LRS & Business Integration@ MnDOT
Jesse Pearson | LRS Integration Portfolio Manager
Minnesota Department of Transportation
GIS-T 2017 conference, session 7.3.3
mndot.gov
How do you eat an elephant?
mndot.gov 2
Goals for session
mndot.gov/ 3
1. Learn options for staying in Sync with R&H data
2. MnDOT’s successes and failures
3. MnDOT’s approach for LRS integration
4. Lessons learned
Successes at MnDOT
mndot.gov/ 4
Speed Limit data
➢ Internal registered event
➢ Edited in separate RCE app.
Transportation Asset Management System (Agile Assets)
➢ Currently integrated with R&H 10.3.1 and Agile Assets 7.1.5.1
➢ Late April – moving to R&H 10.5 with TAMS2 ver.7.2
Failure #1
mndot.gov/ 5
Traffic Data (Segments, Forecast, Count locations)
➢ Internal registered event
➢ Orig. converted with other events
➢ QA process in place to return “changed” roads made by R&H
➢ Defects in R&H product at 10.3.1 became nail-in-coffin
➢ Pulled out of ALRS in Dec. 2016, became a stand-alone FC.
Failure #2
mndot.gov/ 6
Upgrade to R&H 10.4.1
➢ Agile Assets needed the export network GP Tool for integration
➢ Export network GP Tool didn’t work at 10.4.1
➢ Forced MnDOT to skip to 10.5 upgrade
High-level Integration Strategy
System Data analysis
Business Process Design & Strategy
Plan, Identify Resources and Recommend
Steering Commitee Prioritization
Present to Steering Committee
1 2 3
45
What is needed for integration?
8
Effort
System context diagram
Current business process
System Dependencies
Users (#, roles, etc.)
System Data needs
Identify quick wins
9
Construction Planning
Effort
Dependencies:
PUMACHIMES
(Replacing PPMS)
P6(Scheduling)
FMIS(Fed. Auth.)
FFATA
Bridge (BRM)
PUMAPUMAPUMA
Bridge (BRM)
Bridge (BRM)
Project Tracker
(State Aid Projects)
Who gets integrated first?
mndot.gov/ 10
• 12 critical systems were already identified out of 130 systems.
• Dependencies (Federal Funding/Mandates, Internal/External customers)
• Level of Effort
• Quick wins may go ahead of larger efforts
Level of Effort – Initial Analysis
11
Low Med. High
mndot.gov/
RWMMPUMA
MnCMAT
RCA, WOM,MDSS, AVL
Crash
P6 FMIS &FFATA
Bridge
Project Risks
mndot.gov/ 12
➢ Mixing Data (Old/New)
➢ IT Resources (DBAs)
➢ Delivery of products (timeline)
➢ Intersections not clearly defined for MnDOT(Crash Effort)
Options for business systems using LRS data
13
• New systems = must consume new LRS data
• For existing systems that consume the LRS data:
1. Internal registered event (Bridge)
2. External registered event, changes automatically consumed
3. External registered event, business receives notice of a change, not automatically consumed
4. Not a Registered event, business area would need to develop a process to update their data.
mndot.gov/
LRS data conversion process
14
• Convert data to the new LRS measures
• Data is frozen
• Corrections are made
• Re-load new data into Production with new LRS measures
mndot.gov/
0.0001.000
0.000 0.950
View from the side:
View on map:
True Miles
Cartographic Length
Lessons Learned at MnDOT
15
• Communicate!
• Plan for 6+ month learning curve for any new analyst
• A Strategic plan is a must
• Prioritizing is essential
mndot.gov/
Wrap up & Questions?
Jesse Pearson
LRS Integration Portfolio Manager
651-366-3881
mndot.gov 16