ls96 milking parlor operator’s manual · ls96 milking parlor operator’s manual includes...

14
LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions

Upload: others

Post on 30-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

LS96 Milking ParlorOperator’s Manual

Includes Installation, Assembly, and Adjustment Instructions

Page 2: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of
Page 3: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

1. When left and right sections of stalls are securely fastened to concrete, join all units together by bolting braces in place as shown.

2. On the exit side, check to insure that the gate stop is properly adjusted. Stops should rest in the middle of the gate stop tabs. If required, loosen stop nut and turn adjustment bolt. When adjustment is made, tighten stop nut.

3. Insert gate release lever locking rod on right side, sliding rod through bushing at latch from the left as shown, then through bushing on right between the two gates.

4. Slide locking collar on right gate locking rod and, leaving approxi-mately 1/16” free space, lock collar on rod.

5. With gate latch in locked position, allow lobe on rod to rotate back against latch adjustment plate. Using vise grips hold lobe in place against plate

6. Position release lever pivot with long end resting on stall brace. Drill thru locking rod using a 3/16” bit.

3

1

Page 4: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

7. Drive the roll pin through the pivot and rod securing it in place.

8. Insert left gate release lever locking rod with locking collar on rod into center bushing first, then into gate bushing.

9. Following previous steps, secure locking collar. Clamp lobe to plate and fasten pivot onto rod.

10. On a flat surface, attach equipment rack cross braces to cen-ter support. Note that cross pieces must be bolted so that their ends are positioned to allow bolts to pass through to connect to rack sides.

12. Bolt center support with cross bars to equipment rack sides. Loosen side clamp bolts and lower assem-bly onto floor. Tighten all side clamp bolts securing unit to stall posts. Bolt base plate of equipment rack center post to floor.

11. Position equip-ment rack fully at the top of the stall post. Tighten the top bolt (only) enough to hold rack in place. Additional adjustment will be done in next step.

2

Page 5: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

13. Pass both left and right release rods through their respective mounting brackets, and bolt brackets onto the top equipment rack cross brace.

14. Connect release rods to pivots as shown.

15. Attach optional seat onto equipment rack center post. Adjust seat swing if desired.

16. Bolt stall roof in place on both sides.

17. Attach mid-dividers using channel brackets.

18. End dividers require brackets, shown in this photo.

3

Page 6: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

While all required adjustments are made prior to shipping there may be a need for some adjustments over time.

Gate swing is adjusted by loosening the stop nut, shown here, and turning the bolt in or out. Gate should hit stop bolt before the rod hits hinge shaft. See illustration below.

Automatic latch reset is adjusted by turning the bolt shown here.

In the event that gate alignment ever needs to be adjusted use the following procedure.

1. With the gates in the ready position (unlocked toward the stall entrance) loosen the jam nuts on the top (right) and bottom (left) tie rods on the exit side of the stall. 2. Remove the nuts securing the tie rods to the stall. Place the gate in the locked position. Remove both tie rods from their bolts. 3. Turn the bottom tie rod end in or out until it will fit comfortably on its bolt. Replace the bottom tie rod nut and tighten. 4. Follow these instructions on the top tie rod end.5. Tighten jam nuts on both tie rod ends.

Adjustments

1/8” clearance

4

Page 7: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

1

9

2

8

10

12

14

15

46

12

5

8

10

1311

3

12

H

C

E

D

B

A

Figure 1A LS96 Headgate Top Assembly

7

ITEM QTY. PART NUMBER DESCRIPTION1 1 LS96-7 Top Cover2 2 LS96-3 Top Hinge Bracket3 0.5 LS96-21 Contour Tube4 1 LS96-19 Control Rod Arm5 1 LS96-25 Door Return Spring6 1 LS96-17 Brass Bushing7 1 LS96-2 Main Frame8 4 H5C38*114 3/8" x 1 1/4" Hex Bolt9 2 H5C38*1 3/8" x 1" Hex Bolt

10 2 H5C38*2 3/8" x 2" Hex Bolt11 1 H5C38*3 3/8" x 3" Hex Bolt12 11 NC38 3/8" Hex Nut13 2 1008 1/2" Hose 1 1/2" Long14 1 CT18*1 1/8" x 1" Cotter Pin15 1 FW38 3/8" Flat Washer16 1 LS96-26 Control Handle Return Spring

16

5

1

9

2

8

10

12

14

15

46

12

5

8

10

1311

3

12

H

C

E

D

B

A

Figure 1A LS96 Headgate Top Assembly

7

ITEM QTY. PART NUMBER DESCRIPTION1 1 LS96-7 Top Cover2 2 LS96-3 Top Hinge Bracket3 0.5 LS96-21 Contour Tube4 1 LS96-19 Control Rod Arm5 1 LS96-25 Door Return Spring6 1 LS96-17 Brass Bushing7 1 LS96-2 Main Frame8 4 H5C38*114 3/8" x 1 1/4" Hex Bolt9 2 H5C38*1 3/8" x 1" Hex Bolt

10 2 H5C38*2 3/8" x 2" Hex Bolt11 1 H5C38*3 3/8" x 3" Hex Bolt12 11 NC38 3/8" Hex Nut13 2 1008 1/2" Hose 1 1/2" Long14 1 CT18*1 1/8" x 1" Cotter Pin15 1 FW38 3/8" Flat Washer16 1 LS96-26 Control Handle Return Spring

16

Not included with the unit.

Page 8: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

16

7

13

14

172

18

8

6

155

1

11

9

13 10

7

8

3

19

16

19

4

J

J

FIgure 1B LS96 Headgate Top Assembly: Latches

ITEM QTY. PART NUMBER DESCRIPTION1 1 LS96-10 Latch Lock2 1 LS96-9 Front Latch3 1 LS96-8 Back Latch4 1 LS96-15 Latch Dog5 1 LS96-24 Latch Sping6 1 LS96-33 UMHW Wear Strip7 4 LS96-17 9/16" x 3/4" x 1/2"L. Brass Bushing8 2 LS96-90 Latch Bushing Spacer9 1 LS96-2 Main Frame

10 1 H5C38*4 3/8" x 4" Hex Bolt11 1 H5C38*34 3/8" x 3/4" Hex Bolt12 1 H5C38*3 3/8" x 3" Hex Bolt13 2 H5C12*6 1/2" x 6" Hex Bolt14 1 SH516*112 5/16" x 1 1/2" Set Screw15 2 MR1024*34 10-24 x 3/4" Machine Screw16 2 NNC12 1/2" Nylon Lock Nut17 2 NC1024 10-24 Nut18 1 JNC516 5/16" Jam Nut19 2 SNC38 3/8" Steel Lock Nut6

Page 9: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

2

3

1

H

Figure 1C LS96 Headgate Top Assembly: Control Rod

ITEM QTY. PART NUMBER DESCRIPTION1 1 LS96-2 Main Frame2 1 LS96-18 Control Rod3 2 LS96-17 Brass Bushing

7

Page 10: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

12

11

10

8

7

14

13

13

9

3 5

6

1

4

2

15

Figure 2 LS96 Headgate

G

F

E

C

D

ITEM QTY. PART NUMBER DESCRIPTION1 1 LS96-2 Main Frame2 1 LS96-1R Right Door3 4 LS96-16 Door Bearing4 1 LS96-1L Left Door5 2 LS96-31 Alum. Bushing6 1 LS96-32 Spacer7 4 F8SB Rod End w/ Socket

8 2 LS96-5 Tie Rod

ITEM QTY. PART NUMBER DESCRIPTION9 1 LS96-4 Cable Cam

10 1 LS96-6 Cable w/ Loop11 2 H5C12*2 1/2" x 2" Hex Bolt12 2 H5C12*212 1/2" x 2 1/2" Hex Bolt13 4 SNC12 1/2" Steel Lock Nut14 4 JNC12 1/2" Jam Nut15 1 LS96-27 1/8" Cable Clamp

8

Page 11: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

17

3

3

9

12

10

14

1

15

7

12

12

5

18

4 7

12

6

16

7

12

2

A

B

1312

3

G

Figure 3 Equipment Rack & Seat Assembly

ITEM QTY. PART NUMBER DESCRIPTION1 2 LS96-14 Side Frame2 1 LS96-13 Rack Leg

3 1 LS96-SE Seat4 2 LS96-12 Control Rod Guide5 4 H5C38*2 3/8" x 2" Hex Bolt6 2 H5C14*2 1/4" x 2" Hex Bolt7 6 H5C38*3 3/8" x 3" Hex Bolt8 6 PT6-12S #6 x 1/2" Tap Screw

9 1 H5C38*6 3/8" x 6" Hex Bolt

ITEM QTY. PART NUMBER DESCRIPTION10 2 H5C38*212 3/8" x 2 1/2" Hex Bolt11 1 H5C38*34 3/8" x 3/4" Hex Bolt12 14 NC38 3/8" Hex Nut13 2 H5C38*112 3/8" x 1 1/2" Hex Bolt14 1 SNC38 3/8" Steel Lock Nut15 2 LS96-20 Pull Rod16 2 NC14 1/4" Hex Nut17 1 LS96-50 Milking Stall Seat

18 2 LS96-11 Cross Bar20 1 LS96-SE3

9

Page 12: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

Figure 4 Side & End Rails

1

6

7

4

8

3

2

5

F

ITEM NO. QTY. PART NUMBER DESCRIPTION1 1 LS96DC Milking Stall Center Divider2 1 LS96DE Milking Stall End Divider3 2 LS96-14B U-Clip for End Divider4 2 H5C38*112 3/8" x 1 1/2" hex bolt5 2 H5C38*4 3/8" x 4" hex bolt6 2 H5C38*3 3/8" x 3" hex bolt7 6 NC38 3/8" nut8 1 LS96-30 Front Plate for Center Divider

10

Page 13: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

LS96 Walk-Through Milking ParlorFor Flat Floor Installations

40"

32"

32"

10"

39 3/4" 41 3/4"10 1/2" between stalls

43 3/4" lg. anchor channel8 1/2" between anchor channels

64" to 68"

32"96"

S S curb

12" to 17"7"

4" to 6"

center draintrough drain

channel w/ S.S.anchor bolts

8"4" to 6"

TOP VIEW

REAR VIEW

END VIEW

11

Page 14: LS96 Milking Parlor Operator’s Manual · LS96 Milking Parlor Operator’s Manual Includes Installation, Assembly, and Adjustment Instructions. 1. When left and right sections of

11-08