LOWER TIZU HYDRO ELECTRIC PROJECT

(3 X 14 MW)

DISTRICT: KIPHIRE, NAGALAND

DETAILED PROJECT REPORT

VOLUME-III: COST ESTIMATE

OCTOBER 2016

DEPARTMENT OF POWER, GOVT OF NAGALAND

DPR PREPARED BY: MAY ENCONS PRIVATE LIMITED

Lower Tizu HEP (3 x 14 MW) Detailed Project Report

Department of Power, Government of Nagaland.

Lower Tizu HEP (42 MW)

DETAILED PROJECT REPORT

VOLUME I

: MAIN REPORT

VOLUME II

: DRAWINGS

VOLUME III

:

COST ESTIMATES

VOLUME IV : GEOLOGY, SEISMICITY AND CONSTRUCTION MATERIAL

CONTENTS

Lower Tizu HEP (3 x14 MW) Detailed Project Report Cost Estimate

Department of Power, Government of Nagaland.

TABLE OF CONTENT

VOLUME – III COST ESTIMATES

S. No. DESCRIPTION PAGE

1 Introduction of cost Estimate 1 - 6

2 Abstract of Cost 8 - 7

3 Unit Rates 8 - 9

4 Detailed Cost Estimates

3.1- Civil Works 12 - 22

5 K - Buildings 23

6 O - Miscellaneous 24 - 27

7 M-Plantation 28

8 Q - Special Tools & Plants 29

9 R- Communication / Roads 30

10 X (a) - Environment, Ecology 31

11 V - Receipt & Recoveries 32

12 Unit Rates 33 - 122

INTRODUCTION OF COST ESTIMATE

Lower Tizu HEP (3 X 14 MW) Detailed Project Report DOP, Government of Nagaland Estimate of Cost

May Encons Private Limited (Formerly Thottapalli Power Private Limited) Page 1

VOLUME-III - ESTIMATE OF COST

1. GENERAL

This chapter describes Estimates of Cost for execution of Lower Tizu HEP. Basis

for arriving hourly use rate of the equipment, analysis of rates for individual items

of Civil works and cost of the E&M works is also presented. Quantities for various

items of civil works have been calculated from the design drawings given in

Volume-II for various components of the project.

BASIS OF THE ESTIMATES

The analysis of unit rate for various items of civil works is based on the standard

practices, guidelines and following assumptions.

Guidelines and inputs for préparation of estimâtes for the project issued

by GON and Indian standard IS: 4877.

The analysis of rates for various items have been worked out in

consideration the cost of materials, carriage, handling, storing, labour and

equipment required for various items of work and including overheads.

Overhead charges and contractor’s profit have been kept at 20% in

accordance with guidelines.

The base line of estimates is at Sep 2016, Price level and all costs are

expressed in Indian Rupees.

1.1 E&M EQUIPMENT COSTS

The cost of the turbines, generators and the related electrical and mechanical

equipment for the project has been estimated based on experiences of recent

projects of similar size and design parameters/ Budgetary offer of suppliers. Major

component of the electro-mechanical equipment are:

Lower Tizu HEP (3 X 14 MW) Detailed Project Report DOP, Government of Nagaland Estimate of Cost

May Encons Private Limited (Formerly Thottapalli Power Private Limited) Page 2

Turbine, Inlet emergency values Draft tube Gates and Generators;

All Balance of plant (BOP) Electrical Equipments;

All BOP Mechanical Equipments;

Powerhouse overhead crane and Draft Tube Gate Hoist:

Main Power Transformers;

Switchyard equipment and interconnection;

1.2 COMPOSITION OF THE COST ESTIMATE

The project cost estimate has been divided under the following heads in line with

the Guideline for preparation of estimate for river valley projects “issued by CWC

and Indian standard IS: 4877. The cost has been classified into direct and indirect

charges and covered under the following minor heads:

DIRECT CHARGES

I – Works

II – Establishment

III – Ordinary Tools and Plants

IV – Suspense

V – Receipt and Recoveries on Capital Account

INDIRECT CHARGES

a. – Capitalized Value of Abatement of Land Revenue

b. – Audit and Account Charges

Lower Tizu HEP (3 X 14 MW) Detailed Project Report DOP, Government of Nagaland Estimate of Cost

May Encons Private Limited (Formerly Thottapalli Power Private Limited) Page 3

1.2.1 Direct Charges

The various components of the estimates for direct charges are discussed hereunder:

I - WORKS

Various cost components having direct bearing on the cost have been identified under this head.

A. Preliminary

The total estimated cost under this Sub-head is Rs. 1.50 Crores. This includes

works relating to various investigations, surveys, Model tests, ecological studies,

detailed engineering fee, consultancy charges etc.

B. Land

A provision of Rs 0.30 Crores under this head has been made towards R & R Plan, Survey & other expenses.

C. Works

The total estimated cost under this sub-head is Rs. 211.48 Crores. This includes the

cost of Concrete Dam, Intake structure including gates, hoisting arrangement,

embedded parts, upstream and downstream dykes/ coffer dams, diversion

tunnels etc.

J. Power Plant Civil Works

The total estimated cost under this sub-head is Rs.104.12 Crores. This includes the

cost of civil and hydro-mechanical works for Head Race Tunnel cum pressure

shaft, unit penstock , surface powerhouse, Tail Race Channel and Switchyard etc.

Lower Tizu HEP (3 X 14 MW) Detailed Project Report DOP, Government of Nagaland Estimate of Cost

May Encons Private Limited (Formerly Thottapalli Power Private Limited) Page 4

K. Buildings

The total estimated cost under this Sub-head is Rs. 7.99 Crores. It includes the cost

of temporary and permanent buildings required for the project.

M. Plantation

The total estimated cost under this Sub-head is Rs.1.00 Crore.

O. Miscellaneous

The total estimated cost under this Sub-head is Rs. 8.49 Crores. It includes the cost

of various miscellaneous works identified for the project including maintenance of

Electrification, Water supply, Sewage disposal and drainage works, Recreation,

Medical, Fire fighting equipment’s, Inspection vehicles, School bus, Pay van, Visit

of dignitaries, welfare works etc.

P. Maintenance during construction

The total estimated cost under this Sub-head is Rs.3.24 Crores and includes the

cost of maintenance of all works during the construction period.

Q. Special Tools and Plants

The total estimated cost under this sub–head is Rs. 1.15 Crores and covers the cost

of essential equipment not covered in Hourly Use Rate of construction equipment.

R. Communication

The total estimated cost under this sub–head is Rs. 3.00 Crores. It includes the cost

of the construction of main approach roads, quarry roads, temporary or

permanent river crossing, Bridges, connecting roads etc.

Lower Tizu HEP (3 X 14 MW) Detailed Project Report DOP, Government of Nagaland Estimate of Cost

May Encons Private Limited (Formerly Thottapalli Power Private Limited) Page 5

S. Power Plant and Electro–Mechanical System

The total estimated cost under this sub–head is Rs. 96.35 Crores. It covers the cost

of Electro-Mechanical equipment for the power plant given in “Abstract of cost

Estimates as Electro-Mechanical Works.

X. Environmental and Ecology

The total estimated cost under this sub –head is Rs.4.80 Crores. It includes the cost

of catchment area treatment, wild life protection, landscaping, Public Health

Measures, Compensatory afforestation, implementation of EMP, etc.

Y. Losses on Stock (0.25% of C+J+K+R)

The total estimated cost under this sub –head is Rs. 0.81 Crores, which is 0.25% of

the total cost of C-works, J-Power Plant civil works, K-Buildings and R-

Communication.

II ESTABLISHMENT COST

The total estimated cost under this sub –head is Rs. 10.43 Crores @ 3 % of the I-

Works exclusive of cost of Land.

III TOOLS AND PLANTS

The provision under this sub-head is Rs.1.00 Crores and covers the Survey

instruments, camp equipments, office equipments and other small tools.

IV SUSPENSE

The net provision under this sub-head is “NIL” as all the outstanding suspense

account are expected to be cleared by adjustment to appropriate heads on

completion of the project.

Lower Tizu HEP (3 X 14 MW) Detailed Project Report DOP, Government of Nagaland Estimate of Cost

May Encons Private Limited (Formerly Thottapalli Power Private Limited) Page 6

V RECEIPT & RECOVERIES

This head accounts for recoveries by sale or transfer of temporary building etc. The

recovery on account of temporary building has been taken as 15% of the cost. The

total estimated recoveries under this sub-head are Rs.0.55 Crores.

1.2.2 Indirect Charges

a) Abatement of land Revenue

The total estimated cost under this sub-head is 0.02. It covers charges for

capitalization of abatement of cost of land revenue which is generally calculated @

4% of the agricultural land cost. There is no agricultural land involved hence the

cost under this head is not applicable.

b) Audits and Accounts charges

The total estimated cost under this sub-head is Rs.1.74 Crore, which is 0.5 % of cost

of I-works.

1.3 COMPLETION COST

The cost to completion of the project including Escalation and IDC has been

worked out as Rs. 601.36 Crores at Sep 2016, price level.

ABSTRACT OF COST

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

Civil Works E&M Works Total1. DIRECT COST

I - WorksA - Preliminary 1.50 1.50B - Land 0.30 0.30C - Works 211.48 211.48J - Power Plant Civil Works 104.12 104.12K - Buildings 7.99 7.99M - Plantations 1.00 1.00O - Miscellaneous 8.49 8.49P - Maintenance during Construction 3.24 3.24Q - Special Tools & Plants 1.15 1.15R - Communication 3.00 3.00S - Power Plant and Electrical Mechanical System 90.00 90.00X - Environment & Ecology 4.80 4.80Y - Losses on Stock 0.81 0.81

Total of I-Works 347.88 90.00 437.88II - Establishment 10.43 5.40 15.83III - Tools and Plants 1.00 0.50 1.50IV - Suspense 0.00 0.00 0.00V - Receipt & Recoveries -0.55 0.00 -0.55

Total Direct Cost 358.75 95.90 454.662. INDIRECT COST

a) Capitalisation of Abatement of Land Revenue 0.02 0.00 0.02b) Audit and Account Charges 1.74 0.45 2.19

Total Indirect Cost 1.75 0.45 2.20TOTAL OF DIRECT & INDIRECT COST 360.51 96.35 456.86

Total Hard Cost 456.86

(October 2016 Price Level)

S.No ITEM

ABSTRACT OF COST ESTIMATES

Amount at Present Day Cost (Rs. Crores)

May Encons Private Limited Page 7

DETAILED COST ESTIMATE

CIVIL WORKS

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Item Unit Rate (Rs)

1 Cement bag 434

2 Common excavation Cum 175

3 Rock excavation Cum 450

4 Rock bolts 25 mm diameter m 1,305

5 Rock bolts 32 mm diameter m 1,560

6 Wiremesh Sqm 300

7 Shotcrete Cum 11,992

8 Drilling of 45 mm dia. Hole more than 5 m deep m 695

9 Drilling of 76 mm diameter Hole more than 5 m deep m 1,230

10 Supply & installation of 70 mm diameter PVC Pipes m 669

11 Grouting bag 1,235

12 Coarse Aggregate Cum 2,150

13 Fine aggregate Cum 2,280

14 M10 grade concrete Cum 6,452

15 M15 grade concrete in powerhouse area Cum 7,504

16 M20 grade concrete in powerhouse area Cum 8,069

17 M25 grade concrete in powerhouse area Cum 8,415

18 M30 grade concrete in powerhouse area Cum 8,834

19 M40 grade concrete Cum 9,563

20 Rock excavation in steel lined tunnel area Cum 2,378

21 Rock bolts 25 mm diameter in steel lined tunnel area m 1,250

22 Excavation in class I, II & III rocks in Pressure Shaft Cum 2,258

23 Excavation in class IV & V rocks in HRT Cum 3,050

24 Drilling & installation of 25 mm diameter forepoles m 1,006

25 RCC Lagging in Tunnel Cum 19,778

26 Drilling, supply & installation of 38 mm dia PVC pipe m 966

27 Grouting operation in Dam area bag 1,235

28 Filter Compaction Cum 4,245

29 Brick Masonry (1:4) Cum 7,589

30 40 mm aggregate placing and compaction Cum 3,219

31 Supply & installation of 75 mm dia PVC Pipes m 792

32 Stone Masonry (1:4) Cum 3,689

Unit rates of main items of Civil works

May Encons Private Limited Page 8

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Description Unit Rate (Rs)1 Cement Bag 434 2 Aggregate at Dam site Cum 2,250 3 Aggregate at powerhouse site Cum 2,250 4 Sand at Dam site Cum 2,400 5 Sand at Powerhouse site Cum 2,400 6 Supply of TOR steel at site MT 60,053 7 Supply,Fabrication and erection of steel reinforcement MT 89,377 8 Supply of Structural steel at site MT 58,013 9 Supply,Fabrication and erection of structural steel MT 100,612 10 Supply,Fabrication and erection of A-516 Grade 70 Penstock Liner MT 168,663

11 Fabrication and Erection of lifting Beam MT 169,575 12 Fabrication and Erction of Stop log gates MT 172,973 13 Fabrication and Erection of Steel Bridge MT 152,289 14 Fabrication and Erection of Trash Rack MT 170,554 15 Fabrication and Erection of Gates (Fixed Wheel Gates) MT 173,523 16 2Nd Stage Embedded Parts MT 163,841 17 Boulder filling Cum 1,918 18 Loose earthfill Cum 364 19 Compacted earth fill Cum 525 20 Drilling & Blasting Cum 197 21 Gabions Cum 5,260 22 PVC Water stops m 639

WORKING RATES FOR ITEMS OF CIVIL WORKSSummary (September 2016 Price level)

May Encons Private Limited Page 9

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate (in Lakhs)

Amount (Rs. in Lakhs)

1 Establishment expenditure & Charges

2 Temporary Camp & Equipment

3 Temporary stores & Sheds, Model tests etc.

TOTAL 150.00

A-PRELIMINARY

LS 150.00

May Encons Private Limited Page 10

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate in Rs. Rs. In Lakhs

1 Reservoir Area Hectare 72.00

2 Powerhouse, Water Conductor system,Colony etc.

Hectare 10.00

3 Out of the above total land category wisecost of land

3.1 Forest (49 Hectares = 121.03 Acres) Acres 121.03 15,000.00 18.15

3.2 Jhum (33 Hectare= 81.51 Acres) Acres 81.51 15,000.00 12.23

Total Cost of Land 30.38

B - LAND

LAND ACQUISITION

May Encons Private Limited Page 11

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. DescriptionCIVIL HM TOTAL

C-1 CONCRETE GRAVITY DAM 12,175.93 12,175.93

C-2 POWER INTAKE STRUCTURE 968.84 968.84

C-3 UPSTREAM & DOWNSTREAM COFFERDAMS 774.86 774.86

C-4 COST OF HYDROMECHANICAL COMPONENTS 3,849.92 3,849.92

C-5 DIVERSION TUNNEL 2,371.75 2,371.75

TOTAL 16,291.38 3,849.92 20,141.30

ADD FOR WORKS TAX @ 4% 651.66 154.00 805.65

CONSTRUCTION WORKS CESS @1% 162.91 38.50 201.41

GRAND TOTAL 17,105.95 4,042.42 21,148.36

C - WORKS

Amount (Rs. in Lakhs)

May Encons Private Limited Page 12

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate (Rs.)Amount (Rs. in Lakhs)

1 Site clearance LS LS 10.002 Surface excavation

2.1 Common excavation m³ 67,695 175.00 118.472.2 Rock excavation m³ 383,605 450.00 1,726.22

3 Concrete3.1 M10/A150 m³ 35,000.00 6,452.00 2,258.203.2 M15/A75 m³ 60,000.00 7,504.00 4,502.403.3 M20/A40 m³ 12,000.00 8,069.00 968.283.4 M25/A20 m³ 12,000.00 8,415.00 1,009.803.5 M30/A20 m³ 150.00 8,834.00 13.253.6 M40/A20 m³ 1,500.00 9,563.00 143.453B

3B.1 Compacted backfill m³ 20,000.00 525.00 105.003B.2 Transition filter material/sand filling m³ 3,000.00 2,400.00 72.003B.3 Gabion wall m³ 2,000.00 5,260.00 105.20

4 Rock stabilization and supports

4.1 Rockbolts/anchors including accessories and testing (32 mm dia) m 2,916.67 1,560.00 45.50

4.2 Welded wire mesh reinforcement m² 10,500.00 300.00 31.505 Shotcrete m³ 1,023.75 11,992.00 122.776 Drilling for Drainage holes of 76mm Dia m 492.19 1,230.00 6.057 Reinforcing steel

7.1 Deformed reinforcing bars Grade Fe 500 MT 486.00 89,377.00 434.378 Pressure relief holes

8.1 Pressure relief holes m 500.00 500.00 2.509 Rock protection m3 3,000.00 450.00 13.5010 PVC Waterstop m 3,000.00 639.00 19.17

Sub-Total except LS 11,707.63

11

Dewatering of construction sites including supply, installation and removal of pumping equipment from the site @ 1% of above items except LS items

1% 117.08

12 Instrumentation @ 1% of sub-total 1% 117.08

13 Contingencies & work-charged establishment @ 2% of above except LS

2% 234.15

TOTAL 12,175.93

C-1 CONCRETE GRAVITY DAM

May Encons Private Limited Page 13

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate (Rs.)Amount (Rs. in Lakhs)

1 Site clearance LS LS 10.00

2 Surface excavation

2.1 Common excavation m³ 2,409.75 175.00 4.22

2.2 Rock excavation m³ 21,687.75 450.00 97.59

3 Concrete

3.1 M10/A75 m³ 750.00 6,452.00 48.39

3.2 M25 m³ 5,000.00 8,415.00 420.75

4 Rock stabilization and supports 0.00

4.1 Rockbolts/anchors including accessories and testing (25 mm dia) m 1,000.00 1,305.00 13.05

4.2 Welded wire mesh reinforcement m² 3,500.00 300.00 10.50

5 Shotcrete m³ 341.25 11,992.00 40.92

6 Drilling for Drainage holes of 76mm Dia m 164.06 1,230.00 2.02

7 Reinforcing steel

7.1 Deformed reinforcing bars Grade Fe 500 MT 300.00 89,377.00 268.13

8 PVC Waterstop m 1,000.00 639.00 6.39

Sub-Total except LS 921.96

9Dewatering of construction sites including supply, installation and removal of pumping equipment from the site @ 1% of above items except LS items

1% 9.22

10 Instrumentation @ 1% of sub-total 1% 9.22

11 Contingencies & work-charged establishment @ 2% of above except LS items 2% 18.44

TOTAL 968.84

C-2 POWER INTAKE STRUCTURE

May Encons Private Limited Page 14

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate (Rs.)Amount (Rs. in Lakhs)

1 Site clearance L.S. 1.002 Surface excavation

2.1 Common excavation m³ 300.00 175.00 0.532.2 Rock excavation m³ 2,700.00 450.00 12.15

3 Jet Grouting 3.1 Jet Grouting under cofferdam m 800.00 15,000.00 120.00

4 Embankment construction

4.1 Compacted backfill for phase I and phase II cofferdams m³ 63,289.00 525.00 332.27

4.2 Transition filter Material m³ 0.00 2,400.00 0.004.3 Rock protection m³ 400.00 450.00 1.805 Concrete on water side of coffer dams

5.1 M-25 m³ 2,216.30 8,415.00 186.506 RR Masonry Wall m³ 2,000.00 3,689.00 73.78

Sub-Total except LS 728.027 Temporary bridge LS 1.00 2,500,000.00 25.00

8Dewatering of construction sites including supply, installation and removal of pumping equipment from the site @ 1% of above items except LS items

1% 7.28

9 Contingencies & work-charged establishment @ 2% of above except LS items 2% 14.56

TOTAL 774.86

C-3 UPSTREAM AND DOWNSTREAM COFFERDAMS

May Encons Private Limited Page 15

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

A Gates B. Hoists1 SPILLWAY LOCATION

1.1 Maintenance Gate(Stoplog Gate)a) Stoplogs (Vert. Lift Slide Type) 1 164,560 173 28,464,437b) Embedded Parts, dogging devices. 6 37,500 164 6,144,038c) Lifting beam with automatic engaging /disengaging device

1 12,555 170 2,129,014

d) Rails 1 4,500 152 685,301d) Msc. Works, hand rails, ladder 1 12,555 152 1,911,988

1.2 Service Gate (Radial Gate)a) Radial gates 6 475,766 174 82,556,286b) Embedded Parts, dogging devices. 6 142,730 164 23,384,977c) Msc. Works, hand rails, ladder 1 6,000 152 913,734

2 POWER INTAKE LOCATION2.1 Trash Rack

a) Trash Racks 6 280,000 171 47,755,120b) For Trash Racks, Embedded Parts, Anchors 6 11,900 152 1,812,239

2.2 Maintenance Gate (Stoplog Gate)a) Vertical Lift Slide Type Stoplogs 1 24,000 173 4,151,352b) Embedded Parts, anchors, dogging devices, nuts, bolts, tie flates etc. necessary for installation. 2

12,000 164 1,966,092

c) Mono Rail Beam & Support Structure including maintenance plateform 1

3,000 152 456,867

d) Lifting beam with automatic engaging /disengaging device 1

5,400 170 915,705

2.3 Service Gate(Vert. Lift Fixed Wheel Type)a) Vertical Lift Fixed Wheel Type Gate 2 60,000 174 10,411,380b) Embedded Parts, anchors, dogging devices, nuts, bolts, tie flates etc. necessary for installation.

2 5,400 164 884,741

c) Super Structure & Bridge Assembly 2 12,800 152 1,949,299d) Msc. Works, hand rails, ladder 1 20,000 152 3,045,780

1,290,665 219,538,34913,100,000

Sub - Total Hoists including Electrical .(B) 78,600,000Sub Total for Gates & Hoists (A+B) 298,138,349Weightage for Transportation of Gates & Hoists = 6% of (A+B) = C 17,888,301Weightage for site transportation @10% of C = D 1,788,830Weightage for Spares of Gates, Hoists & Electrical = 10% of A + B = (E) 29,813,835Sub Total A+B+C+D = 347,629,315

Weightage for Erection, Testing & Commissioning @ 10% of A+B = 29,813,835Total for Gates + Hoists + Electrical + Spares + ETC = 377,443,150 INR

Contingency and Work-charged establishment @ 2%2% 7,548,863TOTAL 3,849.92 (in lakhs)

TOTAL Weightage for Electrical components of Hoist @20% of cost of Hoist

Electric Rope Hoist 2 20 2,000,000 4,000,000

Electric Monorail Hoist 1 15 1,500,000 1,500,000

Trash Rack Cleaning Machine

1 12,500,000

Hydraulic Hoist 5 2 x 50 8,000,000 40,000,000

Gantry Crane 1 45 7,500,000 7,500,000

C4-COST OF HYDROMECHANICAL COMPONENT

QTY. in number

s

Total Estimated Weight in

kg.

Rate (Rs.) AMOUNT in Rs.

S No:

ITEM ITEM QTY. in number

s

Estimated Capacity of

each in ton.

Rate (Rs.) AMOUNT in Rs.

GATES HOISTS

May Encons Private Limited Page 16

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate Amount (Rs. in Lakhs)

1 Open Excavation for portals

1.1 Common Excavation m³ 1800 175.00 3.15

1.2 Rock Excavation m³ 4200 450.00 18.90

2 Support for portal

2.1 Rock Bolts m 267 1,305.00 3.48

2.2 Drainage Holes m 40 1,230.00 0.49

2.3 Shotcrete m³ 60 11,992.00 7.20

2.4 Wire Mesh m² 600 300.00 1.80

3 Underground Excavation

3.1 class II to IV m³ 45,749.84 2,257.88 1,032.98

3.2 class V m³ 500.00 3,050.30 15.25

3.3 Removal of overbreak in excavation in very poor rock (class V) due to geological reasons m³ 0.00 915.09 0.00

4 Rock stabilization and supports

4.1 Rockbolts including accessories and testing of bolts 25 mm dia m 4,166.10 1,305.00 54.37

4.2 Welded wire mesh reinforcement (4mm thick, 100*100mm opening) m² 14,877.01 300.00 44.63

4.3 Steel ribs, supply and installation (including accessories) MT 80.37 100,612.00 80.87

4.4 Precast concrete lagging m³ 190.79 19,778.00 37.74

4.5 Reinforcement in laggaing MT 28.62 89,377.00 25.58

5 Shotcrete m³ 743.85 11,992.00 89.20

6 Drilling and Grouting

6.1 Drilling of 45 mm dia holes

6.1.1 Consolidation grouting drilling m 2,073.45 695.00 14.41

6.1.2 Contact grouting drilling m 103.67 695.00 0.72

6.1.3 Drainage holes drilling m 4,996.79 695.00 34.73

6.3 Placing grout for consolidation/ contact grouting inc. material Bag 2,177.12 1,235.00 26.89

6.4 Supply and installation of PVC pipe 38 mm diameter m 2,498.39 966.15 24.14

7 Concrete

7.1 Concrete Lining M-25 A20 m³ 8,418.21 8,415.00 708.39

Sub Total(A) except LS 2,224.91

8 Miscellaneous and ancillary works @ 2.5% 2.5% 55.62

Sub Total(B) except LS 2,280.53

9 Instrumentation @ 1% of sub-total 1% 22.81

10 Dewatering @ 1% of sub-total 1% 22.81

11 Contingency and Work-charged establishment @ 2% 2% 45.61

TOTAL 2,371.75

C-5 DIVERSION TUNNEL

May Encons Private Limited Page 17

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description

CIVIL HM TOTALJ-1 PRESSURE SHAFT 2,992.56 2,992.56

J-2 POWER HOUSE COMPLEX 6,320.76 6,320.76

J-3 TAIL RACE BASIN 417.00 417.00

J-4 COST ESTIMATE OF HM COMPONENTS 185.44 185.44

TOTAL 9,730.32 185.44 9,915.76

ADD FOR WORKS TAX @ 4% 389.21 7.42 396.63CONSTRUCTION WORKS CESS @1% 97.30 1.85 99.16

GRAND TOTAL 10,216.84 194.71 10,411.55

J -POWER PLANT APPURTENANCES

Amount (Rs. in Lakhs)

May Encons Private Limited Page 18

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity RateAmount (Rs. in Lakhs)

1 Underground Excavation1.1 Class II to IV m³ 12,978.24 2,257.88 293.031.2 Class V m³ 1,442.03 3,050.30 43.99

1.3 Removal of overbreak in excavation in very poor rock (class V) due to geological reasons m³ 1,442.03 915.09 13.20

2 Rock stabilization and supports2.1 Rockbolts including accessories and testing of bolts 25 mm dia m 1,902.53 1,305.00 24.83

2.2 Welded wire mesh reinforcement (4mm thick, 100*100mm opening) m² 200.00 300 0.60

2.3 Steel ribs, supply and installation (including accessories) MT 135.91 100,612.00 136.742.4 Precast concrete lagging m³ 44.34 19,778.00 8.772.5 Reinforcement in laggaing MT 6.65 89,377.00 5.94

3 Shotcrete m³ 170.13 11,992.00 20.404 Drilling and Grouting

4.1 Drilling of 45 mm dia holes4.1.1 Consolidation grouting drilling m 1,701.70 695.00 11.834.1.2 Contact grouting drilling m 102.10 695.00 0.714.1.3 Drainage holes drilling m 1,000.00 695.00 6.954.3 Placing grout for consolidation/ contact grouting inc. material Bag 1,803.80 1,235.00 22.284.4 Supply and installation of PVC pipe 38 mm diameter m 500.00 966.15 4.83

5 Concrete5.1 Back fill concrete M15/A40 m³ 708.68 7,504.00 53.185.2 Backfill Concrete behind steel ribs (M15A40) m³ 150.00 7,504.00 11.265.3 Backfill (M15/A40) (in geological accepted overbreaks) m³ 0.00 7,504.00 0.00

6 Pressure Shaft Liner 6.1 ASTM A-516 Grade-70 Penstock Steel iner MT 1,274 168,663.00 2,148.75

Sub Total(A) except LS 2,807.287 Miscellaneous and ancillary works @ 2.5% 2.5% 70.18

Sub Total(B) except LS 2,877.478 Instrumentation @ 1% of sub-total 1% 28.779 Dewatering @ 1% of sub-total 1% 28.7710 Contingency and Work Charged establishment @ 2% of sub-total 2% 57.55

TOTAL 2,992.56

J-1 PRESSURE SHAFT

May Encons Private Limited Page 19

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate Amount (Rs. in Lakhs)

1 Site clearance LS 10.00 2 Excavation

2.1 Common excavation m³ 40,714.40 175.00 71.25 2.2 Rock excavation m³ 366,429.60 450.00 1,648.93

3 Rock stabilization and supports

3.1 Rock bolts including accessories and testing of bolts 32 mm m 9,778 1,560.00 152.53

3.4 Welded wire mesh reinforcement (4mm thick, 100 mm*100 mm opening) m² 22,000.00 300.00 66.00

4 Shot crete m³ 2,145.00 11,992.00 257.23 5 Drilling and Grouting

5.1 Drilling of 45mm dia holes for pregrouting/consolidation gr. m 1,500.00 695.00 10.43

5.2.1 Drilling of 76mm dia holes more than 5m length m 1,031.25 1,230.00 12.68 5.2.2 Supply and installation of PVC pipe 70mm dia m 1,031.25 669.00 6.90

5.3 Placing grout for pregrouting/consolidation grouting inc. mat. Bag 1,500 1,235.00 18.53

6 Concrete 6.1 PCC (M10) m³ 4,500.00 6,452 290.34 6.2 Reinforced Concrete M20/A40 (First stage) m³ 12,000.00 8,069.00 968.28 6.3 Reinforced concrete M25/A40 (Second stage) m³ 10,000.00 8,415.00 841.50 6.4 Reinforced concrete M30/A40 m³ 750.00 8,834.00 66.26 6.5 Penstock

7 Reinforced steel7.1 Deformed reinforcing bars Grade Fe500 MT 1,402.50 89,377.00 1,253.51

8 Structural Steel MT 150.00 100,612.00 150.92 9 Brickwork m³ 750.00 3,689.00 27.67 10 Covering CGI sheet MT 30.00 100,612.00 30.18

Sub Total(A) except LS 5,873.14

11 Miscellaneous & Ancillary Works @ of Sub total(A) 2.5% 146.83

Sub Total(B) except LS 6,019.96 Water Supply and Sanitary fitting LS 10.00 Door and Windows LS 5.00 Painting LS 5.00 Expansion joints (fillers & sealers) LS 5.00 Damp proofing LS 5.00 MS pipes LS 5.00 Plastering LS 5.00

Sub Total(C) only LS items 50.00

12 Instrumentation @ 1% of sub-total(B) 1% 60.20 13 Dewatering @ 1% of sub-total(B) 1% 60.20

14 Contingencies and Work Charged Establishment @ 2% of sub-total(B) 2% 120.40

TOTAL 6,320.76

J-2 POWERHOUSE

May Encons Private Limited Page 20

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity RateAmount (Rs. in Lakhs)

1 Excavation

1.1 Common excavation (included In powerhouse excavations) m³ 0.00 175.00 0.00

1.2 Rock excavation (included in Powerhouse excavations) m³ 0.00 450.00 0.00

2 Concrete 2.1 PCC M10 m³ 300.00 6,452.00 19.362.2 M20 m³ 2,650.00 8,069.002.3 M25 m³ 1,500.00 8,415.00 126.23

3 Reinforcing Steel MT 252.50 89,377.00 225.68Sub Total(A) except LS 371.26

4 Miscellaneous and ancillary works @8% of sub-total A 8% 29.70

Sub Total(B) except LS 400.965 Instrumentation @ 1% of sub-total B 1% 4.016 Dewatering @ 3% of sub total B 1% 4.01

7 Contingencies and Work Charged Establishment @ 2% of sub-total(B) 2% 8.02

TOTAL 417.00

J3 - TAIL RACE CHANNEL

May Encons Private Limited Page 21

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

GATES HOISTS

3 POWER HOUSE LOCATION3.1 Draft Tube Gate

a) Vertical Lift Slide Type Gate (Stoplog Gate) 2 30,000 173 5,189,190

b) Embedded Parts, dogging devices. 3 31,500 164 5,160,992

d) Mono Rail Beam 1

8,000152 1,218,312

e) Lifting beam with automatic engaging /disengaging device

14,000

170 678,300

f) Msc. Works, hand rails, ladder 1 6,000 152 913,734 Sub - Total Hoists 1,000,000

Total for Gates (A) 79,500 13,160,528200,000

Sub - Total Hoists including Electrical (B) 1,200,000

Sub Total for Gates & Hoists (A+B) 14,360,528

Weightage for Transportation of Gates & Hoists = 6% of (A+B) = C 861,632

Weightage for site transportation @10% of C = D 86,163

Weightage for Spares of Gates, Hoists & Electrical = 10% of A + B = (E) 1,436,053

Sub Total A+B+C+D = 16,744,375

Weightage for Erection, Testing & Commissioning @ 10% of A+B = 1,436,053

Total for Gates + Hoists + Electrical + Spares + ETC = 18,180,428 INR

Contingency and Work-charged establishment @ 2% 2%

363,609

TOTAL 185.44 (in lakhs)

Weightage for Electrical components of Hoist @20% of cost of Hoist

Rate (Rs.)

Electric Monorail Hoist 1 10 1,000,000 1,000,000

J4-COST OF HYDROMECHANICAL COMPONENT

QTY. in numbers

Total Estimated Weight in

kg.

Rate (Rs.)

AMOUNT in Rs.

ITEMS No. ITEM QTY. in numbers

Estimated

Capacity of each in ton.

AMOUNT in Rs.

May Encons Private Limited Page 22

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description of BuildingTotal Plinth Area

Rate (per sqm)

Amount (Rs. in Lakhs)

Total Plinth Area

Rate (per sqm)

Amount (Rs. in Lakhs)

1 Residential Buildings1.1 Permanent Township

1.1.1 Type A 49.10 9448.00 4.641.1.2 Type B 70.80 9448.00 6.691.1.3 Type C 104.80 9448.00 9.901.1.4 Type D 191.90 9448.00 18.13

1.1.5 Head of Project residence 214.00 9448.00 20.22

1.2 Temporary HutmentsSub total (1) 630.60 59.58

2 Non- residential Buildings

2.1 Project Township (permanent)

2.1.1 Small Clinic home (2 beds) 400.00 10610.00 42.44

2.1.2 Guest house 200.00 8954.00 17.91

2.1.3 Field hostel/training center 200.00 8954.00 17.91

Club/ Welfare Association 300.00 10610.00 31.83

Sub total (2.1) 1100.00 110.09

2.2 Other buildings (permanent)

2.2.1 Administrative building 300.00 10610.00 31.83

2.2.2 Other office buildings in Project area 200.00 10610.00 21.22

2.2.3 Workshop at site 500.00 10610.00 53.052.2.4 Stores 200.00 10610.00 21.222.2.5 Testing laboratory 100.00 10610.00 10.612.2.6 Canteen 100.00 10610.00 10.61

Sub total (2.2) 1400.00 148.54

2.3 Other buildings (temporary)

2.3.1 Site store & workshop 1000.00 10000.00 100

2.3.2 Explosive magazine (temp.)

1100.00 10000.00 110

2.3.3 Substation 5

2.3.4 Diesel Power house shed 5

Sub total (2.3) 2100.00 220.00Sub total 5230.60 318.21 2100.00 220.00

3 Services

3.1 Water Supply, sanitation and Electrical fittings 8% 25.46 17.60

3.2 Land development 2% 6.36 4.403.3 Colony roads 2% 6.36 4.403.4 Fencing 1% 3.18 2.20

3.5 Landscaping, lawns, gardens 1% 3.18 2.20

3.6 Retaining walls 8% 25.46 17.60Total 388.21 268.40

656.61Contingencies @ 3% 3% 142.26

TOTAL 798.87

Permanent Buildings Temporary Buildings

K-BUILDINGS

May Encons Private Limited Page 23

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Description Units Amount (Rs in Lacs)1 Capital Cost

1.01 Hospital Equipments LS 5.001.02 Water supply, purification and distribution LS 5.001.03 Sewerage disposal and storm water drainage works LS 10.001.04 Fire fighting equipments LS 5.001.05 Telephonic facilities LS 5.001.06 Construction Power LS 5.001.07 Wireless communication facilities LS 5.00

1.08 Construction of local infrastructural facilities like toilets, etc LS 10.00

1.09 Dish Antena and accessories LS 5.001.10 POL Pumps LS 10.001.11 Quality Control laboratory/equipments LS 10.00

1.12 Purchase of computers, Laptop, LAN system photocopiers etc LS 25.00

1.13 Purchase of furniture's and fixtures for offices, Guest House and Field Hostel LS 25.00

1.14 Deployment of security at Project sites/colonies including their temporary accomodation LS 100.00

Sub Total 225.002 Maintenance and services

2.01 Medical assistance for 3 years including dispensary provision for initial one years LS 50.00

2.02 Running and maintenance of telephonic facilities for 3 years LS 15.00

2.03 Running and maintenance of wireless station for 3 years 10.00

2.04 Running and maintenance of local infrastructural facilities for 3 years 20.00

2.05 Running and maintenance of pick up vans 50.002.06 Running and maintenance of ambulance 50.00

2.07 Running and maintenance of recreation club for 3 years @ Rs. 3 lacs/ year 9.00

2.08 Transport for labour and staff 20.00Sub Total 224.00

3 Other Items3.01 Visits of dignitories LS 10.003.02 Inaugural and dedication ceremonies LS 10.003.03 Models and Exhibits LS 15.003.04 Public and information LS 5.003.05 Canteen facilities LS 10.003.08 Boundary Pillars, distance marks and bench marks LS 25.003.09 Street lights in colonies LS 10.003.10 Library facilities LS 15.003.11 Furnishing of field hostels and rest houses (8 nos) LS 10.003.12 R/M of field hostels and rest houses for 3 years LS 25.003.13 Labour welfare and compensation to labour LS 25.003.14 Anti Malaria measures LS 25.003.15 Police station LS 15.003.16 Completion report etc. LS 25.003.17 Publication of pamhlets and sign board etc LS 10.003.18 Training for Engineers LS 100.003.19 Seismological observations LS 15.003.20 Social activities for Local area LS 10.00

Sub Total 360.00Total 809.00Contingencies @ 3% 3.00% 24.27Work-charged establishment @ 2% 2.00% 16.18Total 849.45

O - Miscellaneous

May Encons Private Limited Page 24

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Description Nos

1 Laptops 5

2 Desktops 10

3 A3 size printers 3

4 A4 size printers 5

5 Plotters (For printing drawings) 2

6 A3 size photocopiers 2

8 Purchase cost of various softwares

O1-Details of Purchase of computers, laptop, LAN system, photocopiers etc

May Encons Private Limited Page 25

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Description Nos

1 Jeeps/Pick up Vans 6.00

2 Cars 3.00

3 Buses 2

4 Ambulance 1

5 Explosive Van 1

O2-Details of Running and maintenance of vehicles

May Encons Private Limited Page 26

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Category of Employee

No of times seminar,training imparted (Within

India)

1 Project Incharge 2

2 HODs 30

3 Sectional Heads 50

4 Junior Staff/Support Staff 100

O3-Details Training for Engineers

May Encons Private Limited Page 27

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Description Units Amount (Rs in Lacs)

1 Cost of 1 lac plants to be planted along project roads, colonies, rim of reservoir LS 50.00

2 Cost of digging 1 lac pits @ Rs 40/pit LS 40.00

3 Cost of protection by barbed wire @ Rs 40/plant LS 40.00

4Casual labour 15 Nos. for protection and plantation for 3 months every year for 5 years @ 15x3x5x30x120

LS 8.10

Total 138.10Say 100

M-Plantation

May Encons Private Limited Page 28

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S.No. Description of equipment Quantity Unit Rate (Rs. in Lacs)

Scheduled life (Yrs)

Project Duration

(Yrs)

Amount (Rs in Lakhs)

1 Trucks 4.00 Nos. 10.00 8.00 3.00 15.00

2 Tipper (6cum) 5.00 Nos. 12.00 8.00 3.00 22.50

3 Pick up vans 1.5 MT 2.00 Nos. 6.00 8.00 3.00 4.50

4 Buses, 30 seater 2.00 Nos. 10.00 8.00 3.00 7.50

5 Cars (Petrol) 3.00 Nos. 5.50 8.00 3.00 6.19

6 Jeeps(Petrol/Diesel) 2.00 Nos. 8.00 8.00 3.00 6.00

7 Ambulance Van 1.00 Nos. 8.00 8.00 3.00 3.00

8 Diesel Tanker 10 KL 1.00 Nos. 15.00 8.00 3.00 5.63

9 Petrol Tanker 8 KL 1.00 Nos. 15.00 8.00 3.00 5.63

10 Explosive Van 1.00 Nos. 8.00 8.00 3.00 3.00

11 Wheel Dozer 200 HP 1.00 Nos. 80.00 8.00 3.00 30.00

12 Road Roller 1.00 Nos. 15.00 8.00 3.00 5.63

Transportation/Inspection Vehicles (S.No.-4 to S.No-10) 41.44

Cost of Q-Spl. T&P other than personnel carriers 73.13

TOTAL 114.56

S.No. Cost (Rs. in lakhs) Q R&R

1 73.13 18.28 13.71

2 41.44 41.44 8.29

114.56 59.72

22.00

Provision under head Q - Spl. T&P

Recoveries to be shown under V- Receipt and Recoveries

Q-SPECIAL TOOLS & PLANTS

DISTRIBUTION OF COST UNDER HEAD Q - SPECIAL T&P AND V - RECEIPT & RECOVERIES

Description of equipment

Cost of equipments excluding inspection vehicles

Cost of inspection vehicles

May Encons Private Limited Page 29

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description Unit Quantity Rate (Rs in Lakhs)

Amount (Rs. in Lakhs)

1Road widening from Phelungre Village to Project site at various locations

LS LS LS 80.00

2

Project Approach road including approaches to quarry, magazine and dumping grounds etc. (1600 m)

LS LS LS 140.00

3 Miscellanous expenses LS LS LS 80.00

Total 300.00

R - COMMUNICATION

May Encons Private Limited Page 30

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Description of Environment and Ecology Plan UnitAmount (Rs.in Lakhs)

1 Catchment Area Treatment Plan LS 100.00

2 Biodiversity Management and Wildlife Conservation Plan LS 75.00

3 Muck Disposal Plan LS 50.00

4 Restoration of Construction Areas and Landscaping LS 10.00

5 Green Belt Development Plan LS 10.00

6 Fishery Development and Downstream Management Plan LS 20.00

7 Public Health Delivery System LS 25.00

8 Waste Management Plan LS 25.00

9 Fuel Wood Energy Management and Conservation LS 25.00

10 Management of Air & Water Quality and Noise Level LS 5.00

11 Rehabilitation and Resettlement Plan LS 50.00

12 Disaster Management Plan LS 50.00

13 Good Practice LS 10.00

14 Implementation & Monitoring Programme LS 25.00

TOTAL 480.00

X-ENVIRONMENT & ECOLOGY

May Encons Private Limited Page 31

Lower Tizu (3 x 14 MW)DOP, Government of Nagaland

Detailed Project ReportCost Estimate

S. No. Item Amount (Rs. in Lakhs)

1. Recovery from the Sale of Equipments 22.00

2 Recovery from temporary Buildings 33.00

Total 55.00

V - RECEIPT & RECOVERIES

May Encons Private Limited Page 32

UNIT RATES ANALYSES

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

1 Cement Rs. 434 per bag2 Common excavation in Powerhouse Rs. 242 per cum3 Rock excavation in Powerhouse Rs. 529 per cum4 Rock bolts 25 mm dia. In Powerhouse Rs. 1,305 per m5 Rock bolts 32 mm dia. In Powerhouse Rs. 1,560 per m6 Wiremesh in powerhouse Rs. 316 per sqm7 Shotcrete in powerhouse Rs. 11,992 per cum

8 Drilling of 45 mm dia. Hole more than 5 m deep in PH Rs. 695 per m

9 Drilling of 76 mm dia. Hole more than 5 m deep in PH Rs. 1,230 per m10 Supply & installation of 70 mm dia PVC Pipes Rs. 669 per m11 Grouting in powerhouse area Rs. 1,235 per bag12 Aggregate in powerhouse area Rs. 2,150 per cum13 Fine aggregate in powerhouse area Rs. 2,280 per cum14 M15 grade concrete in powerhouse area Rs. 7,510 per cum15 M20 grade concrete in powerhouse area Rs. 8,233 per cum16 M25 grade concrete in powerhouse area Rs. 8,957 per cum17 M30 grade concrete in powerhouse area Rs. 9,375 per cum18 Rock excavation in steel lined tunnel area Rs. 2,378 per cum19 Rock bolts 25 mm dia. in steel lined tunnel area Rs. 1,299 per m20 Rock bolts 32 mm dia. in steel lined tunnel area Rs. 1,488 per m21 Wiremesh in steel lined tunnel area Rs. 316 per sqm22 Shotcrete in steel lined tunnel area Rs. 11,992 per cum23 Drilling of 45 mm dia. Hole more than 5 m deep Rs. 641 per m24 M20 grade concrete in steel lined tunnel area Rs. 8,075 per cum25 Common excavation in HRT adit portal area Rs. 271 per cum26 Rock excavation in HRT adit portal area Rs. 552 per cum27 Excavation in class I, II & III rocks in HRT Rs. 2,258 per cum28 Excavation in class IV & V rocks in HRT Rs. 3,050 per cum29 Rock bolts 25 mm dia. in HRT Rs. 1,239 per m30 Rock bolts 32 mm dia. In HRT Rs. 1,488 per m31 Drilling & installation of 25 mm dia forepoles Rs. 1,006 per m32 Wiremesh in HRT Rs. 316 per cum33 Shotcrete in HRT Rs. 11,992 per cum

34Drilling of 45 mm dia. Hole more than 5 m deep in HRT Rs. 553 per m

35Drilling of 76 mm dia. Hole more than 5 m deep in HRT Rs. 1,200 per m

36 Grouting in HRT Rs. 1,261 per bag37 M15 grade concrete in HRT Rs. 7,511 per cum38 M20 grade concrete in HRT Rs. 8,070 per cum39 M25 grade concrete in HRT Rs. 8,714 per cum40 M30 grade concrete in HRT Rs. 8,840 per cum41 RCC Lagging in Tunnel Rs. 19,778 per cum42 Excavation in Surge Shaft in Class-II, III & IV Rs. 2,730 per cum43 Excavation in Surge Shaft in Class-V Rs. 3,140 per cum44 Excavation in Vertical Pressure Shaft Rs. 8,631 per cum45 Common excavation in Barrage area Rs. 217 per cum46 Rock excavation in Barrage area Rs. 492 per cum47 Rock bolts 25 mm dia. in Barrage area Rs. 1,335 per m48 Rock bolts 32 mm dia. In Barrage area Rs. 1,560 per m

49 Drilling, supply & installation of 38 mm dia PVC pipe Rs. 966 per m50 Wiremesh in Barrage area Rs. 316 per sqm51 Shotcrete in Barrage area Rs. 12,110 per cum

52Drilling of 45 mm dia. Hole more than 5 m deep in Barrage area Rs. 695 per m

53Drilling of 76 mm dia. Hole more than 5 m deep in Barrage area Rs. 1,230 per m

54 Grouting in Barrage area Rs. 1,235 per Bag55 Grouting operation in Barrage area Rs. 1,235 per Bag56 Aggregates in Barrage area Rs. 704 per cum57 Fine aggregate in Barrage area Rs. 2,280 per cum58 M10 grade concrete in Barrage Rs. 6,452 per cum59 M15 grade concrete in Barrage Rs. 7,504 per cum60 M20 grade concrete in Barrage Rs. 8,069 per cum61 M25 grade concrete in Barrage Rs. 8,415 per cum62 M30 grade concrete in Barrage Rs. 8,834 per cum63 M40 grade concrete in Barrage Rs. 9,563 per cum64 Filter Compaction Rs. 3,502 per cum65 Brick Masonry (1:4) Rs. 7,589 per cum66 40 mm aggregate placing and compaction Rs. 3,092 per cum67 Supply & installation of 75 mm dia PVC Pipes Rs. 792 per m68 Stone Masonry (1:4) Rs. 3,689 per cum

Unit rates of main items of works

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 33

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Main Construction Materials Unit Rate (Rs)

1 Cement Bag 434

3 Aggregate at Dam site Cum 2,150

3a Aggregate at powerhouse site Cum 2,150

3b Sand at Dam site Cum 2,280

3c Sand at Powerhouse site Cum 2,280

4 Supply of TOR steel at site MT 60,053

5 Supply,Fabrication and erection of steel reinforcement MT 89,377

6 Supply of Structural steel at site MT 58,013

7 Supply,Fabrication and erection of structural steel MT 100,612

8a Supply of Penstock steel liner A STM A- 537 CL II at site MT 119,970

8b Supply,Fabrication and erection of ASTM A-537 CL II Penstock Liner MT 187,403

8c Fabrication and Erection of lifting Beam MT 188,417

8d Fabrication and Erction of Stop log gates MT 192,193

8e Fabrication and Erection of Steel Bridge MT 169,210

8f Fabrication and Erection of Trash Rack MT 189,505

8g Fabrication and Erection of Gates (Fixed Wheel Gates) MT 192,803 8h 2Nd Stage Embedded Parts MT 182,046 9 Boulder filling Cum 1,918

10 Loose earthfill Cum 364

11 Compacted earth fill Cum 525

12 Drilling & Blasting Cum 197

13 Gabions Cum 5,260

14 PVC Water stops m 639

WORKING RATES FOR ITEMS OF CIVIL WORKSSummary (September 2016 Price level)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 34

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 5,500

c) Carriage from Guwahati to Store at Project site (For 1.0 Tonne)

- Distance = km 291.00

- Rate/km = 8.90

2,589.90

Sub - Total (A) = Rs. 8,089.90

g) Carriage from Store to work site

- Distance = km 1.00

* Carriage per Tonne = Rs. 8.90

Sub - Total (B) = Rs. 8,098.80

i) Supervision Charges @ 2% of sub total (B) = Rs. 161.98 Sub - Total ( C ) = Rs. 8,260.78

j) Wastage and Incidentals to work @ 5% of sub total ( C ) = Rs. 413.04 Total Cost / MT = Rs. 8,673.81

Cost per Bag (50 Kg) = Rs. 433.69 Therefore,

Cost per Bag of Cement = Rs. 434.00

WORKING RATE - CEMENT WITH SILICA FUMES

a) = Rs. 8,680.00

Silica @ 4 kg/per bag (50 kg) f0r 20 bags 80.00

Cost of Silica Fumes (4 kg/bag @ Rs 35.10 per kg 2,808.00 Sub - Total (A) = Rs. 11,488.00

g) Storage Charges @ 1.5% of sub total (A) = Rs. 172.32

i) Carriage from Store to work site (For 10 Tonne)

- Distance = km 1.00

* Carriage per Tonne = Rs. 8.90

Sub - Total (B) = Rs. 11,669.22

j) Supervision Charges @ 0.5% of sub total (B) = Rs. 58.35 Sub - Total ( C ) = Rs. 11,727.57

k) Wastage and Incidentals to work @ 5% of sub total ( C ) = Rs. 586.38 Total Cost / MT = Rs. 12,313.94

Cost per Bag (50 Kg) = Rs. 615.70 Therefore,

Cost per Bag of Cement = Rs. 616.00

Cost of Cement per MT at Guwahati

Cost of Cement per MT at site/MT

WORKING RATE - CEMENT

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 35

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 55,000.00

b) Carriage from Factory to Store (For 10 Tonne)

- Distance = km 431.00

* Carriage per 10 Tonne = Rs./km 89.00

* Carriage per Tonne = Rs. 3,835.90

Sub - Total = Rs. 58,835.90

c) Storage Charges @ 1.5 % = 882.54

d) Carriage from Store to work site (For 10 Tonne)

- Distance = km 4.00

* Carriage per Tonne = Rs./km 89.00

* Carriage per Tonne = Rs. 35.60

Sub - Total = Rs. 59,754.04

f) Supervision Charges @ 0.500 % = 298.77

Sub - Total = Rs. 60,052.81

Total Cost / MT = Rs. 60,052.81

Therefore,

Cost per MT = Rs. 60,053

WORKING RATE - SUPPLY OF STEEL (TWISTED REINFORCEMENT BAR) AT SITE

Cost of Mild Steel / Tor bar per MT at Supply Store at Bandardewa (Incl. Sale Tax etc.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 36

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 53,000.00

b) Carriage from Factory to Store (for 10 tonne)

- Distance = km 431.00

* = Rs./km 89.00

* = Rs. 3,835.90

Sub - Total = Rs. 56,835.90

c) Storage Charges @ 1.5% = 852.54

d) Carriage from Store to work site (For 10 Tonne)

- Distance = km 4.00

* = Rs. 35.60

Sub - Total = Rs. 57,724.04

e) 0.5% = Rs. 288.62

Sub - Total = Rs. 58,012.66

Total Cost / MT = Rs. 58,012.66

Therefore,

Cost per MT = Rs. 58013

WORKING RATE - SUPPLY OF STRUCTURAL STEEL AT SITE

Supervision Charges @

Carriage per Tonne (Including loading, unloading, stacking)

Carriage per Tonne(including loading, unloading, stacking)

Cost of Steel Ribs at Supply Store (incl. of sales tax)

Carriage per 10 Tonne (Including loading, unloading, stacking)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 37

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A1 Reinforcement Steel Rs. 52,500 per Tonne

2 Structural Steel (Plate, Angles etc.) Rs. 55,000 per Tonne

3 Penstock Steel (537 Grade-70) Rs. 110,000 per Tonne

5 Cement Rs. 6,500 per Tonne

6 Welded wire mesh 58,333 per MT

7 Drill Bit for Jack Hammer Rs. 8000.00 per bit

8 Drill Bit for Wagon Drill Rs. 8200.00 per bit

B1 Diesel Rs. 58.88 per litre2 Hydraulic Oil Rs. 215.00 per litre3 Petrol Rs. 62.79 per litre4 Lubricant Oil Rs. 288.00 per litre5 Filter Oil Rs. 288.00 per litre6 Gear Oil Rs. 247.00 per litre7 Grease Rs. 275.00 per Kg8 Electrical Energy Rs. 17.05 per Unit9 Compressed air (100cfm) Rs. 402.67 per hour10 Acetylene gas Rs. 1,842.50 per cum11 Oxygen gas Rs. 478.50 per cum

C1 Drill Steel for Jack Hammer Rs. 74.00 per meter

2 Drill Steel for Wagon Drill Rs. 118.01 per meter

3 Drill Steel for Drill Jumbo Rs. 140.92 per meter

4 Gelatin Rs. 100.49 per Kg

5 Detonator Rs. 27.13 per piece

6 M S welding electrodes Rs. 3.30 Piece

7 Steel Fibres for Shotcrete Rs. 108.35 per Kg

8 Silica fume Rs. 35.10 per Kg

9 PVC Waterstop Rs. 478.50 per meter

DSkilled Labour

1 Foreman Rs. 32,765 per month

2 Asst. Foreman Rs. 24,170 per month

3 Operator Rs. 24,170 per month

4 Driller Rs. 24,170 per month

5 Blastman Rs. 24,170 per month

6 Mechanic Rs. 24,170 per month

7 Electrician Rs. 24,170 per month

8 Wireman Rs. 24,170 per month

9 Carpenter Rs. 24,170 per month

10 Mason Rs. 24,170 per month

11 Explosive Inspector Rs. 24,170 per month

12 Explosive Blaster Rs. 24,170 per month

13 Wireman Rs. 24,170 per month

Semi Skilled Labour1 Beldar Rs. 9,788 per month

2 Mucker Rs. 9,788 per month

3 Helper Rs. 9,788 per month

4 Chowkidar Rs. 9,788 per month

5 Cleaner Rs. 9,788 per month

Basic rates (July 2016)

BASIC MATERIAL RATES

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 38

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Features- Size of Hole = 38 mm.- Hole Pattern = 1.50 m. x 1.50 m.- Area per Hole = 2.25 sqm.- Volume per meter = 2.25 cum.- Explosive required = 0.97 kg- Explosive required per cum. Of rock

* 100% hole filled = 0.430 Kg* 75% hole filled = 0.323 Kg

b) Drilling- Length of Drill required per 100 cum of rock = m 44.44 - Horizontal Drilling & Pattern Effect @ 50% = m 22.22

Total = m 66.67 Say, Total drilling required for 100 cum. = 67.00

c) Cost of Drilling- Rate of Drilling per hour with Jack Hammer = m 6.00 - Cost of Drilling per hour Rs. 1,453 - Cost of Drilling per 100 Cum = Rs. 16,224.57 - Cost of Drill Steel per meter with Jack Hammer = Rs. 74.00 - Cost of Drill Rod per 100 Cum. = Rs. 4,958.00

Sub - Total = Rs. 21,182.57

d) Blastingi) Gelatin requirement- Assuming hole filled upto 100% of its capacity- Quantity of Explosive Required per 100 Cum. = Kg 43.00 - Rate of Gelatin per Kg = Rs. 100.49 - Total cost of Gelatin per 100 Cum of blasting = Rs. 4,321.24

ii) Electric Detonator- Average depth of Hole = m 1.75 - Quantity of Rock per linear meter of hole = cum. 2.25 - Quantity of Rock per 1.75 meter depth of hole = cum. 3.94 - No. of hole per 100 cum. = Nos. 26 - Detonator required per 100 cum. = Nos. 26 - Cost of a detonator = Rs. 27.13 - Total cost of detonators = Rs. 705.48

iii) Blasting Batteries, prima cord loading wire etc. @50% of i) = Rs. 2,160.62

iv) Stemming @ 40% of i) = Rs. 1,728.50 Sub - Total = Rs. 8,915.84

TOTAL = Rs. 30,098.41 - Add 10% for secondary drill blasting = Rs. 3,009.84

TOTAL = Rs. 33,108.25 Therefore,

Rate of drilling & blasting per cum. = Rs. 331.00

WORKING RATE - DRILLING AND BLASTING (JACK HAMMER)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 39

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Features- Size of Hole = 76 mm.- Hole Pattern = 2.50 m. x 2.50 m.- Area per Hole = 6.25 sqm.- Volume per meter = 6.25 cum.- Explosive required = 2.69 kg- Explosive required per cum. Of rock

* 100% hole filled = 0.430 Kg* 75% hole filled = 0.323 Kg

b) Drilling- Length of Drill required per 100 cum of rock = m 16.00

Total = m 24.00 Say, Total drilling required for 100 cum. = 24.00

c) Cost of Drilling- Rate of Drilling per hour with Air track = m 16.00 - Cost of Drilling per hour Rs. 4,398 - Cost of Drilling per 100 Cum = Rs. 6,596.65 - Cost of Drill Steel per meter with air track = Rs. 118.01 - Cost of Drill Rod per 100 Cum. = Rs. 2,832.29

Sub - Total = Rs. 9,428.94

d) Blastingi) Gelatin requirement- Assuming hole filled upto 100% of its capacity- Quantity of Explosive Required per 100 Cum. = Kg 43.00 - Rate of Gelatin per Kg = Rs. 100.49 - Total cost of Gelatin per 100 Cum of blasting = Rs. 4,321.24

ii) Electric Detonator- Average depth of Hole = m 1.75 - Quantity of Rock per linear meter of hole = cum. 6.25 - Quantity of Rock per 1.75 meter depth of hole = cum. 10.94 - No. of hole per 100 cum. = Nos. 10 - Detonator required per 100 cum. = Nos. 10 - Cost of a detonator = Rs. 27.13 - Total cost of detonators = Rs. 271.34

iii) Blasting Batteries, prima cord loading wire etc. @50% of i) = Rs. 2,160.62

iv) Stemming @ 40% of i) = Rs. 1,728.50 Sub - Total = Rs. 8,481.70

TOTAL = Rs. 17,910.64 - Add 10% for secondary drill blasting = Rs. 1,791.06

TOTAL = Rs. 19,701.70 Therefore,

Rate of drilling & blasting per cum. = Rs. 197.00

WORKING RATE - DRILLING AND BLASTING (AIR TRACK)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 40

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Machinery Chargesa) Hydraulic Excavator ( 1.5 cum)

- Final output of hydraulic excavator per hour = cum 124 - Use rate of excavator per hour = 3,301

Rate per cum. = 26.66

b) Dumper (25T)- Average Lead = km 1.40 - Capacity = cum. 15.63 - Therefore, actual capacity = cum. 15.63 Cycle Time- Loading Time = min 7.57 - Spotting Time = min 2.50 - Turning & Dumping Time = min 2.50 - Empty haul @ 20kmph = min 4.20 - Loaded haul @ 15kmph = min 5.60

Total Cycle Time = min 22.37 - No. of trips per 50min working hours = Nos. 2.23 - Output of Dumper per working hour = cum. 34.92 - Use rate of dumper per hour = 4,120

Rate per cum. = 117.97

c) Crawler Dozer (180 HP)- Assuming one crawler dozer will be enough for one excavator- Output of Excavator = Output of Crawler Dozer per hour = cum. 123.82 - Use rate of Crawler dozer per hour = Rs. 4,801

Rate per cum. = 38.78

TOTAL MACHINERY CHARGES ( a + b + c) Rate per cum. = Rs. 183.41

B Others- Construction and maintenance of haul road @ 5% of (A) = Rs. 9.17 - Electrical Energy charges @ 2% of (A) = Rs. 3.67 - Leveling & trimming of waste piles etc. @ 3% of (A) = Rs. 5.50

PRIME COST (A + B) = Rs. 201.76

c) Overhead + Contractors profit @ 20% = Rs. 40.35 Total Cost / cum. = Rs. 242.11

Therefore,Cost per cum. = Rs. 242.00

WORKING RATE - COMMON EXCAVATION (NO ROCK)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 41

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A = Rs. 223.80

B Machinery Chargesa) Loader cum Excavator (1.5 cum)

- Final output of excavator per hour = cum 135.95 - Use rate excavator per hour = 3,301

Rate per cum. = 24.28

b) Dumper (25 T)- Average Lead = km 1.40 - Capacity = cum. 15.63 - Swell Factor = 63%- Therefore, actual capacity = cum. 9.84 Cycle Time- Loading Time = min 4.34 - Spotting Time = min 0.30 - Turning & Dumping Time = min 2.00 - Empty haul @ 20kmph = min 4.20 - Loaded haul @ 15kmph = min 5.60

Total Cycle Time = min 16.44 - No. of trips per 50min working hours = Nos. 3.04 - Output of Dumper per working hour = cum. 29.93 - Use rate of dumper per hour = 4,120

Rate per cum. = 137.65

c) Wheeled Dozer (180 HP)- Assuming one wheeled dozer will be enough for one excavator- Output of Excavator = Output of wheeled dozer per hour = cum. 135.95 - Use rate of wheeled dozer per hour = Rs. 4,801

Rate per cum. = 35.31

TOTAL MACHINERY CHARGES ( a + b + c) Rate per cum. = Rs. 197.24

C Others- Construction and maintenance of haul road @ 5% of (B) = Rs. 9.86 - Electrical Energy charges @ 2% of (B) = Rs. 3.94 - Leveling & trimming of waste piles etc. @ 3% of (B) = Rs. 5.92

PRIME COST (A + B + C) = Rs. 440.77

c) Overhead + Contractors profit @ 20% = Rs. 88.15 Total Cost / cum. = Rs. 528.92

Therefore,Cost per cum. = Rs. 529.00

WORKING RATE - OPEN EXCAVATION (IN ROCK BY 100% BLASTING)Drilling & blasting charges per cum. (Considering 80% drilling by wagon drill and 20% drilling by Jack Hammer

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 42

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by Jack Hammer (Per hour) = Rs. 1,453

I) = m/hr 6Hence rate of drilling per meter = Rs. 242.16

ii) Cost of drill rod per meter of drill rod = Rs. 74.00

iii) Labour lighting and scaffolding etc. LS = Rs. 100

iv) Ventilation and shop charges LS = Rs. 40

Total = Rs. 456.16

B Supply and making of Rock Bolts

I) Rock bolt 25 mm dia , 3.85Kg/m @ Rs. 60,053 Rs./MT = Rs. 231.20

ii) Wastage in cutting @ 2.5% of (i) 5.78

iii) Cutting and making tips LS = Rs. 25.00

iv) Threading LS = Rs. 50.00

v) Cost of nut and bolts, plates = Rs. 125.00

Total = Rs. 431.20C Installation

i) Placing, grouting & misc.works LS Rs. 50.00

ii) Grouting Rock Bolts LS Rs. 100.00

iii) Miscellaneous work LS Rs. 50.00Total Rs. 200.00

Prime Cost 1,087.36

Add 20% for Overhead and Contractor's Profit = Rs. 217.47

Cost of Rock Bolting per m = Rs. 1,305.00

Average rate of drilling 25mm dia. hole per hour

WORKING RATE - ROCK BOLTING ( 25.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 43

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by Jack Hammer (Per hour) = Rs. 1,453

i) = m/hr 6

Hence rate of drilling per meter = Rs. 242.16

ii) Cost of drill rod per meter of drill rod Rs. 103.77

iii) Labour ,lightning and scaffolding LS Rs. 100

iii) Ventilation and shop charges = Rs. 40

Total = Rs. 485.93

B Supply and making of Rock Bolts

i) Rock bolt 32 mm dia , 6.32 Kg/m @ Rs. 60,053 Rs./MT = Rs. 379.53

ii) Wastage @ 2.5% of (I) Rs. 9.488374

iii) Cutting and making tips LS = Rs. 50.00

iv) Threading @ 20% of B (i) LS = Rs. 50.00

v) Cost of nut and bolts, plates etc. LS = Rs. 125.00

Total = Rs. 614.02C Installation

i) Placing, grouting & misc.works LS = Rs. 50.00

ii) Grouting Rock Bolt LS Rs. 100.00

iii) Miscellaneous Works LS Rs. 50.00

Total Rs. 200.00

Prime Cost Rs. 1,299.96

Add 20% for Overhead and Contractor's Profit = Rs. 259.99

Total cost of Rock Bolting per m = Rs. 1,560.00

Average rate of drilling 45/50 mm dia. hole per hour

WORKING RATE - ROCK BOLTING ( 32.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 44

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 58,333.33

Wastage 2.5% 1,458.33

b) Carriage from Factory to Store (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 851.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs./km 89.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs. 7,573.90

Sub - Total = Rs. 67,365.57

e) Storage Charges @ 3% = 2,020.97

g) Carriage from Store to work site (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 4.00

* Carriage per Tonne = Rs. 35.60

Sub - Total = Rs. 69,422.13

i) Supervision Charges @ 2% = 1,388.44

Sub - Total = Rs. 70,810.58

Total Cost / MT = Rs. 70,810.58

Therefore,

Cost per Kg = Rs. 71.0

Weight per square meter of wire mesh (100x100x4mm) = 3 kg

Cost of one square meter = 213.0

Fixing charges 50 Rs per sq m LS 50

Total Cost / sq m 263.0

Add 20% for Overhead and Contractor's Profit 52.60

Rs. 315.6

Cost of welded wire mesh per MT at supply store including (Sale Tax+ VAT + Surcharge)

Cost per sq m

WORKING RATE - SUPPLY OF WELDED WIRE MESH AT SITE

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 45

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 1.050 bags 434 = Rs. 455.70 2 Sand 0.100 cum 2,280 = Rs. 228.00 3 Coarse aggregate 0.033 cum 2,150 = Rs. 70.95 4 Water LS = Rs. 25.00 5 Admixture LS = Rs. 50.00

Total cost of material per bag = Rs. 829.65

B Mixing charges of material (per cum.)- Density of dry mixture 1 : 1 : 3 in Kg/cum. = 1,756.00 - Weight of cement in mixture (1756*1/5) = Kg 351.20 - No of bags ( 50 Kg per bag) = Kg 7.02 - Mixing charges for shotcrete (per cum) = Rs. 112.94

Mixing charges per bag = Rs. 16.08

Use 60 cum batching and mixing plant 60.00 - Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

C Transportation to site- Transportation charges(per cum.) = Rs. 202.16

Transportation charges per bag = Rs. 28.78

D Placement charges- Use rate of Shotcrete machine (6 cum) = Rs. 5,245.00

Placement rate (With 80 % efficiency) = cum/hr 4.80 - Use rate of Shotcrete machine per bag = Rs. 155.57

E Lighting, work shop charges and other misc. Items @ 100 % of use = Rs. 155.57 rate of Shotcrete machine per day

Sub Total (A+B+C+D+E) = Rs. 1,185.65 F Add 20% for loss in rebound = Rs. 237.13

Total (Sub Total + F) = Rs. 1,422.78

G Add 20% for Overhead & Profit on prime cost 284.56

Total cost per bag = Rs. 1,707.33 Therefore,

Rate per cum of Shotcrete = Rs. 11,992.00

WORKING RATE - SHOTCRETING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 46

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Use Rate of Wagon Drill = Rs./hrs 4,397.77

Hence, rate of drilling per meter = Rs. 366.48

b) Cost of Drill Rod per meter = Rs. 118.01

c) Cost of shifting the Wagon Drill @ 40% of (b) = Rs. 47.20

d) Ventilation, lighting and workshop charges @ 40% of (b) = Rs. 47.20

Sub - Total = Rs. 578.90

c) Overhead + Contractors profit @ 20% = Rs. 115.78

Total Cost / meter = Rs. 694.68

Therefore,

Cost per meter drilling by Wagon Drill = Rs. 695.00

Average rate of drilling 45mm dia. Hole per hour is16m. Consider 75% efficiency.

WORKING RATE - DRILLING OF 45MM HOLE (MORE THAN 5 METER DEPTH)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 47

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Cost of Materiali) Cost of PVC Pipe per metre length = Rs. 500

ii) Wastage @ 2.5% of (i) = Rs 12.5

Total Cost of material = Rs. 512.50

B Rs. 20.00

C Fixing charges at different locations including consumables etc LS Rs. 25

D Prime Cost per metre = Rs. 557.50

E Add 20% for Overhead and Contractor's Profit = Rs. 111.50 Total cost per metre = Rs. 669.00

SUPPLY & INSTALLATION OF 70 MM DIA PVC PIPE

Miscellaneous Charges, i.e. Local transportation, storage, ventilation etc

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 48

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Use Rate of Wagon Drill = Rs./hrs 4,397.77

Hence, rate of drilling per meter = Rs. 418.84

b) Cost of Drill Rod per meter = Rs. 336.61

c) Cost of shifting the Wagon Drill @ 40% of (b) = Rs. 134.64

d) Ventilation, lighting and workshop charges @ 40% of (b) = Rs. 134.64

Sub - Total = Rs. 1,024.73

c) Overhead + Contractors profit @ 20% = Rs. 204.95

Total Cost / meter = Rs. 1,229.68

Therefore,

Cost per meter drilling by Wagon Drill = Rs. 1,230.00

Average rate of drilling 76mm dia. Hole per hour is14m. Consider 75% efficiency.

WORKING RATE - DRILLING OF 76MM HOLE (MORE THAN 5 METER DEPTH)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 49

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A - Cost of one bag of cement on site = Rs. 434.00

- Cost of sand in 1:2 mix for one bag at site = Rs. 161.88

Total cost = Rs. 595.88

B Washing of holes

- Cost of Equipment L.S = Rs. 20.00

- Cost of labour L.S. = Rs. 20.00

Total cost = Rs. 40.00

C Grouting

- Grouting machine charges = Rs. 2119

- Use Rate of Grouting machine = Rs. 353.10

Taking 6 bags progress of machine per hour

- Cost of Labour L.S. = Rs. 20.00

Total cost 373.10

D Other Misc. charges such as G.I pipes fitting etc. L.S. = Rs. 20.00

Total prime cost = Rs. 1028.98

Add 20% Overhead and contractors profit = Rs. 205.80

Total cost per bag = Rs. 1235.00

GROUTING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 50

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(i)

(ii)

Assuming that

I 100%

II 0%

A DRILLING & BLASTINGa) Drilling at quarry site is proposed to be carried out with Jack Hammer

(Consider 1 ft drilling is sufficient for blasting 0.59 cu.yd of Rock)

- As per working rate of driiling and blasting with jack hammer = m 44.44 - Add 50% horizontal drilling for pull effect = m 22.22

Total depth of drilling = m 66.66

b) Jack hammer charges per hour = Rs 1,453 Taking rate of drilling as 6 per hour- Cost of drilling = Rs 16,142.24

c) Drilling rod charges per meter = Rs 74.00 Drilling rod charges = Rs. 4,932.84

d) Blasting - Explosive

Rate of Explosive per Kg = Rs 100.49 - Explosive req. for 100 cum rock (0.43Kg/cum.) = Kg 43.00 - Cost of gelatin = Rs 4,321.24

e) Blasting - Detonators- Average depth of hole = m 1.75 - No. of holes = m 38 - No. of detonator used, when 1 detonator used for 1 hole = m 58 - Cost of one detonator = m 27.13 - Cost of detonator = Rs 1,573.77

f) Blasting batteries, primacord and loading wire etc.@ 15% of the cost of gelatin = Rs 648.19

g) Stemming @ 7% of cost of gelatin = Rs 302.49

Total charges for drilling and blasting (b+c+d+e+f+g) = Rs 27,920.76

Assuming that1 Losses for 100 cum are as below

I) 3% in transit from processing plant to batching plantii) 10% in process rejectioniii) 5% for transit quarry to processing plantiv) 20% rejection at quarry site 19,544.5 Therefore, rate after adding rejection and losses (38%) = Rs 26,971.5

Swell factor for hard rock = 0.63

Rate per 100 cum (Bulk volume) of aggregate = Rs 16,992.02

Drilling & Blasting Rate per cum of agg.(Bulk Volume) = Rs 169.92

WORKING RATE - COARSE AGGREGATE FROM QUARRY SITE

(The aggregate crushing & processing plant is at aavarage distance of 1. km. from quarry site.)

Assuming that drill hole can be filled with dynamite upto 75% of their capacity

from aggregate crushing and processing plant)(The Batching & mixing plants are available at a avarage distance of 1. km.

Material will be available from Quarry Site

Material will be available from excavated muck

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 51(1of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

B CARRIAGE OF BLASTED ROCKS UP TO CRUSHING PLANTa) Loader (2 cum)

- Consider Actual output per hour (Borrow measure) = cum 135.95 - Rate of Loader per hour = Rs 3,081

Rate per cum (Borrow measure) = Rs 22.66

b) Dumper (25T )Capacity = cum 15.63

Actual capacity (Borrow measure) = cum 15.63

Hauling cycle time- Loading time = min 6.9 - Spotting time = min 0.5 - Turning and dumping time = min 2.0 - Empty haul @ 20 Km/hr = min 3.0 - Loading haul@ 15 Km/hr = min 4.0

Total cycle time = min 14.0

- No. of trips per working hour of 50 minutes = Nos. 3.6 - Output of dumper per working hour =output of dozer = cum 55.8 - Use rate of dumper per working hour = Rs. 4,120

Rate per cum = Rs 73.83

c) Wheeled dozer (130 HP)Assuming that wheeld dozer will work with one loader

- Output of wheelded dozer ( Borrow measure ) = cum 135.95 - Use rate of dozer = Rs 3,549

Rate per cum = Rs 26.10

Total machinery charges (a+b+c) = Rs 122.59

Rate per cum (Borrow measure) = Rs 122.59 Swell factor for hard rock = 0.63

Rate per cumec (Bulk volume) = Rs 77.23 Rate per cum after adding for rejection = Rs 91.88 and transit losses (Increase by 18%)

Carriage of blasted rock per cum of aggregate (Bulk Volume) = Rs 91.88

C CRUSHING AND PROCESSING OF AGGREGATE (120 T)- Use rate of plant per hour = Rs 9,873 - Capacity of crushing plant = T 150.00 - Production per hour (150/0.63/2.4) = cum 99.21 - Output per hour with 75% job management factor = cum 74.40 - Rate per cum (Bulk volume) = Rs 132.70 - Rate after adding rejection (3%)and transit losses (10%) = Rs 150.35

Crushing and processing of agg. (Bulk Volume) = Rs 150.35

D CARRIAGE UP TO BATCHING & MIXING PLANT

a) Loader (2.0 cum)- Use rate of loader (2.0 cum) = Rs 3,081 - Production of (2.0 cum) front end loader per hour = cum 135.95

Rate per cum = Rs 22.66

(Average Lead = 1. km)

Average lead = 1. Km

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 51(2of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

b) Dumper (25 T)Capacity = cum 15.63

Actual capacity = cum 15.63

Hauling cycle time- Loading time = min 6.9 - Spotting time = min 0.5 - Turning and dumping time = min 2.0 - Empty haul @ 20 Km/hr = min 3.0 - Loading haul@ 15 Km/hr = min 4.0

Total cycle time = min 16.4

- No of truck trip in 50 min = 3.05 - Output of truck per working hour = cum 47.65

Use rate of Dumper = Rs 4,120 Rate per cum (Borrow measures) = Rs 86.46 Rate per cum (Bulk measures) Rs 86.46

c) cost storage charges @ 10% of transportation charges = Rs 8.65

d) Conveyance to batching and mixing plant @ 10% of tipper = Rs 8.65

Carriage charges per cum (Bulk volume) (a+b+c+d) = Rs 126.41

- Add 3 % for transit losses = Rs 3.79

Rate per cum = Rs 130.21

Carriage of aggregate (Bulk Volume) = Rs 130.21

E MISCELLANEOUS CHARGES = Rs 5.00 F Royalty Charges = Rs 40.00

Since 100% material will be available from Quarry Site

i = Rs 169.92 ii = Rs. 91.88 iii Crushing and Processing of Aggregate (C) = Rs. 150.35 iv Carriage upto Batching and Mixing Plant (D) = Rs. 130.21 v Miscellaneous Charges (E) = Rs. 5.00

Total cost per cum (Bulk Volume) = Rs. 547.35

Add for maintenance of haul roads @ 5% = Rs 27.37 Electric charges @ 2% = Rs 10.95 Prime cost = Rs 585.67

Cost of aggregate per cum = Rs 2,150.00

Drilling and Blasting ( 100% * A) Carriage of Blasted Rock upto Crushing Plant ( 100% * B)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 51(3of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(i)(i)

Assuming that

I 100%

II 0%

A CARRIAGE OF RIVER BED MATERIAL UP TO CRUSHING PLANT

a) Loader (2.0 cum)- Consider Actual Output per hour (Borrow Measure) = cum 135.95 - Rate per hour = Rs 3,081

Rate per cum (Borrow measure) = Rs 22.66 Rate per cum (Bulk volume) = Rs 15.18

b) Dumper (25 T)- Average Lead = km 42.00 - Capacity = cum 15.63

Actual Capacity Borrow Measure = cum 15.63

Hauling cycle time- Loading Time = min 6.90 - Spotting Time = min 0.50 - Turning and Dumping time = min 2.00 - Loading Haul @ 25 Km/hr = min 100.80 - Empty Haul @ 30 Km/hr = min 84.00

Total cycle time = min 194.20

- No. of Trips per working hour of 50 minutes = Nos. 0.26 - Output of Dumper per working hour = cum 4.02 - Use Rate of Dumper per working hour = Rs. 4,120

Rate per cum (borrow measure) = Rs. 1,024.07 Rate per cum (bulk volume) = Rs. 686.12

Carriage of River Bed Material up to Crushing Plant (Bulk Volume) Rs 698.30

Assuming that1 Losses for 100 cum are as below

I) 3% in transit from processing plant to batching plantii) 10% in process rejectioniii) 5% for transit from river bed to processing plantiv) 20% rejection at River Bed Therefore, rate after adding rejection and losses (38%) = Rs 963.66

Rate per cum (Bulk volume) of aggregate = Rs 963.66

WORKING RATE - FINE AGGREGATE FROM RIVER BED

(The aggregate crushing & processing plant is at a avarage distance of 42. km. from river bed.)

Material will be available from excavated muck

Material will be available from River Bed

(The Batching & mixing plants are available at a avarage distance of 1. km. from aggregate crushing and processing plant)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 52(1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

B CARRIAGE UP TO BATCHING & MIXING PLANT

a) Loader (2.0 cum)- Use rate of loader (2.0 cum) = Rs 3,081 - Production of (2.0 cum) loader per hour = cum 135.95

Rate per cum (Borrow measure) = Rs 22.66 Rate per cum (Bulk Volume) = Rs 15.18

b) Dumper (25T)Average Lead = km. 1.00 Capacity = cum 15.63

Actual capacity = cum 15.63

Hauling cycle time- Loading time = min 6.9 - Spotting time = min 0.5 - Turning and dumping time = min 2.0 - Empty haul @ 20 Km/hr = min 3.0 - Loading haul@ 15Km/hr = min 4.0

Total cycle time = min 16.4

- No of truck trip in 50 min = 3.05 - Output of truck per working hour = cum 47.65

Use rate of Dumper = Rs 4,120 Rate per cum (Bank measures) = Rs 86.46 Rate per cum (Bulk measures) Rs 86.46

c) Cost of storage charges @ 10% of transportation charges = Rs 8.65

d) Conveyance to batching and mixing plant @ 10% of tipper = Rs 8.65

Carriage charges per cum (Bulk volume) (a+b+c+d) = Rs 118.94

- Add 3 % for transit losses = Rs 3.57

Rate per cum = Rs 122.50

Carriage of aggregate (Bulk Volume) = Rs 122.50

C MISCELLANEOUS CHARGES = Rs 5.00 D Royalty Charges = Rs 40.00

Abstract of cost

Since 100% material will be available from River Bed

i = Rs 963.66 ii Carriage upto Batching and Mixing Plant (B) = Rs. 122.50 iii Miscellaneous Charges (C) = Rs. 5.00

Iv Royalty Charges (D) = Rs. 40.00 Total cost per cum (Bulk Volume) = Rs. 1,131.16

Add for maintenance of haul roads @ 5% = Rs 56.56 Electric charges @ 2% = Rs 22.62 Prime cost = Rs 1,210.34

Cost of aggregate per cum = Rs 2,280.00

Cost of Carriage of River Bed Material upto processing plant ( 100% * A)

(Average Lead = 01. km)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 52(2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. wastage) 5.25 bags 434 = Rs. 2,278.50 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Coarse aggregate 0.90 cum 2,150 = Rs. 1,935.00 4 Water LS = Rs. 25.00 5 Admixture LS = Rs. 210.00

Total material cost per cum. = Rs. 5,474.50

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378.40

Transportation rate per cum = Rs. 202.16

Working Rate - M15 Concreting in Powerhouse area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 53(1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155.00

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement LS = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25 +Labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 200.00

Abstract of chargesA Material = Rs. 5,474.50 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 200.00

Total cost = Rs. 6,258.39

Add 20% for Overhead & Profit on prime cost = Rs. 1,251.68

Cost for concrete per cum = Rs. 7510.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 53(2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. wastage) 6.30 bags 434 = Rs. 2,734.20 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Coarse aggregate 0.90 cum 2,150 = Rs. 1,935.00 4 Water LS = Rs. 30.00 5 Admixture LS = Rs. 252.00

Total material cost per cum. = Rs. 5,977.20

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378.40

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155.00

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement LS = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25 +Labour Rs 25) LS = Rs. 50.00

Working Rate - M20 Concreting in Powerhouse area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 54(1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 300.00

Abstract of chargesA Material = Rs. 5,977.20 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 300.00

Total cost = Rs. 6,861.09

Add 20% for Overhead & Profit on prime cost = Rs. 1,372.22

Cost for concrete per cum = Rs. 8233.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 54(2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. wastage) 7.35 bags 434 = Rs. 3,189.90 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Coarse aggregate 0.90 cum 2,150 = Rs. 1,935.00 4 Water LS = Rs. 35.00 5 Admixture LS = Rs. 294.00

Total material cost per cum. = Rs. 6,479.90

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378.40

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155.00

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement LS = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25 +Labour Rs 25) LS = Rs. 50.00

Working Rate - M25 Concreting in Powerhouse area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 55(1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 400.00

Abstract of chargesA Material = Rs. 6,479.90 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 400.00

Total cost = Rs. 7,463.79

Add 20% for Overhead & Profit on prime cost = Rs. 1,492.76

Cost for concrete per cum = Rs. 8957.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 55(2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. wastage) 7.88 bags 434 = Rs. 3,417.75 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Coarse aggregate 0.90 cum 2,150 = Rs. 1,935.00 4 Water LS = Rs. 35.00 5 Admixture LS = Rs. 315.00

Total material cost per cum. = Rs. 6,728.75

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378.40

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155.00

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement LS = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25 +Labour Rs 25) LS = Rs. 50.00

Working Rate - M30 Concreting in Powerhouse area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 56(1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 500.00

Abstract of chargesA Material = Rs. 6,728.75 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 500.00

Total cost = Rs. 7,812.64

Add 20% for Overhead & Profit on prime cost = Rs. 1,562.53

Cost for concrete per cum = Rs. 9375.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 56(2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Excavation

CL II CL III CL IV Finished Diameter of Pressure shaft m = 5.75 5.75 5.75Linning Thickness m = 0.30 0.30 0.30Payline Thickness m = 0.10 0.10 0.10Shotcrete Thickness m = 0.05 0.05 0.05Steel Rib Thickness m = 0.00 0.00 0.00Excavated Diameter of HRT m = 6.65 6.65 6.65

Maximum Working Hours assumed in 24hrs in 3shift allowing 2hrs for shift change hrs = 20.00 20.00 20.00

Progress per cycle m = 3.50 3.00 2.50i) Drilling and Blasting

Depth of holes to be drilled m = 3.75 3.25 2.75Cross sectional area of Tunnel m2 = 39.62 39.62 39.62Spacing of the holes m = 0.85 0.85 0.85

Assuming spacing of holes @0.85m c/c m2 = 0.72 0.72 0.72

No. of holes required per face nos. = 55 55 55Spacing of the holes m = 0.5 0.5 0.5Heading Perimeter m = 19.305 19.305 19.305

Additional hole for line drilling / burn hole nos. = 39 39 39

Total no. of holes nos. = 94 94 94Total depth of drilling m = 352.5 305.5 258.5Output of Double Boom Drill Jumbo m/hr = 100.00 100.00 100.00Drill Jumbo no. = 1 1 1

Profile Marking & Setting of Operation hr = 1.00 1.00 1.00

Drilling Time hr = 3.53 3.06 2.59Charging and blasting hr = 1.00 1.00 1.00Defuming hr = 1.00 1.00 1.00Scaling and cleaning hr = 1.00 1.00 1.00Total time for drilling and blasting hr = 7.53 7.06 6.59

ii) MuckingQuantity of muck (bank) cum = 138.67 118.86 99.05

Output of Excavator cum loader 1.5 cum(loose) cum/hr = 80.00 80.00 80.00

Loose density of excavated muck T/m3 = 1.600 1.600 1.600Capacity of Dump Truck cum = 15.63 15.63 15.63Swell factor = 0.63 0.63 0.63Total Loose muck per pull cum = 220.11 188.66 157.22Mucking hours required hr = 2.75 2.36 1.97

iii) Cycle TimeDrilling and Blasting hr = 7.53 7.06 6.59Mucking time hr = 2.75 2.36 1.97Time for rock bolt and shotcrete hr = 3.00 5.00 5.00

Erection of steel ribs, lagging and backfilling hr = - - -

Forepoling & grouting hr = - - -Total time required hr = 13.28 14.41 13.55No. of cycle nos. = 1.51 1.39 1.48

iv) Requirement of Dump TrucksCapacity of Dump Truck cum =

Output of Excavator cum loader 1.5 cum(loose) cum/hr =

Average Lead km =Loading Time min =Spotting Time min =Turning and Dumping Time min =Empty Haul @20 km/hr min =Loading Haul @15 km/hr min =Total cycle time min =

No. of Trips per working hour 50 minutes nos. =

Output of Dump Truck per 50 minutes cum =Total nos. of Dump Trucks required nos. =

B Cycle of Operation

Profile Marking & Setting of Operation Hours = 1.00 1.00 1.00

Drilling Time Hours = 3.53 3.06 2.59

2.009.0012.0035.22

1.42

22.18

15.63

80.00

3.0011.720.50

4.00

Excavation in Steel Lined Tunnel

Type of Rock

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 57(1 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Charging & Blasting Hours = 1.00 1.00 1.00

Defuming & clearing Hours = 1.00 1.00 1.00

Scaling and Bottom Clearing Hours = 0.50 0.50 0.50Mucking and Cleaning Hours = 2.75 2.36 1.97Supporting & Rock bolting Hours = 3.00 5.00 5.00

Erection of Ribs and laggings Hours = - - -

Cycle time Hours = 12.78 13.91 13.05

C Direct labour charges

Category Shift/day Nos. Rate Amt. (Rs.)

Skilled Labour(i) Foreman 3 0.5 32,765 49,148 49,148 49,148

(ii) Asst Foreman special drilling 3 0.5 24,170 36,255 36,255 36,255

(iii) Blastman 3 0.5 24,170 36,255 36,255 36,255

(iv) Electrician 3 0.5 24,170 36,255 36,255 36,255

157,913 157,913 157,913 Un Skilled Labour

(i) Beldar 3 4 9,788 117,456 117,456 117,456

(ii) Helper to Electrician 3 0.5 9,788 14,682 14,682 14,682

(iii) Muckers 3 2 9,788 58,728 58,728 58,728

(iv) Explosive chargeman 3 1 9,788 29,364 29,364 29,364

(v) Hole Cleaner 3 2 9,788 58,728 58,728 58,728

278,958 278,958 278,958 Total Direct Labour Charges per month 436,871 436,871 436,871 Indirect Cost @ 80% for skilled labour 126,330 126,330 126,330

Indirect Cost @ 55% for un-skilled labour 153,427 153,427 153,427

Total Labour Cost per Month 716,627 716,627 716,627

No of days per month 30 30 30

Total Labour Cost per day 23,888 23,888 23,888

Quantity of excavation per day per face 209 165 146

Rate of Labour Per cum of excavation 114.35 144.84 163.40

D Machinery Charges

Equipment Nos.Use Rate per hour

(Rs)Amt. Amt. Amt.

In Rs. In Rs. In Rs.(i) 2 boom Hydraulic Drill 1 8,673 30,574 26,497 22,421

(ii) Excavator 1 3,446 11,202 9,848 8,494

(iii) Dumper - 25T 4 4,120 45,340 38,863 32,386

(iv) Crawler / Dozer - 180 HP 1 5,453 15,004 12,860 10,717

Total Machinery Charges 102,120 88,068 74,017

Quantity of excavation per cycle per face 139 119 99

Rate of machinery per cum 736.44 740.96 747.29

E Materials Charges 1 Drilling and Blasting

Depth of holes to be drilled. 3.75 3.25 2.75

Cross sectional area of tunnel (heading ) incl. 10% overbrk. 39.62 39.62 39.62

No. of holes required per face 55 55 55

Additional hole for line drilling/ burn hole 39 39 39

Total no. of holes 94 94 94

Total depth of drilling 352.5 305.5 258.5

Rate of drill steel per metre 140.92 140.92 140.92

Cost of drill steel 49,675 43,052 36,428

Quantity of rock excavated / cycle 139 119 99

Rate of drill steel per cum 358 362 368

2 Explosives

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 57(2 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(i) GELATINGelatin required/cum 1.00 1.00 1.00

Cost of gelatin 100.49 100.49 100.49

Rate/cum 100.49 100.49 100.49(ii) DETONATORS

No. of Detonators required 94 94 94

Rate of Detonator + Fuse 27 27 27

Total Cost of Detonators 2,551 2,551 2,551

Quantity of rock excavated/cycle 139 119 99

Rate/cum 18.39 21.46 25.75 (iii) OTHERS

Other consumable @ 50% of (i+ii) 59.44 60.98 63.12

Rate of Explosives + Detonator 178.33 182.93 189.37

3 Timber for Support & Packing 10 10 104 Miscellaneous Supplies LS 15 15 15

Total Material Charges per cum (1+2+3+4) 561.57 570.14 582.15

F Ventilation Use rate of Blower per working hour 2,035 2,035 2,035

No of working hours per day 24.00 24.00 24.00

Total ventilation Charges per day for 1 blower 48,840 48,840 48,840

Rate for Ventilation Per Cum.. 234 296 334

G Shop Charges (i) Machine Shop 15 15 15

(ii) Structural shop 15 15 15

(iii) Steel Metal shop 15 15 15

(iv) Air & Water pipe shop 15 15 15

(v) Carpentry 15 15 15

75 75 75

H Electrical Material Charges Per Cum.. 15 15 15I Compressed Air 10 10 10J Water Charges Per Cum.. 10 10 10

Abstract of Charges Per Cum.. Labour Charges 114.35 144.84 163.40

Machinery Charges 736.44 740.96 747.29

Material Charges 561.57 570.14 582.15

Ventilation Charges 233.80 296.13 334.08

Shop Charges 75.00 75.00 75.00

Electrical Material Charges 15.00 15.00 15.00

Compressed Air 10.00 10.00 10.00

Water Charges 10.00 10.00 10.00

Rock Excavation in tunnel (per cum) 1,756.16 1,862.07 1,936.92 Add for electrical energy charges at 2% of total charges 35.12 37.24 38.74

Add for cons. & maintenance of haul road 5% of total charges 87.81 93.10 96.85

Prime Cost 1,879.10 1,992.42 2,072.51 Overhead charges and contractor's profit @ 20% 375.82 398.48 414.50

Grand Total 2,254.91 2,390.90 2,487.01

HENCE RATE PER CUM. (in Hard Rock) 2,254.91 2,390.90 2,487.01

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 57(3 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by two boom Jumbo (Per hour) = Rs. 9,034

I) = m 100Hence rate of drilling per meter = Rs. 120.45

ii) Cost of drill rod per meter of drill rod = Rs. 140.92

iii) Labour lighting and scaffolding etc. LS = Rs. 100

iv) Ventilation and shop charges LS = Rs. 40

Total = Rs. 401.37

B Supply and making of Rock Bolts

I) Rock bolt 25 mm dia , 3.85Kg/m @ Rs. 60,053 Rs./MT = Rs. 231.20

ii) Wastage in cutting @ 2.5% of (i) 5.78

iii) Cutting and making tips LS = Rs. 50.00

iv) Threading LS = Rs. 50.00

v) Cost of nut and bolts, plates = Rs. 150.00

Total = Rs. 481.20C Installation

i) Placing, grouting & misc.works LS Rs. 50.00

ii) Grouting Rock Bolts LS Rs. 100.00

iii) Miscellaneous work LS Rs. 50.00Total Rs. 200.00

Prime Cost 1,082.58

Add 20% for Overhead and Contractor's Profit = Rs. 216.52

Cost of Rock Bolting per m = Rs. 1,299.00

Average rate of drilling 38mm dia. hole per hour (considering 75% efficiency)

WORKING RATE - ROCK BOLTING ( 25.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 58

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by two boom Jumbo (Per hour) = Rs. 9,034

i) = m/hr 100

At 100% efficiency = m/hr 100Hence rate of drilling per meter = Rs. 120.45

ii) Cost of drill rod per meter of drill rod Rs. 140.92

iii) Labour ,lightning and scaffolding LS Rs. 100

iii) Ventilation and shop charges = Rs. 40

Total = Rs. 401.37

B Supply and making of Rock Bolts

i) Rock bolt 32 mm dia , 6.32Kg/m @ Rs. 60,053 Rs./MT = Rs. 379.53

ii) Wastage @ 2.5% of (I) Rs. 9.49

iii) Cutting and making tips LS = Rs. 50.00

iv) Threading LS = Rs. 50.00

v) Cost of nut and bolts, plates etc. LS = Rs. 150.00

Total = Rs. 639.02C Installation

i) Placing, grouting & misc.works LS = Rs. 100.00

ii) Grouting Rock Bolt LS Rs. 50.00

iii) Miscellaneous Works LS Rs. 50.00

Total Rs. 200.00

Prime Cost Rs. 1,240.40

Add 20% for Overhead and Contractor's Profit = Rs. 248.08

Total cost of Rock Bolting per m = Rs. 1,488.00

Average rate of drilling 45/50 mm dia. hole per hour by two boom drilling jumbo

WORKING RATE - ROCK BOLTING ( 32.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 59

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 58,333.33

Wastage 2.5% 1,458.33

b) Carriage from Factory to Store (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 851.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs./km 89.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs. 7,573.90

Sub - Total = Rs. 67,365.57

e) Storage Charges @ 3% = 2,020.97

g) Carriage from Store to work site (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 4.00

* Carriage per Tonne = Rs. 35.60

Sub - Total = Rs. 69,422.13

i) Supervision Charges @ 2% = 1,388.44

Sub - Total = Rs. 70,810.58

Total Cost / MT = Rs. 70,810.58

Therefore,

Cost per Kg = Rs. 71.0

Weight per square meter of wire mesh (100x100x4mm) = 3 kg

Cost of one square meter = 213.0

Fixing charges 50 Rs per sq m LS 50

Total Cost / sq m 263.0

Add 20% for Overhead and Contractor's Profit 52.60

Rs. 315.6

Cost of welded wire mesh per MT at supply store including (Sale Tax+ VAT + Surcharge)

Cost per sq m

WORKING RATE - SUPPLY OF WELDED WIRE MESH AT SITE

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 60

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 1.050 bags 434 = Rs. 455.70 2 Sand 0.100 cum 2,280 = Rs. 228.00 3 Coarse aggregate 0.033 cum 2,150 = Rs. 70.95 4 Water LS = Rs. 25.00 5 Admixture LS = Rs. 50.00

Total cost of material per bag = Rs. 829.65

B Mixing charges of material (per cum.)- Density of dry mixture 1 : 1 : 3 in Kg/cum. = 1,756 - Weight of cement in mixture (1756*1/5) = Kg 351.20 - No of bags ( 50 Kg per bag) = Bags 7.02 - Mixing charges for shotcrete (per cum) = Rs. 112.94

Mixing charges per bag = Rs. 16.08

Use 60 cum batching and mixing plant 60.00 - Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

C Transportation to site- Transportation charges(per cum.) = Rs. 202.16

Transportation charges per bag = Rs. 28.78

D Placement charges- Use rate of Shotcrete machine (6 cum) = Rs. 5,245.00

Placement rate (With 80 % efficiency) = cum/hr 4.80 - Use rate of Shotcrete machine per bag = Rs. 155.57

E Lighting, work shop charges and other misc. Items @ 100 % of use = Rs. 155.57 rate of Shotcrete machine per day

Sub Total (A+B+C+D+E) = Rs. 1,185.65 F Add 20% for loss in rebound = Rs. 237.13

Total (Sub Total + F) = Rs. 1,422.78

G Add 20% for Overhead & Profit on prime cost 284.56

Total cost per bag = Rs. 1,707.33 Therefore,

Rate per cum = Rs. 11,992.00

WORKING RATE - SHOTCRETING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 61

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Use Rate of Wagon Drill = Rs./hrs 4,120

Hence, rate of drilling per meter = Rs. 321.86

b) Cost of Drill Rod per meter = Rs. 118.01

c) Cost of shifting the wagon drill @ 40% of (b) = Rs. 47.20

d) Ventilation, lighting and workshop charges @ 40% of (b) = Rs. 47.20

Sub - Total = Rs. 534.28

c) Overhead + Contractors profit @ 20% = Rs. 106.86

Total Cost / meter = Rs. 641.14

Therefore,

Cost per meter drilling by Wagon Drill = Rs. 641.00

Average rate of drilling 45mm dia. Hole per hour is16m with 80% efficiency

WORKING RATE - DRILLING OF 45MM HOLE (MORE THAN 5 METER DEPTH)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 62

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 6.30 bags 434 = Rs. 2,734.20 2 Sand 0.43 cum 2,280 = Rs. 980.40 3 Coarse aggregate 0.86 cum 2,150 = Rs. 1,849.00 4 Water LS = Rs. 30.00 5 Admixture LS = Rs. 252.00

Total material cost per cum. = Rs. 5,845.60

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155.00

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement = Rs. 50.00

Working Rate - M20 Concreting in steel lined tunnel

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 63(1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

iv) Vibrating charges (Vibrators Rs 25 + Labours Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 300.00

Abstract of chargesA Material = Rs. 5,845.60 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 300.00

Total cost = Rs. 6,729.49

Add 20% for Overhead & Profit on prime cost = Rs. 1,345.90

Cost for concrete per cum = Rs. 8075.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 63(2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Machinery Chargesa) Hydraulic Excavator ( 1.5 cum)

- Final output of hydraulic excavator per hour = cum 124 - Use rate of excavator per hour = 3,301

Rate per cum. = 26.66

b) Dumper (25T)- Average Lead = km 2.00 - Capacity = cum. 15.63 - Therefore, actual capacity = cum. 15.63 Cycle Time- Loading Time = min 7.57 - Spotting Time = min 2.50 - Turning & Dumping Time = min 2.50 - Empty haul @ 20kmph = min 6.00 - Loaded haul @ 15kmph = min 8.00

Total Cycle Time = min 26.57 - No. of trips per 50min working hours = Nos. 1.88 - Output of Dumper per working hour = cum. 29.40 - Use rate of dumper per hour = 4,120

Rate per cum. = 140.12

c) Crawler Dozer (180 HP)- Assuming one crawler dozer will be enough for one excavator- Output of Excavator = Output of Crawler Dozer per hour = cum. 123.82 - Use rate of Crawler dozer per hour = Rs. 4,801

Rate per cum. = 38.78

TOTAL MACHINERY CHARGES ( a + b + c) Rate per cum. = Rs. 205.56

B Others- Construction and maintenance of haul road @ 5% of (A) = Rs. 10.28 - Electrical Energy charges @ 2% of (A) = Rs. 4.11 - Leveling & trimming of waste piles etc. @ 3% of (A) = Rs. 6.17

PRIME COST (A + B) = Rs. 226.12

c) Overhead + Contractors profit @ 20% = Rs. 45.22 Total Cost / cum. = Rs. 271.34

Therefore,Cost per cum. = Rs. 271.00

WORKING RATE - COMMON EXCAVATION (NO ROCK)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 64

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A = Rs. 223.80

B Machinery Chargesa) Excavator (1.5 cum)

- Final output of excavator per hour = cum 101.97 - Use rate excavator per hour = 3,301

Rate per cum. = 32.38

b) Dumper (25 T)- Average Lead = km 2.00 - Capacity = cum. 15.63 - Therefore, actual capacity = cum. 15.63 Cycle Time- Loading Time = min 9.19 - Spotting Time = min 0.50 - Turning & Dumping Time = min 2.00 - Empty haul @ 20kmph = min 6.00 - Loaded haul @ 15kmph = min 8.00

Total Cycle Time = min 25.69 - No. of trips per 50min working hours = Nos. 1.95 - Output of Dumper per working hour = cum. 30.41 - Use rate of dumper per hour = 4,120

Rate per cum. = 135.50

c) Crawler Dozer (180 HP)- Assuming one wheeled dozer will be enough for one excavator- Output of Excavator = Output of wheeled dozer per hour = cum. 101.97 - Use rate of wheeled dozer per hour = Rs. 4,801

Rate per cum. = 47.08

TOTAL MACHINERY CHARGES ( a + b + c) Rate per cum. = Rs. 214.96

C Others- Construction and maintenance of haul road @ 5% of (B) = Rs. 10.75 - Electrical Energy charges @ 2% of (B) = Rs. 4.30 - Leveling & trimming of waste piles etc. @ 3% of (B) = Rs. 6.45

PRIME COST (A + B + C) = Rs. 460.25

c) Overhead + Contractors profit @ 20% = Rs. 92.05 Total Cost / cum. = Rs. 552.30

Therefore,Cost per cum. = Rs. 552.00

WORKING RATE - OPEN EXCAVATION (IN ROCK BY 100% BLASTING)Drilling & blasting charges per cum. (Considering 80% drilling by wagon drill and 20% drilling by Jack Hammer

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 65

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Excavation

CL II CL III CL IV CL VFinished Diameter of HRT m = 6.50 6.50 6.50 6.50Linning Thickness m = 0.30 0.30 0.30 0.30Payline Thickness m = 0.10 0.10 0.10 0.10Shotcrete Thickness m = 0.05 0.075 0.075 0.10Steel Rib Thickness m = 0.00 0.00 0.00 0.15Excavated Diameter of HRT m = 7.40 7.45 7.45 7.80Maximum Working Hours assumed in24hrs in 3 shift allowing 2hrs for shiftchange

hrs = 20.00 20.00 20.00 20.00

Progress per cycle m = 3.50 3.00 2.50 1.50i) Drilling and Blasting

Depth of holes to be drilled m = 3.75 3.25 2.75 1.75Cross sectional area of Tunnel m2 = 45.02 45.88 45.88 49.30Spacing of the holes m = 0.85 0.85 0.85 0.85Assuming spacing of holes @0.85mc/c m2 = 0.72 0.72 0.72 0.72

No. of holes required per face nos. = 63 64 64 69Spacing of the holes m = 0.5 0.5 0.5 0.5Heading Perimeter m = 19.305 19.305 19.305 19.85Additional hole for line drilling / burnhole nos. = 39 39 39 40

Total no. of holes nos. = 102 103 103 109Total depth of drilling m = 382.5 334.75 283.25 190.75Output of Double Boom Drill Jumbo m/hr = 100.00 100.00 100.00 100.00Drill Jumbo no. = 1 1 1 1

Profile Marking & Setting of Operation hr = 1.00 1.00 1.00 1.00

Drilling Time hr = 3.83 3.35 2.83 1.91Charging and blasting hr = 1.00 1.00 1.00 1.00Defuming hr = 1.00 1.00 1.00 1.00Scaling and cleaning hr = 1.00 1.00 1.00 1.00Total time for drilling and blasting hr = 7.83 7.35 6.83 5.91

ii) MuckingQuantity of muck (bank) cum = 157.56 137.63 114.70 73.96Output of Excavator cum loader 1.5 cum(loose) cum/hr = 102.00 102.00 102.00 102.00

Loose density of excavated muck T/m3 = 1.600 1.600 1.600 1.600Capacity of Dump Truck cum = 15.63 15.63 15.63 15.63Swell factor = 0.63 0.63 0.63 0.63Total Loose muck per pull cum = 250.09 218.47 182.06 117.39Mucking hours required hr = 2.45 2.14 1.78 1.15

iii) Cycle TimeDrilling and Blasting hr = 7.83 7.35 6.83 5.91Mucking time hr = 2.45 2.14 1.78 1.15Time for rock bolt and shotcrete hr = 4.00 6.00 6.00 -Erection of steel ribs, lagging andbackfilling hr = - - -

Forepoling & grouting hr = - - -Total time required hr = 14.28 15.49 14.62 19.06No. of cycle nos. = 1.40 1.29 1.37 1.05

iv) Requirement of Dump TrucksCapacity of Dump Truck cum =Output of Excavator cum loader 1.5 cum(loose) cum/hr =

Average Lead km =Loading Time min =Spotting Time min =Turning and Dumping Time min =Empty Haul @20 km/hr min =Loading Haul @15 km/hr min =Total cycle time min =No. of Trips per working hour 50minutes nos. =

Output of Dump Truck per 50 minutes cum =Total nos. of Dump Trucks required nos. =

B Cycle of Operation

Profile Marking & Setting of Operation Hours = 1.00 1.00 1.00 1.00

Drilling Time Hours = 3.83 3.35 2.83 1.91

0.50

3.00

32.69

23.905.00

Excavation in Head Race Tunnel

Type of Rock

12.00

15.63

12.00

9.19

2.009.00

1.53

102.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 66(1 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Charging & Blasting Hours = 1.00 1.00 1.00 1.00

Defuming & clearing Hours = 1.00 1.00 1.00 1.00

Scaling and Bottom Clearing Hours = 1.00 1.00 1.00 1.00Mucking and Cleaning Hours = 2.45 2.14 1.78 1.15Supporting & Rock bolting Hours = 4.00 6.00 6.00 -

Erection of Ribs and laggings Hours = - - - 12.00

Cycle time Hours = 14.28 15.49 14.62 19.06

C Direct labour charges

Category Shift/day Nos. Rate Amt. (Rs.)

Skilled Labour(i) Foreman 3 0.5 32,765 49,148 49,148 49,148 49,148

(ii) Asst Foreman special drilling 3 0.5 24,170 36,255 36,255 36,255 36,255

(iii) Blastman 3 0.5 24,170 36,255 36,255 36,255 36,255

(iv) Electrician 3 0.5 24,170 36,255 36,255 36,255 36,255

157,913 157,913 157,913 157,913 Un Skilled Labour

(i) Beldar 3 4 9,788 117,456 117,456 117,456 117,456

(ii) Helper to Electrician 3 0.5 9,788 14,682 14,682 14,682 14,682

(iii) Muckers 3 2 9,788 58,728 58,728 58,728 58,728

(iv) Explosive chargeman 3 1 9,788 29,364 29,364 29,364 29,364

(v) Hole Cleaner 3 2 9,788 58,728 58,728 58,728 58,728

278,958 278,958 278,958 278,958 Total Direct Labour Charges per month 436,871 436,871 436,871 436,871 Indirect Cost @ 80% for skilled labour 126,330 126,330 126,330 126,330

Indirect Cost @ 55% for un-skilled labour 153,427 153,427 153,427 153,427

Total Labour Cost per Month 716,627 716,627 716,627 716,627

No of days per month 30 30 30 30

Total Labour Cost per day 23,888 23,888 23,888 23,888

Quantity of excavation per day per face 221 178 157 78

Rate of Labour Per cum of excavation 108.23 134.42 152.22 307.79

D Machinery Charges

Equipment Nos.Use Rate per hour

(Rs)Amt. Amt. Amt. Amt.

In Rs. In Rs. In Rs. In Rs.(i) 2 boom Hydraulic Drill 1 8,673 33,176 29,034 24,567 16,544

(ii) Excavator 1 3,446 11,893 10,825 9,595 7,411

(iii) Dumper - 25T 5 4,120 50,506 44,120 36,766 23,707

(iv) Crawler / Dozer - 180 HP 1 5,453 13,371 11,680 9,733 6,276

Total Machinery Charges 108,946 95,659 80,662 53,939 Quantity of excavation per cycle per face 158 138 115 74

Rate of machinery per cum 691.47 695.03 703.28 729.34

E Materials Charges 1 Drilling and Blasting

Depth of holes to be drilled. 3.75 3.25 2.75 1.75

Cross sectional area of tunnel (heading ) incl. 10% overbrk. 45.02 45.88 45.88 49.30

No. of holes required per face 63 64 64 69

Additional hole for line drilling/ burn hole 39 39 39 40

Total no. of holes 102 103 103 109

Total depth of drilling 382.5 334.75 283.25 190.75

Rate of drill steel per metre 140.92 140.92 140.92 140.92

Cost of drill steel 53,903 47,174 39,916 26,881

Quantity of rock excavated / cycle 158 138 115 74

Rate of drill steel per cum 342 343 348 363

2 Explosives

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 66(2 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(i) GELATINGelatin required/cum 1.00 1.00 1.00 1.00

Cost of gelatin 100.49 100.49 100.49 100.49

Rate/cum 100.49 100.49 100.49 100.49(ii) DETONATORS

No. of Detonators required 102 103 103 109

Rate of Detonator + Fuse 27 27 27 27

Total Cost of Detonators 2,768 2,795 2,795 2,958

Quantity of rock excavated/cycle 158 138 115 74

Rate/cum 17.57 20.31 24.37 39.99 (iii) OTHERS

Other consumable @ 50% of (i+ii) 59.03 60.40 62.43 70.24

Rate of Explosives + Detonator 177.09 181.20 187.29 210.73

3 Timber for Support & Packing 10 10 10 104 Miscellaneous Supplies LS 15 15 15 15

Total Material Charges per cum (1+2+3+4) 544.21 548.95 560.31 599.20

F Ventilation Use rate of Blower per working hour 2,035 2,035 2,035 2,035

No of working hours per day 24.00 24.00 24.00 24.00

Total ventilation Charges per day for 1 blower 48,840 48,840 48,840 48,840

Rate for Ventilation Per Cum.. 221 275 311 629

G Shop Charges (i) Machine Shop 15 15 15 15

(ii) Structural shop 15 15 15 15

(iii) Steel Metal shop 15 15 15 15

(iv) Air & Water pipe shop 15 15 15 15

(v) Carpentry 15 15 15 15

75 75 75 75

H Electrical Material Charges Per Cum.. 15 15 15 15I Compressed Air 10 10 10 10J Water Charges Per Cum.. 10 10 10 10

Abstract of Charges Per Cum.. Labour Charges 108.23 134.42 152.22 307.79

Machinery Charges 691.47 695.03 703.28 729.34

Material Charges 544.21 548.95 560.31 599.20

Ventilation Charges 221.28 274.82 311.22 629.30

Shop Charges 75.00 75.00 75.00 75.00

Electrical Material Charges 15.00 15.00 15.00 15.00

Compressed Air 10.00 10.00 10.00 10.00

Water Charges 10.00 10.00 10.00 10.00

Rock Excavation in tunnel (per cum) 1,675.19 1,763.21 1,837.03 2,375.63 Add for electrical energy charges at 2% of total charges 33.50 35.26 36.74 47.51

Add for cons. & maintenance of haul road 5% of total charges 83.76 88.16 91.85 118.78

Prime Cost 1,792.45 1,886.64 1,965.62 2,541.92 Overhead charges and contractor's profit @ 20% 358.49 377.33 393.12 508.38

Grand Total 2,150.94 2,263.96 2,358.75 3,050.30

HENCE RATE PER CUM. (in Hard Rock) 2,150.94 2,263.96 2,358.75 3,050.30

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 66(3 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by three boom Drilling Jumbo (Per hour) = Rs. 9,034

I) = m 100Hence rate of drilling per meter @ 75% efficiency = Rs. 120.45

ii) Cost of drill rod per meter of drill rod = Rs. 140.92

iii) Labour lighting and scaffolding etc. LS = Rs. 100

iv) Ventilation and shop charges LS = Rs. 40

Total = Rs. 401.37

B Supply and making of Rock Bolts

I) Rock bolt 25 mm dia , 3.85Kg/m @ Rs. 60,053 Rs./MT = Rs. 231.20

ii) Wastage in cutting @ 2.5% of (i) 5.78

iii) Cutting and making tips LS = Rs. 50.00

iv) Threading LS = Rs. 50.00

v) Cost of nut and bolts, plates = Rs. 100.00

Total = Rs. 431.20C Installation

i) Placing, grouting & misc.works LS Rs. 50.00

ii) Grouting Rock Bolts LS Rs. 100.00

iii) Miscellaneous work LS Rs. 50.00Total Rs. 200.00

Prime Cost 1,032.58

Add 20% for Overhead and Contractor's Profit = Rs. 206.52

Cost of Rock Bolting per m = Rs. 1,239.00

Average rate of drilling 38mm dia. hole per hour

WORKING RATE - ROCK BOLTING ( 25.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 67

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by three boom Drilling Jumbo (Per hour) = Rs. 9,034

i) = m/hr 100

At 75% efficiency = m/hr 75Hence rate of drilling per meter = Rs. 120.45

ii) Cost of drill rod per meter of drill rod Rs. 140.92

iii) Labour ,lightning and scaffolding LS Rs. 100

iii) Ventilation and shop charges = Rs. 40

Total = Rs. 401.37

B Supply and making of Rock Bolts

i) Rock bolt 32 mm dia , 6.31Kg/m @ Rs. 60,053 Rs./MT = Rs. 378.93

ii) Wastage @ 2.5% of (I) Rs. 9.47336075

iii) Cutting and making tips LS = Rs. 50.00

iv) Threading @ 20% of B (i) LS = Rs. 50.00

v) Cost of nut and bolts, plates etc. LS = Rs. 150.00

Total = Rs. 638.41C Installation

i) Placing, grouting & misc.works LS = Rs. 50.00

ii) Grouting Rock Bolt LS Rs. 100.00

iii) Miscellaneous Works LS Rs. 50.00

Total Rs. 200.00

Prime Cost Rs. 1,239.78

Add 20% for Overhead and Contractor's Profit = Rs. 247.96

Total cost of Rock Bolting per m = Rs. 1,488.00

Average rate of drilling 45/50 mm dia. hole per hour by two boom drilling jumbo

WORKING RATE - ROCK BOLTING ( 32.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 68

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by three boom Drilling Jumbo (Per hour) = Rs. 9,034

I) = m 100Hence rate of drilling per meter @ 75% efficiency = Rs. 120.45

ii) Cost of drill rod per meter of drill rod = Rs. 140.92

iii) Labour lighting and scaffolding etc. LS = Rs. 100

iv) Ventilation and shop charges LS = Rs. 40

Total = Rs. 401.37

B Cost of Materiali) Cost of PVC Pipe per metre length = Rs. 350

ii) Wastage @ 2.5% of (i)= Rs 8.75

Total Cost of material = Rs. 358.75

C Rs. 20.00

D Fixing charges at different locations including consumables etc LS Rs. 25

E Prime Cost per metre = Rs. 805.12

F Add 20% for Overhead and Contractor's Profit = Rs. 161.02

Total cost per metre = Rs. 966.15

DRILLING, SUPPLY & INSTALLATION OF 38 MM DIA PVC PIPE

Miscellaneous Charges, i.e. Local transportation, storage, ventilation etc

Average rate of drilling 38mm dia. hole per hour

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 69

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by three boom Drilling Jumbo (Per hour) = Rs. 9,034

i) = m/hr 100

At 75% efficiency = m/hr 75Hence rate of drilling per meter = Rs. 120.45

ii) Cost of drill rod per meter of drill rod Rs. 140.92

iii) Labour ,lightning and scaffolding LS Rs. 100

iii) Ventilation and shop charges = Rs. 40

Total = Rs. 401.37

B Supply and making of Forepoles

i) Forepole 25 mm dia , 3.85Kg/m @ Rs. 60,053 Rs./MT = Rs. 231.20

ii) Wastage @ 2.5% of (I) Rs. 5.78

iii) Cutting and making tips LS = Rs. 50.00Total = Rs. 286.98

C Installation

i) Placing, grouting & misc.works LS = Rs. 50.00

ii) Grouting LS Rs. 100.00Total Rs. 150.00

Prime Cost Rs. 838.36

Add 20% for Overhead and Contractor's Profit = Rs. 167.67

Total cost of Rock Bolting per m = Rs. 1,006.00

WORKING RATE - FOREPOLING ( 25.0 mm Dia.)

Average rate of drilling 38 mm dia. hole per hour by two boom drilling jumbo

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 70

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 58,333.33

Wastage 2.5% 1,458.33

b) Carriage from Factory to Store (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 851.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs./km 89.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs. 7,573.90

Sub - Total = Rs. 67,365.57

e) Storage Charges @ 3% = 2,020.97

g) Carriage from Store to work site (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 4.00

* Carriage per Tonne = Rs. 35.60

Sub - Total = Rs. 69,422.13

i) Supervision Charges @ 2% = 1,388.44

Sub - Total = Rs. 70,810.58

Total Cost / MT = Rs. 70,810.58

Therefore,

Cost per Kg = Rs. 71.0

Weight per square meter of wire mesh (100x100x4mm) = 3 kg

Cost of one square meter = 213.0

Fixing charges 50 Rs per sq m LS 50

Total Cost / sq m 263.0

Add 20% for Overhead and Contractor's Profit 52.60

Rs. 315.6

Cost of welded wire mesh per MT at supply store including (Sale Tax+ VAT + Surcharge)

Cost per sq m

WORKING RATE - SUPPLY OF WELDED WIRE MESH AT SITE

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 71

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 1.050 bags 434 = Rs. 455.70 2 Sand 0.100 cum 2,280 = Rs. 228.00 3 Coarse aggregate 0.033 cum 2,150 = Rs. 70.95 4 Water LS = Rs. 25.00 5 Admixture LS = Rs. 50.00

Total cost of material per bag = Rs. 829.65

B Mixing charges of material (per cum.)- Density of dry mixture 1 : 1 : 3 in Kg/cum. = 1,756.00 - Weight of cement in mixture (1756*1/5) = Kg 351.20 - No of bags ( 50 Kg per bag) = Kg 7.02 - Mixing charges for shotcrete (per bag) = Rs. 112.94

Mixing charges per bag = Rs. 16.08

Use 60 cum batching and mixing plant 60.00 - Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

C Transportation to site- Transportation charges(per cum.) = Rs. 202.16

Transportation charges per bag = Rs. 28.78

D Placement charges- Use rate of Shotcrete machine (6 cum) = Rs. 5,245.00

Placement rate (With 80 % efficiency) = cum/hr 4.80 - Use rate of Shotcrete machine per bag = Rs. 155.57

E Lighting, work shop charges and other misc. Items @ 100 % of use = Rs. 155.57 rate of Shotcrete machine per day

Sub Total (A+B+C+D+E) = Rs. 1,185.65 F Add 20% for loss in rebound = Rs. 237.13

Total (Sub Total + F) = Rs. 1,422.78

G Add 20% for Overhead & Profit on prime cost 284.56

Total cost per bag = Rs. 1,707.33

Therefore,Rate per cum of Shotcrete = Rs. 11,992.00

WORKING RATE - SHOTCRETING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 72

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Use Rate of Wagon Drill = Rs./hrs 3,174

Hence, rate of drilling per meter = Rs. 248.01

b) Cost of Drill Rod per meter = Rs. 118.01

c) Cost of shifting the Jack Hammer@ 40% of (b) = Rs. 47.20

d) Ventilation, lighting and workshop charges @ 40% of (b) = Rs. 47.20

Sub - Total = Rs. 460.43

c) Overhead + Contractors profit @ 20% = Rs. 92.09

Total Cost / meter = Rs. 552.51

Therefore,

Cost per meter drilling by Wagon Drill = Rs. 553.00

Average rate of drilling 45mm dia. Hole per hour is16m. Consider 80% efficiency.

WORKING RATE - DRILLING OF 45MM HOLE (MORE THAN 5 METER DEPTH)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 73

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Use Rate of Wagon Drill = Rs./hrs 4,398

Hence, rate of drilling per meter = Rs. 392.66

b) Cost of Drill Rod per meter = Rs. 336.61

c) Cost of shifting the Jack Hammer @ 40% of (b) = Rs. 134.64

d) Ventilation, lighting and workshop charges @ 40% of (b) = Rs. 134.64

Sub - Total = Rs. 998.56

c) Overhead + Contractors profit @ 20% = Rs. 199.71

Total Cost / meter = Rs. 1,198.27

Therefore,

Cost per meter drilling by Wagon Drill = Rs. 1,200.00

Average rate of drilling 76mm dia. Hole per hour is14m. Consider 80% efficiency.

WORKING RATE - DRILLING OF 76MM HOLE (MORE THAN 5 METER DEPTH)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 74

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A - Cost of one bag of cement on site = Rs. 455.70

- Cost of sand in 1:2 mix for one bag at site = Rs. 161.88

Total cost = Rs. 617.58

B Washing of holes

- Cost of Equipment L.S = Rs. 20.00

- Cost of labour L.S. = Rs. 20.00

Total cost = Rs. 40.00

C Grouting

- Grouting machine charges = Rs. 2118.62

- Use Rate of Grouting machine = Rs. 353.10

Taking 6 bags progress of machine per hour

- Cost of Labour L.S. = Rs. 20.00

Total cost 373.10

E Other Misc. charges such as G.I pipes fitting etc. L.S. = Rs. 20.00

Total prime cost = Rs. 1050.68

Add 20% Overhead and contractors profit = Rs. 210.14

Total cost per bag = Rs. 1261

GROUTING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 75

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. wastage) 5.25 bags 434 = Rs. 2,278.50 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Coarse aggregate 0.90 cum 2,150 = Rs. 1,935.00 4 Water LS = Rs. 20.00 5 Admixture LS = Rs. 210.00

Total material cost per cum. = Rs. 5,469.50

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement LS = Rs. 50.00

Working Rate - M15 Concreting in Barrage area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

76 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

iv) Vibrating charges (Vibrators Rs 25 +Labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 200.00

Abstract of chargesA Material = Rs. 5,469.50 B Batching and mixing = Rs. 583.89 C Shuttering = Rs. 200.00

Total cost = Rs. 6,253.39

Add 20% for Overhead & Profit on prime cost = Rs. 1,250.68

Cost for concrete per cum = Rs. 7504.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

76 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 7.35 bags 434 = Rs. 3,189.90 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Coarse aggregate 0.90 cum 2,150 = Rs. 1,935.00 4 Reinforcement Steel 100.00 kg 74 = Rs. 7,448.07 5 Water LS = Rs. 25.00 6 Admixture LS = Rs. 294.00

Total material cost per cum. = Rs. 13,917.97

Volume of Lagging 500 mm 125 mm 100 mm = Cum 0.0063Total length of longitudinal reinforcement

4 nos 6 mm dia =4x(500-50) mm = m 1.80

Total length of transverse reinforcement4 nos 6 mm dia = m 1.00

Total steel in one lagging = kg 0.62Reinforcement steel per cum = kg/cum 99.55

B Batching, mixing and laying of concreteUse 60 cum batching and mixing plant 60.00 - Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

C 4.0% of (A+B) = Rs 561

D Cost of loading and carriageLead = km 3Rate per km = Rs/km 89RCC Lagging carried in a trip = Nos 200Weight of laggings carried per trip = MT 3.125Volume of laggings carried per trip = cum 1.25Transportation rate per cum = Rs 222.5

E Labour ChargesCosting & Fixing of lagging per day = Nos 400Volume of lagging = Cum 0.0063Volume of concrete place per day = Cum 2.5Number of working days per month = Days 25

=S.No. Category Nos Rate Amount (Rs)

1 Mason 1 24,170 = Rs 24,170 2 Beldar 4 9,788 = Rs 39,152

Sub-Total = Rs 63,322 Indirect Cost @ 80% for skilled labour = Rs 19,336 Indirect Cost @ 55% for un-skilled labour = Rs 21,534 Total crew charges per month = Rs 104,192 Total lagging concrete per month = Cum 62.5Total crew charges per cum = Rs 1,667

Total charges per cum = Rs 16,482 Add 20% for Overhead & Profit on prime cost = Rs. 3,296

Cost for concrete per cum = Rs. 19778.06

Working Rate - RCC Lagging

=4x((125-50)*2+(100-50)*2)

Formwork, Vibration, curing etc charges @

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 77

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 6.30 bags 434 = Rs. 2,734.20 2 Sand 0.43 cum 2,280 = Rs. 980.40 3 Coarse aggregate 0.86 cum 2,150 = Rs. 1,849.00 4 Water LS = Rs. 25.00 5 Admixture LS = Rs. 252.00

Total material cost per cum. = Rs. 5,840.60

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155.00

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement = Rs. 50.00

Working Rate - M20 Concreting in HRT

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 78 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

iv) Vibrating charges (Vibrators Rs 25 + Labours Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 300.00

Abstract of chargesA Material = Rs. 5,840.60 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 300.00

Total cost = Rs. 6,724.49

Add 20% for Overhead & Profit on prime cost = Rs. 1,344.90

Cost for concrete per cum = Rs. 8070.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 78 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 7.35 bags 434 = Rs. 3,189.90 2 Sand 0.42 cum 2,280 = Rs. 957.60 3 Coarse aggregate 0.84 cum 2,150 = Rs. 1,806.00 4 Water LS = Rs. 30.00 5 Admixture LS = Rs. 294.00

Total material cost per cum. = Rs. 6,277.50

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement per cum = Rs. 50.00

iv) Vibrating charges(Vibrators Rs 25 + Labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

Working Rate - M25 Concreting in HRT

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 79 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 400.00

Abstract of chargesA Material = Rs. 6,277.50 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 400.00

Total cost = Rs. 7,261.39

Add 20% for Overhead & Profit on prime cost = Rs. 1,452.28

Cost for concrete per cum = Rs. 8714.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 79 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 7.35 bags 434 = Rs. 3,189.90 2 Sand 0.42 cum 2,280 = Rs. 957.60 3 Coarse aggregate 0.84 cum 2,150 = Rs. 1,806.00 4 Water LS = Rs. 35.00 5 Admixture LS = Rs. 294.00

Total material cost per cum. = Rs. 6,282.50

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 20 Km/hr = 4.0 min- Empty haul @ 25 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement per cum = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25+ labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

Working Rate - M30 Concreting in HRT

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 80 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 500.00

Abstract of chargesA Material = Rs. 6,282.50 B Batching and mixing = Rs. 583.89 C Shuttering charges = Rs. 500.00

Total cost = Rs. 7,366.39

Add 20% for Overhead & Profit on prime cost = Rs. 1,473.28

Cost for concrete per cum = Rs. 8840.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 80 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A = Rs. 223.80

B Machinery Chargesa) Excavator (1.5 cum)

- Final output of excavator per hour = cum 101.97 - Use rate excavator per hour = 3,301

Rate per cum. = 32.38

b) Dumper (25 T)- Average Lead = km 1.40 - Capacity = cum. 15.63 - Therefore, actual capacity = cum. 15.63 Cycle Time- Loading Time = min 9.19 - Spotting Time = min 0.50 - Turning & Dumping Time = min 2.00 - Empty haul @ 20kmph = min 4.20 - Loaded haul @ 15kmph = min 5.60

Total Cycle Time = min 21.49 - No. of trips per 50min working hours = Nos. 2.33 - Output of Dumper per working hour = cum. 36.35 - Use rate of dumper per hour = 4,120

Rate per cum. = 113.35

c) Wheeled Dozer (180 HP)- Assuming one wheeled dozer will be enough for one excavator- Output of Excavator = Output of wheeled dozer per hour = cum. 203.93 - Use rate of wheeled dozer per hour = Rs. 4,801

Rate per cum. = 23.54

TOTAL MACHINERY CHARGES ( a + b + c) Rate per cum. = Rs. 169.27

C Others- Construction and maintenance of haul road @ 5% of (B) = Rs. 8.46 - Electrical Energy charges @ 2% of (B) = Rs. 3.39 - Leveling & trimming of waste piles etc. @ 3% of (B) = Rs. 5.08

PRIME COST (A + B + C) = Rs. 409.99

c) Overhead + Contractors profit @ 20% = Rs. 82.00 Total Cost / cum. = Rs. 491.99

Therefore,Cost per cum. = Rs. 492.00

WORKING RATE - OPEN EXCAVATION (IN ROCK BY 100% BLASTING)Drilling & blasting charges per cum. (Considering 80% drilling by wagon drill and 20% drilling by Jack Hammer

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 81

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Machinery Chargesa) Hydraulic Excavator ( 1.5 cum)

- Final output of hydraulic excavator per hour = cum 124 - Use rate of excavator per hour = 3,301

Rate per cum. = 26.66

b) Dumper (25 T)- Average Lead = km 1.40 - Capacity = cum. 15.63 - Therefore, actual capacity = cum. 15.63 Cycle Time- Loading Time = min 7.57 - Spotting Time = min 2.50 - Turning & Dumping Time = min 2.50 - Empty haul @ 20kmph = min 4.20 - Loaded haul @ 15kmph = min 5.60

Total Cycle Time = min 22.37 - No. of trips per 50min working hours = Nos. 2.23 - Output of Dumper per working hour = cum. 34.92 - Use rate of dumper per hour = 4,120

Rate per cum. = 117.97

c) Wheeled Dozer (180 HP)- Assuming one crawler dozer will be enough for one excavator- Output of Excavator = Output of Crawler Dozer per hour = cum. 247.63 - Use rate of Crawler dozer per hour = Rs. 4,801

Rate per cum. = 19.39

TOTAL MACHINERY CHARGES ( a + b + c) Rate per cum. = Rs. 164.03

B Others- Construction and maintenance of haul road @ 5% of (A) = Rs. 8.20 - Electrical Energy charges @ 2% of (A) = Rs. 3.28 - Leveling & trimming of waste piles etc. @ 3% of (A) = Rs. 4.92

PRIME COST (A + B) = Rs. 180.43

c) Overhead + Contractors profit @ 20% = Rs. 36.09 Total Cost / cum. = Rs. 216.51

Therefore,Cost per cum. = Rs. 217.00

WORKING RATE - COMMON EXCAVATION (NO ROCK)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 82

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by Jack Hammer(Per hour) = Rs. 1,453

I) = m/hr 6=

Hence rate of drilling per meter = Rs. 242.16

ii) Cost of drill rod per meter of drill rod = Rs. 74.00

iii) Labour lighting and scaffolding etc. LS = Rs. 100

iv) Ventilation and shop charges LS = Rs. 40

Total = Rs. 456.16

B Supply and making of Rock Bolts

I) Rock bolt 25 mm dia , 3.85Kg/m @ Rs. 60,053 Rs./MT = Rs. 231.20

ii) Wastage in cutting @ 2.5% of (i) 5.78

iii) Cutting and making tips LS = Rs. 50.00

iv) Threading LS = Rs. 50.00

v) Cost of nut and bolts, plates = Rs. 125.00

Total = Rs. 456.20C Installation

i) Placing, grouting & misc.works LS Rs. 50.00

ii) Grouting Rock Bolts LS Rs. 100.00

iii) Miscellaneous work LS Rs. 50.00Total Rs. 200.00

Prime Cost 1,112.36

Add 20% for Overhead and Contractor's Profit = Rs. 222.47

Cost of Rock Bolting per m = Rs. 1,335.00

Average rate of drilling 38mm dia. hole per hour

WORKING RATE - ROCK BOLTING ( 25.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 83

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Drilling costRate of drilling by Jack Hammer (Per hour) = Rs. 1,453

i) = m/hr 6

Hence rate of drilling per meter = Rs. 242.16

ii) Cost of drill rod per meter of drill rod Rs. 103.77

iii) Labour ,lightning and scaffolding LS Rs. 100

iii) Ventilation and shop charges = Rs. 40

Total = Rs. 485.93

B Supply and making of Rock Bolts

i) Rock bolt 32 mm dia , 6.31Kg/m @ Rs. 60,053 Rs./MT = Rs. 378.93

ii) Wastage @ 2.5% of (I) Rs. 9.47336075

iii) Cutting and making tips LS = Rs. 50.00

iv) Threading @ 20% of B (i) LS = Rs. 50.00

v) Cost of nut and bolts, plates etc. LS = Rs. 125.00

Total = Rs. 613.41C Installation

i) Placing, grouting & misc.works LS = Rs. 50.00

ii) Grouting Rock Bolt LS Rs. 100.00

iii) Miscellaneous Works LS Rs. 50.00

Total Rs. 200.00

Prime Cost Rs. 1,299.34

Add 20% for Overhead and Contractor's Profit = Rs. 259.87

Total cost of Rock Bolting per m = Rs. 1,560.00

Average rate of drilling 45/50 mm dia. hole per by Jack Hammer

WORKING RATE - ROCK BOLTING ( 32.0 mm Dia.)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 84

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 58,333.33

Wastage 2.5% 1,458.33

b) Carriage from Factory to Store (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 851.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs./km 89.00

* Carriage per Tonne ( Loading, unloading & stacking) = Rs. 7,573.90

Sub - Total = Rs. 67,365.57

e) Storage Charges @ 3% = 2,020.97

g) Carriage from Store to work site (For 10 Tonne)

- Capacity of Truck = Ton 10.00

- Distance = km 8.00

* Carriage per Tonne = Rs. 71.20

Sub - Total = Rs. 69,457.73

i) Supervision Charges @ 2% = 1,389.15

Sub - Total = Rs. 70,846.89

Total Cost / MT = Rs. 70,846.89

Therefore,

Cost per Kg = Rs. 71.0

Weight per square meter of wire mesh (100x100x4mm) = 3 kg

Cost of one square meter = 213.0

Fixing charges 50 Rs per sq m LS 50

Total Cost / sq m 263.0

Add 20% for Overhead and Contractor's Profit 52.60

Rs. 315.6

Cost of welded wire mesh per MT at supply store including (Sale Tax+ VAT + Surcharge)

Cost per sq m

WORKING RATE - SUPPLY OF WELDED WIRE MESH AT SITE

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 85

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 1.050 bags 434 = Rs. 455.70 2 Sand 0.100 cum 2,280 = Rs. 228.00 3 Coarse aggregate 0.033 cum 704 = Rs. 23.23 4 Water LS = Rs. 30.00 5 Admixture LS = Rs. 50.00

Total cost of material per bag = Rs. 786.93

B Mixing charges of material (per cum.)- Density of dry mixture 1 : 1 : 3 in Kg/cum. = 1,756.00 - Weight of cement in mixture (1756*1/5) = Kg 351.20 - No of bags ( 50 Kg per bag) = Kg 7.02 - Mixing charges for shotcrete (per bag) = Rs. 112.94

Mixing charges per bag = Rs. 16.08

Use 60 cum batching and mixing plant 60.00 - Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

C Transportation to site- Transportation charges(per cum.) = Rs. 583.89

Transportation charges per bag = Rs. 83.13

D Placement charges- Use rate of Shotcrete machine (6 cum) = Rs. 5,245

Placement rate (With 80 % efficiency) = cum/hr 4.80 - Use rate of Shotcrete machine per bag = Rs. 155.57

E Lighting, work shop charges and other misc. Items @ 100 % of use = Rs. 155.57 rate of Shotcrete machine per day

Sub Total (A+B+C+D+E) = Rs. 1,197.27 F Add 20% for loss in rebound = Rs. 239.45

Total (Sub Total + F) = Rs. 1,436.73

G Add 20% for Overhead & Profit on prime cost 287.35

Total cost per bag = Rs. 1,724.08

Therefore,Rate per sqm of Shotcrete (100 mm thick) = Rs. 12,109.91

WORKING RATE - SHOTCRETING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 86

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Use Rate of Wagon Drill = Rs./hrs 4,398

12.00

Hence, rate of drilling per meter = Rs. 366.48

b) Cost of Drill Rod per meter = Rs. 118.01

c) Cost of shifting theWagon Drill @ 40% of (b) = Rs. 47.20

d) Ventilation, lighting and workshop charges @ 40% of (b) = Rs. 47.20

Sub - Total = Rs. 578.90

c) Overhead + Contractors profit @ 20% = Rs. 115.78

Total Cost / meter = Rs. 694.68

Therefore,

Cost per meter drilling by Wagon Drill = Rs. 695.00

Average rate of drilling 45mm dia. Hole per hour is16m. Consider 75% efficiency.

WORKING RATE - DRILLING OF 45MM HOLE (MORE THAN 5 METER DEPTH)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 87

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Use Rate of Wagon Drill = Rs./hrs 4,398

10.50

Hence, rate of drilling per meter = Rs. 418.84

b) Cost of Drill Rod per meter = Rs. 336.61

c) Cost of shifting the Wagon Drill @ 40% of (b) = Rs. 134.64

d) Ventilation, lighting and workshop charges @ 40% of (b) = Rs. 134.64

Sub - Total = Rs. 1,024.73

c) Overhead + Contractors profit @ 20% = Rs. 204.95

Total Cost / meter = Rs. 1,229.68

Therefore,

Cost per meter drilling by Wagon Drill = Rs. 1,230.00

Average rate of drilling 76mm dia. Hole per hour is14m. Consider 75% efficiency.

WORKING RATE - DRILLING OF 76MM HOLE (MORE THAN 5 METER DEPTH)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 88

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A - Cost of one bag of cement on site = Rs. 434.00

- Cost of sand in 1:2 mix for one bag at site = Rs. 161.88

Total cost = Rs. 595.88

B Washing of holes

- Cost of Equipment L.S = Rs. 20.00

- Cost of labour L.S. = Rs. 20.00

Total cost = Rs. 40.00

C Grouting

- Grouting machine charges = Rs. 2119

- Use Rate of Grouting machine = Rs. 353.10

Taking 6 bags progress of machine per hour

- Cost of Labour L.S. = Rs. 20.00

Total cost 373.10

E Other Misc. charges such as G.I pipes fitting etc. L.S. = Rs. 20.00

Total prime cost = Rs. 1028.98

Add 20% Overhead and contractors profit = Rs. 205.80

Total cost per bag = Rs. 1235

GROUTING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 89

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(i)

(ii)

Assuming that

I 100%

II 0%

A DRILLING & BLASTINGa) Drilling at quarry site is proposed to be carried out with Jack Hammer

(Consider 1 ft drilling is sufficient for blasting 0.59 cu.yd of Rock)

- As per working rate of driiling and blasting with jack hammer = m 44.44 - Add 50% horizontal drilling for pull effect = m 22.22

Total depth of drilling = m 66.66

b) Jack hammer charges per hour = Rs 1,453 Taking rate of drilling as 6 per hour- Cost of drilling = Rs 16,142.24

c) Drilling rod charges per meter = Rs 74.00 Drilling rod charges = Rs. 4,932.84

d) Blasting - Explosive

Rate of Explosive per Kg = Rs 100.49 - Explosive req. for 100 cum rock (0.43Kg/cum.) = Kg 43.00 - Cost of gelatin = Rs 4,321.24

e) Blasting - Detonators- Average depth of hole = m 1.75 - No. of holes = m 38 - No. of detonator used, when 1 detonator used for 1 hole = m 58 - Cost of one detonator = m 27.13 - Cost of detonator = Rs 1,573.77

f) Blasting batteries, primacord and loading wire etc.@ 15% of the cost of gelatin = Rs 648.19

g) Stemming @ 7% of cost of gelatin = Rs 302.49

Total charges for drilling and blasting (b+c+d+e+f+g) = Rs 27,920.76

Assuming that1 Losses for 100 cum are as below

I) 3% in transit from processing plant to batching plantii) 10% in process rejectioniii) 5% for transit quarry to processing plantiv) 20% rejection at quarry site 19,544.53 Therefore, rate after adding rejection and losses (38%) = Rs 26,971.46

Swell factor for hard rock = 0.63

Rate per 100 cum (Bulk volume) of aggregate = Rs 16,992.02

Drilling & Blasting Rate per cum of agg.(Bulk Volume) = Rs 169.92

(The aggregate crushing & processing plant is at aavarage distance of 3. km. from quarry site.)

Assuming that drill hole can be filled with dynamite upto 75% of their capacity

from aggregate crushing and processing plant)(The Batching & mixing plants are available at a avarage distance of 1. km.

Material will be available from Quarry Site

Material will be available from excavated muck

WORKING RATE - COARSE AGGREGATE FROM QUARRY SITE

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 90 (1 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

B CARRIAGE OF BLASTED ROCKS UP TO CRUSHING PLANTa) Front end loader (2.0 cum)

- Consider Actual output per hour (Borrow measure) = cum 135.95 - Rate of Loader per hour = Rs 3,081

Rate per cum (Borrow measure) = Rs 22.66

b) Dumper (25T )Capacity = cum 15.63

Actual capacity (Borrow measure) = cum 15.63

Hauling cycle time- Loading time = min 6.9 - Spotting time = min 0.5 - Turning and dumping time = min 2.0 - Empty haul @ 30 Km/hr = min 6.0 - Loading haul@ 25 Km/hr = min 7.2

Total cycle time = min 22.6

- No. of trips per working hour of 50 minutes = Nos. 2.2 - Output of dumper per working hour =out put of tractor dozer = cum 34.6 - Use rate of dumper per working hour = Rs. 4,120

Rate per cum = Rs 119.16

c) Wheeled dozer (200 HP)Assuming that wheeled dozer will work with one loader

- Output of wheeled dozer ( Borrow measure ) = cum 135.95 - Use rate of dozer = Rs 4,692

Rate per cum = Rs 34.51

Total machinery charges (a+b+c) = Rs 176.33

Rate per cumec (Borrow measure) = Rs 176.33 Swell factor for hard rock = 0.63

Rate per cumec (Bulk volume) = Rs 111.09 Rate per cum after adding for rejection = Rs 132.16 and transit losses (Increase by 18%)

Carriage of blasted rock per cum of aggregate (Bulk Volume) = Rs 132.16

C CRUSHING AND PROCESSING OF AGGREGATE (150 T)- Use rate of plant per hour = Rs 9,873 - Capacity of crushing plant = T 150.00 - Production per hour (150/0.63/2.4) = cum 99.21 - Output per hour with 75% job management factor = cum 74.40 - Rate per cum (Bulk volume) = Rs 132.70 - Rate after adding rejection (3%)and transit losses (10%) = Rs 150.35

Crushing and processing of agg. (Bulk Volume) = Rs 150.35

D CARRIAGE UP TO BATCHING & MIXING PLANT

a) Front end loader (2.0 cum)- Use rate of loader (2.0 cum) = Rs 3,081 - Production of (2.0 cum) front end loader per hour = cum 135.95

Rate per cum = Rs 22.66

Average lead = 3. Km

(Average Lead = 1. km)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 90 (2 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

b) Dumper (25T)Capacity = cum 15.63

Actual capacity = cum 15.63

Hauling cycle time- Loading time = min 6.9 - Spotting time = min 0.5 - Turning and dumping time = min 2.0 - Empty haul @ 20 Km/hr = min 3.0 - Loading haul@ 15 Km/hr = min 4.0

Total cycle time = min 16.4

- No of truck trip in 50 min = 3.05 - Output of truck per working hour = cum 47.65

Use rate of Dumper = Rs 4,120 Rate per cum (Borrow measures) = Rs 86.46 Rate per cum (Bulk measures) Rs 86.46

c) cost storage charges @ 10% of transportation charges = Rs 8.65

d) Conveyance to batching and mixing plant @ 10% of tipper = Rs 8.65

Carriage charges per cum (Bulk volume) (a+b+c+d) = Rs 126.41

- Add 3 % for transit losses = Rs 3.79

Rate per cum = Rs 130.21

Carriage of aggregate (Bulk Volume) = Rs 130.21

E MISCELLANEOUS CHARGES = Rs 5.00 F Royalty Charges = Rs 70.00

Since 100% material will be available from Quarry Site

i = Rs 169.92 ii = Rs. 132.16 iii Crushing and Processing of Aggregate (C) = Rs. 150.35 iv Carriage upto Batching and Mixing Plant (D) = Rs. 130.21 v Miscellaneous Charges (E) = Rs. 5.00 vi Royality Charges (F) = Rs. 70.00

Total cost per cum (Bulk Volume) = Rs. 657.63

Add for maintenance of haul roads @ 5% = Rs 32.88 Electric charges @ 2% = Rs 13.15 Prime cost = Rs 703.66

Cost of aggregate per cum = Rs 704

Drilling and Blasting ( 100% * A) Carriage of Blasted Rock upto Crushing Plant ( 100% * B)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 90 (3 of 3)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(i)(i)

Assuming that

I 100%

II 0%

A CARRIAGE OF RIVER BED MATERIAL UP TO CRUSHING PLANT

a) Front End Loader (2.0 cum)- Consider Actual Output per hour (Borrow Measure) = cum 135.95 - Rate per hour = Rs 3,081

Rate per cum (Borrow measure) = Rs 22.66 Rate per cum (Bulk volume) = Rs 15.18

b) Dumper (25 T)- Average Lead = km 32.00 - Capacity = cum 15.81

Actual Capacity Borrow Measure = cum 15.81

Hauling cycle time- Loading Time = min 6.98 - Spotting Time = min 0.50 - Turning and Dumping time = min 2.00 - Loading Haul @ 25 Km/hr = min 76.80 - Empty Haul @ 30 Km/hr = min 64.00

Total cycle time = min 150.28

- No. of Trips per working hour of 50 minutes = Nos. 0.33 - Output of Dumper per working hour = cum 5.26 - Use Rate of Dumper per working hour = Rs. 4,120

Rate per cum (borrow measure) = Rs. 783.06 Rate per cum (bulk volume) = Rs. 524.65

Carriage of River Bed Material up to Crushing Plant (Bulk Volume) Rs 539.84

Assuming that1 Losses for 100 cum are as below

I) 3% in transit from processing plant to batching plantii) 10% in process rejectioniii) 5% for transit from river bed to processing plantiv) 20% rejection at River Bed Therefore, rate after adding rejection and losses (38%) = Rs 744.97

Rate per cum (Bulk volume) of aggregate = Rs 744.97

WORKING RATE - COARSE AGGREGATE FROM RIVER BED

(The aggregate crushing & processing plant is at a avarage distance of 32. km. from river bed.)

Material will be available from excavated muck

Material will be available from River Bed

(The Batching & mixing plants are available at a avarage distance of 1. km. from aggregate crushing and processing plant)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 91 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

B CARRIAGE UP TO BATCHING & MIXING PLANT

a) Front End Loader (2.0 cum)- Use rate of loader (2.0 cum) = Rs 3,081 - Production of (2.0 cum) front end loader per hour = cum 135.95

Rate per cum (Borrow measure) = Rs 22.66 Rate per cum (Bulk Volume) = Rs 15.18

b) Dumper (25T)Average Lead = km. 1.00 Capacity = cum 15.81

Actual capacity = cum 15.81

Hauling cycle time- Loading time = min 7.0 - Spotting time = min 0.5 - Turning and dumping time = min 2.0 - Empty haul @ 25 Km/hr = min 2.4 - Loading haul@ 20Km/hr = min 3.0

Total cycle time = min 14.9

- No of truck trip in 50 min = 3.36 - Output of truck per working hour = cum 53.14

Use rate of Dumper = Rs 4,120 Rate per cum (Bank measures) = Rs 77.53 Rate per cum (Bulk measures) Rs 77.53

c) Cost of storage charges @ 10% of transportation charges = Rs 7.75

d) Conveyance to batching and mixing plant @ 10% of tipper = Rs 7.75

Carriage charges per cum (Bulk volume) (a+b+c+d) = Rs 108.22

- Add 3 % for transit losses = Rs 3.25

Rate per cum = Rs 111.46

Carriage of aggregate (Bulk Volume) = Rs 111.46

C MISCELLANEOUS CHARGES = Rs 5.00 D Royalty Charges = Rs 70.00

Abstract of cost

Since 100% material will be available from River Bed

i = Rs 744.97 ii Carriage upto Batching and Mixing Plant (B) = Rs. 111.46 iii Miscellaneous Charges (C) = Rs. 5.00 iv Royality Charges (D) = Rs. 70.00

Total cost per cum (Bulk Volume) = Rs. 931

Add for maintenance of haul roads @ 5% = Rs 46.57 Electric charges @ 2% = Rs 18.63 Prime cost = Rs 996.64

Cost of aggregate per cum = Rs 997

Cost of Carriage of River Bed Material upto processing plant ( 100% * A)

(Average Lead = 01. km)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 91 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. wastage) 4.20 bags 434 = Rs. 1,822.80 2 Sand 0.40 cum 2,280 = Rs. 912.00 3 Coarse aggregate 0.80 cum 2,150 = Rs. 1,720.00 4 Water LS = Rs. 20.00 5 Admixture LS = Rs. 168.00

Total material cost per cum. = Rs. 4,642.80

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement LS = Rs. 50.00

Working Rate - M10 Concreting in Barrage area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 92 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

iv) Vibrating charges (Vibrators Rs 25 +Labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 150.00

Abstract of chargesA Material = Rs. 4,642.80 B Batching and mixing = Rs. 583.89 C Shuttering = Rs. 150.00

Total cost = Rs. 5,376.69

Add 20% for Overhead & Profit on prime cost = Rs. 1,075.34

Cost for concrete per cum = Rs. 6452.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 92 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. wastage) 5.25 bags 434 = Rs. 2,278.50 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Coarse aggregate 0.90 cum 2,150 = Rs. 1,935.00 4 Water LS = Rs. 20.00 5 Admixture LS = Rs. 210.00

Total material cost per cum. = Rs. 5,469.50

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement LS = Rs. 50.00

Working Rate - M15 Concreting in Barrage area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 93 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

iv) Vibrating charges (Vibrators Rs 25 +Labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 200.00

Abstract of chargesA Material = Rs. 5,469.50 B Batching and mixing = Rs. 583.89 C Shuttering = Rs. 200.00

Total cost = Rs. 6,253.39

Add 20% for Overhead & Profit on prime cost = Rs. 1,250.68

Cost for concrete per cum = Rs. 7504.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 93 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 6.30 bags 434 = Rs. 2,734.20 2 Sand 0.43 cum 2,280 = Rs. 980.40 3 Coarse aggregate 0.86 cum 2,150 = Rs. 1,849.00 4 Water LS = Rs. 25.00 5 Admixture LS = Rs. 252.00

Total material cost per cum. = Rs. 5,840.60

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155.00

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25 + Labours Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

Working Rate - M20 Concreting in Barrage area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 94 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 300.00

Abstract of chargesA Material = Rs. 5,840.60 B Batching and mixing = Rs. 583.89 C Shuttering = Rs. 300.00

Total cost = Rs. 6,724.49

Add 20% for Overhead & Profit on prime cost = Rs. 1,344.90

Cost for concrete per cum = Rs. 8069.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 94 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 6.83 bags 434 = Rs. 2,962.05 2 Sand 0.42 cum 2,280 = Rs. 957.60 3 Coarse aggregate 0.84 cum 2,150 = Rs. 1,806.00 4 Water LS = Rs. 30.00 5 Admixture LS = Rs. 273.00

Total material cost per cum. = Rs. 6,028.65

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60.00

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement per cum = Rs. 50.00

iv) Vibrating charges(Vibrators Rs 25 + Labour Rs 25) LS = Rs. 50.00

Working Rate - M25 Concreting in Barrage area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 95 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 400.00

Abstract of chargesA Material = Rs. 6,028.65 B Batching and mixing = Rs. 583.89 C Shuttering = Rs. 400.00

Total cost = Rs. 7,012.54

Add 20% for Overhead & Profit on prime cost = Rs. 1,402.51

Cost for concrete per cum = Rs. 8415.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 95 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 7.35 bags 434 = Rs. 3,189.90 2 Sand 0.42 cum 2,280 = Rs. 957.60 3 Coarse aggregate 0.84 cum 2,150 = Rs. 1,806.00 4 Water LS = Rs. 30.00 5 Admixture LS = Rs. 294.00

Total material cost per cum. = Rs. 6,277.50

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement per cum = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25+ labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

Working Rate - M30 Concreting in Barrage area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 96 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 500.00

Abstract of chargesA Material = Rs. 6,277.50 B Batching and mixing = Rs. 583.89 C Shuttering = Rs. 500.00

Total cost = Rs. 7,361.39

Add 20% for Overhead & Profit on prime cost = Rs. 1,472.28

Cost for concrete per cum = Rs. 8834.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 96 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material Sr. No. Item Quantity Unit Rate Amount

1 Cement (incl. waste) 8.40 bags 434 = Rs. 3,645.60 2 Sand 0.42 cum 2,280 = Rs. 957.60 3 Coarse aggregate 0.84 cum 2,150 = Rs. 1,806.00 4 Water LS = Rs. 40.00 5 Admixture LS = Rs. 336.00

Total material cost per cum. = Rs. 6,785.20

B Batching, mixing and laying of concreteI) Use 60 cum batching and mixing plant 60

- Use rate of mixing plant per hour = Rs. 5,082 - Consider, actual output of mixer per hour = cum 45.00 - Rate of mixing plant per cum = Rs. 112.94

ii) Transportation by transit mixer from batching andmixing plant to work site - Average Lead = 1.00 km- Transit mixer (Capacity - 6.0 cum) = 6.00 cum.

CYCLE TIME- Loading time = 8.0 min- Spotting time & waiting time = 2.5 min- Turning and dumping time = 8.0 min- Loading haul @ 15 Km/hr = 4.0 min- Empty haul @ 20 Km/hr = 3.0 min

Total cycle time = 25.50 min

- Consider, Actual working time in 1 hour duration = min 50.00 - No. of trips in 50 min working hour = 1.96 - Output of transit mixer = cum 11.76 - Use rate of transit mixer ( 6 cum. Capacity) = Rs. 2,378

Transportation rate per cum = Rs. 202.16

iii) Placement charges(a) Placement by concrete pump (80% efficiency)- Theoretical Output of concrete pump per hour = cum 38 - Actual output = cum 30.40 - Use rate of pump = Rs. 3,155

Use rate of pump per cum = Rs. 103.78

(b) Labour for placement per cum = Rs. 50.00

iv) Vibrating charges (Vibrators Rs 25+ labour Rs 25) LS = Rs. 50.00

v) Cleaning, curing and finishing- Sand blasting (LS) = Rs. 5.00 - Cement for slurry mort (LS) = Rs. 5.00 - Cleaning and wastage (LS) = Rs. 5.00 - Curing and finishing (LS) = Rs. 10.00

Total cost = Rs. 25.00

vi) Catwalks and other aids for concreting (LS) = Rs. 15.00

Working Rate - M40 Concreting in Barrage area

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 97 (1 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

vii) Other charges- Electric charges (LS) = Rs. 5.00 - Compressed air (LS) = Rs. 2.50 - Work shop (LS) = Rs. 5.00 - Haul road (LS) = Rs. 2.50

Total cost = Rs. 15.00

viii) Misc charges such as hose pipe gum bolts and (LS) = Rs. 10.00 small tools

Total cost for batching, mixing etc. = Rs. 583.89

C Shuttering charges (LS) = Rs. 600.00

Abstract of chargesA Material = Rs. 6,785.20 B Batching and mixing = Rs. 583.89 C Shuttering = Rs. 600.00

Total cost = Rs. 7,969.09

Add 20% for Overhead & Profit on prime cost = Rs. 1,593.82

Cost for concrete per cum = Rs. 9563.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 97 (2 of 2)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Pilot Shaft Excavationi) Drilling & Blasting

Working Hours per day hrs = 20.00Working Days per month days = 25.00Height of Surge Shaft m = 78.50Time taken for initial setup of equipment days = 10.00

Time taken to through the 300 mm dia pilot hole using Raise Borer @3 m per day average progress days = 26.00

Enlargement of 300 mm dia hole to 2.5 m dia hole from bottom to top @ 2.0 m per day average progress

days = 39.00

Diameter of Pilot shaft m = 2.50Total Excavation area in pilot hole m2 = 4.91

ii) Mucking

Quantity of muck (bank) per metre cum = 4.91Capacity of Loader Cum Excavator cum = 0.70Operating factor (50min/60min) = 0.83Job management Factor = 0.78Bucket Fill factor (Rock well blasted) = 0.70Number of seconds per One Cycle of Operaion sec = 20.00Number of Operations per hour = 180.00Calculated output of loader cum excavator Cum/hr = 57.10Output of loader cum excavator (loose) Cum/hr = 57.10Loose density of excavated muck T/m3 = 1.60Capacity of dumper T = 15.00Capacity of dumper m3 = 9.38Swell Factor = 0.63Total loose muck per 2 m cycle Cum = 15.71Mucking hours required hr = 0.28Drilling of 300 mm dia pilot hole will be done by using raise borer from top to bottomDia of initial driving of hole m = 0.30Dia of reaming by raise borer m = 2.50Hourly use rate of raise borer Rs = 16,055.00Average Progress per hour for drilling pilot hole m = 0.30Average Progress per hour for reaming m = 0.20Rate per metre of length Rs = 133,791.67Cost of drill bit (50% of machinery charges) Rs = 66,895.83Total cost per metre Rs = 200,687.50Total cost per cum Rs = 40,883.72Mucking Equipment Nos Hrs Amount (Rs)Loader cum excavator (0.7 cum) 1 0.28 651.57Dump Trucks (15T) 2 0.28 1,327.02Crawler Dozer (130 HP) 1 0.28 976.18Total 2,954.78Total cost per cum Rs = 300.97Total cost per cum for pilot shaft Rs = 41,184.69

Time taken for excavation of Pilot Shaft days 75.00Time for excavation and rock support works in Surge Shaft top (Dome) Months 3.00

Casting of ring beam and erection of Gantry crane at Surge Shaft top Months 3.00

B Surge Shaft Enlargementi) Drilling & Blasting

Dia of Pilot Shaft m = 2.50Height of Surge Shaft m = 78.50Finished Dia of Surge Shaft m = 13.50Avg. Excavated Dia of Surge Shaft m = 15.90Progress per Pull m = 1.00Working Hours per day hrs = 20.00Working Days per month days = 25.00Depth of holes to be drilled m = 0.85Cross sectional area of pilot hole m2 = 4.91Cross sectional area of Surge Shaft m2 = 198.55Net area for drilling (area of pilot shaft excluded) m2 = 193.64

WORKING RATE - EXCAVATION IN SHAFT & BENCHING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 98 (1 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Excavation in one part m2 96.82Spacing of the holes m = 1.50Assuming spacing of holes @1.25m c/c m2 = 2.25No. of holes required per face nos. = 44.00Spacing of the holes m = 1.50Perimeter of the one half m = 24.96Additional hole for line drilling / burn hole nos. = 25.00Total no. of holes nos. = 69.00Total depth of drilling m = 86.25Output of Wagon Drill m/hr = 16.00No. of Wagon Drill no. = 2.00Drilling time hr = 2.70

ii) MuckingQuantity of muck (bank) cum = 96.82Swell Factor = 0.63Quantity of muck (Loose) 157.82Output of 0.7 cum loader (loose) cum/hr = 57.10Mucking hours required hr = 2.76

iii) Cycle TimeDescending from top hr = 0.50Profile Marking & Setting of Operation hr = 0.50Drilling Time hr = 2.70Charging hr = 1.00Ascending hr = 0.50Blasting & Defuming hr = 1.00Scaling & Cleaning hr = 1.00Rock Bolting hr = 4.00Shotcrete hr = 2.00Mucking hr = 2.76Total Cycle Time hr = 15.96Total time required for 1.0 m advance in one half of surge shaft hr = 15.96Total time required for 1.0 m advance in surge shaft hr = 31.92Progress per day m = 0.63working time required for complete widening of surge shaft days = 126.00working time required for complete widening of surge shaft Month = 6.00

iv) Requirement of DumpersLoose density of excavated muck T/m3 = 1.60Capacity of Dumper T = 15.00Capacity of Dumper cum = 9.38Average Lead km = 2.40Loading Time min = 9.85Spotting Time min = 0.50Turning and Dumping Time min = 2.00Empty Haul @20 km/hr min = 7.20Loading Haul @15 km/hr min = 9.60Total cycle time min = 29.15No. of Trips per working hour 50 minutes nos. = 1.72Output of Dumpers per 50 minutes cum = 16.08Total nos. of Dumpers required nos. = 3.00

C Cycle of Operation

Descending, Profile Marking & Setting of Operation Hours = 1.00

Drilling Time Hours = 2.70

Charging & Blasting Hours = 1.00

Ascending, Defuming & clearing Hours = 1.50

Scaling and Bottom Clearing Hours = 1.00Mucking and Cleaning Hours = 2.76Supporting & Rock bolting Hours = 6.00

Cycle time Hours = 15.96

D Direct labour charges

Category Shift/day Nos. Rate

Skilled Labour(i) Foreman 3 0.5 32,765 49,148

(ii) Asst Foreman special drilling 3 0.5 24,170 36,255

(iii) Blastman 3 0.5 24,170 36,255

(iv) Electrician 3 0.5 24,170 36,255

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 98 (2 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

157,913 Un Skilled Labour

(i) Beldar 3 2 9,788 58,728

(ii) Helper to Electrician 3 0.5 9,788 14,682

(iii) Muckers 3 2 9,788 58,728

(iv) Explosive chargeman 3 1 9,788 29,364

(v) Hole Cleaner 3 2 9,788 58,728

220,230 Total Direct Labour Charges per month 378,143 Indirect Cost @ 80% for skilled labour 126,330

Indirect Cost @ 55% for un-skilled labour 121,127

Total Labour Cost per Month 625,599

No of days per month 30

Total Labour Cost per day 20,853

Quantity of excavation per day per face 97

Rate of Labour Per cum of excavation 215.38

E Machinery Charges

Equipment Nos.Use Rate per hour

(Rs)Hour per day Amt.

In Rs.(i) Wagon Drill 2 4,398 2.70 23,707

(ii) Excavator 1 2,369 2.76 6,546

(iii) Dumper - 15T 3 2,412 2.76 19,999

(iv) Crawler / Dozer - 130 HP 1 3,549 2.76 9,808

Total Machinery Charges 60,060 Quantity of excavation per cycle per face 97 Rate of machinery per cum 620.32

F Materials Charges 1 Drilling and Blasting

Depth of holes to be drilled. 1.25

Cross sectional area of tunnel (heading ) incl. 10% overbrk. 96.82

No. of holes required per face 69.00

Total depth of drilling 86.25

Rate of drill steel per metre 118.01

Cost of drill steel 10,179

Quantity of rock excavated / cycle 97

Rate of drill steel per cum 105

2 Explosives(i) GELATIN

Gelatin required/cum 1.00

Cost of gelatin 100.49

Rate/cum 100.49(ii) DETONATORS

No. of Detonators required 69

Rate of Detonator + Fuse 27

Total Cost of Detonators 1,872

Quantity of rock excavated/cycle 97

Rate/cum 19.34 (iii) OTHERS

Other consumable @ 50% of (i+ii) 59.92

Rate of Explosives + Detonator 179.75

3 Timber for Support & Packing 104 Miscellaneous Supplies LS 15

Total Material Charges per cum (1+2+3+4) 309.87

G Ventilation Use rate of Blower per working hour 2,160

No of working hours per day 5.00

Total ventilation Charges per day for 1 blower 10,800

Rate for Ventilation Per Cum.. 112

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 98 (3 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

H Shop Charges (i) Machine Shop 15

(ii) Structural shop 15

(iii) Steel Metal shop 15

(iv) Air & Water pipe shop 15

(v) Carpentry 15

75

I Electrical Material Charges Per Cum.. 15J Compressed Air 10K Water Charges Per Cum.. 10

Abstract of Charges Per Cum.. Labour Charges 215.38

Machinery Charges 620.32

Material Charges 309.87

Ventilation Charges 111.55

Shop Charges 75.00

Electrical Material Charges 15.00

Compressed Air 10.00

Water Charges 10.00

Rock Excavation in tunnel (per cum) 1,367.12 Add for electrical energy charges at 2% of total charges 27.34

Add for cons. & maintenance of haul road 5% of total charges 68.36

Prime Cost 1,462.82 Overhead charges and contractor's profit @ 20% 292.56

Grand Total 1,755.38

HENCE RATE PER CUM. (in Hard Rock) 1,755.38

Excavation Rate of Pilot Shaft = Rs 41,184.69

Excavation Rate of Benching = Rs 1,755.38

Volume of Pilot Shaft per meter = Rs 4.91

Volume of Benching per meter = Rs 193.64

Total Volume = Rs 198.55

% of Pilot = Rs 2.47%

% of Benching = Rs 97.53%

HENCE RATE PER CUM. (in Hard Rock in Class-II,III & IV) 2,730.19

HENCE RATE PER CUM. (in Hard Rock in Class-V) 3,139.72

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 98 (4 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Pilot Shaft Excavationi) Drilling & Blasting

Working Hours per day hrs = 20.00Working Days per month days = 25.00Height of Pressure Shaft m = 154.00Time taken for initial setup of equipment days = 10.00

Time taken to through the 300 mm dia pilot hole using Raise Borer @3 m per day average progress days = 51.00

Enlargement of 300 mm dia hole to 2.5 m dia hole from bottom to top @ 2.0 m per day average progress

days = 77.00

Diameter of Pilot shaft m = 2.50Total Excavation area in pilot hole m2 = 4.91

ii) Mucking

Quantity of muck (bank) per metre cum = 4.91Capacity of Loader Cum Excavator cum = 0.70Operating factor (50min/60min) = 0.83Job management Factor = 0.78Bucket Fill factor (Rock well blasted) = 0.70Number of seconds per One Cycle of Operaion sec = 35.00Number of Operations per hour = 102.86Calculated output of loader cum excavator Cum/hr = 32.63Output of loader cum excavator (loose) Cum/hr = 30.00Loose density of excavated muck T/m3 = 1.60Capacity of dumper T = 15.00Capacity of dumper m3 = 9.38Swell Factor = 0.63Total loose muck per 2 m cycle Cum = 15.71Mucking hours required hr = 0.52Drilling of 300 mm dia pilot hole will be done by using raise borer from top to bottomDia of initial driving of hole m = 0.30Dia of reaming by raise borer m = 2.50Hourly use rate of raise borer Rs = 16,055.00Average Progress per hour for drilling pilot hole m = 0.30Average Progress per hour for reaming m = 0.20Rate per metre of length Rs = 133,791.67Cost of drill bit (50% of machinery charges) Rs = 66,895.83Total cost per metre Rs = 200,687.50Total cost per cum Rs = 40,883.72Mucking Equipment Nos Hrs Amount (Rs)Loader cum excavator (0.7 cum) 1 0.52 1,240.16Dump Trucks (15T) 2 0.52 2,525.76Crawler Dozer (130 HP) 1 0.52 1,858.01Total 5,623.93Total cost per cum Rs = 572.85Total cost per cum for pilot shaft Rs = 41,456.57

Time taken for excavation of Pilot Shaft days 138.00

B Pressure Shaft Enlargementi) Drilling & Blasting

Dia of Pilot Shaft m = 2.50Height of Pressure Shaft m = 154.00Finished Dia of Pressure Shaft m = 5.75Avg. Excavated Dia of Pressure Shaft m = 6.65Progress per Pull m = 1.00Working Hours per day hrs = 20.00Working Days per month days = 25.00Depth of holes to be drilled m = 0.85Cross sectional area of pilot hole m2 = 4.91Cross sectional area of Pressure Shaft m2 = 34.71Net area for drilling (area of pilot shaft excluded) m2 = 29.81Excavation in benching m2 29.81Spacing of the holes m = 1.25Assuming spacing of holes @1.25m c/c m2 = 1.56No. of holes required per face nos. = 20.00

WORKING RATE - EXCAVATION IN VERTICAL PRESSURE SHAFT & BENCHING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 99 (1 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Spacing of the holes m = 1.25Perimeter of the shaft m = 20.88Additional hole for line drilling / burn hole nos. = 21.00Total no. of holes nos. = 41.00Total depth of drilling m = 51.25Output of Wagon Drill m/hr = 16.00No. of Wagon Drill no. = 1.00Drilling time hr = 3.20

ii) MuckingQuantity of muck (bank) cum = 29.81Swell Factor = 0.63Quantity of muck (Loose) 48.58Output of 0.7 cum loader (loose) cum/hr = 30.00Mucking hours required hr = 1.62

iii) Cycle TimeDescending from top hr = 0.50Profile Marking & Setting of Operation hr = 0.50Drilling Time hr = 3.20Charging hr = 1.00Ascending hr = 0.50Blasting & Defuming hr = 1.00Scaling & Cleaning hr = 1.00Rock Bolting hr = 4.00Shotcrete hr = 2.00Mucking hr = 1.62Total Cycle Time hr = 15.32working time required for complete widening of Pressure Shaft days = 236.00working time required for complete widening of Pressure Shaft Month = 10.00

iv) Requirement of DumpersLoose density of excavated muck T/m3 = 1.60Capacity of Dumper T = 15.00Capacity of Dumper cum = 9.38Average Lead km = 2.40Loading Time min = 18.75Spotting Time min = 0.50Turning and Dumping Time min = 2.00Empty Haul @20 km/hr min = 7.20Loading Haul @15 km/hr min = 9.60Total cycle time min = 38.05No. of Trips per working hour 50 minutes nos. = 1.31Output of Dumpers per 50 minutes cum = 12.32Total nos. of Dumpers required nos. = 3.00

C Cycle of Operation

Descending, Profile Marking & Setting of Operation Hours = 1.00

Drilling Time Hours = 3.20

Charging & Blasting Hours = 1.00

Ascending, Defuming & clearing Hours = 1.50

Scaling and Bottom Clearing Hours = 1.00Mucking and Cleaning Hours = 1.62Supporting & Rock bolting Hours = 6.00

Cycle time Hours = 15.32

D Direct labour charges

Category Shift/day Nos. Rate

Skilled Labour(i) Foreman 3 0.25 32,765 24,574

(ii) Asst Foreman special drilling 3 0.25 24,170 18,128

(iii) Blastman 3 0.25 24,170 18,128

(iv) Electrician 3 0.25 24,170 18,128

78,956 Un Skilled Labour

(i) Beldar 3 2 9,788 58,728

(ii) Helper to Electrician 3 0.5 9,788 14,682

(iii) Muckers 3 2 9,788 58,728

(iv) Explosive chargeman 3 1 9,788 29,364

(v) Hole Cleaner 3 1 9,788 29,364

190,866

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 99 (2 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Total Direct Labour Charges per month 269,822 Indirect Cost @ 80% for skilled labour 63,165

Indirect Cost @ 55% for un-skilled labour 104,976

Total Labour Cost per Month 437,964

No of days per month 30

Total Labour Cost per day 14,599

Quantity of excavation per day per face 30

Rate of Labour Per cum of excavation 489.79

E Machinery Charges

Equipment Nos.Use Rate per hour

(Rs)Hour per day Amt.

In Rs.(i) Wagon Drill 1 4,398 3.20 14,087

(ii) Excavator 1 2,369 1.62 3,836

(iii) Dumper - 15T 3 2,412 1.62 11,718

(iv) Crawler / Dozer - 130 HP 1 3,549 1.62 5,747

Total Machinery Charges 35,387 Quantity of excavation per cycle per face 30 Rate of machinery per cum 1,187.25

F Materials Charges 1 Drilling and Blasting

Depth of holes to be drilled. 1.25

Cross sectional area of tunnel (heading ) incl. 10% overbrk. 29.81

No. of holes required per face 41.00

Total depth of drilling 51.25

Rate of drill steel per metre 118.01

Cost of drill steel 6,048

Quantity of rock excavated / cycle 30

Rate of drill steel per cum 203

2 Explosives(i) GELATIN

Gelatin required/cum 1.00

Cost of gelatin 100.49

Rate/cum 100.49(ii) DETONATORS

No. of Detonators required 41

Rate of Detonator + Fuse 27

Total Cost of Detonators 1,112

Quantity of rock excavated/cycle 30

Rate/cum 37.32 (iii) OTHERS

Other consumable @ 50% of (i+ii) 68.91

Rate of Explosives + Detonator 206.73

3 Timber for Support & Packing 104 Miscellaneous Supplies LS 15

Total Material Charges per cum (1+2+3+4) 434.64

G Ventilation Use rate of Blower per working hour 2,160

No of working hours per day 4.00

Total ventilation Charges per day for 1 blower 8,640

Rate for Ventilation Per Cum.. 290

H Shop Charges (i) Machine Shop 15

(ii) Structural shop 15

(iii) Steel Metal shop 15

(iv) Air & Water pipe shop 15

(v) Carpentry 15

75

I Electrical Material Charges Per Cum.. 15

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 99 (3 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

J Compressed Air 10K Water Charges Per Cum.. 10

Abstract of Charges Per Cum.. Labour Charges 489.79

Machinery Charges 1,187.25

Material Charges 434.64

Ventilation Charges 289.88

Shop Charges 75.00

Electrical Material Charges 15.00

Compressed Air 10.00

Water Charges 10.00

Rock Excavation in tunnel (per cum) 2,511.56 Add for electrical energy charges at 2% of total charges 50.23

Add for cons. & maintenance of haul road 5% of total charges 125.58

Prime Cost 2,687.37 Overhead charges and contractor's profit @ 20% 537.47

Grand Total 3,224.85

HENCE RATE PER CUM. (in Hard Rock) 3,224.85

Excavation Rate of Pilot Shaft = Rs 41,456.57

Excavation Rate of Benching = Rs 3,224.85

Volume of Pilot Shaft per meter = Rs 4.91

Volume of Benching per meter = Rs 29.81

Total Volume = Rs 34.71

% of Pilot = Rs 14.14%

% of Benching = Rs 85.86%

HENCE RATE PER CUM. (in Hard Rock) 8,630.91

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 99 (4 of 4)

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Cost of Material at Store = Rs. 60,053.00

Wastage and Incidentals to work @ 2.5% = Rs 1,501.33

Sub total = Rs 61,554.33

b) Handling and Placing

- Bending & Cutting @ 6% of (a) = Rs. 3,693.26

- Handling @ 5% of (a) Rs. 3,077.72

- Placing & Welding @ 5% of (a) Rs. 3,077.72

- Binding Wire & Other Material 5% of (a) Rs. 3,077.72

Total - (a+b) = Rs. 74,480.73

c) Overhead + Contractors profit @ 20% of Rs. 14,896.15

Total Cost / MT = Rs. 89,376.88

Therefore,Cost per MT = Rs. 89,377

WORKING RATE - SUPPLY, FABRICATION AND ERECTION OF STEEL REINFORCEMENT

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 100

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) Cost of Material at Store = Rs. 58,013

Wastage and Incidentals to work @ 2.5% = Rs 1,450.33

Sub total = Rs 59,463.33

b) Fabrication

- Marking & Cutting @ 1.5% of (a) = Rs. 891.95

- Bending of Rolled Section @ 1.5% of (a) Rs. 891.95

- Welding

-- Cost of Welding Rods @ 8% of (a) Rs. 4,757.07

-- Labour & Elect. Charges @ 10% of (a) Rs. 5,946.33

-- Temporary Fixtures @ 8% of (a) Rs. 4,757.07

- Erection Charges @ 12% of (a) Rs. 7,135.60

Sub - Total = Rs. 24,379.96

c) Overhead + Contractors profit @ 20% of (b) Rs. 16,768.66

Total Cost / MT = Rs. 100,611.95

Therefore,

Cost per MT = Rs. 100,612.00

WORKING RATE - SUPPLY, FABRICATION AND ERECTION OF STRUCTURAL STEEL

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 101

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Drill steel for Jack Hammer

Upto 4m to 6m deep holeThe drilling accessories required for 4 m deep drill hole with one air track are as belowCost of Drill Rod at Siliguri Nos Unit Rate (Rs) % Uses Amount (Rs)

Shank adopter 1.00 8,250.00 100% 8,250.00

Coupling sleeves 1.00 2,375.00 0% 0.00

Extension rod 3.1 mtr 1.00 8,375.00 50% 4,187.50

Extension rod 1.800 mtr. 2.00 4,780.00 50% 4,780.00

17,217.50

Add for transportation on cost to site, handling etc @ 5% 860.88

Sub Total 18,078.38

Economic life (m) 460.00

a) Cost of drill steel per mtr. of drilling 39.30

Add 5% CST, 4% WCT and 2.5% freight & insurance 12% 4.52

Sub Total (a) 43.82

b) Cost of drill bit at Siliguri 8,200.00

Add for transportation on cost to site, handling etc @ 5% 410.00

8,610.00

Bit life (m) 130.00

Cost of bit per mtr. of drill 66.23

Add 4% CST, 4% WCT and 1% freight & insurance 9% 5.96

Sub Total (b) 72.19

c) Sharpening charges of bit LS 2.00

Total (a+b+c) 118.01

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 102

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Drill steel for Drill Jumbo

Upto 6m to 9m deep holeThe drilling accessories required for 6 m deep drill hole with one air track are as belowCost of Drill Rod at Guwahati Nos Unit Rate (Rs) % Uses Amount (Rs)

Shank adopter 1.00 8,250.00 100% 8,250.00

Coupling sleeves 2.00 2,375.00 100% 4,750.00

Extension rod 3.1 mtr 2.00 8,375.00 50% 8,375.00

Extension rod 1.800 mtr. 2.00 4,780.00 50% 4,780.00

26,155.00

Add for transportation on cost to site, handling etc @ 5% 1,307.75

Sub Total 27,462.75

Economic life (m) 460.00

a) Cost of drill steel per mtr. of drilling 59.70

Add 4% CST, 4% WCT and 1% freight & insurance 9% 5.37

Sub Total (a) 65.07

b) Cost of drill bit at Guwahati 8,200.00

Add for transportation on cost to site, handling etc @ 5% 410.00

8,610.00

Bit life (m) 130.00

Cost of bit per mtr. of drill 66.23

Add 5% CST, 4% WCT and 2.5% freight & insurance 12% 7.62

Sub Total (b) 73.85

c) Sharpening charges of bit LS 2.00

Total (a+b+c) 140.92

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 103

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Drill steel for Jack Hammer

Cost of Drill Rod at Guwahati Nos Amount (Rs)

Cost of Drill Steel 8,000.00

Add 5% CST, 4% WCT and 2.5% freight & insurance 11.50% 920.00

Add for transportation on cost to site, handling etc @ 5.00% 400.00

9,320.00

Bit life (m) 130.00

Cost of bit per mtr. of drill 71.69

Sharpening charges of bit LS 2.00

Total 74.00

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 104

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

It is proposed to use excavated material for filling purpose. The average lead is assumed as 15 m.

As such no material charges involved

Labour charges- It is estimated that one beldar will

collect, carry and fill about 2 cum

loose earth per day

Category Shift/day Nos. Rate Amt. (Rs.)

(i) Beldar 1 1 9,788 9,788

Total 9,788

Total Direct Labour Charges per month

Indirect Cost @ 55% for un-skilled labour 5,383 Rs.

- Total Labour Cost per Month = Rs. 15,171

- Total Labour Cost per cum = Rs. 303.43

Total Charges per cum. = Rs. 303.43

Add 20% for Overhead and contractors profit = Rs. 60.69

Rate per cum = Rs. 364.11

Hence Rate of Loose earth fill per cum = Rs. 364.00

WORKING RATE - EARTH FILL ( LOOSE )

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 105

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

- Prime cost of earth fill loose = Rs. 303.43

- Compaction charges per cum @ 15 % of above = Rs. 45.51

Total cost = Rs. 348.94

Add 20% for Overhead and contractors profit = Rs. 69.79

Rate of compacted earth fill = Rs. 418.73

Swell factor = 0.80

Rate of compacted earth fill per cum = Rs. 525

WORKING RATE - EARTH FILL ( COMPACT SOIL )

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 106

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

WORKING RATE - FILTER MATERIAL

A Abstract of cost

Cost per cum upto Processing Plant = Rs 2,280

Water charges = Rs 15

Dozer charges at stockpile = Rs 20

Cost per cum upto Processing Plant = Rs 2,315

B Placement of Filter

Front End Loader (1.5 cum)

Capacity of bucket = Cum 1.5

Oprerating Factor = 0.83

Bucket Fill Factor = 0.7

Job Management Factor = 0.78

Number of Seconds per one cycle of Operation = Nos 40

Production of 1.5 Cum front end loader per Hour = cum 61.18

Use rate of loader per hour = Rs 3,081

Rate per cum = Rs 50.36

C Use rate of Dumper per hour

Dumper 25 T

Average Lead = km 1.4

Unit weight of Filter Material ( Bank ) = T/m³ 1.6

Actual Capacity = Cum 15.625

Cycle Time

i) Loading Time = min 15.32

ii) Spotting Time = min 0.5

iii) Turning & Dumping Time = min 2

iv) Empty Haul @ 20 km/hr = min 4.2

v) Loading Haul @ 15 km/hr = min 5.6

Total Cycle Time = min 27.62

Consider, Actual working time in 1 hour duration = min 50

Number of trips in 50min working hour = Nos 1.81

Output of Dumper perworking hour = Cum 28.28

Use rate of Dumper per hour = Rs 4,120

Rate per Cum = Rs 146

D Dozer (130 HP)

Assuming one Dozer will be enough for Two excavator

Output of Excavator = Output of Dozer per hour = Cum 122.36

Use rate of Dozer per hour = Rs 3,548.53

Rate per Cum = Rs 29.00

E Compaction Charges

Cost per Cum for Compaction = Rs 20

F TOTAL PLACEMENT CHARGES = Rs 2,560.03

G Miscellaneous Charges

Blending Charges @5% of F = Rs 128.00

Watering Charges @2% of F = Rs 51.20

Maintenance of haul roads @2% of F = Rs 51.20

Electricity Charges @2% of F = Rs 51.20

Levelling and trimming charges @3% of F = Rs 76.80

Prime Cost = Rs 2,918.43

Add 20% for Overhead and contractors profit = Rs 583.69

Total Cost per cum 3,502.12

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 107

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

WORKING RATE - 40 MM COARSE AGGREGATE FILLING AND COMPACTION

A Abstract of cost

Cost per cum upto Processing Plant = Rs 2,150

Water charges = Rs 15

Dozer charges at stockpile = Rs 20

Cost per cum upto Processing Plant = Rs 2,185

B Placement of Coarse Aggregate

Rate per cum = Rs 50.00

C Use rate of Dumper per hour

Dumper 25 T

Average Lead = km 1.4

Unit weight of Coarse Aggregate Material ( Bank ) = T/m³ 1.6

Actual Capacity = Cum 15.625

Cycle Time

i) Loading Time = min 15.32

ii) Spotting Time = min 0.5

iii) Turning & Dumping Time = min 2

iv) Empty Haul @ 20 km/hr = min 4.2

v) Loading Haul @ 15 km/hr = min 5.6

Total Cycle Time = min 27.62

Consider, Actual working time in 1 hour duration = min 50

Number of trips in 50min working hour = Nos 1.81

Output of Dumper perworking hour = Cum 28.28

Use rate of Dumper per hour = Rs 4,120

Rate per Cum = Rs 146

D Compaction Charges

Cost per Cum for Compaction = Rs 50

E TOTAL PLACEMENT CHARGES = Rs 2,430.67

F Miscellaneous Charges

Watering Charges @2% of F = Rs 48.61

Maintenance of haul roads @2% of F = Rs 48.61

Electricity Charges @2% of F = Rs 48.61

Prime Cost = Rs 2,576.51

Add 20% for Overhead and contractors profit = Rs 515.30

Total Cost per cum 3,091.81

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 108

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Boulder is assumed to be available free of cost within 15 meters lead

Labour for collection and stackingA Cost of Boulder per truck (3 Cum) 4000

Cost of Boulder per Cum 1333B Labour charges

Category Shift/day Nos. Rate Amt. (Rs.)

(i) Beldar 1 1 9,788 9,788

Total 9,788

Total Direct Labour Charges per month

Indirect Cost @ 55% for un-skilled labour 5,383 Rs.

- Total Labour Cost per Month = Rs. 15,171

(Assuming that 1.25 cum of work is done in a day)

- Total Labour Cost per cum = Rs. 485.48

Add 20% for Overhead and contractors profit = Rs. 97.10

Total cost = Rs. 582.58

Rate of Boulder filling per cum (A+B) = Rs. 1,918.00

WORKING RATE - BOULDER FILLING

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 109

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Cost of Materiali) Cost of PVC Pipe per metre length = Rs. 600

ii) Wastage @ 2.5% of (i)= Rs 15

Total Cost of material = Rs. 615.00

B Rs. 20.00

C Fixing charges at different locations including consumables etc LS Rs. 25

D Prime Cost per metre = Rs. 660.00

E Add 20% for Overhead and Contractor's Profit = Rs. 132.00

Total cost per metre = Rs. 792.00

SUPPLY & INSTALLATION OF 75 MM DIA PVC PIPE

Miscellaneous Charges, i.e. Local transportation, storage, ventilation etc

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 110

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material I) 1.17 cum stone at site @ 1918 Rs/Cum = Rs. 2,244.06 II) Wire net for crate size (1m x 1m x 1m)

wire mesh size 15cm x 15cm, 5 mm thickLength of wire per meter per face = m 18Length of wire per meter for 6 faces = m 108Add 10% extra = m 118.80weight of wire per meter = kg 0.154Total weight per crate = kg 18.31cost of wire per crate, steel @ 50 Rs/kg = Rs. 915.56

Total material charges = Rs. 3,159.62

B Labour charges Number of Crates constructed per day = No. 3Number of working days per month = days 25

work done in a month (Cum) = cum 75Category Nos. Rate Amt.

1 Mason 1/2 24,170 12,085 2 Black smith 1/2 24,170 12,085 3 Beldar 3 9,788 29,364

Sub-Total 53,534

Indirect Cost @ 80% for skilled labour = Rs. 19,336 Indirect Cost @ 55% for un-skilled labour = Rs. 16,150

Therefore,- Total Crew Charges per Month Rs. 89,020

Total Crew Charges per crater. = Rs. 1,186.94

- Prime cost (A+B) = Rs. 4,347

Add for royalty of material Rs. 40.00 Add 20% for Overhead and contractors profit = Rs. 869.31

Rate of Stone wire crates = Rs. 5,255.87

Rate of Stone wire crates per cum = Rs. 5,260

WORKING RATE - STONE CRATERS IN WIRE NETS (Gabions )

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 111

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material A Material

Sr. No. Item Quantity Unit Rate Amount1 Cement (incl. wastage) 0.53 bags 434 = Rs. 230.02 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Bricks 500.00 Nos 8 = Rs. 4,000.00 4 Water LS = Rs. 20.00

Total material cost per cum. = Rs. 5,276.02

B Labour charges for 100 cft workCategory Nos. Rate Amt.

1 Mason 1 24,170 24,170 2 Beldar 2 9,788 19,576 3 Helper 1 9,788 9,788

Sub-Total 53,534

Indirect Cost @ 80% for skilled labour = Rs. 19,336 Indirect Cost @ 55% for un-skilled labour = Rs. 16,150

Therefore,- Total Crew Charges per Month Rs. 89,020

Total Crew Charges per day = Rs. 2,967.34 Total Crew Charges per cum = Rs. 1,048.53

- Prime cost (A+B) 6,325

Add 20% for Overhead and contractors profit = Rs. 1,264.91

Rate of brick masonry per cum = Rs. 7,589

WORKING RATE - BRICK MASONRY (1:4)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 112

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A Material A Material

Sr. No. Item Quantity Unit Rate Amount1 Cement (incl. wastage) 0.53 bags 434 = Rs. 230.02 2 Sand 0.45 cum 2,280 = Rs. 1,026.00 3 Bricks 1.00 cum 750 = Rs. 750.00 4 Water LS = Rs. 20.00

Total material cost per cum. = Rs. 2,026.02

B Labour charges for 100 cft workCategory Nos. Rate Amt.

1 Mason 1 24,170 24,170 2 Beldar 2 9,788 19,576 3 Helper 1 9,788 9,788

Sub-Total 53,534

Indirect Cost @ 80% for skilled labour = Rs. 19,336 Indirect Cost @ 55% for un-skilled labour = Rs. 16,150

Therefore,- Total Crew Charges per Month Rs. 89,020

Total Crew Charges per day = Rs. 2,967.34 Total Crew Charges per cum = Rs. 1,048.53

- Prime cost (A+B) 3,075

Add 20% for Overhead and contractors profit = Rs. 614.91

Rate of Stone masonry per cum = Rs. 3,689

WORKING RATE - STONE MASONRY (1:4)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 113

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

Cost in Rs.

Cost of waterstop per m 478.50

Transportation Charges LS 20.00

Cost of Installation @ 5% of material cost 23.93

Sundries L.S. 10.00

Total 532.43

Add 20% for contractors overheads and profits 106.49

Total 638.91

639.00

WORKING RATE - PVC WATERSTOPS

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 114

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

a) = Rs. 110,000.00

b) Carriage from Factory to Store

- Distance = km 851.00

* = Rs./km 89.00

* = Rs. 7,573.90

Sub - Total = Rs. 117,573.90

c) Storage Charges @ 1.5% = 1,763.61

d) Carriage from Store to work site

- Distance = km 4.00

* = Rs./km 89.00

* = Rs. 35.60

Sub - Total = Rs. 119,373.11

i) Supervision Charges @ 0.5% = 596.87

Sub - Total = Rs. 119,969.97

Total Cost / MT = Rs. 119,969.97

Therefore,

Cost per MT = Rs. 119,970

Cost of Penstock steel liner per MT at Supply Store at Guwahati (Incl. 4 %Sale Tax etc.)

COST OF OF PENSTOCK LINER INCLUDING TRANSPORTATION CHARGE AT SITE

Carriage per Tonne (including loading, unloading, stacking)

Carriage per Tonne (loading, unloading, stacking)

Carriage per 10 Tonne (including loading, unloading, stacking)

Carriage per 10 Tonne (loading, unloading, stacking)

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 115

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

A = Rs. 119,970

Wastage for cutting and incidentals 2.50% of cost =

of Penstock steel Rs. 2,999.25

Cost of Penstock steel = Rs. 122,969.25

B Fabrication charges

Fabrication charges as ferrules, penstocks, marking

cutting, bending, welding and handling etc.

Strengthening LS Rs 500.00

Marking LS Rs 400.00

Cutting LS Rs 600.00

Rolling LS Rs 1,000.00

Welding LS Rs 5,000.00

Radiographic Testing LS Rs 1500.00

Workshop Operation LS Rs 1300.00

Temporary Fixtures LS Rs 1300.00

Charges for fabrication LS Rs 11600.00

Rs 23,200.00

C Erection charges

Transportation of material out of workshop, operation, handling

final matching and welding at work site @ LS of

cost of structural steel = Rs. 10,000.00

Prime Cost LS Rs. 156,169.25

Add 20% overheads and contractor's profit = Rs. 31,233.85

Total rate = Rs. 187,403.10

Rs 187,403.10

Cost of structural steel (For ASTM A 537- CL II) at project site

WORKING RATE - SUPPLY, FABRICATION AND ERECTION OF PENSTOCK LINER

Rate of Supply, Erection & Fabrication of Penstock Liner per MT

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 116

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(A) Materiali Cost of Structural Steel = Rs. 55,000.00ii Add 2.5% for wastage = Rs. 1,375.00

= Rs. 56,375.00Other parts @ 105% of cost of steel = Rs. 59,193.75Special steel 70%Rubber seal 5%Miscellaneous purchase 5%Bearing 15%Forged and cost of other steel items 10%

Sub Total 105%

(B) Fabrication @ 80% = Rs. 45,100.00i Straightening 5%ii Marking 5%iii Cutting 5%iv Drilling and machining etc 10%v Welding 20%vi Handling of material during fabrication 10%vii Temporary jigs & fixtures 10%viii Painting, sand blasting etc 15%

Sub Total 80%(C) Transportation

@ 0% of cost of steel = Rs. 0.00

(D) Erection, Testing & Commissioning@ 0% of cost of steel = Rs. 0.00

(A) Material = Rs. 115,568.75(B) Fabrication = Rs. 45,100.00(C) Transportation = Rs. 0.00(D) Erection = Rs. 0.00

Prime cost = Rs. 160,668.75Add overhead charges and contractor's profit @

20% of Prime cost = Rs. 32,134.00Grand total = Rs. 192,802.75

= Rs. 192.80

ANALYSIS OF RATES FOR Vertical Lift/Slide/Fixed Wheel Gates (per M.T.)

Cost of Steel

Insurance, Transportation from fabrication shop to

Erection, Testing & Commissioning charges

Abstract of Charges

Hence rate of Vertical Lift/slide/fixed wheel Gates per kg

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 117

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(A) Material

i Cost of Structural Steel = Rs. 55,000.00ii Add 2.5% for wastage = Rs. 1,375.00

= Rs. 56,375.00Transportation of material at site1.5 cu.m. acetylene @ Rs. 258.00 per cu. Meter = Rs. 387.007.5 cu.m. oxygen @ Rs. 48.00 per cu. Meter = Rs. 360.00200 Nos. of electrodes @ Rs. 12.00 each = Rs. 2,400.0012.0 cu.m Gun metal 635 = Rs. 7,620.002.5 cum Rubber Seal = Rs. 0.00Miscellaneous items like oil paint 5% = Rs. 2818.75

= Rs. 69,960.75(B) Fabrication @ 160% of cost of steel plates = Rs. 90,200.00

i Straightening 15%ii Marking 15%iii Cutting 15%iv Machining 15%v Welding & forging 60%vi 5%vii 25%viii 10%

Sub Total 160%(C) Transportation

@ 0% of cost of steel = Rs. 0.00

(D) Erection, Testing & Commissioning@ 0% of cost of steel = Rs. 0.00

(A) Material = Rs. 69,960.75(B) Fabrication = Rs. 90,200.00(C) Transportation = Rs. 0.00(D) Erection = Rs. 0.00

Prime cost = Rs. 160,160.75Add overhead charges and contractor's profit @

20% of Prime cost = Rs. 32,032.00Grand total = Rs. 192,192.75

= Rs. 192.19

ANALYSIS OF RATES FOR Stop Log Gates (per M.T.)

Cost of Steel

Cost of SteelCost of Material

Handling of material Temporary fixturesPainting & sand

Insurance, Transportation from fabrication shop to Erection, Testing &

Abstract of Charges

Hence rate of Stop Log Gates per kg

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 118

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(A) Materiali Cost of 1 MT of B/Q steel plates (IS:2002 Gr. 3) = Rs. 55,000.00ii Add 2.5% for wastage = Rs. 1,375.00

Cost of Steel = Rs. 56,375.003.8 cu.m. acetylene @ Rs. 258.00 per cu. Meter = Rs. 980.4016 cu.m. oxygen @ Rs. 48.00 per cu.meter = Rs. 768.00330 Nos. of electrodes @ Rs. 12.00 each = Rs. 3,960.00Miscellaneous items like oil paint 10% = Rs. 5637.5

= Rs. 67,720.90(B) Fabrication @ 160% of cost of steel plates = Rs. 90,200.00

i Straightening 15%ii Marking 15%iii Cutting 15%iv Drilling and machining etc 80%v Welding 25%vi 10%

Sub Total 160%(C) Transportation

@ 0% of cost of steel = Rs. 0.00

(D) Erection, Testing & Commissioning@ 0% of cost of steel = Rs. 0.00

(A) Material = Rs. 67,720.90(B) Fabrication = Rs. 90,200.00(C) Transportation = Rs. 0.00(D) Erection = Rs. 0.00

Prime cost = Rs. 157,920.90Add overhead charges and contractor's profit @

20% of Prime cost = Rs. 31,584.00Grand total = Rs. 189,504.90

= Rs. 189.50

Abstract of Charges

Hence rate of Trash Rack per kg.

ANALYSIS OF RATES FOR Trash Rack (per M.T.)

of Cost of SteelCost of Material

Handling of material during

Insurance, Transportation from

Erection, Testing &

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 119

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(A) Materiali Cost of structural steel = Rs. 55,000.00ii Add 2.5% for wastage = Rs. 1,375.00

= Rs. 56,375.001.5 cu.m. acetylene @ Rs. 258.00 0 = Rs. 0.007.5 cu.m. oxygen @ Rs. 48.00 0 = Rs. 0.00200 Nos. of electrodes @ Rs. 12.000 = Rs. 0.0012.0 cu.m Gun metal 0 635 = Rs. 7,620.00Miscellaneous items like oil paint 10% = Rs. 5637.5

= Rs. 69,632.50(B) Fabrication @ 155% of cost of steel plates = Rs. 87,381.25

i Straightening 15%ii Marking 15%iii Cutting 15%iv Machining 50%v Welding & forging 30%vi 10%vii 5%viii 15%

Sub Total 155%(C) Transportation

@ 0% of cost of steel = Rs. 0.00

(D) Erection, Testing & Commissioning@ 0% of cost of steel = Rs. 0.00

(A) Material = Rs. 69,632.50(B) Fabrication = Rs. 87,381.25(C) Transportation = Rs. 0.00(D) Erection = Rs. 0.00

Prime cost = Rs. 157,013.75Add overhead charges and contractor's profit @

20% of Prime cost = Rs. 31,403.00Grand total = Rs. 188,416.75

= Rs. 188.42

ANALYSIS OF RATES FOR Lifitng Beam (per M.T.)

Cost of Steel

Cost of SteelCost of Material

Handling of material during Temporary fixturesPainting & sand blasting

Insurance, Transportation

Erection, Testing &

Abstract of Charges

Hence rate of Lifting beam per kg

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 120

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(A) Materiali Cost of structural steel = Rs. 55,000.00ii Add 2.5% for wastage = Rs. 1,375.00

= Rs. 56,375.001.5 cu.m. acetylene @ Rs. 258.00 per cu. Meter 0 = Rs. 387.007.5 cu.m. oxygen @ Rs. 48.00 per cu meter 0 = Rs. 360.00200 Nos. of electrodes @ Rs. 12.00 each 0 = Rs. 2,400.0012.0 cu.m Gun metal 0 635 = Rs. 7,620.00Miscellaneous items like oil paint 10% = Rs. 5637.5

= Rs. 72,779.50(B) Fabrication @ 140% of cost of steel plates = Rs. 78,925.00

i Straightening 15%ii Marking 15%iii Cutting 15%iv Machining 15%v Welding & forging 50%vi 10%vii 10%viii 10% = Rs.

Sub Total140%

(C) Transportation@ 0% of cost of steel = Rs. 0.00

(D) Erection, Testing & Commissioning@ 0% of cost of steel = Rs. 0.00

(A) Material = Rs. 72,779.50(B) Fabrication = Rs. 78,925.00(C) Transportation = Rs. 0.00(D) Erection = Rs. 0.00

Prime cost = Rs. 151,704.50Add overhead charges and contractor's profit @

20% of Prime cost = Rs. 30,341.00Grand total = Rs. 182,045.50

= Rs. 182.05

ANALYSIS OF RATES FOR Embedment (per M.T.)

Cost of Steel

Cost of SteelCost of Material

Handling of material during fabrication(labour) Temporary fixturesPainting & sand blasting

Insurance, Transportation from fabrication shop to erection site & storage at site

Erection, Testing & Commissioning charges Abstract of Charges

Hence rate of Embedment per kg

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 121

Lower Tizu HEP (3 X 14 MW)DOP, Government of Nagaland

Detailed Project Report Estimate of Cost

(A) Materiali Cost of 1 MT of Sructural steel plates (IS:2062) = Rs. 55,000.00ii Add 2.5% for wastage = Rs. 1,375.00

Cost of Steel = Rs. 56,375.003.8 cu.m. acetylene @ Rs. 258.00 0 = Rs. 980.4016 cu.m. oxygen @ Rs. 48.00 0 = Rs. 768.00330 Nos. of electrodes @ Rs. 12.00 0 = Rs. 3,960.00Miscellaneous items like oil paint 10% = Rs. 5637.5

= Rs. 67,720.90(B) Fabrication @ 130% of cost of steel plates = Rs. 73,287.50

i Straightening 15%ii Marking 15%iii Cutting 15%iv Drilling and machining etc 50%v Welding 25%vi 10%

Sub Total 130%

(C) Transportation@ 0% of cost of steel = Rs. 0.00

(D) Erection, Testing & Commissioning@ 0% of cost of steel = Rs. 0.00

(A) Material = Rs. 67,720.90(B) Fabrication = Rs. 73,287.50(C) Transportation = Rs. 0.00(D) Erection = Rs. 0.00

Prime cost = Rs. 141,008.40Add overhead charges and contractor's profit @

20% of Prime cost = Rs. 28,202.00Grand total = Rs. 169,210.40

= Rs. 169.21

Abstract of Charges

Hence rate of Structural Steel Bridge per kg.

ANALYSIS OF RATES FOR STRUCTURAL STEEL BRIDGE for hoists (per M.T.)

Cost of SteelCost of Material

Handling of material during fabrication(labour)

Insurance, Transportation from fabrication shop to erection site & storage at site

Erection, Testing & Commissioning charges

May Encons Private Limited (Formerly Thottapalli Power Private Limited)

Page 122