.s t +q qt8il (r{ 3ffit-q fuqT rr{il Fr Hfi Jrrr-n sT{-mH s+nBa t w drF.rB+-firFr fr Bs 6 ftft + ryr^v seTrfi et-ir F+ft s-m-R fi 1ft tti .r{ eftil-F?tru 6'* qtrn 6'd s-r m-E-s ntt The outage programme of Generating Units and Transmission Lines proposed by Generating companies and Transmission Licensees were discussed in the 1T?"d OCC meeting helc on 15.06.2020 and the approved list of outage prCIgramme has been uploaded on NRPC web portal All outage programmes are approved tentatively, subjecl to real time grid conditions Discrepancy, if any may kinrlly be intimated at the ea.liest. c*- 1v1*iunn" (ritfiT rrym) 3TeftqrsT 3rffridr (q*qffin) *il di, TrrflTrET {rfl""Erq 5(rgfr'fr t ssft Tr{frrl tg-t' srfrq drf, fr'F rfi-dt. szdft4T Frrq, ,€ RFfr-16 ({ailq: 011-2051,326s fr-+s: 011-26g65206 *-d-a: ms-nrr;c@)nic.in ,}sqrrr:z: www.nrocoov rn 6032-6073

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

ffiCrq tr{ir

fiI{cT flSrRGovernment of lndia

Fr{gr drrtrqMinistry of Power

3'itfiqtftqPfqilsftfrNorthern Regional Power Committee

+i, : s,q+,ft.s,/rErrrcr/ 01 I 1 0612020 I karm': '18 06 zozo

frtrry: qtllarr wliFirzT Jq rftfr fi flzfr }cfi tf Fftfd 3Trsfu rrd5rr fi q61lsubject: outage programme approved in 1 Tznd occ Meeting.

Effi sFqltn Eiqmt q qrtwuT angdv trrdt eFRr 3rqrE-,T n+rFqt dwtq"I dT t e-€f,rf{f, 3f,TTesT ffi-ffit qt frHitr 15.06. ZOZO dl 3ilq)Gd yarilnHflaTq 3q-Hfrfr fi flzn *dq- fr ilqt E, fr *. qqilil 3{rgb +Td-mq fi F-fr:"fid

qP +t s.ql,B.s t +q qt8il (r{ 3ffit-q fuqT rr{il Fr Hfi Jrrr-n sT{-mHs+nBa t w drF.rB+-firFr fr Bs 6 ftft + ryr^v seTrfi et-ir F+ft s-m-R fi1ft tti .r{ eftil-F?tru 6'* qtrn 6'd s-r m-E-s ntt

The outage programme of Generating Units and Transmission Lines proposed

by Generating companies and Transmission Licensees were discussed in the 1T?"d

OCC meeting helc on 15.06.2020 and the approved list of outage prCIgramme has

been uploaded on NRPC web portal All outage programmes are approved

tentatively, subjecl to real time grid conditions Discrepancy, if any may kinrlly be

intimated at the ea.liest.

c*- 1v1*iunn"(ritfiT rrym)

3TeftqrsT 3rffridr (q*qffin)

*il di,

TrrflTrET {rfl""Erq 5(rgfr'fr t ssft Tr{frrl

tg-t' srfrq drf, fr'F rfi-dt. szdft4T Frrq, ,€ RFfr-16 ({ailq: 011-2051,326s fr-+s: 011-26g65206 *-d-a: ms-nrr;c@)nic.in ,}sqrrr:z: www.nrocoov rn

6032-6073

Page 2: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

Sr No Reference Number

OCC Number Name of Requesting Agency

Element Type Element Name Daily/ Continous

Reason Requester Remarks Request Type Shutdown Status

Approved From Date Time

Approved To Date Time Rpc Remarks

1 RQ25719 OCC_172 rappc_sd GENERATING UNIT 200 MW RAPS-A - UNIT 2 C BIENNIAL SHUTDOWN ORIGINALLY PLANNED BOILER HAIRPIN REPLACEMENT JOB DEFERRED DUE TO DELAY IN SUPPLY.THIS REPLACEMENT JOB WAS AS PER LGBR.

PLANNED Approved 01/Jul/2020 08:00 10/Aug/2020 18:00

2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4

C STG Minor inspection Planned outage already approved in 169th OCC, Ref : RQ20685

PLANNED Approved 25/Jun/2020 00:00 04/Jul/2020 00:00

3 RQ25810 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV AGRA-GWALIOR (PG) CKT-2

D For enabling M2 LBB function and checking tripping on LBB operation of Main Bay (701). After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 01/Jul/2020 08:00 01/Jul/2020 15:00 Subject to WRPC Consent and 1700 MW reduction in NR import.

4 RQ25811 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV ORAI-SATNA (PG) CKT-1

D Installation of counter weight in pilot insulators of gantry tower

PLANNED Approved 02/Jul/2020 08:00 02/Jul/2020 18:00 Subject to WRPC consent.

5 RQ25813 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV ORAI-JABALPUR (PG) CKT-1

D Installation of counter weight in pilot insulators of gantry tower

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00 Subject to WRPC consent.

6 RQ25812 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV ORAI-GWALIOR (PG) CKT-1

D Installation of counter weight in pilot insulators of gantry tower

PLANNED Approved 04/Jul/2020 08:00 04/Jul/2020 18:00 Subject to WRPC consent and 1400 MW reduction in NR import.

7 RQ25722 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV PHAGI(RS)-GWALIOR(PG) (PG) CKT-1

D TOWER STRENGTHENING WORK & AMP work and STRINGING OF EARTH WIRE OF KOTA/RAPP - JAIPUR SOUTH (LOC. 476-478) WHICH IS UNDERCROSSING.

PLANNED Approved 05/Jul/2020 08:00 06/Jul/2020 18:00 Subject to WRPC consent and 1700 MW reduction in NR import.

Page 3: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

8 RQ25933 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV FATEHPUR-SASARAM (PG) CKT-1

D For Replacement of flashed insulator, which occured due to 2-3 A/R/Tripping in May-2020 between Tower location 705-786(tower Section-728/709/710/732/733/734/755/756/757/782)

PLANNED Approved 02/Jul/2020 08:00 03/Jul/2020 18:00 Subject to ERPC consent.

9 RQ25860 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV BALIA-GAYA (PG) CKT-1

D S/D Requested by ER1, FOR STRENGTHENING OF 765 KV LINE WIND ZONE-II TOWERS. Total tower-131/completed-54/ Balance-77

PLANNED Approved 01/Jul/2020 08:00 15/Jul/2020 18:00 Subject to ERPC consent.

10 RQ25749 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-VINDHYACHAL(PG) (PG) CKT-2

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 27/Jul/2020 08:00 28/Jul/2020 18:00 Subject to WRPC consent.

11 RQ25748 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-VINDHYACHAL(PG) (PG) CKT-1

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 22/Jul/2020 08:00 23/Jul/2020 18:00 Subject to WRPC consent.

12 RQ25909 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALIA-BIHARSHARIFF (PG) CKT-1

D Requested by ER1, Relay Seting may be changed from Auto to non-Auto TO FACILITATE THE S/D OF OTHER CKT ON THE SAME TOWER

PLANNED Approved 17/Jul/2020 08:00 19/Jul/2020 18:00 Subject to ERPC consent and upto 100 MW curtailment in NR import.

13 RQ25937 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALIA-BIHARSHARIFF (PG) CKT-2

D S/D Requested by ER1,Replacement of porcelain insulators by polymer insulator on Road/Rail/River/Power crossing at 08 Location. Total 38/replaced10/balance-28

PLANNED Approved 17/Jul/2020 08:00 19/Jul/2020 18:00 Subject to ERPC consent.

14 RQ25910 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALIA-BIHARSHARIFF (PG) CKT-2

D Requested by ER1, Relay Seting may be changed from Auto to non-Auto TO FACILITATE THE S/D OF OTHER CKT ON THE SAME TOWER

PLANNED Approved 14/Jul/2020 08:00 16/Jul/2020 18:00 Subject to ERPC consent.

15 RQ25936 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALIA-BIHARSHARIFF (PG) CKT-1

D S/D Requested by ER1,Replacement of porcelain insulators by polymer insulator on Road/Rail/River/Power crossing at 08 Location. Total 38/replaced10/balance-28

PLANNED Approved 16/Jul/2020 08:00 18/Jul/2020 18:00 Subject to ERPC consent. Should not be clubbed with Balia -Gaya.

Page 4: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

16 RQ25907 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV VARANASI-BIHARSHARIFF (PG) CKT-1

D Requested by ER1, Relay Seting may be changed from Auto to non-Auto TO FACILITATE THE S/D OF OTHER CKT ON THE SAME TOWER

PLANNED Approved 10/Jul/2020 08:00 13/Jul/2020 18:00 Subject to ERPC consent.

17 RQ25935 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV VARANASI-BIHARSHARIFF (PG) CKT-2

D S/D Requested by ER1,Replacement of porcelain insulators by polymer insulator on Road/Rail/River/Power crossing at 10 Location. Total 48/replaced10/balance-38

PLANNED Approved 16/Jul/2020 08:00 19/Jul/2020 18:00 Subject to ERPC consent. Should not be clubbed with Balia -Gaya. To be Clubbed with Sl. No.13

18 RQ25833 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALIA-PATNA (PG) CKT-3

D Erection of Fire wall between Patna-3 & 4 Line Reactor at Balia Substation.

PLANNED Approved 18/Jul/2020 08:00 19/Jul/2020 18:00 Subject to ERPC consent. Should not be clubbed with Balia -Gaya.

19 RQ25834 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALIA-PATNA (PG) CKT-4

D Erection of Fire wall between Patna-3 & 4 Line Reactor at Balia Substation.

PLANNED Approved 18/Jul/2020 08:00 19/Jul/2020 18:00 Subject to ERPC consent. Should not be clubbed with Balia -Gaya.

20 RQ25908 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV VARANASI-BIHARSHARIFF (PG) CKT-2

D Requested by ER1, Relay Seting may be changed from Auto to non-Auto TO FACILITATE THE S/D OF OTHER CKT ON THE SAME TOWER

PLANNED Approved 06/Jul/2020 08:00 09/Jul/2020 18:00 Subject to ERPC consent.

21 RQ25934 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV VARANASI-BIHARSHARIFF (PG) CKT-1

D S/D Requested by ER1,Replacement of porcelain insulators by polymer insulator on Road/Rail/River/Power crossing at 10 Location. Total 48/replaced10/balance-38

PLANNED Approved 06/Jul/2020 08:00 09/Jul/2020 18:00 Subject to ERPC consent.

22 RQ25816 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANKROLI-ZERDA (PG) CKT-1

D Integration of switchable Reactor CB With 400 KV Zerda line at Kankroli

PLANNED Approved 03/Jul/2020 09:00 03/Jul/2020 13:00 Subject to WRPC consent.

23 RQ25911 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV GORAKHPUR(PG)-MOTIHARI(BS) (PG) CKT-2

D Requested by ER1, Relay Seting may be changed from Auto to non-Auto for OPGW STRINGING WORK

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00 Subject to ERPC consent.

24 RQ25919 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV MODAK(RS)-BHANPURA(MP) (MPSEB) CKT-1

D QUARTERLY Bay MAINTENANCE & testing WORK

PLANNED Approved 10/Jul/2020 09:30 10/Jul/2020 17:00 Subject to WRPC consent.

25 RQ25767 OCC_172 apl_sd HVDC LINE CIRCUIT 500 KV HVDC BALIA-BHIWADI (PG) CKT-1

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

PLANNED Approved 25/Jul/2020 08:00 31/Jul/2020 18:00

Page 5: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

26 RQ25768 OCC_172 apl_sd HVDC LINE CIRCUIT 500 KV HVDC BALIA-BHIWADI (PG) CKT-2

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

PLANNED Approved 25/Jul/2020 08:00 31/Jul/2020 18:00

27 RQ26088 OCC_172 cpcc1_sd BUS 500KV HVDC BUS 2 AT BHIWADI(PG)

D FOR AMP WORK PLANNED Approved 26/Jun/2020 08:00 26/Jun/2020 18:00

28 RQ26087 OCC_172 cpcc1_sd BUS 500KV HVDC BUS 1 AT BHIWADI(PG)

D FOR AMP WORK PLANNED Approved 25/Jun/2020 08:00 25/Jun/2020 18:00

29 RQ26159 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

765 KV MOGA-BHIWANI (PG) CKT-1

D For additional Tower strengthening works.

Kindly approve PLANNED Approved 20/Jul/2020 09:00 31/Jul/2020 18:00

30 RQ25763 OCC_172 apl_sd AC TRANSMISSION LINE CIRCUIT

765 KV KANPUR_GIS-ALIGARH (PG) CKT-1

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

Auto Re-closure will be in disable mode

PLANNED Approved 19/Jul/2020 08:00 24/Jul/2020 18:00

31 RQ25730 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV JHATIKARA-ALIGARH (PG) CKT-1

D A Type Tower Strengthening Work

During Line shutdown, swtiching of Line Reactor is required for CSD commissioning. Line reactor would be charged as Bus reactor during switching.

PLANNED Rejected 17/Jul/2020 08:00 21/Jul/2020 18:00 Already availed in June month.

32 RQ25727 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV BIKANER-MOGA (PG) CKT-2

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

'Non auto mode of circuit 1

PLANNED Approved 16/Jul/2020 08:00 18/Jul/2020 18:00

33 RQ25726 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV BIKANER-MOGA (PG) CKT-1

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

'Non auto mode of circuit 2

PLANNED Approved 13/Jul/2020 08:00 15/Jul/2020 18:00

34 RQ25723 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV PHAGI(RS)-BHIWANI(PG) (PG) CKT-1

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

PLANNED Approved 06/Jul/2020 08:00 08/Jul/2020 18:00 350 MW TTC reduction in NR import

35 RQ26108 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV MEERUT-BHIWANI (PG) CKT-1

C De-stringing, dismantling of towers and stringing work for shifting/modification of line due to infringement with DFCCIL.

PLANNED Rejected 06/Jul/2020 08:00 18/Jul/2020 18:00 To be applied post OCC.

36 RQ26165 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

765 KV MOGA-BHIWANI (PG) CKT-1

D Auto reclose scheme of protection system is to be checked.

Kindly approve PLANNED Rejected 05/Jul/2020 09:30 05/Jul/2020 17:30

Page 6: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

37 RQ25729 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV BIKANER-AJMER (PG) CKT-2

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

'Non auto mode of circuit 1

PLANNED Rejected 04/Jul/2020 08:00 06/Jul/2020 18:00 Already availed in June month.

38 RQ25856 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV VARANASI-KANPUR_GIS (PG) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

39 RQ25857 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV ORAI-ALIGARH (PG) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

40 RQ25858 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

765 KV BAREILLY_2-LUCKNOW_2 (PG) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

41 RQ25724 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV GR.NOIDA_2(UPC)-MEERUT(PG) (PG) CKT-1

D A Type Tower Strengthening Work

PLANNED Approved 08/Jul/2020 08:00 11/Jul/2020 18:00 400MW TTC reduction in NR import

42 RQ25728 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV BIKANER-AJMER (PG) CKT-1

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

'Non auto mode of circuit 2

PLANNED Rejected 01/Jul/2020 08:00 03/Jul/2020 18:00 Already availed in June month.

43 RQ25725 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

765 KV MEERUT-BHIWANI (PG) CKT-1

D A Type Tower Strengthening Work.This SD was rejected in OCC 171 due to 765KV Moga-Bhiwani

This SD is required from dt 16.06.20 to 21.06.20

PLANNED Rejected 25/Jun/2020 08:00 30/Jun/2020 18:00 Already availed in June month.

44 RQ25782 OCC_172 sldcrs_sd BUS 765KV BUS 1 AT PHAGI(RS) D 1. To check the operation timings of CB & measurement of contact resistance.. 2. Measurement of Tan-delta of CTs. 3.Tightening of clamps & connectors.

There will be no interruption during shut-down period as the 765KV Phagi-Bhiwani-1 line will be remained connected to 765KV Bus-A through 800 KV CB(702-52A). The ICT-2 will also be remained connected to 765KV Bus -B through 800KV CB(702-52B).

PLANNED Rejected 21/Jul/2020 08:00 22/Jul/2020 18:00 Deferred till revival of Anta-Phagi line.

Page 7: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

45 RQ25735 OCC_172 cpcc1_sd BUS 765KV BUS 1 AT BHIWANI(PG)

D FOR AMP WORK "For AMP Work, Apprved in Last OCC for May'20 but could not be availed due to lockdown."

PLANNED Approved 02/Jul/2020 08:00 03/Jul/2020 18:00

46 RQ25733 OCC_172 cpcc1_sd BR/BSR/MSC/MSR 240 MVAR BUS REACTOR NO 2 AT 765KV JHATIKARA(PG)

D CSD commission of 702th Bay+AMP Work+Earth switch replacement

PLANNED Approved 16/Jul/2020 08:00 17/Jul/2020 18:00

47 RQ25734 OCC_172 cpcc1_sd BR/BSR/MSC/MSR 240 MVAR BUS REACTOR NO 1 AT 765KV MEERUT(PG)

D FOR AMP WORK PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

48 RQ25979 OCC_172 cpcc3_sd BAY 710 MAIN BAY - 765KV AGRA-FATEHPUR (PG) CKT-2 AT FATEHPUR(PG)

D AMP & Tightening of Bay Equipments at fatehpur Substation

PLANNED Approved 29/Jul/2020 08:00 29/Jul/2020 18:00

49 RQ25978 OCC_172 cpcc3_sd BAY 706 MAIN BAY - 765/400KV 1500 MVA ICT 1 AT FATEHPUR(PG)

D AMP & Tightening of Bay Equipments at fatehpur Substation

PLANNED Approved 27/Jul/2020 08:00 27/Jul/2020 18:00

50 RQ25982 OCC_172 cpcc3_sd BAY 706 MAIN BAY - 765/400KV 1000 MVA ICT 2 AT ORAI(PG)

D AMP OF BAY EQUIPMENT at Orai S/S

PLANNED Approved 26/Jul/2020 08:00 26/Jul/2020 18:00

51 RQ25980 OCC_172 cpcc3_sd BAY 705 TIE BAY - 765KV ORAI-ALIGARH (PG) CKT-1 AND 765/400KV 1000 MVA ICT 2 AT ORAI(PG)

D AMP OF BAY EQUIPMENT at Orai S/S

PLANNED Approved 24/Jul/2020 08:00 24/Jul/2020 18:00

52 RQ26039 OCC_172 cpcc3_sd BAY 704 MAIN BAY - 765 KV ORAI-ALIGARH (PG) CKT-1 (POWERGRID)

D AMP OF BAY EQUIPMENT at Orai S/S

PLANNED Approved 20/Jul/2020 08:00 20/Jul/2020 18:00

53 RQ25981 OCC_172 cpcc3_sd BAY 702 TIE BAY - 765KV ORAI-ALIGARH (PG) CKT-2 AND 765/400KV 1000 MVA ICT 1 AT ORAI(PG)

D AMP OF BAY EQUIPMENT at Orai S/S

PLANNED Approved 17/Jul/2020 08:00 17/Jul/2020 18:00

54 RQ25977 OCC_172 cpcc3_sd BAY 703 MAIN BAY - 240 MVAR BUS REACTOR NO 1 AT 765KV BALIA(PG)

D AMP of the Bay & its Equipment at Balia Substation

PLANNED Approved 15/Jul/2020 08:00 15/Jul/2020 18:00

55 RQ25976 OCC_172 cpcc3_sd BAY 702 TIE BAY - 240 MVAR BUS REACTOR NO 1 AT 765KV BALIA(PG) AND FUTURE

D AMP of the Bay & its Equipment at Balia Substation

PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

Page 8: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

56 RQ25774 OCC_172 cpcc1_sd BAY 705 TIE BAY - 765/400KV 1500 MVA ICT 2 AT MEERUT(PG) AND 240 MVAR BUS REACTOR NO 1 AT 765KV MEERUT(PG)

D FOR AMP WORK PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

57 RQ25983 OCC_172 cpcc3_sd BAY 701 MAIN BAY - 765KV ORAI-ALIGARH (PG) CKT-2 AT ORAI(PG)

D AMP OF BAY EQUIPMENT at Orai S/S

PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

58 RQ25804 OCC_172 cpcc1_sd BAY 712 MAIN BAY - 765/400 KV 1500 MVA ICT 2 AT BIKANER(PG)

D AMP Of BAY / CT Sampling PLANNED Approved 11/Jul/2020 14:00 11/Jul/2020 16:00

59 RQ25800 OCC_172 cpcc1_sd BAY 709 MAIN BAY - 765/400 KV 1500 MVA ICT 1 AT BIKANER(PG)

D AMP Of BAY / CT Sampling PLANNED Approved 11/Jul/2020 12:00 11/Jul/2020 14:00

60 RQ25799 OCC_172 cpcc1_sd BAY 708 TIE BAY - 765/400 KV 1500 MVA ICT 1 AT BIKANER(PG) AND 765 KV BIKANER-AJMER (PG) CKT-2

D AMP Of BAY / CT Sampling PLANNED Approved 11/Jul/2020 10:00 11/Jul/2020 12:00

61 RQ25798 OCC_172 cpcc1_sd BAY 707 MAIN BAY - 330 MVAR LR ON 765 KV BIKANER-AJMER (PG) CKT-2 @BIKANER(PG) AND 765 KV BIKANER(PG) - BUS 1 AT BIKANER(PG)

D AMP Of BAY / CT Sampling PLANNED Approved 11/Jul/2020 08:00 11/Jul/2020 10:00

62 RQ25975 OCC_172 cpcc3_sd BAY 714 TIE BAY - 765KV AGRA(PG)-GWALIOR(PG) (UNDEF) CKT-1 AND 240 MVAR BUS REACTOR NO 1 AT 765KV AGRA(PG)

D For BAY AMP and associated maintenance works at Agra Substation

PLANNED Approved 11/Jul/2020 08:00 11/Jul/2020 18:00

63 RQ25777 OCC_172 cpcc1_sd BAY 704 MAIN BAY - 765 KV BIKANER(PG) - BUS 1 AND 330 MVAR LR ON 765 KV BIKANER-AJMER (PG) CKT-1 @BIKANER(PG) AT BIKANER(PG)

D AMP Of BAY / CT Sampling PLANNED Approved 10/Jul/2020 14:00 10/Jul/2020 16:00

64 RQ25783 OCC_172 cpcc1_sd BAY 706 MAIN BAY - 330 MVAR BUS REACTOR NO 1 AT 765 KV BIKANER(PG)

D AMP Of BAY / CT Sampling PLANNED Approved 10/Jul/2020 14:00 10/Jul/2020 16:00

Page 9: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

65 RQ25781 OCC_172 cpcc1_sd BAY 705 TIE BAY - 765 KV BIKANER-AJMER (PG) CKT-1 AND 330 MVAR BUS REACTOR NO 1 AT 765 KV BIKANER(PG) AT 765 KV BIKANER(PG)

D AMP Of BAY / CT Sampling PLANNED Approved 10/Jul/2020 12:00 10/Jul/2020 14:00

66 RQ25736 OCC_172 cpcc1_sd BAY 705 TIE BAY - 765 KV CHITTORGARH-BANASKANTHA (PG) CKT-2 AND 765/400 KV 1500 MVA ICT 1 AT CHITTORGARH(PG)

D CT OIL SAMPLEING purpose PLANNED Approved 10/Jul/2020 10:00 10/Jul/2020 12:00

67 RQ25974 OCC_172 cpcc3_sd BAY 713 MAIN BAY - 765 KV AGRA-GWALIOR (PG) CKT-1 AND 765KV BUS 1 AT AGRA(PG)

D For BAY AMP and associated maintenance works at Agra Substation

PLANNED Approved 10/Jul/2020 08:00 10/Jul/2020 18:00

68 RQ25771 OCC_172 cpcc1_sd BAY 704 MAIN BAY - 765 KV CHITTORGARH-BANASKANTHA (PG) CKT-2 AT CHITTORGARH(PG)

D To collect CT oil sample PLANNED Approved 08/Jul/2020 12:00 08/Jul/2020 14:00

69 RQ25770 OCC_172 cpcc1_sd BAY 707 MAIN BAY - 765 KV CHITTORGARH-BANASKANTHA (PG) CKT-1 AT CHITTORGARH(PG)

D To collect CT oil sample Line / equipment will be remain service through Tie bay

PLANNED Approved 08/Jul/2020 08:10 08/Jul/2020 18:12

70 RQ25769 OCC_172 cpcc1_sd BAY 708 TIE BAY - 765 KV CHITTORGARH-BANASKANTHA (PG) CKT-1 AND 765/400 KV 1500 MVA ICT 2 AT CHITTORGARH(PG)

D CT OIL SAMPLEING purpose PLANNED Approved 07/Jul/2020 08:12 07/Jul/2020 18:14

71 RQ25776 OCC_172 cpcc1_sd BAY 720 TIE BAY - 765 KV BHADLA-BIKANER (PG) CKT-1 AND FUTURE AT 765 KV BIKANER(PG)

D NEW BAY CONSTRUCTION FOR BIKANER-KHETRI LINE

PLANNED Approved 03/Jul/2020 08:00 04/Jul/2020 18:00

72 RQ25775 OCC_172 cpcc1_sd BAY 717 TIE BAY - 765 KV BHADLA-BIKANER (PG) CKT-2 AND FUTURE AT BIKANER(PG)

D NEW BAY CONSTRUCTION FOR BIKANER-KHETRI LINE

PLANNED Approved 01/Jul/2020 08:00 02/Jul/2020 18:00

73 RQ25773 OCC_172 cpcc1_sd BAY 710 MAIN BAY - 765KV MOGA-MEERUT (PG) CKT-1 AT MEERUT(PG)

D FOR AMP WORK PLANNED Approved 01/Jul/2020 08:00 02/Jul/2020 18:00

74 RQ25772 OCC_172 cpcc1_sd BAY 712 MAIN BAY - 765KV MEERUT-BHIWANI (PG) CKT-1 AT MEERUT(PG)

D FOR AMP WORK PLANNED Approved 29/Jun/2020 08:00 29/Jun/2020 18:00

Page 10: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

75 RQ26174 OCC_172 cpcc2_sd BAY 712 MAIN BAY - 765/400KV 1500 MVA ICT 2 AT MOGA(PG)

D AMP of Bay equipment Kindly approve PLANNED Approved 26/Jun/2020 09:30 26/Jun/2020 17:30

76 RQ25780 OCC_172 sldcrs_sd BAY 70252T TIE BAY - 765KV PHAGI(RS)-BHIWANI(PG) (PG) CKT-1 AND 765/400KV 1500 MVA ICT 2 AT PHAGI(RS)

D 1. To check the operation timings of CB & measurement of contact resistance.. 2. Measurement of Tan-delta of CTs. 3.Tightening of clamps & connectors.

There will be no interruption during shut-down period as the 765KV Phagi-Bhiwani-1 line will be remained connected to 765KV Bus-A through 800 KV CB(702-52A). The ICT-2 will also be remained connected to 765KV Bus -B through 800KV CB(702-52B).

PLANNED Approved 28/Jul/2020 08:00 28/Jul/2020 18:00

77 RQ25778 OCC_172 sldcrs_sd BAY 70752A MAIN BAY - 765KV PHAGI(RS)-GWALIOR(PG) (UNDEF) CKT-2 AT PHAGI(RS)

D 1. Maintenance of CB & CTs 2. Tightening of clamps & connectors of Isolators, CB & CTs.

1. Maintenance of CB & CTs 2.Tightening of clamps &connectors. 3. measurement of operating time of CB .

PLANNED Approved 16/Jul/2020 08:00 16/Jul/2020 18:00

78 RQ25779 OCC_172 sldcrs_sd BAY 70652A MAIN BAY - 765KV PHAGI(RS)-GWALIOR(PG) (UNDEF) CKT-1 AT PHAGI(RS)

D 1. Maintenance of CB & CTs 2. Tightening of clamps & connectors of Isolators, CB & CTs.

There will be no interruption during shutdown period as the 765 KV Phagi-Gwalior line-1 will be remained energized through 800kV Tie CB (706-52T).

PLANNED Approved 08/Jul/2020 08:00 08/Jul/2020 18:00

79 RQ25972 OCC_172 cpcc3_sd TRANSFORMER 765/400 KV 1500 MVA ICT 2 AT AGRA(PG)

D For enabling M2 LBB function and checking tripping on LBB operation of 765/400 side main bays (706&433), RET CT testing and FDS of HV bushings at Agra Substation. After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 28/Jun/2020 08:00 28/Jun/2020 18:00 To be preponed in June last week. 650

MW TTC reduction in NR import. Before testing of AGRA-

BNC_APD.

Page 11: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

80 RQ25731 OCC_172 cpcc1_sd TRANSFORMER 765/400 KV 1500 MVA ICT 1 AT JHATIKARA(PG)

D CSD commission of 408th Bay

PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

81 RQ25973 OCC_172 cpcc3_sd TRANSFORMER 765/400 KV 1500 MVA ICT 1 AT AGRA(PG)

D For enabling M2 LBB function and checking tripping on LBB operation of 765/400 side main bays (703&430) and REF CT testing of ICTs at Agra Substation. After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 27/Jun/2020 08:00 27/Jun/2020 18:00 To be preponed in June last week. 650

MW TTC reduction in NR import. Before testing of AGRA-

BNC_APD.

82 RQ25732 OCC_172 cpcc1_sd TRANSFORMER 765/400 KV 1500 MVA ICT 4 AT JHATIKARA(PG)

D 400KV side CSD RPH3 commissioning for 417 Bay and 33 KV tertiary transformer commissioning

PLANNED Approved 10/Jul/2020 08:00 11/Jul/2020 18:00

83 RQ25641 OCC_172 stuup_sd TRANSFORMER 765/400 KV 1500 MVA ICT 1 AT HAPUR(UP)

D For Annual Maintenance & Testing of Y phase , ICT will be charged by spare ICT during maintenance of Y phase

PLANNED Approved 03/Jul/2020 10:00 03/Jul/2020 11:00

84 RQ25640 OCC_172 stuup_sd TRANSFORMER 765/400 KV 1500 MVA ICT 2 AT HAPUR(UP)

D B phase will charged with spare ICT on 25-06-2020 and for making Normalization of ICT-2

PLANNED Approved 02/Jul/2020 10:00 02/Jul/2020 11:00

85 RQ25637 OCC_172 sterlite_sd AC TRANSMISSION LINE CIRCUIT

400 KV PATIALA(PG)-PATRAN(PATR) (PATRAN) CKT-2

D AMP & relay testing works PLANNED Approved 31/Jul/2020 08:00 31/Jul/2020 18:00

86 RQ25636 OCC_172 sterlite_sd AC TRANSMISSION LINE CIRCUIT

400 KV PATIALA(PG)-PATRAN(PATR) (PATRAN) CKT-1

D AMP & relay testing works PLANNED Approved 30/Jul/2020 08:00 30/Jul/2020 18:00

87 RQ25868 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV MANESAR(PG)-SOHNA ROAD (GPTL) (GPTL) CKT-1

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

PLANNED Approved 30/Jul/2020 08:00 30/Jul/2020 18:00

88 RQ25891 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV ANTA(RS)-KAWAI SCTPS(APR) (RS) CKT-2

D Annual testing and maintenance of Line isolator, Metering CT and CVT.

PLANNED Rejected 29/Jul/2020 08:00 29/Jul/2020 18:00 To be clubbed with unit outages.

Page 12: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

89 RQ25890 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV ANTA(RS)-KAWAI SCTPS(APR) (RS) CKT-1

D Annual testing and maintenance of Line isolator, Metering CT and CVT at Kawai TPP and Maintenance work at Anta

PLANNED Rejected 27/Jul/2020 08:00 27/Jul/2020 18:00 To be clubbed with unit outages.

90 RQ25915 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV SURATGARH(RVUN)-BIKANER(RS) (RS) CKT-1

D Maintenance of line (Fixing of bird guard)

PLANNED Approved 24/Jul/2020 10:00 24/Jul/2020 18:00

91 RQ25925 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV PHAGI-AJMER (RS) CKT-2

D To replace the R-Phase CVT of 400kV Phagi-Ajmer-2 line due oil seepage.

There will be no interruption during shut-down period as the 400KV Phagi - Ajmer line-1 will be remained energized to export/import the power.

PLANNED Approved 24/Jul/2020 08:00 24/Jul/2020 18:00

92 RQ25918 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV BIKANER-BHADLA (RS) CKT-1

D Maintenance of line (Attending jumper at angle tower)

PLANNED Approved 23/Jul/2020 18:00 23/Jul/2020 23:00

93 RQ25881 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV JAISALMER-BARMER (RS) CKT-2

D Quarterly Maintenance PLANNED Approved 23/Jul/2020 08:00 23/Jul/2020 18:00

94 RQ25880 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV JAISALMER-BARMER (RS) CKT-1

D Quarterly Maintenance PLANNED Approved 22/Jul/2020 08:00 22/Jul/2020 18:00

95 RQ25892 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV BARMER(RS)-RAJWEST(RW) (RS) CKT-1

D Planned maintenance PLANNED Approved 15/Jul/2020 08:00 15/Jul/2020 18:00

96 RQ25886 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV RAJWEST(RW)-JODHPUR(RS) (RS) CKT-2

D Planned maintenance PLANNED Approved 14/Jul/2020 08:00 14/Jul/2020 18:00

97 RQ25929 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV MERTA-HEERAPURA (RS) CKT-1

D QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS

Supply maintained through OTHER 400 KV LINES. Hence No supply disturbance

PLANNED Approved 14/Jul/2020 08:00 14/Jul/2020 18:00

98 RQ25879 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV RAJWEST(RW)-KANKANI (RS) CKT-1

D Planned maintenance PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

99 RQ25930 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV MERTA-RATANGARH (RS) CKT-1

D QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS

Supply maintained through OTHER 400 KV LINES. Hence No supply disturbance

PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

100 RQ25923 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHADLA-MERTA (RS) CKT-1

D QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS

Supply maintained through OTHER 400 KV LINES. Hence No supply disturbance

PLANNED Approved 10/Jul/2020 18:00 10/Jul/2020 23:00

Page 13: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

101 RQ25921 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV ANTA-CHHABRA SCTPS (RS) CKT-1

D For annual maintenance of Main & Tie Bay of line along with relay testing. at CSCTPS, Chhabra.

PLANNED Approved 07/Jul/2020 10:00 09/Jul/2020 18:00

102 RQ25924 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV MERTA-KANKANI (RS) CKT-1

D QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS

Supply maintained through OTHER 400 KV LINES. Hence No supply disturbance

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

103 RQ25932 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV BIKANER-MERTA (RS) CKT-1

D QUARTERLY MAINT.WORK OF Line alongwith line reactor

Supply maintained through OTHER 400 KV LINES. Hence No supply disturbance

PLANNED Approved 06/Jul/2020 10:00 06/Jul/2020 17:00

104 RQ25893 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV CHHABRA(RVUN)-KAWAI SCTPS(APR) (RS) CKT-1

D Annual testing and maintenance of Line isolator, Metering CT and CVT.

PLANNED Rejected 06/Jul/2020 09:30 06/Jul/2020 19:30

105 RQ25926 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV PHAGI-HEERAPURA (RS) CKT-2

D To replace the B-Ph. CVT due to oil seepage from lower capacitor of 400kV Phagi-Heerapura line-2

There will be no interruption during shut-down period as the 400KV Phagi - Heerapura line-1 will be remained energized to export/import the power.

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

106 RQ26142 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHILWARA-CHITTORGARH (RS) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

107 RQ26143 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHILWARA-CHITTORGARH (RS) CKT-2

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

108 RQ25677 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AGRA-AGRA FATEHBAD (UP) CKT-1

D For Replacement of damage jumper & maintenance work

For Replacement of damage jumper & maintenance work

PLANNED Approved 28/Jul/2020 10:00 31/Jul/2020 17:00

109 RQ25589 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV OBRA_B-SULTANPUR (UP) CKT-1

D For Routine Bay Maintenance

PLANNED Rejected 27/Jul/2020 10:00 27/Jul/2020 18:00

110 RQ25591 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AGRA FATEHBAD-MATHURA (UP) CKT-1

D For Line Jumper Tightening works

PLANNED Approved 27/Jul/2020 07:00 29/Jul/2020 19:00

111 RQ25608 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV BANDA-REWA ROAD (UP) CKT-2

D For Routine Testing of 400 KV Banda-Rewaroad 2 line at 400 KV S/S Banda

PLANNED Approved 22/Jul/2020 10:00 22/Jul/2020 15:00

Page 14: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

112 RQ25682 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV ANPARA_B(UPUN)-SARNATH(UP) (UP) CKT-2

C Replacement of old 0.5 class 400KV CT & CVT with 0.2 class accuracy of all the three phases.

PLANNED Rejected 22/Jul/2020 08:00 25/Jul/2020 16:00

113 RQ25607 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV BANDA-REWA ROAD (UP) CKT-1

D For Routine Testing of 400 KV Banda-Rewaroad 1 line at 400 KV S/S Banda

PLANNED Approved 20/Jul/2020 10:00 20/Jul/2020 15:00

114 RQ25681 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV ANPARA-SARNATH (UP) CKT-1

C For division of 400 KV Anpara-Sarnath (L-3) line in DFCC

PLANNED Rejected 20/Jul/2020 09:00 30/Jul/2020 18:00

115 RQ25686 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV GR.NOIDA_2(UPC)-GR.NOIDA(UPC) (UP) CKT-1

C for looping choaping of trees under line corridore

There will be no any supply interruption due to this shut down.Load of sub-station Greater Noida will be fed through 400kv Greater Noida to Dadri line ,400kv Nawada line and 400kv Greater Noida to 400kv (765KV S/S) Greater Noida ckt-II

PLANNED Approved 18/Jul/2020 09:00 18/Jul/2020 17:00

116 RQ25691 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV ANPARA-ANPARA_D (UP) CKT-1

C Replacement of old 0.5 class 400KV CT & CVT with 0.2 class accuracy of all the three phases.

PLANNED Rejected 16/Jul/2020 08:00 19/Jul/2020 18:00

117 RQ25634 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AGRA FATEHBAD-MATHURA (UP) CKT-2

D For Replacement of damage jumper & maintenance work

For Replacement of damage jumper & maintenance work

PLANNED Approved 14/Jul/2020 10:00 17/Jul/2020 17:00

118 RQ25633 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV ALIGARH-SIKANDRABAD (UP) CKT-2

D Replacement of disc insulator by polymer insulator

PLANNED Approved 12/Jul/2020 08:00 18/Jul/2020 18:00

119 RQ25583 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV UNNAO-LUCKNOW (UP) CKT-1

D For routine bay maintenance and annual protection testing.

PLANNED Approved 10/Jul/2020 09:00 10/Jul/2020 18:00

120 RQ25590 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV MURADNAGAR_2-MATHURA (UP) CKT-1

C Height Raising work of 400KV S/C Manth (Mathura)-Muradnagar Line at Location no.496-498 for Construction of RRTS project of NCRTC

PLANNED Approved 10/Jul/2020 07:00 19/Jul/2020 19:00

Page 15: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

121 RQ25586 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV ALIGARH-MURADNAGAR_1 (UP) CKT-1

D For jumper teighting and lopping chopping and bird nest removing

PLANNED Approved 09/Jul/2020 10:00 12/Jul/2020 18:00

122 RQ25680 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AZAMGARH-MAU (UP) CKT-1

C For replacement of two Nos. Line CTs, Three Nos. Line CVTs and three Nos. Bus LA

PLANNED Approved 09/Jul/2020 09:00 11/Jul/2020 18:00

123 RQ25693 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AGRA FATEHBAD-MATHURA (UP) CKT-1

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

PLANNED Approved 07/Jul/2020 09:00 12/Jul/2020 18:00

124 RQ25588 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV TANDA(NT)-SULTANPUR(UP) (UP) CKT-1

D For Routine Bay Maintenance & Line coridor clreance work

PLANNED Approved 06/Jul/2020 10:00 07/Jul/2020 18:00

125 RQ25632 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV ALIGARH-SIKANDRABAD (UP) CKT-1

D Replacement of disc insulator by polymer insulator

PLANNED Approved 05/Jul/2020 08:00 11/Jul/2020 18:00

126 RQ25817 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BARA(UP)-MEJA TPS(MUN) (UP) CKT-1

D For attending the electrical clearance issue with 400 KV S/C Singrauli-Allahabad-III between loc. No. 558-559

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00

127 RQ25818 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV BARA(UP)-MEJA TPS(MUN) (UP) CKT-2

D For attending the electrical clearance issue with 400 KV S/C Singrauli-Allahabad-III between loc. No. 558-559

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00

128 RQ25855 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV SARNATH-AZAMGARH (UP) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

129 RQ25765 OCC_172 apl_sd AC TRANSMISSION LINE CIRCUIT

400 KV MAINPURI-BALLABHGARH (PG) CKT-1

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

Auto Re-closure will be in disable Mode

PLANNED Approved 25/Jul/2020 08:00 31/Jul/2020 18:00

130 RQ25766 OCC_172 apl_sd AC TRANSMISSION LINE CIRCUIT

400 KV MAINPURI-BALLABHGARH (PG) CKT-2

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

Auto Re-closure will be in disable Mode

PLANNED Approved 25/Jul/2020 08:00 31/Jul/2020 18:00

131 RQ25672 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV LUCKNOW_1(PG)-UNNAO(UP) (PG) CKT-2

D Preventive maintenance and routine protection testing at 400 KV S/S Unnao

PLANNED Approved 24/Jul/2020 09:00 24/Jul/2020 17:00

132 RQ25870 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV NEEMRANA-MANESAR (PG) CKT-2

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

PLANNED Approved 23/Jul/2020 08:00 23/Jul/2020 18:00

Page 16: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

133 RQ26033 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV MAINPURI-BALLABHGARH (PG) CKT-1

D Stringing Work of underpassing Jawahar TPS to Firozabad 400 D/C Quad Line between Loc. No. 27-28. This S/D require for Evacuation of power from JAwahar TPS. Line Sketch enclosed.

PLANNED Approved 20/Jul/2020 08:00 20/Jul/2020 18:00

134 RQ26034 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV MAINPURI-BALLABHGARH (PG) CKT-2

D Stringing Work of underpassing Jawahar TPS to Firozabad 400 D/C Quad Line between Loc. No. 27-28. This S/D require for Evacuation of power from JAwahar TPS. Line Sketch enclosed.

PLANNED Approved 20/Jul/2020 08:00 20/Jul/2020 18:00

135 RQ25747 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-RIHAND(NT) (PG) CKT-2

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 20/Jul/2020 08:00 21/Jul/2020 18:00

136 RQ25764 OCC_172 apl_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR-BALLABHGARH (PG) CKT-1

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

Auto Re-closure will be in disable Mode

PLANNED Approved 19/Jul/2020 08:00 24/Jul/2020 18:00

137 RQ25853 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV LUCKNOW_1(PG)-UNNAO(UP) (PG) CKT-2

D AMP of Line Bay equipment at Lucknow end

PLANNED Approved 17/Jul/2020 08:00 17/Jul/2020 18:00

138 RQ25839 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV GORAKHPUR-LUCKNOW_1 (PG) CKT-3

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR 'RE- STRINGING AT TOWER LOCATION NO 07 OF 400 KV LKO-SOHAWAL LINE (DD+30) after replacement of Bent Tower at Location No. 07. Photograph of Bent Tower enclosed.

PLANNED Approved 17/Jul/2020 08:00 17/Jul/2020 18:00

Page 17: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

139 RQ25840 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV GORAKHPUR-LUCKNOW_1 (PG) CKT-4

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR 'RE- STRINGING AT TOWER LOCATION NO 07 OF 400 KV LKO-SOHAWAL LINE (DD+30) after replacement of Bent Tower at Location No. 07. Photograph of Bent Tower enclosed.

PLANNED Approved 17/Jul/2020 08:00 17/Jul/2020 18:00

140 RQ25869 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV NEEMRANA-MANESAR (PG) CKT-1

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

PLANNED Approved 16/Jul/2020 08:00 16/Jul/2020 18:00

141 RQ25746 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-RIHAND(NT) (PG) CKT-1

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 15/Jul/2020 08:00 16/Jul/2020 18:00

142 RQ25905 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWANI-JIND (PG) CKT-1

D Removal of OPGW of under crossing 400kV Bhi-Kabulpur/Bawana line (span 203 - 204) and formation of diamond at 400kV D/C Bhi- Jind line (span 45 - 46)

PLANNED Approved 14/Jul/2020 08:00 15/Jul/2020 18:00

143 RQ25906 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWANI-JIND (PG) CKT-2

D Removal of OPGW of under crossing 400kV Bhi-Kabulpur/Bawana line (span 203 - 204) and formation of diamond at 400kV D/C Bhi- Jind line (span 45 - 46)

PLANNED Approved 14/Jul/2020 08:00 15/Jul/2020 18:00

144 RQ25912 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BAWANA CCGTB(DTL)-BHIWANI(PG) (PG) CKT-1

D Removal of OPGW of under crossing 400kV Bhi-Kabulpur/Bawana line (span 203 - 204) and formation of diamond at 400kV D/C Bhi- Jind line (span 45 - 46)

PLANNED Approved 14/Jul/2020 08:00 15/Jul/2020 18:00

145 RQ25913 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWANI(PG)-KABULPUR(HV) (PG) CKT-1

D Removal of OPGW of under crossing 400kV Bhi-Kabulpur/Bawana line (span 203 - 204) and formation of diamond at 400kV D/C Bhi- Jind line (span 45 - 46)

PLANNED Approved 14/Jul/2020 08:00 15/Jul/2020 18:00

Page 18: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

146 RQ25851 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR(PG)-PANKI(UP) (PG) CKT-1

D Retrofitment of Autoreclose relay at UPPCL panki End. Realys are obsolete and no OEM support is available

PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

147 RQ25745 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-LUCKNOW(UP) (PG) CKT-1

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 13/Jul/2020 08:00 14/Jul/2020 18:00

148 RQ25850 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR(PG)-PANKI(UP) (PG) CKT-1

D Retrofitment of Autoreclose relay at POWERGRID End. Realys are obsolete and no OEM support is available

PLANNED Approved 12/Jul/2020 08:00 12/Jul/2020 18:00

149 RQ26172 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV KISHENPUR-MOGA (PG) CKT-2

D For taking Reactor into service after completion of AMP works

Kindly approve PLANNED Approved 10/Jul/2020 17:30 10/Jul/2020 17:45

150 RQ26170 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV KISHENPUR-MOGA (PG) CKT-2

D For taking line Reactor out of Service for AMP works at Moga Substation

Kindly approve PLANNED Approved 10/Jul/2020 09:30 10/Jul/2020 09:45

151 RQ26171 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV KISHENPUR-MOGA (PG) CKT-1

D For taking Reactor into service after completion of AMP works

Kindly approve PLANNED Approved 09/Jul/2020 17:30 09/Jul/2020 17:45

152 RQ26169 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV KISHENPUR-MOGA (PG) CKT-1

D For taking line Reactor out of Service for AMP works at Moga Substation

Kindly approve PLANNED Approved 09/Jul/2020 09:30 09/Jul/2020 09:45

153 RQ26153 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV LUDHIANA-PATIALA (PG) CKT-2

D For AMP and fixing loose hardware fitting at various locations.

Kindly approve PLANNED Approved 09/Jul/2020 09:00 09/Jul/2020 17:00

154 RQ25900 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWANI-JIND (PG) CKT-2

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

PLANNED Approved 09/Jul/2020 08:00 10/Jul/2020 18:00

155 RQ25928 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV KOTA(PG)-MERTA(RS) (PG) CKT-1

D QUARTERLY MAINT.WORK OF Line alongwith line reactor

Supply maintained through OTHER 400 KV LINES. Hence No supply disturbance

PLANNED Rejected 09/Jul/2020 08:00 09/Jul/2020 18:00

156 RQ25927 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV SHREE CEMENT(SCL)-MERTA(RS) (PG) CKT-1

D QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS

Supply maintained through OTHER 400 KV LINES. Hence No supply disturbance

PLANNED Rejected 08/Jul/2020 10:00 08/Jul/2020 17:00

Page 19: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

157 RQ26152 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV LUDHIANA-PATIALA (PG) CKT-1

D For AMP and fixing loose hardware fitting at various locations.

Kindly approve PLANNED Approved 08/Jul/2020 09:00 08/Jul/2020 17:00

158 RQ25849 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR(PG)-PANKI(UP) (PG) CKT-2

C Replacement of Line side Isolator of Kanpur Panki(UP) 2 at UPPCL panki End under CERC ADD-CAP

PLANNED Approved 08/Jul/2020 08:00 12/Jul/2020 18:00

159 RQ25744 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-FATEHPUR(PG) (PG) CKT-1

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 08/Jul/2020 08:00 09/Jul/2020 18:00

160 RQ25894 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV ROORKEE(PG)-KASHIPUR(UK) (PG) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in Roorkee S/S.

along with Bus-I PLANNED Rejected 08/Jul/2020 08:00 08/Jul/2020 18:00 Rejected as requested by licensee.

161 RQ25878 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV ROORKEE-SAHARANPUR (PG) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators. in S/S

along with Bus-I PLANNED Rejected 07/Jul/2020 08:00 07/Jul/2020 18:00 Rejected as requested by licensee.

162 RQ25899 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWANI-JIND (PG) CKT-1

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

PLANNED Rejected 07/Jul/2020 08:00 08/Jul/2020 18:00 Rejected as requested by licensee.

163 RQ26164 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV KISHENPUR-SAMBA (PG) CKT-2

D Jumper Tightening Non-Auto reclose of ckt-I required during the work

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

164 RQ25819 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV RIHAND(NT)-ALLAHABAD(PG) (PG) CKT-1

D For attending replacement work of damaged insulator string due to flashover at loc no. -779.

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

165 RQ25863 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV ROORKEE-SAHARANPUR (PG) CKT-1

D Summer maintenance work eg.Tightening of loose condutor VD, Corona ring, arcing horn, jumper, string Hook etc

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

166 RQ25743 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-ALLAHABAD(PG) (PG) CKT-2

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 06/Jul/2020 08:00 07/Jul/2020 18:00

Page 20: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

167 RQ25835 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV LUCKNOW_1-SOHAWAL (PG) CKT-1

C DE-STRINGING, DISMANTLING, ERECTION AND RE-STRINGING AT LOCATION NO 07 (DD+30) . Damaged TOWER of mentioned Line IS BENT, IT IS TO BE REPLACED. Photograph of Bent Tower enclosed.

Line crossing Sketch also Enclosed

PLANNED Approved 06/Jul/2020 08:00 17/Jul/2020 18:00

168 RQ25836 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV LUCKNOW_1-SOHAWAL (PG) CKT-2

C DE-STRINGING, DISMANTLING, ERECTION AND RE-STRINGING AT LOCATION NO 07 (DD+30) . Damaged TOWER of mentioned Line IS BENT, IT IS TO BE REPLACED. Photograph of Bent Tower enclosed.

Line crossing Sketch also Enclosed

PLANNED Approved 06/Jul/2020 08:00 17/Jul/2020 18:00

169 RQ25837 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV GORAKHPUR-LUCKNOW_1 (PG) CKT-3

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR DE- STRINGING OF OVER-HEAD LUCKNOW- SOHAWAL LINE AT TOWER LOCATION NO 07 Since location 07 tower is bent and is being Replaced. Photograph of Bent Tower enclosed.

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

170 RQ25838 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV GORAKHPUR-LUCKNOW_1 (PG) CKT-4

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR DE- STRINGING OF OVER-HEAD LUCKNOW- SOHAWAL LINE AT TOWER LOCATION NO 07 Since location 07 tower is bent and is being Replaced. Photograph of Bent Tower enclosed.

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

171 RQ25864 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV RAPS_D(NP)-JAIPUR SOUTH(PG) (PG) CKT-1

C Dismantling of damaged earth wire cross arms,erection of new earth wire cross arms and stringing of earth wire in complete

PLANNED Rejected 05/Jul/2020 08:00 08/Jul/2020 18:00

Page 21: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

172 RQ26167 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV MOGA-HISSAR (PG) CKT-2

D For taking Line Reactor into service after completion of AMP works

Kindly approve PLANNED Approved 03/Jul/2020 17:30 03/Jul/2020 17:45

173 RQ26166 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

400 KV MOGA-HISSAR (PG) CKT-2

D For taking line Reactor out of Service for AMP of line reactor at Moga Substation

Kindly approve PLANNED Approved 03/Jul/2020 09:30 03/Jul/2020 09:45

174 RQ25815 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-ALLAHABAD(PG) (PG) CKT-3

D For attending the electrical clearance issue with 400 KV D/C Meja- Bara TL between loc. No. 558-559 of 400 KV Singrauli-Allahabad-III

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00 Subject to UP consent.

175 RQ26051 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR-BALLABHGARH (PG) CKT-1

D Stringing Work of underpassing Jawahar TPS to Firozabad 400 D/C Quad Line between Loc. No. 29-30. This S/D require for Evacuation of power from JAwahar TPS. Line Sketch enclosed.

PLANNED Approved 03/Jul/2020 08:00 04/Jul/2020 18:00

176 RQ26052 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR-BALLABHGARH (PG) CKT-2

D Stringing Work of underpassing Jawahar TPS to Firozabad 400 D/C Quad Line between Loc. No. 29-30. This S/D require for Evacuation of power from JAwahar TPS. Line Sketch enclosed.

PLANNED Approved 03/Jul/2020 08:00 04/Jul/2020 18:00

177 RQ25703 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV GR.NOIDA(UPC)-NAWADA(HV) (PG) CKT-1

D For mtc of 400KV isolators and breakers

PLANNED Approved 02/Jul/2020 10:00 02/Jul/2020 16:00

178 RQ25877 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BAREILLY_2(PG)-KASHIPUR(UK) (PG) CKT-2

D For providing anchor between overhead conductor (R-ph) & ground, to save line isolator from damage in the event of storm due to long drop down jumper

PLANNED Approved 02/Jul/2020 08:00 02/Jul/2020 20:00

179 RQ25848 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR-BALLABHGARH (PG) CKT-2

D For taking Line Reactor in service after FDS Measurement of Line Reactor oil at Kanpur S/S

PLANNED Approved 01/Jul/2020 17:00 01/Jul/2020 18:00

Page 22: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

180 RQ25704 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALLABHGARH(PG)-NAWADA(HV) (PG) CKT-1

D For mtc of 400KV isolators and breakers

PLANNED Approved 01/Jul/2020 10:00 01/Jul/2020 16:00

181 RQ25761 OCC_172 apl_sd AC TRANSMISSION LINE CIRCUIT

400 KV AURAIYA(NT)-AGRA(PG) (PG) CKT-1

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

Auto Re-closure will be in disable Mode

PLANNED Approved 01/Jul/2020 08:00 06/Jul/2020 18:00

182 RQ25762 OCC_172 apl_sd AC TRANSMISSION LINE CIRCUIT

400 KV AURAIYA(NT)-AGRA(PG) (PG) CKT-2

D Overhead crossing for 765kV Agra- Gr Noida Transmission Line

Auto Re-closure will be in disable Mode

PLANNED Approved 01/Jul/2020 08:00 06/Jul/2020 18:00

183 RQ25847 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV KANPUR-BALLABHGARH (PG) CKT-2

D For taking Line Reactor out for FDS Measurement of Line Reactor oil at Kanpur S/S

PLANNED Approved 01/Jul/2020 08:00 01/Jul/2020 09:00

184 RQ25854 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV AURAIYA(NT)-AGRA(PG) (PG) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

185 RQ25859 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV RIHAND(NT)-ALLAHABAD(PG) (PG) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

186 RQ25865 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV JAIPUR SOUTH-KOTA (PG) CKT-1

C Dismantling of damaged earth wire cross arms,erection of new earth wire cross arms and stringing of earth wire in complete

PLANNED Approved 01/Jul/2020 08:00 04/Jul/2020 18:00

187 RQ25876 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BAREILLY_2(PG)-KASHIPUR(UK) (PG) CKT-1

D For providing anchor between overhead conductor (R-ph) & ground, to save line isolator from damage in the event of storm due to long drop down jumper

PLANNED Approved 01/Jul/2020 08:00 01/Jul/2020 20:00

188 RQ25742 OCC_172 singrauli_sd AC TRANSMISSION LINE CIRCUIT

400 KV SINGRAULI(NT)-ALLAHABAD(PG) (PG) CKT-1

D for Annual PM of bay equipment / protection testing at Singrauli by ntpc.

PLANNED Approved 01/Jul/2020 08:00 02/Jul/2020 18:00

189 RQ26117 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV HAPUR(UP)-MORADABAD(UP) (PG) CKT-1

D Rectification works for OPGW Cable (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

190 RQ26118 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV HAPUR(UP)-MURADNAGAR_1(UP) (PG) CKT-1

D Rectification works for OPGW Cable (Auto Reclose off)

PLANNED Rejected 01/Jul/2020 08:00 31/Jul/2020 18:00

Page 23: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

191 RQ26119 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV DADRI(NT)-MAHARANIBAGH(PG) (PG) CKT-1

D "Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE stringing works (OPGW works completed, minor rectification, if required)"

PLANNED Rejected 01/Jul/2020 08:00 31/Jul/2020 18:00

192 RQ26120 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV GR.NOIDA(UPC)-NAWADA(HV) (PG) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE stringing works under Relabile Communication scheme

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

193 RQ26121 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALLABHGARH(PG)-NAWADA(HV) (PG) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE stringing works under Relabile Communication scheme

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

194 RQ26122 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BASSI-BHIWADI (PG) CKT-2

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

195 RQ26124 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV DADRI(NT)-MANDOLA(PG) (PG) CKT-2

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

196 RQ26125 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV SIKAR(PG)-BABAI(RS) (PG) CKT-1

D "Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE stringing works (158 Kms out of 178 kms OPGW laying Completed-work very slow /some times stopped due to severe ROW/Rain issues)"

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

Page 24: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

197 RQ26126 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BALLABHGARH-GURGAON (PG) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

198 RQ26127 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWADI-GURGAON (PG) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

199 RQ26128 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV DADRI(NT)-PANIPAT(BB) (PG) CKT-2

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

200 RQ26129 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWANI(BB)-HISSAR(PG) (PG) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

201 RQ26130 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV RAPS_D(NP)-KOTA(PG) (PG) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

202 RQ26131 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV JAIPUR SOUTH-KOTA (PG) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

203 RQ25852 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

400 KV LUCKNOW_1(PG)-UNNAO(UP) (PG) CKT-1

D AMP of Line Bay equipment at Lucknow end

PLANNED Approved 26/Jun/2020 08:00 26/Jun/2020 18:00

204 RQ26123 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV BHIWADI-HISSAR (PG) CKT-1

D "Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW LIVE LINE stringing works (195 Kms out of 212 Kms completed)- work very slow /some times stopped due to severe ROW/Rain issues)"

PLANNED Approved 25/Jun/2020 08:00 03/Aug/2020 18:00

Page 25: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

205 RQ25676 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AGRA(PG)-AGRA FATEHBAD(UP) (PG) CKT-1

D For Replacement of damage jumper & maintenance work

For Replacement of damage jumper & maintenance work

PLANNED Approved 22/Jul/2020 10:00 24/Jul/2020 17:00

206 RQ26110 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AGRA(PG)-AGRA FATEHBAD(UP) (PG) CKT-1

D Over head crossing PLANNED Approved 13/Jul/2020 09:00 18/Jul/2020 18:00

207 RQ25675 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV AGRA(UP)-AGRA FATEHBAD(UP) (PG) CKT-2

D For Replacement of damage jumper & maintenance work

For Replacement of damage jumper & maintenance work

PLANNED Approved 09/Jul/2020 10:00 11/Jul/2020 17:00

208 RQ25671 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

400 KV SULTANPUR(UP)-LUCKNOW_1(PG) (PG) CKT-1

D For Routine Bay Maintenance

PLANNED Approved 08/Jul/2020 10:00 08/Jul/2020 18:00

209 RQ25914 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV BIKANER(PG)-BIKANER(RS) (PG) CKT-1

D Maintenance of line (Attending jumper at angle tower)

PLANNED Approved 17/Jul/2020 18:00 17/Jul/2020 23:00

210 RQ25740 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV JHAJJAR(APCL)-DAULATABAD(HV) (HV) CKT-1

C Relocation of tower no-10. stands in midst of badshahpur drain. Replacement of burnt nut and bolts, repaire of jumper, realignment and repair of burnt spacer Tightening of Nut and bolts of jumpers.

PLANNED Rejected 16/Jul/2020 08:00 31/Jul/2020 17:00

211 RQ25741 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV JHAJJAR(APCL)-DAULATABAD(HV) (HV) CKT-2

C Relocation of tower no-10. stands in midst of badshahpur drain. Replacement of burnt nut and bolts, repaire of jumper, realignment and repair of burnt spacer Tightening of Nut and bolts of jumpers.

PLANNED Rejected 16/Jul/2020 08:00 31/Jul/2020 17:00

212 RQ25711 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV GURGAON(PG)-DAULATABAD(HV) (HV) CKT-2

D Tree trimming and bay mtc PLANNED Approved 15/Jul/2020 08:00 15/Jul/2020 17:00

213 RQ25710 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV GURGAON(PG)-DAULATABAD(HV) (HV) CKT-1

D Tree trimming and bay mtc PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 16:00

214 RQ25709 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV DHANODA-DAULATABAD (HV) CKT-2

D Tree trimming and bay mtc PLANNED Rejected 09/Jul/2020 08:00 09/Jul/2020 17:00

215 RQ25708 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV DHANODA-DAULATABAD (HV) CKT-1

D Tree trimming and bay mtc PLANNED Rejected 06/Jul/2020 08:00 06/Jul/2020 16:00

Page 26: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

216 RQ25707 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV CLP JHAJJAR(CLP)-DHANODA(HV) (HVPNL) CKT-2

D for preventive mtc of line equipments

PLANNED Approved 03/Jul/2020 07:00 03/Jul/2020 19:00

217 RQ25706 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV CLP JHAJJAR(CLP)-DHANODA(HV) (HVPNL) CKT-1

D for preventive mtc of line equipments

PLANNED Approved 02/Jul/2020 07:00 02/Jul/2020 19:00

218 RQ25705 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

400 KV CLP JHAJJAR(CLP)-KABULPUR(HV) (HVPNL) CKT-1

D for preventive mtc of line equipments

PLANNED Approved 01/Jul/2020 07:00 01/Jul/2020 19:00

219 RQ25917 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

400 KV ALWAR(ATIL)-HINDAUN(RS) (ATIL) CKT-1

D Quarterly Maintenance PLANNED Approved 10/Jul/2020 08:00 10/Jul/2020 18:00

220 RQ25896 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV ROORKEE(PG)-RISHIKESH(UK) (PG) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in Roorkee S/S.

along with Bus-I PLANNED Rejected 09/Jul/2020 08:00 09/Jul/2020 18:00

221 RQ25895 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400 KV ROORKEE(PG)-MUZAFFARNAGAR(UP) (PG) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in Roorkee S/S.

along with Bus-I PLANNED Rejected 08/Jul/2020 08:00 08/Jul/2020 18:00

222 RQ25595 OCC_172 sterlite_sd AC TRANSMISSION LINE CIRCUIT

400 KV AMARGARH(NRSS XXIX)-SAMBA(PG) (NRSS XXIX) CKT-1

D A/R in non Auto mode, for the installation of OPGW in place of earth wire.

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 19:00

223 RQ25596 OCC_172 sterlite_sd AC TRANSMISSION LINE CIRCUIT

400 KV AMARGARH(NRSS XXIX)-SAMBA(PG) (NRSS XXIX) CKT-2

D A/R in non Auto mode, for the installation of OPGW in place of earth wire.

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 19:00

224 RQ26041 OCC_172 dadri_sd AC TRANSMISSION LINE CIRCUIT

400 KV DADRI(NT)-LONI HARSH VIHAR(DV) (NT) CKT-1

D Shutdown of line is required for tree trimming and line maintenance.

Shutdown of line may please be provided from 23/06/2020 to 24/06/2020 (06:00 hrs to 19:00 hrs) on daily basis.

PLANNED Approved 27/Jun/2020 06:00 28/Jun/2020 19:00

225 RQ26040 OCC_172 dadri_sd AC TRANSMISSION LINE CIRCUIT

400 KV DADRI(NT)-LONI HARSH VIHAR(DV) (NT) CKT-2

D Shutdown of Line required for tree trimming and line maintenance work.

Shutdown may please be provided from 20/06/2020 to 22/06/2020 on daily basis from 06:00 hrs to 19:00 hrs..

PLANNED Approved 20/Jun/2020 06:00 22/Jun/2020 19:00

226 RQ26094 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT BALLABHGARH(PG)

D S/D required for connection of Bus Jumper of Isolator 40789 (ICT-4 Main bay) after completion of Isolator Retrofitment work under ADD Cap

PLANNED Approved 01/Aug/2020 08:00 01/Aug/2020 12:00

Page 27: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

227 RQ26092 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT BALLABHGARH(PG)

D S/D required for connection of Bus Jumper of Isolator 40489 (ICT-1 Main bay Bus Isolator) after completion of Isolator Retrofitment work & opening of Bus Jumper of Isolator 40789 (ICT-4 Main bay Bus Isolator) for start of Isolator retrofitment work under ADD Cap.

PLANNED Approved 26/Jul/2020 08:00 26/Jul/2020 12:00

228 RQ26062 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT JHATIKARA(PG)

D FOR AMP WORK PLANNED Approved 23/Jul/2020 08:00 23/Jul/2020 18:00

229 RQ26147 OCC_172 cpcc2_sd BUS 400KV BUS 2 AT WAGOORA(PG)

D For AMP works. Kindly approve PLANNED Approved 21/Jul/2020 09:00 21/Jul/2020 17:00

230 RQ26061 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT JHATIKARA(PG)

D FOR AMP WORK PLANNED Approved 21/Jul/2020 08:00 21/Jul/2020 18:00

231 RQ26091 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT BALLABHGARH(PG)

D S/D required for opening of Bus Jumper of Isolator 40489 (ICT-1 Main bay) for start of Isolator Retrofitment work in under ADD Cap

PLANNED Approved 20/Jul/2020 08:00 20/Jul/2020 12:00

232 RQ26096 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT BALLABHGARH(PG)

D S/D required for connection of Bus Jumper of Isolator 40689 (ICT-3 Main bay) after completion of Isolator Retrofitment work under ADD Cap

PLANNED Approved 19/Jul/2020 08:00 19/Jul/2020 12:00

233 RQ26146 OCC_172 cpcc2_sd BUS 400KV BUS 1 AT WAGOORA(PG)

D For AMP works. Kindly approve PLANNED Approved 16/Jul/2020 09:00 16/Jul/2020 17:00

234 RQ26112 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT KANKROLI(PG)

D FOR AMP WORK PLANNED Approved 16/Jul/2020 08:00 16/Jul/2020 18:00

235 RQ26005 OCC_172 cpcc3_sd BUS 400KV BUS 2 AT GORAKHPUR(PG)

C Erection of Tension/ Suspension insulator strings on 02 No. gantry and laying of jack bus over 400 kV Bus II for connection to 41589 T Isolator from one gantry to other For 400 kV Side of 315 MVA ICT 3 under Substation Extn Package SS-XXV, Approved by 39 standing committee.All lines and equipments shall remain charged through 400 kV Bus I during this period.

PLANNED Approved 15/Jul/2020 08:00 16/Jul/2020 18:00

Page 28: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

236 RQ26111 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT KANKROLI(PG)

D FOR AMP WORK PLANNED Approved 14/Jul/2020 08:00 14/Jul/2020 18:00

237 RQ26095 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT BALLABHGARH(PG)

D S/D required for connection of Bus Jumper of Isolator 40989 (ICT-2 Main bay Bus Isolator) after completion of Isolator Retrofitment work & opening of Bus Jumper of Isolator 40689 (ICT-3 Main bay Bus Isolator) for start of Isolator retrofitment work under ADD Cap

PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 12:00

238 RQ26098 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT BASSI(PG) D Connection of Droppers with Bus side conductor of Isolator No.409-89 After replacement of isolator under ADD Cap

PLANNED Approved 11/Jul/2020 13:00 11/Jul/2020 17:00

239 RQ26076 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in S/S.

PLANNED Approved 09/Jul/2020 08:00 09/Jul/2020 18:00

240 RQ26063 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT BHINMAL(PG)

D 400kV Bus-1 CVT testing PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

241 RQ25998 OCC_172 cpcc3_sd BUS 400KV BUS 1 AT FATEHPUR(PG)

D For Connection of New Bus to existing Bus under Substation Extn Package SS-XXV. Approved by 39 standing committee at Fatehpur Substation.

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

242 RQ26071 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in S/S.

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

243 RQ26093 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT BALLABHGARH(PG)

D S/D required for connection of Bus Jumper of Isolator 41589 (Gurgaon Main bay Bus Isolator) after completion of Isolator Retrofitment work & opening of Bus Jumper of Isolator 40989 (ICT-2 Main bay Bus Isolator) for start of Isolator retrofitment work under ADD Cap

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 12:00

Page 29: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

244 RQ26065 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in S/S.

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

245 RQ26097 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT BASSI(PG) D Dis-connection of Droppers with Bus side conductor of isolator No.409-89 before replacement of isolator under ADD Cap.

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 13:00

246 RQ26072 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in S/S.

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

247 RQ26066 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in S/S.

PLANNED Approved 05/Jul/2020 08:00 05/Jul/2020 18:00

248 RQ26064 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT AJMER(PG) D Bus Earth switch and isolator tightning and checking work

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00

249 RQ26048 OCC_172 cpcc3_sd BUS 400KV AGRA(PG) - BUS 8 D For checking tripping of 400kV Bus-8 via M2 LBB of main bays connected to Bus 8. After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00

250 RQ26047 OCC_172 cpcc3_sd BUS 400KV AGRA(PG) - BUS 7 D For checking tripping of 400kV Bus-7 via M2 LBB of main bays connected to Bus 7. After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 01/Jul/2020 08:00 01/Jul/2020 18:00

251 RQ25999 OCC_172 cpcc3_sd BUS 400KV BUS 2 AT FATEHPUR(PG)

D AMP & Tightening of 400 KV Bus-II at Fatehpur Substation

PLANNED Approved 01/Jul/2020 08:00 01/Jul/2020 18:00

Page 30: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

252 RQ26090 OCC_172 cpcc1_sd BUS 400KV BUS 1 AT BALLABHGARH(PG)

D S/D required for opening of Bus Jumper of Isolator 41589 (Guragon Main bay Bus Isolator) for start of Isolator Retrofitment work in under ADD Cap

PLANNED Approved 01/Jul/2020 08:00 01/Jul/2020 18:00

253 RQ26070 OCC_172 cpcc1_sd BUS 400KV BUS 2 AT HISSAR(PG) D FOR AMP WORK PLANNED Approved 25/Jun/2020 08:00 25/Jun/2020 16:00

254 RQ25758 OCC_172 ntpcos_sd BUS 400KV BUS5 AT RIHAND(NT) D Shutdown of Bus Section Bay 427 is required for Annual Maintenance works

Bus Shutdown is not required, only bus section shutdown is required

PLANNED Approved 28/Jul/2020 09:00 28/Jul/2020 18:00

255 RQ25757 OCC_172 ntpcos_sd BUS 400KV BUS 4 AT RIHAND(NT)

D Shutdown of Bus Section Bay no. 414 is required for Annual Maintenance Works

Shutdown of Bus 4 is not required only bus section bay is required

PLANNED Approved 21/Jul/2020 09:00 21/Jul/2020 18:00

256 RQ25756 OCC_172 ntpcos_sd BUS 400KV BUS 3 AT RIHAND(NT)

D Shutdown of Bus Section Bay no. 413 required for Annual Maintenance works

Bus3 Shutdown not required, only Bus Section Shutdown is required

PLANNED Approved 14/Jul/2020 09:00 14/Jul/2020 18:00

257 RQ25759 OCC_172 ntpcos_sd BUS 400KV BUS6 AT RIHAND(NT) D Shutdown of Bay 428 is required for annual maintenance works

Bus 6 shutdown is not required, only bus section shutdown is required

PLANNED Approved 02/Jul/2020 09:00 02/Jul/2020 18:00

258 RQ25585 OCC_172 stuup_sd BUS 400KV BUS 1 AT GR.NOIDA(UPC)

C For replacement of CTs of 400KV buscoupler

PLANNED Approved 27/Jul/2020 08:00 28/Jul/2020 18:00

259 RQ25584 OCC_172 stuup_sd BUS 400KV BUS 2 AT GR.NOIDA(UPC)

C For maintenance work of B-Phase PG Isolator of 400/220/33kv 500MVA ict-III Under 400KV main bus-II

PLANNED Approved 09/Jul/2020 09:00 09/Jul/2020 17:00

260 RQ25627 OCC_172 stuup_sd BUS 400KV BUS 2 AT MURADNAGAR_2(UP)

D Preventive Maintenance & Tightening of clamps

PLANNED Approved 23/Jul/2020 10:00 23/Jul/2020 17:00

261 RQ26016 OCC_172 cpcc3_sd BUS 400KV BUS 2 AT PANKI(UP) C For BUS-2 Pantograph Isolator replacement at UPPCL Panki End in POWERGRID bays under CERc ADD-CAP

PLANNED Approved 23/Jul/2020 08:00 24/Jul/2020 18:00

262 RQ25629 OCC_172 stuup_sd BUS 400KV BUS 2 AT MATHURA(UP)

D for jumpering work of new 500MVA ICT Bays and busbar protection testing for same

PLANNED Approved 22/Jul/2020 07:00 23/Jul/2020 19:00

Page 31: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

263 RQ26015 OCC_172 cpcc3_sd BUS 400KV BUS 1 AT PANKI(UP) C For BUS-1 Pantograph Isolator replacement at UPPCL Panki End in POWERGRID bays under CERc ADD-CAP

PLANNED Approved 21/Jul/2020 08:00 22/Jul/2020 18:00

264 RQ25628 OCC_172 stuup_sd BUS 400KV BUS 1 AT MATHURA(UP)

D for jumpering work of new 500MVA ICT Bays and busbar protection testing for same

PLANNED Approved 20/Jul/2020 07:00 21/Jul/2020 19:00

265 RQ26014 OCC_172 cpcc3_sd BUS 400KV BUS 2 AT PANKI(UP) C For BUS-2 Pantograph Isolator replacement at UPPCL Panki End in POWERGRID bays under CERc ADD-CAP

PLANNED Approved 16/Jul/2020 08:00 17/Jul/2020 18:00

266 RQ25643 OCC_172 stuup_sd BUS 400KV BUS 2 AT SARNATH(UP)

D Gemeral Maintenance & repairing of Bus

PLANNED Approved 15/Jul/2020 08:00 15/Jul/2020 18:00

267 RQ26013 OCC_172 cpcc3_sd BUS 400KV BUS 1 AT PANKI(UP) C For BUS-1 Pantograph Isolator replacement at UPPCL Panki End in POWERGRID bays under CERc ADD-CAP

PLANNED Approved 14/Jul/2020 08:00 15/Jul/2020 18:00

268 RQ25642 OCC_172 stuup_sd BUS 400KV BUS 1 AT SARNATH(UP)

D Gemeral Maintenance & repairing of Bus

PLANNED Approved 14/Jul/2020 08:00 14/Jul/2020 18:00

269 RQ26032 OCC_172 sldcrs_sd BUS 400KV BUS 2 AT BHADLA(RS)

D Quarterly Maintenance work PLANNED Approved 15/Jul/2020 18:00 15/Jul/2020 23:00

270 RQ26031 OCC_172 sldcrs_sd BUS 400KV BUS 1 AT BHADLA(RS)

D Quarterly Maintenance work PLANNED Approved 13/Jul/2020 18:00 13/Jul/2020 23:00

271 RQ26056 OCC_172 bbmb_sd BUS 400KV BUS 2 AT BHIWANI(BB)

D Half yearly mtc PLANNED Approved 10/Jul/2020 08:00 10/Jul/2020 18:00

272 RQ26055 OCC_172 bbmb_sd BUS 400KV BUS 1 AT BHIWANI(BB)

D Half yearly mtc PLANNED Approved 09/Jul/2020 08:00 09/Jul/2020 18:00

273 RQ25604 OCC_172 sldcuk_sd BUS 400KV BUS 3 AT SRINAGAR(UK)

C for schedule maintenance PLANNED Approved 08/Jul/2020 10:00 08/Jul/2020 17:00

274 RQ25579 OCC_172 sldcuk_sd BUS 400KV BUS 3 AT SRINAGAR(UK)

D for schedule maintenance PLANNED Rejected 08/Jul/2020 10:00 08/Jul/2020 17:00 Repeated entry.

275 RQ25603 OCC_172 sldcuk_sd BUS 400KV BUS 2 AT SRINAGAR(UK)

C for schedule maintenance PLANNED Approved 07/Jul/2020 10:00 07/Jul/2020 17:00

276 RQ25578 OCC_172 sldcuk_sd BUS 400KV BUS 2 AT SRINAGAR(UK)

D for schedule maintenance PLANNED Rejected 07/Jul/2020 10:00 07/Jul/2020 17:00 Repeated entry.

277 RQ25602 OCC_172 sldcuk_sd BUS 400KV BUS 1 AT SRINAGAR(UK)

C for schedule maintenance PLANNED Approved 06/Jul/2020 10:00 06/Jul/2020 17:00 To be clubbed with sl.no.294

278 RQ25577 OCC_172 sldcuk_sd BUS 400KV BUS 1 AT SRINAGAR(UK)

D for schedule maintenance PLANNED Rejected 06/Jul/2020 10:00 06/Jul/2020 17:00 Repeated entry.

Page 32: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

279 RQ25599 OCC_172 sterlite_sd BUS 400KV BUS 2 AT AMARGARH(NRSS XXIX)

C For Bay 415 CB replacement. Require Bus-2,BR-1&2 shutdowns on same day.

PLANNED Approved 01/Jul/2020 08:00 03/Jul/2020 18:00

280 RQ25582 OCC_172 karcham_sd LINE REACTOR 80 MVAR LR ON 400 KV KARCHAM WANGTOO(JSW)-WANGTO_GIS(HP) (HPPTCL) CKT-1 @KARCHAM WANGTOO(JSW)

C To attend the minor leakage in reactor no.1.Also the CO & H2 content also increase .

To attend this work shutdown of the reactor required.

PLANNED Approved 25/Jun/2020 00:00 03/Jul/2020 23:59

281 RQ25807 OCC_172 sldcrs_sd BR/BSR/MSC/MSR 125 MVAR BUS REACTOR NO 1 AT 400KV BARMER(RS)

D Quarterly Maintenance PLANNED Approved 24/Jul/2020 10:00 24/Jul/2020 18:00

282 RQ25809 OCC_172 sldcrs_sd BR/BSR/MSC/MSR 125 MVAR BUS REACTOR NO 2 AT 400KV BIKANER(RS)

D Routine Bay Maintenance Work

PLANNED Approved 16/Jul/2020 10:00 16/Jul/2020 18:00

283 RQ25808 OCC_172 sldcrs_sd BR/BSR/MSC/MSR 125 MVAR BUS REACTOR NO 1 AT 400KV BHADLA(RS)

D Quarterly Maintenance work PLANNED Approved 08/Jul/2020 10:00 08/Jul/2020 14:00

284 RQ25951 OCC_172 sldcrs_sd BR/BSR/MSC/MSR 50 MVAR BUS REACTOR NO 1 AT 400KV BHILWARA(RS)

D Half yearly of 400 KV 50MVAR BUS REACTOR BAY (4452A)& ASSOCIATED EQUIPMENTS

PLANNED Approved 06/Jul/2020 08:00 07/Jul/2020 18:00

285 RQ25806 OCC_172 sldcrs_sd BR/BSR/MSC/MSR 63 MVAR BUS REACTOR NO 2 AT 400 KV KAWAI SCTPS(APR)

D For testing of relay in Bus Reactor #2 Breaker Panel.

PLANNED Approved 20/Jul/2020 09:30 20/Jul/2020 19:30

286 RQ25805 OCC_172 sldcrs_sd BR/BSR/MSC/MSR 63 MVAR BUS REACTOR NO 1 AT 400 KV KAWAI SCTPS(APR)

D For testing of relay in Bus Reactor #1 Breaker Panel.

PLANNED Approved 17/Jul/2020 09:30 17/Jul/2020 19:30

287 RQ25626 OCC_172 stuup_sd BR/BSR/MSC/MSR 63 MVAR BUS REACTOR NO 1 AT 400KV MURADNAGAR_2(UP)

D Preventive Maintenance & Tightening of clamps

PLANNED Approved 16/Jul/2020 10:00 16/Jul/2020 17:00

288 RQ25690 OCC_172 stuup_sd BR/BSR/MSC/MSR 63 MVAR BUS REACTOR NO 1 AT 400KV BANDA(UP)

C For work of installation of 125 MVAR Bus Reactor by replacing 63 MVAR Bus Reactor at 400 KV S/S Banda.

PLANNED Rejected 01/Jul/2020 06:00 31/Jul/2020 17:00

289 RQ26060 OCC_172 cpcc1_sd BR/BSR/MSC/MSR 50 MVAR BUS REACTOR NO 1 AT 400KV BASSI(PG)

C Dis-connection of Droppers with both side conductor of isolator No. (403-89R) before replacement of isolator at Bassi under ADD CAP.

PLANNED Approved 13/Jul/2020 08:00 18/Jul/2020 18:00

Page 33: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

290 RQ25993 OCC_172 cpcc3_sd BR/BSR/MSC/MSR 125 MVAR BUS REACTOR NO 3 AT 400KV AGRA(PG)

D For enabling M2 LBB function and checking tripping on LBB operation of Main bay (432), For BR AMP at Agra(PG) Substation. After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 08/Jul/2020 08:00 08/Jul/2020 18:00

291 RQ25992 OCC_172 cpcc3_sd BR/BSR/MSC/MSR 125 MVAR BUS REACTOR NO 2 AT 400KV AGRA(PG)

D For enabling M2 LBB function and checking tripping on LBB operation of Main bay (435), For BR AMP/ Protection Testing and DGA sampling of BHEL HV bushings. at Agra(PG) Substation After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

292 RQ26058 OCC_172 cpcc1_sd BR/BSR/MSC/MSR 125 MVAR BUS REACTOR NO 1 AT 400KV ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in S/S.

PLANNED Approved 05/Jul/2020 08:00 05/Jul/2020 18:00

293 RQ26018 OCC_172 cpcc3_sd BR/BSR/MSC/MSR 93 MVAR BUS REACTOR NO 2 AT 400KV VINDHYACHAL(PG)

C RETRO FITMENT OF CIRCUIT BREAKER UNDER ADD CAP AT VINDHYACHAL S/S.

PLANNED Approved 01/Jul/2020 08:00 30/Jul/2020 18:00

294 RQ25606 OCC_172 sldcuk_sd BR/BSR/MSC/MSR 80 MVAR BUS REACTOR NO 1 AT 400 KV SRINAGAR(UK)

C for schedule maintenance PLANNED Approved 06/Jul/2020 10:00 06/Jul/2020 16:00 To be clubbed with Sl. No. 277

295 RQ25580 OCC_172 sldcuk_sd BR/BSR/MSC/MSR 80 MVAR BUS REACTOR NO 1 AT 400 KV SRINAGAR(UK)

D for schedule maintenance PLANNED Rejected 09/Jul/2020 10:00 09/Jul/2020 16:00

296 RQ25597 OCC_172 sterlite_sd BR/BSR/MSC/MSR 63 MVAR BUS REACTOR NO 1 AT 400 KV AMARGARH(NRSS XXIX)

C For Bay 415 CB replacement. Require Bus-2,BR-1&2 shutdowns on same day.

PLANNED Approved 01/Jul/2020 08:00 03/Jul/2020 18:00

Page 34: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

297 RQ25598 OCC_172 sterlite_sd BR/BSR/MSC/MSR 63 MVAR BUS REACTOR NO 2 AT 400 KV AMARGARH(NRSS XXIX)

C For Bay 415 CB replacement. Require Bus-2,BR-1&2 shutdowns on same day.

PLANNED Approved 01/Jul/2020 08:00 03/Jul/2020 18:00

298 RQ25825 OCC_172 sldcrs_sd BAY 401052D MAIN BAY - 400KV PHAGI-AJMER (RS) CKT-1 AT PHAGI(RS)

D 1-Measurement of Tan-Delta of CTs. 2- Measurement of operation timings of CB. 3- Measurement of contact resistance of CB

There will be no interruption during shut-down period as the 400KV Phagi-Ajmer line-1 will be remained connected to 400 KV Bus-C through 400 KV Tie CB (410-52T) & 400 KV CB (410-52C).

PLANNED Approved 30/Jul/2020 09:00 30/Jul/2020 18:00

299 RQ25829 OCC_172 sldcrs_sd BAY 419 MAIN BAY - 765/400KV 1500 MVA ICT 3 AT ANTA(RS)

D HALF YEARLY MAINTENANCE

TIE Circuit Breaker 411-52-T will remain available in the network.

PLANNED Approved 23/Jul/2020 09:30 23/Jul/2020 17:00

300 RQ25830 OCC_172 sldcrs_sd BAY 416 MAIN BAY - 765/400KV 1500 MVA ICT 2 AT ANTA(RS)

D HALF YEARLY MAINTENANCE TIE Circuit Breaker 409-52-T will remain available in the network.

PLANNED Approved 22/Jul/2020 09:30 22/Jul/2020 17:00

301 RQ25832 OCC_172 sldcrs_sd BAY 413 MAIN BAY - 400KV ANTA(RS)-CHHABRA(RVUN) (RS) CKT-2 AT ANTA(RS)

D HALF YEARLY MAINTENANCE 400 KV Anta-CHABARA Line II will be fed through 408-52-T Tie Circuit Breaker.

PLANNED Approved 16/Jul/2020 09:30 16/Jul/2020 17:00

302 RQ25831 OCC_172 sldcrs_sd BAY 410 MAIN BAY - 765/400KV 1500 MVA ICT 1 AT ANTA(RS)

D HALF YEARLY MAINTENANCE TIE Circuit Breaker 406-52-T will remain available in the network

PLANNED Approved 15/Jul/2020 09:30 15/Jul/2020 17:00

303 RQ25826 OCC_172 sldcrs_sd BAY 419 MAIN BAY - 765/400KV 1500 MVA ICT 2 AT PHAGI(RS)

D 1-Measurement of Tan-Delta of CTs. 2- Measurement of operation timings of CB. 3- Measurement of contact resistance of CB

There will be no interruption during shut-down period as the 400KV side of ICT-2 will be remained connected to 400KV Bus-D through 400KV Tie CB(410-52T).

PLANNED Approved 14/Jul/2020 09:00 14/Jul/2020 18:00

304 RQ26106 OCC_172 cpcc1_sd BAY 407 MAIN BAY - 400/220KV 500 MVA ICT 4 AT BALLABHGARH(PG)

C S/D required for retrofitment of old Bus Isolator (RK make) with new Isolator (S&S make) under ADD Cap.

PLANNED Approved 26/Jul/2020 08:00 01/Aug/2020 18:00

Page 35: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

305 RQ26105 OCC_172 cpcc1_sd BAY 404 MAIN BAY - 400/220KV 500 MVA ICT 1 AT BALLABHGARH(PG)

C S/D required for retrofitment of old Bus Isolator (RK make) with new Isolator (S&S make) under ADD Cap.

PLANNED Approved 20/Jul/2020 08:00 26/Jul/2020 18:00

306 RQ26026 OCC_172 cpcc3_sd BAY 409 MAIN BAY - 400 KV KANPUR(PG)-PANKI(UP) (PG) CKT-2

C For BUS-1 Pantograph Isolator replacement at UPPCL Panki End in POWERGRID bays under CERc ADD-CAP

PLANNED Approved 20/Jul/2020 08:00 26/Jul/2020 18:00

307 RQ26046 OCC_172 cpcc3_sd BAY W6BS2 BUS SECTIONALIZER BAY - 400KV AGRA(PG) - BUS 4 AND 400KV AGRA(PG) - BUS 8 AT AGRA(PG)

D For enabling M2 LBB function and checking tripping on LBB operation (429) & BAY AMP and associated maintenance works. After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 17/Jul/2020 08:00 17/Jul/2020 18:00

308 RQ26045 OCC_172 cpcc3_sd BAY W5BS1 BUS SECTIONALIZER BAY - 400KV AGRA(PG) - BUS 7 AND 400KV AGRA(PG) - BUS 3 AT AGRA(PG)

D For enabling M2 LBB function and checking tripping on LBB operation (428) & BAY AMP and associated maintenance works. After enabling, wiring , testng of LBB function in Main-2 relay. The trip test of connected tie CB, Direct trip / Inter trip send shall be actually verified.

PLANNED Approved 15/Jul/2020 08:00 15/Jul/2020 18:00

309 RQ26007 OCC_172 cpcc3_sd BAY 414 MAIN BAY - 400KV GORAKHPUR-GORAKHPUR (PG) CKT-2 AT GORAKHPUR(PG)

C Erection of Tension/ Suspension insulator strings on 02 No. gantry and laying of jack bus over 400 kV Bus II for connection to 41589 T Isolator from one gantry to other For 400 kV Side of 315 MVA ICT 3 under Substation Extn Package SS-XXV, Approved by 39 standing committee.

PLANNED Approved 15/Jul/2020 08:00 16/Jul/2020 18:00

Page 36: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

310 RQ26100 OCC_172 cpcc1_sd BAY 403 MAIN BAY - 50 MVAR BUS REACTOR NO 1 AT 400KV BASSI(PG) AND 400KV BUS 2 AT BASSI(PG)

C RK-make Isolator (403-89R) Replacement work with S&S Make-Isolator under ADD Cap

PLANNED Approved 13/Jul/2020 08:00 18/Jul/2020 18:00

311 RQ26101 OCC_172 cpcc1_sd BAY 402 TIE BAY - 125 MVAR BUS REACTOR NO 4 AT 400KV BASSI(PG) AND 50 MVAR BUS REACTOR NO 1 AT 400KV BASSI(PG)

C RK-make Isolator (403-89R) Replacement work with S&S Make-Isolator under ADD Cap

PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

312 RQ26104 OCC_172 cpcc1_sd BAY 406 MAIN BAY - 400/220KV 500 MVA ICT 3 AT BALLABHGARH(PG)

C S/D required for retrofitment of old Bus Isolator (RK make) with new Isolator (S&S make) under ADD Cap.

PLANNED Approved 13/Jul/2020 08:00 19/Jul/2020 18:00

313 RQ26025 OCC_172 cpcc3_sd BAY 408 MAIN BAY - 400 KV KANPUR(PG)-PANKI(UP) (PG) CKT-1

C For BUS-1 Pantograph Isolator replacement at UPPCL Panki End in POWERGRID bays under CERc ADD-CAP

PLANNED Approved 13/Jul/2020 08:00 18/Jul/2020 18:00

314 RQ26006 OCC_172 cpcc3_sd BAY 414 MAIN BAY - 400KV GORAKHPUR-GORAKHPUR (PG) CKT-2 AT GORAKHPUR(PG)

C Erection/ Installation of CB/CT/Isolator etc. For 400 kV Side of 315 MVA ICT 3 under Substation Extn Package SS-XXV, Approved by 39 standing committee. 400 kV GKP UPPTCL Line 2 shall remain charged through 413 Bay during this period.

PLANNED Approved 08/Jul/2020 08:00 14/Jul/2020 18:00

315 RQ26103 OCC_172 cpcc1_sd BAY 409 MAIN BAY - 400/220KV 500 MVA ICT 2 AT BALLABHGARH(PG)

C S/D required for retrofitment of old Bus Isolator (RK make) with new Isolator (S&S make) under ADD Cap.

PLANNED Approved 07/Jul/2020 08:00 13/Jul/2020 18:00

316 RQ26008 OCC_172 cpcc3_sd BAY 419 MAIN BAY - 400 KV ORAI(PG)-ORAI(UP) (PG) CKT-1

D AMP OF BAY EQUIPMENT at Orai UPPTCL S/S

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

317 RQ26099 OCC_172 cpcc1_sd BAY 409 TIE BAY - 400 KV BASSI-KOTPUTLI (PG) CKT-1 AND 400KV BUS 2 AT BASSI(PG)

C RK-make Isolator (409-89) Replacement work with S&S Make-Isolator under ADD Cap

PLANNED Approved 06/Jul/2020 08:00 11/Jul/2020 18:00

Page 37: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

318 RQ26102 OCC_172 cpcc1_sd BAY 415 MAIN BAY - 400KV BALLABHGARH-GURGAON (PG) CKT-1 AT BALLABHGARH(PG)

C S/D required for retrofitment of old Bus Isolator (RK make) with new Isolator (S&S make) under ADD Cap.

PLANNED Approved 01/Jul/2020 08:00 07/Jul/2020 18:00

319 RQ26030 OCC_172 dadri_sd BAY 403 MAIN BAY - 400 KV DADRI(NT)-PANIPAT(BB) (PG) CKT-2 AT DADRI(NT)

D Bay shutdown is required for maintenance

Line will remain charge through Tie bay.

PLANNED Approved 29/Jun/2020 09:00 29/Jun/2020 18:00

320 RQ26027 OCC_172 dadri_sd BAY 407 MAIN BAY - 400/220KV 500 MVA ICT 2 AT DADRI(NT)

D Shutdown required for bay maintenance

ICT-2 will remain charge through Tie bay.

PLANNED Approved 17/Jul/2020 09:00 17/Jul/2020 18:00

321 RQ26028 OCC_172 dadri_sd BAY 404 MAIN BAY - 400/220KV 500 MVA ICT 1 AT DADRI(NT)

D Shutdown required for bay maintenance

ICT-1 will remain charge through Tie bay.

PLANNED Approved 15/Jul/2020 09:00 15/Jul/2020 18:00

322 RQ25824 OCC_172 sldcrs_sd BAY 411 TIE BAY - 400/22 KV 810 MVA GT 2 AT KAWAI SCTPS(APR) AND 400/11 KV 80 MVA ST 2 AT KAWAI SCTPS(APR)

D Circuit Breaker Maintenance and Testing.

PLANNED Approved 14/Jul/2020 09:30 14/Jul/2020 19:30

323 RQ26022 OCC_172 dadri_sd BAY 421 MAIN BAY - 400KV DADRI(NT)-GR.NOIDA(UPC) (PG) CKT-1 AT DADRI(NT)

D Shutdown required for bay maintenance

Line will remain charge through Tie bay.

PLANNED Approved 13/Jul/2020 09:00 13/Jul/2020 18:00

324 RQ26021 OCC_172 dadri_sd BAY 422 MAIN BAY - 400KV DADRI(NT)-MAHARANIBAGH(PG) (PG) CKT-1 AT DADRI(NT)

D Shutdown required for bay maintenance

Line will remain charge through Tie bay.

PLANNED Approved 09/Jul/2020 09:00 09/Jul/2020 18:00

325 RQ26020 OCC_172 dadri_sd BAY 424 MAIN BAY - 400KV DADRI(NT)-LONI HARSH VIHAR(DV) (NT) CKT-2 AT DADRI(NT)

D Shutdown required for bay maintenance.

Line will remain charge through Tie bay.

PLANNED Approved 01/Jul/2020 09:00 01/Jul/2020 18:00

326 RQ26019 OCC_172 dadri_sd BAY 430 MAIN BAY - 400KV DADRI(NT)-LONI HARSH VIHAR(DV) (NT) CKT-1 AT DADRI(NT)

D Shutdown required for bay maintenance

Line will remain charge through Tie bay.

PLANNED Approved 30/Jun/2020 09:00 30/Jun/2020 18:00

327 RQ26029 OCC_172 dadri_sd BAY 412 MAIN BAY - 400KV DADRI(NT)-PANIPAT(BB) (PG) CKT-1 AT DADRI(NT)

D Shutdown required for bay maintenance

Line will remain charge through Tie bay.

PLANNED Approved 27/Jun/2020 09:00 27/Jun/2020 18:00

328 RQ26023 OCC_172 dadri_sd BAY 419 MAIN BAY - 400KV DADRI(NT)-MANDOLA(PG) (PG) CKT-2 AT DADRI(NT)

D Shutdown required for bay maintenance

Line will remain charge through Tie bay.

PLANNED Approved 26/Jun/2020 09:00 26/Jun/2020 18:00

Page 38: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

329 RQ26024 OCC_172 dadri_sd BAY 415 MAIN BAY - 400KV DADRI(NT)-MANDOLA(PG) (PG) CKT-1 AT DADRI(NT)

D Shutdown required for bay maintenance

Line will remain charge through Tie bay.

PLANNED Approved 25/Jun/2020 09:00 25/Jun/2020 18:00

330 RQ25823 OCC_172 sldcrs_sd BAY 408 TIE BAY - 63 MVAR BUS REACTOR NO 2 AT 400 KV KAWAI SCTPS(APR) AND 400 KV ANTA(RS)-KAWAI SCTPS(APR) (RS) CKT-2

D Circuit Breaker Maintenance and Testing.

PLANNED Approved 13/Jul/2020 09:30 13/Jul/2020 19:30

331 RQ25827 OCC_172 sldcrs_sd BAY 414 TIE BAY - 400KV CHHABRA(RVUN)-KAWAI SCTPS(APR) (RS) CKT-1 AND FUTURE AT KAWAI SCTPS(APR)

C Circuit Breaker Overhauling. PLANNED Approved 10/Jul/2020 09:30 11/Jul/2020 19:30

332 RQ25828 OCC_172 sldcrs_sd BAY 413 MAIN BAY - 400KV CHHABRA(RVUN)-KAWAI SCTPS(APR) (RS) CKT-1 AT KAWAI SCTPS(APR)

C Circuit Breaker Overhauling. PLANNED Approved 08/Jul/2020 09:30 09/Jul/2020 19:30

333 RQ26054 OCC_172 bbmb_sd BAY 403 MAIN BAY - 50 MVAR BUS REACTOR NO 1 AT 400KV BHIWANI(BB)

D Half yearly mtc PLANNED Approved 08/Jul/2020 08:00 08/Jul/2020 18:00

334 RQ26053 OCC_172 bbmb_sd BAY X2 TIE BAY - 400 KV BHIWANI(BB)-RAJPURA(PS) (BB) CKT-1 AND FUTURE AT 400 KV BHIWANI(BB)

D Half yearly mtc PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

335 RQ25610 OCC_172 sterlite_sd BAY 412 MAIN BAY - 125 MVAR BUS REACTOR NO 1 AT 400 KV PRITHALA (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 04/Jul/2020 13:00 04/Jul/2020 16:00

336 RQ25611 OCC_172 sterlite_sd BAY 411 TIE BAY - 125 MVAR BUS REACTOR NO 1 AT 400 KV PRITHALA (GPTL) AND FUTURE AT 400 KV PRITHALA (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 04/Jul/2020 10:00 04/Jul/2020 13:00

337 RQ25612 OCC_172 sterlite_sd BAY 408 TIE BAY - 400 KV ALIGARH(PG)-PRITHALA (GPTL) (NRSS XXIX) CKT-1 AND 400/220 KV 500 MVA ICT 2 AT PRITHALA (GPTL) AT 400 KV PRITHALA (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 03/Jul/2020 13:00 03/Jul/2020 16:00

Page 39: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

338 RQ25619 OCC_172 sterlite_sd BAY 407 MAIN BAY - 400 KV ALIGARH(PG)-PRITHALA (GPTL) (NRSS XXIX) CKT-1

D For Signal Testing work in Remote Control Centre

PLANNED Approved 03/Jul/2020 10:00 03/Jul/2020 13:00

339 RQ25613 OCC_172 sterlite_sd BAY 405 TIE BAY - 400 KV KADARPUR (GPTL)-PRITHALA (GPTL) (NRSS XXIX) CKT-2 AND 400 KV ALIGARH(PG)-PRITHALA (GPTL) (NRSS XXIX) CKT-2 AT 400 KV PRITHALA (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 02/Jul/2020 13:00 02/Jul/2020 16:00

340 RQ25615 OCC_172 sterlite_sd BAY 404 MAIN BAY - 400 KV KADARPUR (GPTL)-PRITHALA (GPTL) (NRSS XXIX) CKT-2

D For Signal Testing work in Remote Control Centre

PLANNED Approved 02/Jul/2020 10:00 02/Jul/2020 13:00

341 RQ25618 OCC_172 sterlite_sd BAY 403 MAIN BAY - 400/220 KV 500 MVA ICT 1 AT PRITHALA (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 01/Jul/2020 16:00 01/Jul/2020 18:00

342 RQ25616 OCC_172 sterlite_sd BAY 401 MAIN BAY - 400 KV KADARPUR (GPTL)-PRITHALA (GPTL) (NRSS XXIX) CKT-1

D For Signal Testing work in Remote Control Centre

PLANNED Approved 01/Jul/2020 10:00 01/Jul/2020 13:00

343 RQ25617 OCC_172 sterlite_sd BAY 409 MAIN BAY - 400/220 KV 500 MVA ICT 2 AT PRITHALA (GPTL) (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 03/Jul/2020 16:00 03/Jul/2020 18:00

344 RQ25620 OCC_172 sterlite_sd BAY 406 MAIN BAY - 400 KV ALIGARH(PG)-PRITHALA (GPTL) (GPTL) CKT-2 (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 02/Jul/2020 16:00 02/Jul/2020 18:00

345 RQ25614 OCC_172 sterlite_sd BAY 402 TIE BAY - 400 KV KADARPUR -PRITHALA (GPTL) CKT-1 (GPTL) AND 400/220 KV 500 MVA ICT 1 AT PRITHALA (GPTL) AT 400 KV PRITHALA (GPTL) (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 01/Jul/2020 13:00 01/Jul/2020 16:00

346 RQ25692 OCC_172 stuup_sd BAY 404 MAIN BAY - 400KV ANPARA_B(UPUN)-ANPARA_D(UP) (UP) CKT-1 AT ANPARA_D(UP)

C For replacement of 28 years old 400KV HITACHI make Gas circuit breaker with new GE T&D make Gas circuit breaker

Line will remain charged through Transfer bus

PLANNED Approved 02/Jul/2020 08:00 15/Jul/2020 16:00

Page 40: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

347 RQ25592 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT UNNAO(UP)

D Preventive maintenance and routine protection testing of Transformer

PLANNED Approved 30/Jul/2020 09:00 30/Jul/2020 17:00

348 RQ25623 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 3 AT SULTANPUR(UP)

D For Routine Bay Maintenance

PLANNED Approved 29/Jul/2020 10:00 29/Jul/2020 18:00

349 RQ25673 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT SULTANPUR(UP)

D For Routine Bay Maintenance

PLANNED Approved 22/Jul/2020 10:00 22/Jul/2020 18:00

350 RQ25601 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT BANDA(UP)

D For Routine Testing & Maintenance of 315 MVA ICT-1 at 400 KV S/S Banda

PLANNED Approved 15/Jul/2020 09:00 15/Jul/2020 17:00

351 RQ25687 OCC_172 stuup_sd TRANSFORMER 400/220 KV 500 MVA ICT 5 AT GR.NOIDA(UPC)

C For maintenance work of Y-Phase Male Female contact of standard isolator

There will be no supply intrruption due to this shut down load of 400kV S/S Greater noida will be feed by (2x135+1x500)MVA ICTS

PLANNED Approved 14/Jul/2020 10:00 14/Jul/2020 14:00

352 RQ25594 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT ORAI(UP)

D routine breaker maintenance & hot spot attending.

PLANNED Approved 14/Jul/2020 09:00 14/Jul/2020 19:00

353 RQ25622 OCC_172 stuup_sd TRANSFORMER 400/220 KV 240 MVA ICT 2 AT SULTANPUR(UP)

D For Routine Bay Maintenance

PLANNED Approved 13/Jul/2020 10:00 17/Jul/2020 18:00

354 RQ25600 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT BANDA(UP)

D For Routine Testing & Maintenance of 315 MVA ICT-2 at 400 KV S/S Banda

PLANNED Approved 13/Jul/2020 09:00 13/Jul/2020 17:00

355 RQ25635 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 3 AT SARNATH(UP)

D Rejumpering of Bushing & LA of HV and IV side of 315MVA ICT-III

PLANNED Approved 13/Jul/2020 09:00 15/Jul/2020 18:00

356 RQ25639 OCC_172 stuup_sd TRANSFORMER 400/220 KV 500 MVA ICT 1 AT SIKANDRABAD(UP)

C For Annual Maintenance & Testing work

PLANNED Approved 11/Jul/2020 09:00 11/Jul/2020 13:00

357 RQ25625 OCC_172 stuup_sd TRANSFORMER 400/220 KV 240 MVA ICT 1 AT MURADNAGAR_2(UP)

D Testing & Preventive Maintenance

PLANNED Approved 10/Jul/2020 10:00 10/Jul/2020 17:00

358 RQ25624 OCC_172 stuup_sd TRANSFORMER 400/220 KV 500 MVA ICT 2 AT SARNATH(UP)

D Rejumpering of Bushing & LA of HV and IV side of 500MVA ICT-II

PLANNED Approved 09/Jul/2020 09:00 11/Jul/2020 18:00 Load management to be done by UP.

Page 41: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

359 RQ25689 OCC_172 stuup_sd TRANSFORMER 400/220 KV 240 MVA ICT 3 AT MORADABAD(UP)

D General maintenance, Checking & tightening of clamps and connectors of complete bay, including transformer bushing clamps for avoiding any breakdown.

PLANNED Approved 08/Jul/2020 09:00 08/Jul/2020 18:00

360 RQ25638 OCC_172 stuup_sd TRANSFORMER 400/220 KV 500 MVA ICT 1 AT AZAMGARH(UP)

C For Attending Oil seepage in OLTC conservator tank of 500MVA ICT-I

PLANNED Approved 07/Jul/2020 10:00 07/Jul/2020 18:00

361 RQ25593 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT ORAI(UP)

D routine relay testing,bushing tan delta testing & hot spot attending.

PLANNED Approved 07/Jul/2020 09:00 07/Jul/2020 19:00

362 RQ25621 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT SARNATH(UP)

D Rejumpering of Bushing & LA of IV side of 315MVA ICT-I

PLANNED Approved 06/Jul/2020 09:00 07/Jul/2020 18:00

363 RQ25688 OCC_172 stuup_sd TRANSFORMER 400/220 KV 500 MVA ICT 6 AT GR.NOIDA(UPC)

C Maintinance work at R phase standard isolator

There will be no supply intrruption due to this shut down load of 400kV S/S Greater noida will be feed by (2x135+1x500)MVA ICTS

PLANNED Approved 06/Jul/2020 09:00 06/Jul/2020 17:00

364 RQ25605 OCC_172 stuup_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT BAREILLY(UP)

C TO REPLACE OLD AND OBSOLETE PNEUMATIC TYPE HV SIDE BREAKER (ABB) BY NEW SIEMENS MAKE BREAKER

DURING SHUTDOWN PERIOD 315 MVA ICT- 01 WILL REMAIN ENERGISED THROUGH TRANSFER BREAKER

PLANNED Approved 01/Jul/2020 10:00 05/Aug/2020 17:00

365 RQ26144 OCC_172 cpcc2_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT PARBATI POOLING BANALA(PG)

C For pipe bus connectionof ICT 220kv side SF6 to Air Bushing in Y & B phases to resolve clearance issue.

Kindly approve PLANNED Approved 24/Jul/2020 08:00 25/Jul/2020 13:00

366 RQ26145 OCC_172 cpcc2_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT PARBATI POOLING BANALA(PG)

D For AMP works. Kindly approve PLANNED Approved 22/Jul/2020 08:00 22/Jul/2020 18:00

Page 42: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

367 RQ26154 OCC_172 cpcc2_sd TRANSFORMER 400/220 KV 500 MVA ICT 2 AT KURUKSHETRA(PG)

C For (i) AMP activities, (ii) replacing of O-ring/gasket of PRD for attending leakage & (iii) replacement of faulty gas density switch in 220kV GIS ICT-2 bay (G2 compartment)- for the same simulatneous shut down of 220kV GIS Busbar-2 Kurukshetra is required.

Kindly approve PLANNED Approved 21/Jul/2020 08:00 22/Jul/2020 20:00 Subject to Haryana consent.

368 RQ25968 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Transfer bus.

PLANNED Rejected 14/Jul/2020 08:00 14/Jul/2020 18:00

369 RQ25969 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Transfer bus.

PLANNED Rejected 14/Jul/2020 08:00 14/Jul/2020 18:00

370 RQ25966 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Main bus-2.

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

371 RQ25967 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Main bus-2.

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

372 RQ25964 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

373 RQ25965 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

374 RQ25962 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#2.

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

375 RQ25963 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#2.

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

376 RQ25971 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT KOTA(PG)

D Polymer Insulator replacement work in S/S

PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

Page 43: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

377 RQ25960 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#1.

PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

378 RQ25961 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#1.

PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

379 RQ26116 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT KANKROLI(PG)

D FOR AMP WORK PLANNED Approved 10/Jul/2020 08:00 10/Jul/2020 18:00

380 RQ25957 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 500 MVA ICT 2 AT BAGHPAT(PG)

D FOR AMP WORK PLANNED Approved 09/Jul/2020 08:00 09/Jul/2020 18:00

381 RQ25959 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 500 MVA ICT 2 AT MANESAR(PG)

D FOR AMP WORK PLANNED Approved 09/Jul/2020 08:00 09/Jul/2020 18:00

382 RQ26115 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT BHINMAL(PG)

D FOR AMP WORK PLANNED Approved 08/Jul/2020 08:00 08/Jul/2020 18:00

383 RQ25956 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 500 MVA ICT 1 AT BAGHPAT(PG)

D FOR AMP WORK PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

384 RQ25970 OCC_172 cpcc1_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT KOTA(PG)

D . Polymer Insulator replacement work in S/S(alongwith BUS-2 on dated: 07.07.2020)

PLANNED Approved 06/Jul/2020 08:00 07/Jul/2020 18:00

385 RQ26175 OCC_172 cpcc2_sd TRANSFORMER 400/220 KV 500 MVA ICT 1 AT MOGA(PG)

D Checking of control Circuit and buchholz relay of ICT-I.

Kindly approve PLANNED Approved 27/Jun/2020 09:30 27/Jun/2020 17:30

386 RQ25791 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT BIKANER(RS)

D For routine bay maintenance works

PLANNED Approved 15/Jul/2020 08:00 15/Jul/2020 18:00

387 RQ25788 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT HINDAUN(RS)

D Quarterly Maintenance work PLANNED Approved 14/Jul/2020 08:00 14/Jul/2020 18:00

388 RQ25786 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT HINDAUN(RS)

D Quarterly Maintenance work PLANNED Approved 13/Jul/2020 08:00 13/Jul/2020 18:00

389 RQ25792 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 500 MVA ICT 3 AT BHADLA(RS)

D Quarterly Maintenance PLANNED Approved 10/Jul/2020 18:00 10/Jul/2020 23:00

390 RQ25787 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 500 MVA ICT 2 AT BHADLA(RS)

D Quarterly Maintenance PLANNED Approved 09/Jul/2020 18:00 09/Jul/2020 23:00

391 RQ25789 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 500 MVA ICT 1 AT BHADLA(RS)

D Quarterly Maintenance PLANNED Approved 07/Jul/2020 16:00 07/Jul/2020 21:00

Page 44: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

392 RQ25790 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 315 MVA ICT 3 AT AJMER(RS)

D MAINTENANCE & TESTING WORK OF BAY EQUIPMENTS & TRANSFORMER

During the shutdown the supply shall be fed by the ICT-I hence there will be no supply disturbance.

PLANNED Approved 02/Jul/2020 08:00 03/Jul/2020 18:00

393 RQ25947 OCC_172 sldcrs_sd TRANSFORMER 400/220 KV 315 MVA ICT 2 AT BHILWARA(RS)

D Half yearly maintenance of 315 MVA 400/220/33 KV ICT No.-2 & ASSOCIATED BAY EQUIPMENTS

PLANNED Approved 01/Jul/2020 08:00 02/Jul/2020 18:00

394 RQ25701 OCC_172 sldchr_sd TRANSFORMER 400/220 KV 315 MVA ICT 1 AT DHANODA(HV)

D For annual mtc of T/F and its allied equipments

PLANNED Approved 14/Jul/2020 09:00 14/Jul/2020 16:00

395 RQ25702 OCC_172 sldchr_sd TRANSFORMER 400/220 KV 250 MVA ICT 2 AT NAWADA(HV)

D For yearly mtc of T/F and allied equipment

PLANNED Approved 08/Jul/2020 10:00 08/Jul/2020 16:00

396 RQ25714 OCC_172 sldchr_sd TRANSFORMER 400/220 KV 315 MVA ICT 4 AT DAULATABAD(HV)

D To attend pending observation. oil leakage from conservator

PLANNED Approved 08/Jul/2020 08:00 08/Jul/2020 16:00

397 RQ26009 OCC_172 cpcc3_sd TRANSFORMER 220/132 KV 100 MVA ICT 1 AT TANAKPUR(NH)

D For SFRA test PLANNED Approved 25/Jun/2020 08:00 25/Jun/2020 18:00

398 RQ25949 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV KHARA(UP)-SAHARANPUR(PG) (UP) CKT-1

D FOR AMP WORK PLANNED Approved 30/Jul/2020 08:00 30/Jul/2020 18:00

399 RQ25950 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV NANAUTA(UP)-SAHARANPUR(PG) (UP) CKT-1

D FOR AMP WORK PLANNED Approved 29/Jul/2020 08:00 29/Jul/2020 18:00

400 RQ26035 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV AGRA(PG)-FEROZABAD(UP) (UP) CKT-1

D Stringing Work of under passing 132Kv Firozabad-Narkhi Line between Loc. No 10-11 and 13-14. This S/D require for Evacuation of power from JAwahar TPS. Line Sketch enclosed.

PLANNED Approved 24/Jul/2020 08:00 25/Jul/2020 18:00

401 RQ25843 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV NEW TANDA (UP)-SOHAWAL(PG) (UP) CKT-1

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR 'RE- STRINGING AT TOWER LOCATION NO 07 OF 400 KV LKO-SOHAWAL LINE (DD+30) after replacement of Bent Tower at Location No. 07. Photograph of Bent Tower enclosed.

Line crossing Sketch also Enclosed

PLANNED Approved 17/Jul/2020 08:00 17/Jul/2020 18:00

Page 45: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

402 RQ25844 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV NEW TANDA (UP)-SOHAWAL(PG) (UP) CKT-2

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR 'RE- STRINGING AT TOWER LOCATION NO 07 OF 400 KV LKO-SOHAWAL LINE (DD+30) after replacement of Bent Tower at Location No. 07. Photograph of Bent Tower enclosed.

Line crossing Sketch also Enclosed

PLANNED Approved 17/Jul/2020 08:00 17/Jul/2020 18:00

403 RQ25684 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

220 KV NAPP(NP)-SAMBHAL(UP) (UP) CKT-1

D LOPPING CHOPPING & TREE CUTTING

PLANNED Approved 16/Jul/2020 10:00 18/Jul/2020 17:00

404 RQ25630 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

220 KV SARSAWAN(UP)-KHODRI(UK) (UP) CKT-1

D looping chopping of trees in line corridor of hilly area

PLANNED Approved 16/Jul/2020 10:00 20/Jul/2020 17:00

405 RQ25631 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

220 KV SAHARANPUR(UP)-KHODRI(UK) (UP) CKT-1

D looping chopping of trees in line corridor of hilly area

PLANNED Approved 08/Jul/2020 10:00 12/Jul/2020 17:00

406 RQ25948 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV SAHARANPUR(PG)-SHAMLI(UP) (UP) CKT-1

D FOR AMP WORK PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

407 RQ25846 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV SOHAWAL(PG)-BARABANKI(UP) (UP) CKT-2

D AMP of 220KV Sohawal-Barabanki Ckt-2 Line Bay Equipments (209L Bay) at Sohawal Substation

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

408 RQ25841 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV NEW TANDA (UP)-SOHAWAL(PG) (UP) CKT-1

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR DE- STRINGING OF OVER-HEAD LUCKNOW- SOHAWAL LINE AT TOWER LOCATION NO 07 Since location 07 tower is bent and is being Replaced. Photograph of Bent Tower enclosed.

Line crossing Sketch also Enclosed

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

Page 46: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

409 RQ25842 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV NEW TANDA (UP)-SOHAWAL(PG) (UP) CKT-2

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR DE- STRINGING OF OVER-HEAD LUCKNOW- SOHAWAL LINE AT TOWER LOCATION NO 07 Since location 07 tower is bent and is being Replaced. Photograph of Bent Tower enclosed.

Line crossing Sketch also Enclosed

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

410 RQ25685 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

220 KV NAPP(NP)-DEBAI(UP) (UP) CKT-1

D For jumper teighting and lopping chopping and bird nest removing

There will be no supply interruption due to this shut down.

PLANNED Approved 04/Jul/2020 10:00 06/Jul/2020 18:00

411 RQ25845 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV SOHAWAL(PG)-BARABANKI(UP) (UP) CKT-1

D AMP of 220KV Sohawal-Barabanki Ckt-1 Line Bay Equipments (208L Bay) at Sohawal Substation

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00

412 RQ25674 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

220 KV SULTANPUR(UP)-TANDA(NT) (UP) CKT-2

D For Routine Bay Maintenance and other works

PLANNED Approved 02/Jul/2020 10:00 02/Jul/2020 18:00

413 RQ25801 OCC_172 sldcdv_sd AC TRANSMISSION LINE CIRCUIT

220 KV GAZIPUR(DTL)-SHAHIBABAD(UP) (UP) CKT-2

D Tan delta testing of 220kV CVT and maintenance as per PMS.

Remains on no load. PLANNED Approved 02/Jul/2020 09:30 02/Jul/2020 12:00

414 RQ25803 OCC_172 sldcdv_sd AC TRANSMISSION LINE CIRCUIT

220 KV GAZIPUR(DTL)-NOIDA SEC62(UP) (UP) CKT-1

D Tan delta testing of 220kV CVT and maintenance as per PMS.

Remains on no load. PLANNED Approved 01/Jul/2020 12:30 01/Jul/2020 15:30

415 RQ25587 OCC_172 stuup_sd AC TRANSMISSION LINE CIRCUIT

220 KV NAPP(NP)-KHURJA(UP) (UP) CKT-1

D For jumper teighting and lopping chopping and bird nest removing

PLANNED Approved 01/Jul/2020 10:00 03/Jul/2020 18:00

416 RQ25802 OCC_172 sldcdv_sd AC TRANSMISSION LINE CIRCUIT

220 KV GAZIPUR(DTL)-NOIDA SEC20(UP) (UP) CKT-1

D Tan delta testing of 220kV CVT and maintenance as per PMS.

Remains on no load. PLANNED Approved 01/Jul/2020 09:30 01/Jul/2020 12:30

417 RQ25679 OCC_172 ntpcos_sd AC TRANSMISSION LINE CIRCUIT

220 KV UNCHAHAR(NT)-FATEHPUR(UP) (UP) CKT-2

C Yearly Maintenance PLANNED Approved 29/Jun/2020 08:00 30/Jun/2020 18:00

418 RQ25678 OCC_172 ntpcos_sd AC TRANSMISSION LINE CIRCUIT

220 KV UNCHAHAR(NT)-FATEHPUR(UP) (UP) CKT-1

C HALF YEARLY MAINTENANCE WORK OF 400/220 KV 315 MVA ICT-I

PLANNED Approved 25/Jun/2020 08:00 26/Jun/2020 18:00

Page 47: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

419 RQ25884 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV AGRA(PG)-BHARATPUR(RS) (PG) CKT-1

D For tree cutting and line maintenance

PLANNED Approved 25/Jul/2020 08:00 25/Jul/2020 18:00

420 RQ26036 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV AURAIYA(NT)-SIKANDRA(UP) (PG) CKT-1

D Stringing Work of under passing 132Kv Firozabad-Narkhi Line between Loc. No 09-10. This S/D require for Evacuation of power from JAwahar TPS. Line Sketch enclosed.

PLANNED Approved 22/Jul/2020 08:00 22/Jul/2020 18:00

421 RQ26037 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV AURAIYA(NT)-SIKANDRA(UP) (PG) CKT-2

D Stringing Work of under passing 132Kv Firozabad-Narkhi Line between Loc. No 09-10. This S/D require for Evacuation of power from JAwahar TPS. Line Sketch enclosed.

PLANNED Approved 22/Jul/2020 08:00 22/Jul/2020 18:00

422 RQ26163 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

220 KV KISHENPUR(PG)-SARNA(PS) (PG) CKT-2

D Jumper Tightening Non-Auto reclose of ckt-I required during the work

PLANNED Approved 15/Jul/2020 09:00 15/Jul/2020 18:00

423 RQ25931 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV ANTA(NT)-SAWAIMADHOPUR(RS) (PG) CKT-1

D for Half yearly Maintenance PLANNED Approved 09/Jul/2020 09:00 09/Jul/2020 14:00

424 RQ25820 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV ALLAHABAD(PG)-ALLAHABADREWAROAD(UP) (PG) CKT-1

C For Diversion work due to infringement of DFCCIL Rail Track

line sketch enclosed PLANNED Approved 06/Jul/2020 08:00 12/Jul/2020 18:00 Subject to UPPTCL consent.

425 RQ25821 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV ALLAHABAD(PG)-ALLAHABADREWAROAD(UP) (PG) CKT-2

C For Diversion work due to infringement of DFCCIL Rail Track

line sketch enclosed PLANNED Approved 06/Jul/2020 08:00 12/Jul/2020 18:00 Subject to UPPTCL consent.

426 RQ26162 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

220 KV KISHENPUR(PG)-SALAL(NH) (PG) CKT-2

D Replacement of damaged 2 no.s dropper in Gantry

Kindly approve PLANNED Approved 02/Jul/2020 08:00 02/Jul/2020 18:00

427 RQ25683 OCC_172 ntpcos_sd AC TRANSMISSION LINE CIRCUIT

220 KV UNCHAHAR(NT)-RAEBAREILLY(PG) (PG) CKT-3

C HALF YEARLY MAINTENANCE WORK OF 400/220 KV 315 MVA ICT-I

SHUT DOWN REQUIRED FOR 220 KV SHUT DOWN OF KANPUR LINE 2 WHICH IS NOT MENTIONEDSHUT DOWN REQUEST SYSTEM.

PLANNED Approved 01/Jul/2020 08:00 02/Jul/2020 18:00

428 RQ25721 OCC_172 rappc_sd AC TRANSMISSION LINE CIRCUIT

220 KV RAPS_C(NP)-RAPS_B(NP) (PG) CKT-2

D B PHASE LA REPLACEMENT DUE TO HIGHER THIRD HARMONIC CURRENT

LA REPLACEMENT PLANNED Approved 30/Jun/2020 08:00 30/Jun/2020 18:00

Page 48: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

429 RQ25720 OCC_172 rappc_sd AC TRANSMISSION LINE CIRCUIT

220 KV RAPS_B(NP)-DEBARI(RS) (PG) CKT-1

D B PHASE LA REPLACEMENT DUE TO HIGHER THIRD HARMONIC CURRENT

LA REPLACEMENT PLANNED Approved 29/Jun/2020 08:00 29/Jun/2020 18:00

430 RQ26010 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV TANAKPUR(NH)-SITARGANJ(PG) (PG) CKT-1

D AMP work and line maintenance

PLANNED Approved 27/Jun/2020 08:00 27/Jun/2020 18:00

431 RQ25885 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV AGRA(PG)-SIKANDRA(UP) (PG) CKT-1

D For tree cutting and line maintenance

PLANNED Approved 23/Jul/2020 08:00 23/Jul/2020 18:00

432 RQ26157 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

220 KV KURUKSHETRA(PG)-PEHOWA(HV) (HVPNL) CKT-1

D For (i) AMP works & (ii) replacement of faulty gas density switch in 220kV GIS Kuruksehtra-Pehowa Line bay (G2 compartment)- for the same simultaneous shut down of 220kV GIS Kurukshetra-Kaul Line CKT-1 bay & 220kV GIS Busbar-2 Kurukshetra is required.

Kindly approve PLANNED Approved 21/Jul/2020 08:00 21/Jul/2020 20:00

433 RQ26158 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

220 KV KAUL (HV)-KURUKSHETRA(PG) (HVPNL) CKT-1

D For (i) AMP works & (ii) replacement of faulty gas density switch in 220kV GIS Kuruksehtra-Pehowa Line bay (G2 compartment)- for the same simultaneous shut down of 220kV GIS Kurukshetra-Kaul Line CKT-1 bay & 220kV GIS Busbar-2 Kurukshetra is required.

Kindly approve PLANNED Approved 21/Jul/2020 08:00 21/Jul/2020 20:00

434 RQ25944 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV ROORKEE(PG)-RAMNAGAR(UK) (PTCUL) CKT-1

D For replacement of porcelain insulator in 220 kV Transfer bus. at Roorkee S/S

PLANNED Rejected 14/Jul/2020 08:00 14/Jul/2020 18:00

435 RQ25945 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV PIRANKALIYAR(UK)-ROORKEE(PG) (PTCUL) CKT-1

D For replacement of porcelain insulator in 220 kV Transfer bus. at Roorkee S/S

PLANNED Rejected 14/Jul/2020 08:00 14/Jul/2020 18:00

436 RQ25942 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV ROORKEE(PG)-RAMNAGAR(UK) (PTCUL) CKT-1

D For replacement of porcelain insulator in 220 kV Main bus-2.at Roorkee S/S

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

Page 49: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

437 RQ25943 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV PIRANKALIYAR(UK)-ROORKEE(PG) (PTCUL) CKT-1

D For replacement of porcelain insulator in 220 kV Main bus-2.at Roorkee S/S

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

438 RQ25940 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV ROORKEE(PG)-RAMNAGAR(UK) (PTCUL) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

439 RQ25941 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV PIRANKALIYAR(UK)-ROORKEE(PG) (PTCUL) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

440 RQ25938 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV ROORKEE(PG)-RAMNAGAR(UK) (PTCUL) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#2 at Roorkee S/S

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

441 RQ25939 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV PIRANKALIYAR(UK)-ROORKEE(PG) (PTCUL) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#2 at Roorkee S/S

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

442 RQ25897 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV ROORKEE(PG)-RAMNAGAR(UK) (PTCUL) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#1.

along with ICT PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

443 RQ25898 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV PIRANKALIYAR(UK)-ROORKEE(PG) (PTCUL) CKT-1

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#1.

along with ICT PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

444 RQ25954 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV BHILWARA(RS)-KOTA(PG) (RS) CKT-1

D Polymer Insulator replacement work in KOTAS/S.

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

445 RQ25953 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV KOTA(PG)-KTPS(RVUN) (RS) CKT-2

D Polymer Insulator replacement work in KOTA S/S.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

446 RQ25955 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV DUNI(RS)-KOTA(PG) (RS) CKT-1

D Polymer Insulator replacement work in KOTA S/S along with BUS-2

PLANNED Rejected 09/Jul/2020 08:00 09/Jul/2020 18:00

447 RQ25952 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV KOTA(PG)-KTPS(RVUN) (RS) CKT-1

D Polymer Insulator replacement work in KOTA S/S along with BUS-2

PLANNED Rejected 08/Jul/2020 08:00 08/Jul/2020 18:00

Page 50: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

448 RQ25887 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV BADARPUR(NT)-ALWAR MIA(RS) (RS) CKT-1

D For half yrarly maintenance & tree trimming work under line

PLANNED Approved 06/Jul/2020 09:00 11/Jul/2020 17:00

449 RQ25920 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV RAPS_B(NP)-SAKATPURA(RS) (RS) CKT-1

D QUARTERLY Bay MAINTENANCE & testing WORK

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00

450 RQ26141 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV CHITTORGARH-DEBARI (RS) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

451 RQ25889 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV CHARKHI DADRI(BB)-KHETRI(RS) (BB) CKT-2

D Bay maintenance work & tree trimming work

PLANNED Approved 09/Jul/2020 08:00 09/Jul/2020 18:00

452 RQ25888 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

220 KV CHARKHI DADRI(BB)-KHETRI(RS) (BB) CKT-1

D Bay maintenance work & tree trimming work

PLANNED Approved 07/Jul/2020 08:00 07/Jul/2020 18:00

453 RQ25794 OCC_172 sldcdv_sd AC TRANSMISSION LINE CIRCUIT

220 KV BALLABHGARH(BB)-BADARPUR(NT) (BB) CKT-1

D Attending hot point at Y phase line isolator clamp line side.

Load shall be managed by 220kV Ballabhgarh-BTPS ckt 2.

PLANNED Approved 04/Jul/2020 10:00 04/Jul/2020 13:00

454 RQ26134 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV BALLABHGARH(BB)-BADARPUR(NT) (BB) CKT-1

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW rectification works

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

455 RQ26135 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV BALLABHGARH(BB)-BADARPUR(NT) (BB) CKT-2

D Relay setting may be changed from Auto reclose to Non-auto reclose mode for OPGW rectification works

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

456 RQ26139 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV PANIPAT-DHULKOTE (BB) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

457 RQ26140 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV PANIPAT-DHULKOTE (BB) CKT-2

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

Page 51: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

458 RQ25797 OCC_172 sldcdv_sd AC TRANSMISSION LINE CIRCUIT

220 KV MANDOLA(PG)-NARELA(DV) (DTL) CKT-2

D For jumper tightening of critical towers no 9,2, 1 and gantry Mandola.

PLANNED Approved 08/Jul/2020 05:00 08/Jul/2020 14:00

459 RQ25796 OCC_172 sldcdv_sd AC TRANSMISSION LINE CIRCUIT

220 KV MANDOLA(PG)-NARELA(DV) (DTL) CKT-2

D For jumper tightening of critical towers no 18, 17 & 17 A.

PLANNED Approved 04/Jul/2020 05:00 04/Jul/2020 14:00

460 RQ26132 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV BADARPUR(NT)-SARITA VIHAR(DV) (DTL) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

461 RQ26133 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV BADARPUR(NT)-OKHLA(DV) (DTL) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

462 RQ26136 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV MAHARANIBAGH(PG)-LODHIROAD(DV) (DTL) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

463 RQ26137 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV MAHARANIBAGH(PG)-LODHIROAD(DV) (DTL) CKT-2

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

464 RQ26138 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 KV MAHARANIBAGH(PG)-SARITA VIHAR(DV) (DTL) CKT-1

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

PLANNED Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

465 RQ25795 OCC_172 sldcdv_sd AC TRANSMISSION LINE CIRCUIT

220 KV MANDOLA(PG)-NARELA(DV) (DTL) CKT-2

D For jumper tightening of critical towers no 34, 24 & 21.

PLANNED Approved 01/Jul/2020 05:00 01/Jul/2020 14:00

466 RQ26150 OCC_172 cpcc2_sd AC TRANSMISSION LINE CIRCUIT

220 KV WAGOORA(PG)-PAMPORE(PDD) (PDD JK) CKT-2

D For AMP works. Kindly approve PLANNED Approved 06/Jul/2020 09:00 06/Jul/2020 17:00

467 RQ25822 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV ALLAHABAD(PG)-NAINI(RLY) (RAILWAYS) CKT-1

D for AMP of Line side Equipment at Allahabad Substation

PLANNED Approved 02/Jul/2020 08:00 02/Jul/2020 18:00

Page 52: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

468 RQ26155 OCC_172 cpcc2_sd BUS 220 KV KURUKSHETRA(PG) - BUS 1

D For (i) AMP works & (ii) replacement of faulty gas density switch in 220kV GIS Bus Coupler (G4 compartment)

Kindly approve PLANNED Approved 23/Jul/2020 08:00 23/Jul/2020 20:00

469 RQ25994 OCC_172 cpcc3_sd BUS 220KV BUS 1 AT SHAHJAHANPUR(PG)

D Bus#1 R-Ph CVT repllacement on Secondery Voltage drift at Shahjahanpur Substation.

PLANNED Approved 22/Jul/2020 08:00 22/Jul/2020 18:00

470 RQ26156 OCC_172 cpcc2_sd BUS 220 KV KURUKSHETRA(PG) - BUS 2

C For (i) AMP works & (ii) replacement of faulty gas density switch in 220kV GIS Kuruksehtra-Pehowa Line bay (G2 compartment), 220kV GIS ICT-2 bay (G2 compartment) & 220kV GIS bus Coupler (G3 compartment).

Kindly approve PLANNED Approved 21/Jul/2020 08:00 22/Jul/2020 20:00

471 RQ26004 OCC_172 cpcc3_sd BUS 220KV BUS 1 AT GORAKHPUR(PG)

D Erection/Alignment/ Testing of 1 set DBR Isolator(20789A)with earth switch(20789AE) along with 02 nos BPI Support insulator under Substation Extn Package SS-XXV, Approved by 39 standing committee. All lines & equipments shall remain charged through 220 kV Main Bus II

PLANNED Approved 21/Jul/2020 08:00 22/Jul/2020 18:00

472 RQ26001 OCC_172 cpcc3_sd BUS 220KV BUS 2 AT GORAKHPUR(PG)

D Erection/Alignment/testing of 1 set tandom Isolator(20789B) along with 03 nos BPI Support insulator under Substation Extn Package SS-XXV, Approved by 39 standing committee. All lines & equipments shall remain charged through 220 kV Main Bus I.

PLANNED Approved 19/Jul/2020 08:00 20/Jul/2020 18:00

Page 53: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

473 RQ26002 OCC_172 cpcc3_sd BUS 220KV BUS 1 AT GORAKHPUR(PG)

C Erection of Tension/ Suspension insulator strings on 02 No. gantry and laying of jack bus over 220 kV Bus I/ Bus II/ Transfer Bus from one gantry to other For 220 kV Side of 315 MVA ICT 3 under Substation Extn Package SS-XXV, Approved by 39 standing committee. All 220 kV Lines (Including GKP Barhua, GKP Gola 1 & 2 and GKP Bansi) & 220 kV side side of ICT 1 & 2 shall remain out during this period.

PLANNED Approved 17/Jul/2020 08:00 18/Jul/2020 18:00

474 RQ26003 OCC_172 cpcc3_sd BUS 220KV BUS 2 AT GORAKHPUR(PG)

C Erection of Tension/ Suspension insulator strings on 02 No. gantry and laying of jack bus over 220 kV Bus I/ Bus II/ Transfer Bus from one gantry to other For 220 kV Side of 315 MVA ICT 3 under Substation Extn Package SS-XXV, Approved by 39 standing committee. All 220 kV Lines (Including GKP Barhua, GKP Gola 1 & 2 and GKP Bansi) & 220 kV side side of ICT 1 & 2 shall remain out during this period.

PLANNED Approved 17/Jul/2020 08:00 18/Jul/2020 18:00

475 RQ26083 OCC_172 cpcc1_sd BUS 220KV BUS 2 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Transfer bus.

PLANNED Rejected 14/Jul/2020 08:00 14/Jul/2020 18:00

476 RQ26084 OCC_172 cpcc1_sd BUS 220KV BUS 3 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Transfer bus.

PLANNED Rejected 14/Jul/2020 08:00 14/Jul/2020 18:00

477 RQ26080 OCC_172 cpcc1_sd BUS 220KV BUS 1 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Main bus-1.

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

478 RQ26081 OCC_172 cpcc1_sd BUS 220KV BUS 2 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Main bus-2.

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

479 RQ26082 OCC_172 cpcc1_sd BUS 220KV BUS 3 AT ROORKEE(PG)

D For replacement of porcelain insulator in 220 kV Main bus-2.

PLANNED Rejected 13/Jul/2020 08:00 13/Jul/2020 18:00

Page 54: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

480 RQ26107 OCC_172 cpcc1_sd BUS 220KV BUS 4 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

S/D REQUIRED FOR 220KV BUS COUPLER BAY

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

481 RQ26077 OCC_172 cpcc1_sd BUS 220KV BUS 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

482 RQ26078 OCC_172 cpcc1_sd BUS 220KV BUS 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

483 RQ26079 OCC_172 cpcc1_sd BUS 220KV BUS 3 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of Future ICT#3 and Bus Coupler bay.

PLANNED Rejected 12/Jul/2020 08:00 12/Jul/2020 18:00

484 RQ26073 OCC_172 cpcc1_sd BUS 220KV BUS 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#2.

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

485 RQ26074 OCC_172 cpcc1_sd BUS 220KV BUS 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#2.

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

486 RQ26075 OCC_172 cpcc1_sd BUS 220KV BUS 3 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#2.

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

487 RQ26085 OCC_172 cpcc1_sd BUS 220KV BUS 1 AT KOTA(PG) D Polymer Insulator replacement work in S/S

PLANNED Rejected 11/Jul/2020 08:00 11/Jul/2020 18:00

488 RQ25997 OCC_172 cpcc3_sd BUS 220KV BUS 2 AT FATEHPUR(PG)

D For Connection of New Bus to existing Bus under Substation Extn Package SS-XXV. Approved by 39 standing committee at Fatehpur Substation.

PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

489 RQ26067 OCC_172 cpcc1_sd BUS 220KV BUS 1 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#1.

PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

Page 55: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

490 RQ26068 OCC_172 cpcc1_sd BUS 220KV BUS 2 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#1.

PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

491 RQ26069 OCC_172 cpcc1_sd BUS 220KV BUS 3 AT ROORKEE(PG)

D For replacement of Porcelain Insulators with Polymer insulators in 220 kV Side bay of ICT#1.

PLANNED Rejected 10/Jul/2020 08:00 10/Jul/2020 18:00

492 RQ26114 OCC_172 cpcc1_sd BUS 220KV BUS 2 AT BHINMAL(PG)

D FOR AMP WORK PLANNED Approved 10/Jul/2020 08:00 10/Jul/2020 18:00

493 RQ26149 OCC_172 cpcc2_sd BUS 220KV BUS 2 AT WAGOORA(PG)

D For AMP works. Kindly approve PLANNED Approved 09/Jul/2020 09:00 09/Jul/2020 17:00

494 RQ25996 OCC_172 cpcc3_sd BUS 220KV BUS 1 AT FATEHPUR(PG)

D For Connection of New Bus to existing Bus under Substation Extn Package SS-XXV. Approved by 39 standing committee at Fatehpur Substation.

PLANNED Approved 09/Jul/2020 08:00 09/Jul/2020 18:00

495 RQ26113 OCC_172 cpcc1_sd BUS 220KV BUS 1 AT BHINMAL(PG)

D FOR AMP WORK PLANNED Approved 09/Jul/2020 08:00 09/Jul/2020 18:00

496 RQ26148 OCC_172 cpcc2_sd BUS 220KV BUS 1 AT WAGOORA(PG)

D For AMP works. Kindly approve PLANNED Approved 07/Jul/2020 09:00 07/Jul/2020 17:00

497 RQ26086 OCC_172 cpcc1_sd BUS 220KV BUS 2 AT KOTA(PG) D Polymer Insulator replacement work in S/S

PLANNED Approved 07/Jul/2020 08:00 09/Jul/2020 18:00

498 RQ26012 OCC_172 cpcc3_sd BUS 220KV BUS 2 AT KANPUR(PG)

D For Bus Side Isolator Contact cleaning work to avoid Hotspot at 400kV Kanpur Substation

PLANNED Approved 06/Jul/2020 08:00 06/Jul/2020 18:00

499 RQ26011 OCC_172 cpcc3_sd BUS 220KV BUS 1 AT KANPUR(PG)

D For Bus Side Isolator Contact cleaning work to avoid Hotspot at 400kV Kanpur Substation

PLANNED Approved 03/Jul/2020 08:00 03/Jul/2020 18:00

500 RQ26000 OCC_172 cpcc3_sd BUS 220KV BUS 1 AT GORAKHPUR(PG)

D Erection of CTA Type Tower along with beam falling in induction zone of 220 kV Bus I under Substation Package SS-XXV, Approved by 39 standing committee.All lines & equipments shall remain charged through 220 kV Main Bus II

PLANNED Approved 02/Jul/2020 08:00 02/Jul/2020 18:00

Page 56: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

501 RQ25883 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

132 KV AMARPURATHEDI(RS)-HISAR(BB) (RS) CKT-1

D quarterly maintenance work PLANNED Approved 10/Jul/2020 09:00 10/Jul/2020 18:00

502 RQ25922 OCC_172 sldcrs_sd AC TRANSMISSION LINE CIRCUIT

132 KV SHEOPUR(UP)-KHANDAR(RS) (UP) CKT-1

D For Quarterly/Half Yearly Maintenance of 132 sheopur bay.(CT,CVT and LA are connected on line at khandar GSS)

PLANNED Approved 02/Jul/2020 09:00 02/Jul/2020 12:00 Subject to WRPC consent.

503 RQ25985 OCC_172 cpcc3_sd BUS 132 KV PITHORAGARH(PG) - BUS 1

D To attend hot spot & carry out AMP of 132kV Main Bus at Pithoragarh Substation. Shutdown of 132 KV Main Bus will reflect to outage of 132KV Bays of ICT-I & ICT-II along with 132KV Pithoragarh (UPCL) & 132 KV Almora(UPCL) lines

PLANNED Approved 25/Jun/2020 08:00 25/Jun/2020 18:00

504 RQ25609 OCC_172 sterlite_sd BAY 206 BUS COUPLER BAY - 220 KV PRITHALA (GPTL) - BUS 1 AND 220 KV PRITHALA (GPTL) - BUS 2 AT 220 KV PRITHALA (GPTL)

D For Signal Testing work in Remote Control Centre

PLANNED Approved 04/Jul/2020 16:00 04/Jul/2020 18:00

505 RQ26109 OCC_172 cpcc1_sd SVC/STATCOM SVC No 1(-300/+400MVAR) at 400 KV Kankroli(PG)

D MV Isolator clamps and support structure rectification work

PLANNED Approved 20/Jul/2020 08:00 25/Jul/2020 18:00

506 RQ26160 OCC_172 cpcc2_sd SVC/STATCOM STATCOM No 1(-100/+100MVAR) at 400 KV Nallagarh(PG)

D For AMP works Kindly approve PLANNED Approved 28/Jun/2020 09:30 28/Jun/2020 17:30

507 RQ26161 OCC_172 cpcc2_sd SVC/STATCOM STATCOM No 2(-100/+100MVAR) at 400 KV Nallagarh(PG)

D For AMP works Kindly approve PLANNED Approved 28/Jun/2020 09:30 28/Jun/2020 17:30

508 OCC_172 UPPTCL BUS COUPLER 400 KV Bus coupler ATPS at Anpara TPS

C Replacement of old 0.5 class 400 KV CT with 0.2 class accuracy of all the three phases.

Approved 26/Jul/2020 08:00 31/Jul/2020 16:00

509 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220kV Maharanibag to IP Extension

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

Page 57: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

510 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 kV Kanjawala - Najabgarh

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

511 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 kV Najabgarh - Bamnauli D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

512 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 kV Moradabad - Rampur (UPPTCL)

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

513 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220kV Rampur - C.B.Ganj (UPPTCL)

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

514 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

220 kV Bhilwara - Chittorgarh

D OPGW laying shall be started in this line under Reliable Comunication package (Auto Reclose off)

Approved 01/Jul/2020 08:00 31/Jul/2020 18:00

515 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400KV CHITTORGARH PG CKT-2 BAY NO 6 MAIN at 400kV CHITTORGARH RRVPNL end

C To attend the mechanical issue of main Bay Circuit Breaker ar RRVPNL end. Line remain in service through Tir bay.

Approved 13/Jul/2020 09:15 14/Jul/2020 14:00

516 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400KV RAPP-C BAY NO 1 MAIN at 400kV CHITTORGARH RRVPNL end

D AMP of main bay equipment at RRVPNL end/Chittorgarh. Line remain in serrvice through Tie bay

Approved 14/Jul/2020 14:00 15/Jul/2020 18:00

517 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400KV RAPP-C BAY NO 1 MAIN at 400kV CHITTORGARH RRVPNL end

D AMP of main bay equipment at RRVPNL end/Chittorgarh. Line remain in serrvice through Tie bay

Approved 16/Jul/2020 09:15 16/Jul/2020 18:00

Page 58: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

518 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400KV KANKROLI BAY NO 2 MAIN at 400kV CHITTORGARH RRVPNL end

D AMP of main bay equipment at RRVPNL end/Chittorgarh. Line remain in serrvice through Tie bay

Approved 17/Jul/2020 09:15 17/Jul/2020 18:00

519 OCC_172 cpcc1_sd AC TRANSMISSION LINE CIRCUIT

400KV CHITTORGARH PG CKT-2 BAY NO 5 MAIN at 400kV CHITTORGARH RRVPNL end

D AMP of main bay equipment at RRVPNL end/Chittorgarh. Line remain in serrvice through Tie bay

Approved 18/Jul/2020 09:15 18/Jul/2020 18:00

520 OCC_172 cpcc3_sd BAY 400 KV Block#2 WEST SIDE FILTER BANK B2Z22 BAY AT VINDHYACHAL HVDC

C RETRO FITMENT OF CIRCUIT BREAKER UNDER ADD CAP AT VINDHYACHAL S/S.

Approved 01/Jul/2020 09:00 30/Jul/2020 18:00

521 OCC_172 cpcc3_sd BAY 400 KV Block#1 NORTH SIDE FILTER BANK B1Z12 BAY AT VINDHYACHAL HVDC

C RETRO FITMENT OF CIRCUIT BREAKER UNDER ADD CAP AT VINDHYACHAL S/S.

Approved 01/Jul/2020 09:00 30/Jul/2020 18:00

522 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV SOHAWAL-GONDA Ckt-I & II

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR DE- STRINGING OF OVER-HEAD LUCKNOW- SOHAWAL LINE AT TOWER LOCATION NO 07 Since location 07 tower is bent and is being Replaced. Photograph of Bent Tower enclosed.

Approved 06/Jul/2020 09:00 06/Jul/2020 18:00

523 OCC_172 cpcc3_sd AC TRANSMISSION LINE CIRCUIT

220 KV SOHAWAL-GONDA Ckt-I & II

D S/D OF THIS UNDERPASSING POWERLINE IS REQUIRED FOR 'RE- STRINGING AT TOWER LOCATION NO 07 OF 400 KV LKO-SOHAWAL LINE (DD+30) after replacement of Bent Tower at Location No. 07. Photograph of Bent Tower enclosed.

Approved 17/Jul/2020 09:00 17/Jul/2020 18:00

524 OCC_172 sldchr_sd AC TRANSMISSION LINE CIRCUIT

220kV D/C FGPP- BBMB Samaypur line

C Construction of LILO of both circuits of 220kV D/C FGPP- BBMB Samaypur line at 220 kV S/stn Sec-58 HVPNL Faridabad

Approved 20/Jun/2020 08:00 04/Jul/2020 18:00 Subject to consent of PGCIL, NTPC and BBMB.

Page 59: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

525 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-1 : Low Power, Staged DC Line Faults, Power requirement-450 MW

Poles at BNC, APD & Agra to be de-blocked in multiterminal operation with ground return modewith Normal power direction. Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not envisaged subject to successful restart.

Rejected 06/Jul/2020 08:00 07/Jul/2020 17:00 To be conducted during lean season.

526 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-1 : Low Power, Staged Electrode Line Fault, Power requirement-150 MW

No tripping envisaged. Electrode line fault shall be created artificially to check the control system behaviour.

Rejected 08/Jul/2020 08:00 08/Jul/2020 11:00 To be conducted during lean season.

527 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-2 : Low Power, Staged DC Line Faults, Power requirement-450 MW

Poles at BNC, APD & Agra to be de-blocked in multiterminal operation with ground return modewith Normal power direction. Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not envisaged subject to successful restart.

Rejected 09/Jul/2020 08:00 10/Jul/2020 17:00 To be conducted during lean season.

528 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-2 : Low Power, Staged Electrode Line Fault, Power requirement-150 MW

No tripping envisaged. Electrode line fault shall be created artificially to check the control system behaviour.

Rejected 08/Jul/2020 12:00 08/Jul/2020 14:00 To be conducted during lean season.

Page 60: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

529 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-3 : Low Power, Staged DC Line Faults, Power requirement-450 MW

Poles at BNC, APD & Agra to be de-blocked in multiterminal operation with ground return modewith Normal power direction. Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not envisaged subject to successful restart.

Rejected 06/Jul/2020 08:00 07/Jul/2020 17:00 To be conducted during lean season.

530 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-3 : Low Power, Staged Electrode Line Fault, Power requirement-150 MW

No tripping envisaged. Electrode line fault shall be created artificially to check the control system behaviour.

Rejected 11/Jul/2020 08:00 11/Jul/2020 11:00 To be conducted during lean season.

531 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-4 : Low Power, Staged DC Line Faults, Power requirement-450 MW

Poles at BNC, APD & Agra to be de-blocked in multiterminal operation with ground return modewith Normal power direction. Line fault shall be created at different places of line for tuning of Line fault locator. Tripping not envisaged subject to successful restart.

Rejected 09/Jul/2020 08:00 10/Jul/2020 17:00 To be conducted during lean season.

532 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE TESTS OF POLE-4 : Low Power, Staged Electrode Line Fault, Power requirement-150 MW

No tripping envisaged. Electrode line fault shall be created artificially to check the control system behaviour.

Rejected 11/Jul/2020 12:00 11/Jul/2020 14:00 To be conducted during lean season.

533 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-1 : HIGH POWER, Pole 1: Operation in Reduced Volatge, Power requirement-1500 MW

There will be slight reduction in power in line-1 (Pole1 & Pole3). In the event of tripping of line-1 due to staged line fault, Pole-1 & Pole-3 shall go out of service.Pole-2 & 4 will be avilable at full capacity.

Approved 13/Jul/2020 09:00 13/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

Page 61: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

534 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-1 : HIGH POWER, Pole 1: Operation Metallic Return, RPC verification (MR-GR changeover will be for both Pole1 & Pole3 together in parallel), Power requirement-2000 MW

No tripping envisaged. Pole-2 & 4 will be out. Two Stages viz. 1) Pole-1 & pole-3 will be taken from GR to MR @ 500 MW and then back to GR from MR, 2) Pole- 1 & Pole-3 will be taken from GR to MR @2000 MW

Approved 13/Jul/2020 14:00 13/Jul/2020 18:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

535 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-1 : HIGH POWER, Pole 1: Runbacks, Power requirement-2000 MW

All four poles wil be avilable. There will be reduction in power due to runbacks.

Approved 14/Jul/2020 09:00 14/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

536 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-2 : HIGH POWER, Pole 2: Steady state operation, RPC verification and Heat Run Test, Power requirement-2000 MW

As per MOM dated 16/05/2019 ABB to give clarification regarding Heat run test performed earlier

Approved 15/Jul/2020 09:00 15/Jul/2020 18:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

537 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-2 : HIGH POWER, Pole 2: Operation Metallic Return (MR-GR changeover will be for both Pole2 & Pole4 together in parallel), Power requirement-2000 MW

No tripping envisaged. Pole-1 & 3 will be out. Two Stages viz. 1) Pole-2 & pole-4 will be taken from GR to MR @ 500 MW and then back to GR from MR, 2) Pole- 2 & Pole-4 will be taken from GR to MR @2000 MW

Approved 16/Jul/2020 09:00 16/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

538 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-2 : HIGH POWER, Pole 1: Runbacks, Power requirement-2000 MW

All four poles wil be avilable. There will be reduction in power due to runbacks.

Approved 16/Jul/2020 14:00 16/Jul/2020 18:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

Page 62: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

539 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-3 : HIGH POWER, Pole 3: Operation Metallic Return ,RPC verification (MR-GR changeover will be for both Pole1 & Pole3 together in parallel), Power requirement-2000 MW

No tripping envisaged. Pole-2 & 4 will be out. Two Stages viz. 1) Pole-1 & pole-3 will be taken from GR to MR @ 500 MW and then back GR from MR, 2) Pole- 1 & Pole-3 will be taken from GR to MR @2000 MW

Approved 17/Jul/2020 09:00 17/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

540 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-3 : HIGH POWER, Pole 1: Runbacks, Power requirement-2000 MW

All four poles wil be avilable. There will be reduction in power due to runbacks.

Approved 17/Jul/2020 14:00 17/Jul/2020 18:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

541 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-3 : HIGH POWER, Modulations, Power requirement-450 MW

All four poles wil be avilable. There will be reduction in power due to runbacks.

Rejected 18/Jul/2020 14:00 18/Jul/2020 18:00 To be conducted during lean season.

542 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-4 : HIGH POWER, Pole 4: Steady state operation and Heat Run Test, Power requirement-2000 MW

As per MOM dated 16/05/2019 ABB to give clarification regarding Heat run test performed earlier

Approved 21/Jul/2020 09:00 20/Jul/2020 18:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

543 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-4 : HIGH POWER, Pole 4: Operation in Reduced Volatge, Power requirement-2000 MW

There will be slight reduction in power in line-1 (Pole1 & Pole3). In the event of tripping of line-1 due to staged line fault, Pole-1 & Pole-3 shall go out of service. Pole-2 & 4 will be avilable at full capacity.

Approved 21/Jul/2020 09:00 21/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

Page 63: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

544 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-4 : HIGH POWER, Pole 4: Operation Metallic Return, RPC verification (MR-GR changeover will be for both Pole2 & Pole4 together in parallel), Power requirement-2000 MW

No tripping envisaged. Pole-1 & 3 will be out. Two Stages viz.1) Pole-2 & pole-4 will be taken from GR to MR @ 500 MW and then back GR from MR2) Pole- 2 & Pole-4 will be taken from GR to MR @2000 MW

Approved 21/Jul/2020 14:00 21/Jul/2020 18:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

545 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-4 : HIGH POWER, Pole 1: Runbacks, Power requirement-2000 MW

All four poles wil be avilable. There will be reduction in power due to runbacks.

Approved 22/Jul/2020 09:00 22/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

546 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D MONOPOLAR TESTS POLE-4 : HIGH POWER, Modulations, Power requirement-450 MW

All four poles wil be avilable. There will be reduction in power due to runbacks.

Rejected 22/Jul/2020 14:00 22/Jul/2020 18:00 To be conducted during lean season.

547 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D Pole1, Pole2, Steady state operation, RPC verification, Power requirement-4000 MW

Complete Test To be Done

Approved 23/Jul/2020 08:00 23/Jul/2020 20:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

548 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D Pole1, Pole2, Operation in Reduced Voltage, Power requirement-2400 MW

Complete Test To be Done

Approved 24/Jul/2020 09:00 24/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

549 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D Pole1, Pole2, Steady state operation, Runbacks, Power requirement-3000 MW

Complete Test To be Done

Approved 24/Jul/2020 14:00 24/Jul/2020 18:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

Page 64: m-E-snrpc.gov.in/wp-content/uploads/2020/06/OCC172_OPA.pdf2 RQ26017 OCC_172 antagas_sd GENERATING UNIT 153.2 MW ANTA GPS - UNIT 4 C STG Minor inspection Planned outage already approved

550 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE SYSTEM TESTS OF BIPOLE -2 INTEGRATION & MULTI TEMRINAL, Pole-1 , 2,3,4, Steady State Operation, Power requirement-6000 MW

Complete Test To be Done

Approved 25/Jul/2020 09:00 25/Jul/2020 17:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

551 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE SYSTEM TESTS OF BIPOLE -2 INTEGRATION & MULTI TEMRINAL, Pole-1 , 2,3,4, Staged DC Line Fault , Power requirement-6000 MW

Complete Test To be Done

Approved 27/Jul/2020 09:00 27/Jul/2020 17:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

552 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE SYSTEM TESTS OF BIPOLE -2 INTEGRATION & MULTI TEMRINAL, Pole-1 , 2,3,4, LAN fault, Master/ Control mode Change, Power requirement-6000 MW

Complete Test To be Done

Approved 28/Jul/2020 09:00 28/Jul/2020 13:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

553 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE SYSTEM TESTS OF BIPOLE -2 INTEGRATION & MULTI TEMRINAL, Pole-1 , 2,3,4,Converter Outage and Power Compensation, Power requirement-6000 MW

Complete Test To be Done

Approved 29/Jul/2020 08:00 29/Jul/2020 22:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.

554 OCC_172 cpcc3_sd BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800

BALANCE SYSTEM TESTS OF BIPOLE 1 NEA800 (NORMAL DIRECTION BNC & APD TO AGRA)

D BALANCE SYSTEM TESTS OF BIPOLE -2 INTEGRATION & MULTI TEMRINAL, Pole-1 , 2,3,4, Emergency Power Control, Power requirement-6000 MW

Complete Test To be Done

Approved 30/Jul/2020 09:00 30/Jul/2020 15:00 Subject to power flow above 1000 MW and real time grid conditions. Consent of ERPC/NERPC required.