ls is photovoltaic system · hanoi overseas subsidiaries shanghai, dalian, wuxi, hubei, dubai,...
TRANSCRIPT
-
2014. 04
LS IS PHOTOVOLTAIC SYSTEM
-
Ⅰ. LS IS Photovoltaic Business I. New Start LS IS II. History and Achievements III. LS IS PV Business Frame
Ⅱ Why it has to be LSIS I. Stable Revenue Portfolio II. Total Solution Provider III. Quality Control System IV. Long-term Track Record
Ⅲ Various PV system solutions I. Mega Solar PV Plant II. Commertial/Residential PV system III. Water Floating System IV. Standard Off-grid System V. Photovoltaic Pump
Ⅳ. LSIS note i. News ii. Specification iii. Reference site
Outline
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
I. New Start LS IS
II. About LSIS
III. LS IS PV Business Frame
LS IS Photovoltaic Business
PART 1
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
1. New Start LS IS
PHOTOVOLTAIC SYSTEMS
Electronic & Chemical
Industrial Electric & Electronic
Construction Distribution Industry
CI
Meaning
Signature
Industrial Systems
Innovative Solution
Infra Solution
Intelligent Solution
Part 1
Head Office in Korea
1,261
1,392 1,287
1,133 1,219
1,280
`06 `07 `08 `09 `10 `11
SALES (unit:million dollars)
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
2. About LSIS Part 1
• Leader in Power Solutions, Automation &
Green Business
Company Name LSIS Co., Ltd
Vice-Chairman & CEO Ja-Kyun Koo
Founded 1974
Sales(2011) 1,402,034(million Won)
Employees 3,200
Headquarter LS Tower, Anyang-si, Gyeonggi-do, Korea
Plants Cheonju, Cheonan, Busan, Dalian, Wuxi, Hubei,
Hanoi
Overseas subsidiaries Shanghai, Dalian, Wuxi, Hubei, Dubai, Amsterdam,
Tokyo, Chicago
Overseas branches Shanghai, Beijing, Guangzhou, Qingdao, Chengdu,
Shen Yang, Jinan, Tokyo, Hochiminh, Detroit, India
-
PHOTOVOLTAIC SYSTEMS
3. LS IS PV Business Frame Part 1
• Engineering / Feasibility Study
• PV modules, Inverters manufacturing
-
PHOTOVOLTAIC SYSTEMS
3. LS IS PV Business Frame Part 1
• Residential PV system
• PV System EPC work Solution ( OFF-GRID & ON-GRID )
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
3. LS IS PV Business Frame Part 1
• Water floating PV system
• Special Purpose PV Solution (Solar pump )
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
I. Stable Revenue Portfolio
II. Total Solution Provider
III. After Sales Service
IV. Long-term Track Record
Why it has to be LSIS
PART 2
-
PHOTOVOLTAIC SYSTEMS
I. Stable Revenue Portfolio Part 2
LSIS has Sustainability Growth DNA with Strong Market Position Under Shaking Global Economy
LSIS 2012 Revenue Portfolio LSIS 2012 Turnover Unstable Global PV Industry
LV/HV Elec.
Equipment
Inverter
Metering
PLC
62% 14% 24%
35% 18% 11%
15% 13% 27%
14% 13% 39%
36%
45%
34%
Domestic market shares
Power
Equipment
23%
Power
System 21%
Automation
14%
SOC 3%
PV 6%
Metal 21%
ETC
12%
2012 Sales
1.5B USD
Operating
Profit 100M
USD
-
PHOTOVOLTAIC SYSTEMS
II. Total Solution Provider Part 2
Low Volt
High Volt
Extra-High Volt
LBS
ACB
MCCB(AC)
Inverter
Module
MCCB(DC
)
TR
[Extra-High Voltage]
Power Transmission (more than 20kv) to substation
- LBS : Open/Close Load Current
- VCB : Main Circuit Breaker for
Extra-high/High Voltage part
[Low Voltage]
ACB is the main Circuit breaker in Low Voltage
- ACB : Circuit Breaker of under AC 600V Line,
for under 8000A Rated Current
- MCCB : Protect Low voltage inside Circuit
under AC 600V or under DC 1000V
[Transformer, Low Voltage → Extra-High Voltage]
Boost the 380 voltage of Low voltage to 20kV of Extra-
high Voltage
VCB
1) LSIS Device coverage
-
PHOTOVOLTAIC SYSTEMS
Design
Consulting
Suggestion for PV Module, BOS
(Balance of System) & basic civil work
Execution design
Basic assessment of economy
Stabilization test of System
Field Construction
Manufacturing PV module, Inverter & Junction Box
System test
Drawing up the budget
Expecting effect of installation
Optimal system suggestion
Supporting the approval & authorization
Designing electrical and civil work`
Operation
& Warranty
Manufacturing
& Integration
Construction
& Installation
Trial Test
Analyzing of the electric generation
Assistance of the technical support
Warranty
LSIS offers the optimized service to customers through whole consulting process as below.
II. Total Solution Provider Part 2 2) LSIS Solution coverage
-
PHOTOVOLTAIC SYSTEMS
Completion
LSIS has Special Organization only for after-sales service.
III. After Sales Managing System Part 2
Project Start
Electric Engineer
Project Manager
Construction Engineer
Financial Manager
Procurement Manager
Legal Adviser
Electric Engineer
A site
Project Manager
B site
Construction Engineer
C site Financial Manager
D site
Procurement Manager
E site
Legal Adviser
F site
Normal SI Companies Do LSIS Do
Handover Protocol
•Supervisor Training
PM Monitoring
•O&M Manual
•Spare part preparation
After-sales service team
•Service claim via Internet /E-mail
The Day of Customer request After-sales Service at “Saturday”
It’s only takes 3 days including Weekend.
-
PHOTOVOLTAIC SYSTEMS
IV. Long-term Track Record Part 2
ZCX
53W (100%) 48W (90.57%) 45.4W (85.6%)
1992 2002 2012
Variation of PV Module Power
In 1992, LSIS constructed 45kW PV power plant with 53W PV modules located in Pyoungsado, Korea. Those PV modules still have maintained over 85% power out as below.
South Korea
Pyoungsado PV power plant
1) LSIS PV Module Field Test
-
PHOTOVOLTAIC SYSTEMS
IV. Long-term Track Record Part 2 2) LSIS System Reference
2014 Providing
Total Solution with
own photovoltaic
products
Setting about the
Photovoltaic
Power System
business
1986
1989
1993
2001
2005
2007
2009 Agreement contract with Korea
Energy Management Corporation
Localization of a photovoltaic
power module (50kW class)
Execution of study for BIPV
Research project on alternative energy
Technical development of power system
interconnection.
The first overseas exportation (Mongolia 200kW)
Development of BIPV module
180W module
Lunched photovoltaic product in Japan
(Certification: JET, J-PEC, J-MIC)
Samchun po 100kW
( The first
applying of 22.9KVA
interconnection in
Korea)
Ewha womans univ. (BIPV Silicone Type)
Execution of study
for BIPV
2010 ~
LSIS’s PV SYSTEM in the World
- Japan, Austria, Greece,
- Bulgaria, Vietnam,
- Korea, Belgium
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
I. Mega Solar PV Plant
II. Commercial / Residential PV System
III. Water Floating System
IV. Standard Off-grid System
V. Photovoltaic Pump
Various PV System Solution
PART 3
-
PHOTOVOLTAIC SYSTEMS
I. Mega Solar PV Plant Part 3
LSIS built 14.5MW PV plant in Bulgaria at August 2012
-
PHOTOVOLTAIC SYSTEMS
I. Mega Solar PV Plant
ZCX
PV Power Plant
Substation
TR & Switchgear MCCB Box
LSIS provides total solution for PV power plant not only PV materials but all kinds of electric power equipment.
Electric Power System
PV Power System (Module, Inverter,
Balance of System)
Switchgear
Transformer
SCADA
Interconnection
Part 3
-
PHOTOVOLTAIC SYSTEMS
II. Commercial/Residential PV System
LSIS provides grid connected PV power system with all system equipment such as PV panel, PV inverter, connection box, monitoring system, metallic structure, etc.
ZCX
PV panel w/Structure
Connection Box
RS 422/485 Communication
Inverter
Grid Connection
Load
Monitoring System
Rooftop Arrays On Commercial & Industrial Buildings
Ground Mounted Installations
Rooftop Arrays On Residential Buildings
Applications
Part 3
-
PHOTOVOLTAIC SYSTEMS
II. Commercial/Residential PV System
ZCX
PV Home System Kit
PV Module
PV Inverter
Connection Box
Measuring Unit
Monitoring Unit
It is easy for you to install PV home system kit on your house.
PV Array
Connection Box
PV Inverter
Meter
Interconnection
LSIS has major achievement for rooftop PV Home System Kit in Japan.
Monitoring Unit
Measuring Unit
Part 3
-
PHOTOVOLTAIC SYSTEMS
II. Commercial/Residential PV System
LS IS has become the first Korean firm delivering more than 80MW PV systems to Japanese market . LS IS will provide a whole PV Home System - modules, inverters, switch gear systems.
LSIS Breaks into Japanese Solar Module Market
Part 3
-
PHOTOVOLTAIC SYSTEMS
100KW, Hapchun Dam in Korea
500KW, Hapchun Dam in Korea
III. Water floating system Part 3
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
Wet proof J-Box & Connector
- Wet proof specialized PV Module Junction Box
- Humidity proof specialized PV Module Connector
- Obtain high protection grade IP Grade 67
Corrosion-resisting, Wet proof Frame
- Wet humidity, Corrosion-resisting Anodizing
- Design for reinforced anti-twist frame against wind pressure.
Humidity Proof Technology
- Block humidity off through back and side
Water Humidity Proof Technology
- Prevent short circuit, and grounding from water penetration to electrical point.
Insulation Technology
- Prevent electric leakage due to insulation resistance in moisture environment
Corrosion Resisting and Structural Solidity Technology
Contamination Proof
- Prevent contamination of frontal glass
III. Water floating system Part 3
-
PHOTOVOLTAIC SYSTEMS
•↓Save Installation Cost
HOW - by using public water surface installation
NO - land formation, construction,
steel-frame structure.
•↑ Increase Electricity generation (10%↑)
HOW - Natural cooling effect on water surface.
More than 10% additional power.
NO - Energy lost by heating 100KW, Hapchun Dam in Korea
III. Water floating system Part 3
-
PHOTOVOLTAIC SYSTEMS
III. Water floating system Part 3
-
PHOTOVOLTAIC SYSTEMS
IV. Standard Off-grid System Part 3
PV module & Structure Combiner Box Island Inverter
Load
Photovoltaic Effect causes electric power!
DC Charger
Battery bank
Generator
Bypass panel
Grid
Off-grid system for various applications including local autonomous entities, households, schools, communication, cars, ships, military equipment, rural electricity, livestock industry,
agriculture, rural development, street lamps, street stalls, leisure, events, etc.
-
PHOTOVOLTAIC SYSTEMS
IV. Standard Off-grid System (Example) Part 3
Item Specification Supplier Number Remark
PV module PVM S250 LSIS 72EA 250W X
3(Series) X 24(parallel) = 18KW
DC Charger DC charger LSIS 6EA 3kW
Island Inverter Island inverter LSIS 3EA 6kW
DC combiner box DC combiner box LSIS 6EA 4-IN & 1-OUT
Bypass & battery panel
Bypass panel, Battery panel LSIS 3SET Bypass
batttery Battery LSIS 72EA 2V / 3000AH
Steel structure & Installation
H or C shaped steel pile Local 1set MUST check the local regulation of
Structure
Electric cable & Electric Work
Grounding work, Connecting work (DC cables, AC cables, Modules, Inverters,
Combiner boxes) Local 1set
MUST check the local regulation of cabling work
Supervising Technician’s supervising cost (For design, technical support,
training, etc) LSIS 1set Airfare, Staying cost included
Total
Total Mornitoring solar monitoring LSIS 1set Web server for all solar school
Gererator generator Local 1EA 20KW
-
PHOTOVOLTAIC SYSTEMS
IV. Standard Off-grid System (Example) Part 3
This drawing is just reference drawing. It can be changed by local regulations or site situation.
System diagram
-
PHOTOVOLTAIC SYSTEMS
V. Photovoltaic Pump
PHOTOVOLTAIC SYSTEMS
Operating as much as solar power generation (Avg. 4 hours a day)
Battery-less system (Compact and durable)
Pumping of water from ponds and lakes remotely
Off-Grid system: Installable anywhere
System Architecture
Watering farm Drinking Water
Part 3
-
PHOTOVOLTAIC SYSTEMS PHOTOVOLTAIC SYSTEMS
i. LSIS Award
ii. Exhibition
iii. LSIS Press
LSIS Update
PART 4
-
PHOTOVOLTAIC SYSTEMS
I. LSIS Award
PHOTOVOLTAIC SYSTEMS
Part 4
-
PHOTOVOLTAIC SYSTEMS
II. LSIS Exhibition Part 4
-
PHOTOVOLTAIC SYSTEMS
III. LSIS Press Part 4
LSIS Ranked No.3 at Japanese PV research company named Pveye announced PV module’s reliability Ranking.
Photovoltaic Module Long-term reliability Ranking Translation from Japanese to English
Rank Maker(origin) Score Track record Durability Product Warranty Condition Third party Certification
Over 20 years Thermal cycle
Dump heat
Product Output Reserve Reinsurance JET VDE TUV UL
1 Solarworld(Germany) 25 8 4 4 2 2 2 0 0 1 1 1
2 Suntech(China) 22 8 3 2 2 2 2 1 1 1 0 0
3 LSIS(Korea) 21 8 1 3 2 2 2 0 1 1 1 0
4
Panasonic(Japan) 17 8 1 1 4 2 0 0 0 1 1 1
Mitsubishi(Japan) 17 0 4 4 4 2 0 2 1 0 1 1
Yingli (China) 17 0 4 4 4 2 0 2 1 0 1 1
-
Leading Solution, LS
Always with Our Customers, LS
Green Innovators of Innovation, LSIS
Thank You