M E M S A

CLEARWATER, FL

September 5, 2002

Mining Electrical Maintenance and Safety Association

Page 2: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

FULLY AUTOMATIC BACKUP GENERATOR

SYSTEM

Larry Casson

Drummond Co. Inc.

Page 3: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

METHODS OF APPLYING POWER GENERATORS

1. STAND ALONE GENERATOR(S)• One or more generators provide all the real power

(KW) and reactive power (KVAR) required by the load. Paralleling generators require KW and KVAR sharing.

2. BASE LOADING• One or more generators providing constant real

output power (KW) and reactive power (KVAR). May be expressed as power (KW) and power factor (PF).

Page 4: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 5: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 6: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 7: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 8: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 9: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 10: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 11: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 12: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

34,500 VOLTSGENERATOR

# 1GENERATOR

# 2

OVERHEAD LINE # 1

OVERHEAD LINE # 2

4160 VOLTS

Page 13: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

UNLOADING TRAIN WITH DUAL CAR DUMPER AND POSITIONING CARS WITH A TRAIN CAR INDEXER

POWER IN KW

Page 14: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

MANUAL SWITCH TO GENERATORS

MANUAL SWITCH TO INCOMING POWER

Page 15: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

BASICS

Page 16: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

KW

KVARKVA

POWER TRIANGLE

PF = COS of included angle = KW/KVA

Included angle

Page 17: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

KW

KVAR

POWER TRIANGLE

Base loading

Throttle

Voltage regulator

Page 18: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

+ KW- KW

+ KVAR

- KVAR

4 POWER QUADANTS

+ KVARProducing

REVERSE POWER PROTECTION REQUIRED

-KVAR Absorbing

Page 19: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 20: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 21: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 22: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 23: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 24: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 25: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

UNDERGROUND 14,400 VOLT SYSTEM

KW

KVAR

ONE GENERATOR RUNNING

Page 26: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 27: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 28: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 29: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 30: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 31: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association
Page 32: M E M S A CLEARWATER, FL September 5, 2002 Mining Electrical Maintenance and Safety Association

WHY USE GENERATORS

• BACKUP POWER SYSTEM

• REDUCE POWER SYSTEM LOADING

• HELP STABILIZE VOLTAGE