LRT Network Inserted in Tel Aviv Metropolitan Area
1
David Zaidel, 4sight, Ergonomics & Safety
28th and 29th November 2018 Meeting TII Office, Dublin
UTF 2
Tel Aviv Metropolitan Area Requires a Good PT
28th and 29th November 2018 Meeting TII Office, Dublin
•Tel Aviv Metropolitan Area (TAMA) includes 3.9 million
people, accounting for 43% of Israel's population.
•50% of the workforce in Israel is employed in TAMA
•~ 700,000 vehicles enter the city everyday
• It covers an area of ~ 1,500 km2
•1.2 million tourists visit Tel Aviv City each year
•All North-South roads in the country go through TAMA
1.3 mill
1.2 mill
0.96 mill
0.44 mill
Bus lines
UTF 3
Perspective on size and distances in Israel
28th and 29th November 2018 Meeting TII Office, Dublin
UTF 28th and 29th November 2018 Meeting TII Office, Dublin 4
Tel Aviv in comparison to six cities in EU
Core City Metropolitan Area
density area pop density area pop Metro-City
p/kmsq Kmsq* million p/kmsq Kmsq* million
Lyon
Brussels
Amsterdam
Frankfurt
Berlin
Madrid
Tel Aviv
* Kmsq = km2 value x 103
UTF 5
Comparing Tel Aviv with other cities in PT use
28th and 29th November 2018 Meeting TII Office, Dublin
Tel Aviv 80 5 85
Cities with several PT options average 250 annual journeys per inhabitant Source: EMTA 2016
UTF 28th and 29th November 2018 Meeting TII Office, Dublin 6
PT service indicators in TA, Jerusalem, and EU
indicator Developed cities
in the World Tel Aviv Jerusalem
Km PT travel per person
per year 100
Vkm/p
45 34
Mean Speed of PT
system 25
km/h
17 16
Boarding per person
per year 250 Br/p
111 103
Percent of PT in Modal
split 40%
PT Share
20% 23%
Investment in PT
infrastructure per person 50,000 NIS/p
7,629 2,642
Length of dedicated PT
infrastructure per 1000
pop
150 1000 m/p
69* 25**
*Bus lanes, BRT, U train; ** Bus Lanes, BRT, 1 LRT line
UTF 7
Overview of Tel-Aviv Mass PT Progress
28th and 29th November 2018 Meeting TII Office, Dublin
NTA, Metropolitan Mass Transit System Ltd. is a government owned company responsible for
the design, construction and implementation of the Tel Aviv metropolitan mass transit system.
A similar organization was set up in Jerusalem implementing the 1st LRT line.
The Red Line
The 1st of the mass transit system, the Red line, is currently under construction. It is expected
to begin commercial operation on October 2021.
More LRT and Metro Lines are in various stages of planning QP Tender was issued for
Green Line & Purple Line
NTA is procuring yet another feasibility study for a full Metro network in the Tel Aviv
Metropolitan area.
Jerusalem LRT TA Metro TA LRT
UTF 9
Description of Red LRT line
28th and 29th November 2018 Meeting TII Office, Dublin
The Red LRT line
Direction: South-West to North
and East; crossing 5 Local
Authorities
Length: 24 km
Underground Section: 12 km
Number of Stations: 33, 10
underground
Tunnels: 2 parallel, 5.5 m
diameter
Station Platforms; 125 m’
Frequency: 3-6 min, 1.5 min
underground.[?]
Passengers: 70 million, annually
Fleet: 70-90 LRVs to be supplied
by CRRC Changchun
Depot: 1 Heavy & light
maintenance
Promised Opening: 2021
UTF 10
Red Line LRT South section Bat Yam Terminus
28th and 29th November 2018 Meeting TII Office, Dublin
UTF 12
Red Line LRT Underground Section TA, RG, BB, PT
28th and 29th November 2018 Meeting TII Office, Dublin
UTF 13
Red Line LRT east section including Depot
28th and 29th November 2018 Meeting TII Office, Dublin
UTF 14
Main contractors for the Red Line
28th and 29th November 2018 Meeting TII Office, Dublin
• Eight TBM made by CREG are the digging moles.
• “China Railway Tunnel” and several local Companies build infrastructure
• Fleet of 70-90 LRVs supplied by CNR (China); styling by Buro-staubach (DE)
• Deutsche Bahn responsible for systems management.
• Signaling works Alstom.
• IBI Group of Toronto and
RHDHV from the
Netherlands, do
architectural design of
underground stations,
platforms, and the urban
planning and utility
relocation for the 11km
at-grade sections
• The State and authorities
do all other tasks of
integration outside the ROW of LRT
UTF
Selected Operation Characteristics of LRT (not final)
17 28th and 29th November 2018 Meeting TII Office, Dublin
• Holding time at boarding stations: 20-30 sec
• Headway: 2-10 minutes
• Car length:32-38 m; 2 car set :~ 7o m.
• Platforms: Doors to train, A/C (very costly)
• Carriage Capacity: 70-100 seating; 120-170 standing
• Line capacity: 16,000 passengers/hour per direction
• One TCC for all operators, hosted by State, Backup at Depot
• Signal Priority for Train: not necessarily 100% for train- predetermined per
junction
• State responsible for Traffic Signals affecting LRT; Local authority for
others
• Passenger information in real time: State responsibility; data from
operators
• Enforcement of legal traffic behaviour and public order by State & police
UTF
Major Milestones for Red Line 2015 - 2021
2016 2019 2020 2021
Start
mobilization
at-grade
south section
2nd quarter
2016
Start
launch
of TBM’s
1st quarter
2017
First LRV’s
delivered to
Depot
2nd quarter 2018
Start tracklaying
in underground
section
4th quarter 2018
Start trial
operation on AG
South section
2nd quarter
2020
Line
operation
4th quarter
2021
Start of
underground
stations ( East)
1st quarter 2016
28th and 29th November 2018 Meeting TII Office, Dublin 18
2018
2017
UTF 20
Next Steps for Developing Mass PT Network in Tel
Aviv area
28th and 29th November 2018 Meeting TII Office, Dublin
The Network
• On 2015 It began the construction
of the Red Line
• It is currently preparing for the
construction of the next two LRT
lines approved by the MOT & MOF:
The Green and Purple Lines.
• NTA is also in the process of design
of the Brown LRT Line and a
feasibility study for three additional
Metro lines, to be designed next.
• NTA coordinates new BRT lines and
Bus lanes as well
UTF 21
NTA PQ Tender due December 2018
28th and 29th November 2018 Meeting TII Office, Dublin
The Tenders
Both Green and Purple Lines
will be implemented under a
PPP scheme (DBFM
procurement strategy).
Government Works (by NTA):
Main civil engineering works
including tunneling and
bridges, utilities and urban
development works.
PPP Project: All rail works,
including tracks, systems,
electrification, signaling, rolling
stock and depots. Two
companies will be selected,
one for each line.
UTF 22
NTA Description of Green LRT line
28th and 29th November 2018 Meeting TII Office, Dublin
The Green LRT line
Direction: north to south
Length: 39km 4 local
Authorities
Underground section: 4.5
km
number of stations: 62, 4
underground
Passengers: 65 million,
annually
Depot: 1 Heavy & light
maintenance, 1 light
maintenance
Fleet: approx. 120 vehicles
UTF 23
NTA Description of Purple LRT line
28th and 29th November 2018 Meeting TII Office, Dublin
The PURPLE line
Direction: east to west
Length: 29km 6 Local
Authorities
number of stations: 45
Passengers: 60 million,
annually
Depot: 1 Heavy & light
maintenance
Fleet: approx. 100
vehicles
UTF 24
Newly agreed (or not) Mass PT plan
28th and 29th November 2018 Meeting TII Office, Dublin
The State of Israel
Developing Public Transport Strategic Plan for Developing Mass
Public Transport System in Tel Aviv
Metropolitan Area
Final Report
2016
UTF 28th and 29th November 2018 Meeting TII Office, Dublin 25
Can Current Mass PT Plan Reach its Goals?
Madrid Tel Aviv Tel Aviv Tel Aviv
2013 status Strategic Goals for
2040
2012 approved plan
for 2030
Present
status
5.3 5.2 5.2 3.7 Mill Population
9.9 9.0 9.0 6.0 Mill/day Trips
5.0 5.4 6.7 4.8 Car
4.9 3.6 2.3 1.2 PT
50 40% 26% 20% (% PT) Modal split
215 250 195 111 Br per person per year
? 50,00 22,300 7,600 NIS PT infrastructure investment per
person
Bus 13, LRT 24
Metro 28
U train 40
24 19 17 Km/h Mean speed on PT network
3 ? 2+5
- -
LRT/BRT Mass PT Supply
12 ? - Metro
10 ? 7 Suburban
Rail
40% modal split requires Metro system, huge investment and fast implementation