![Page 1: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/1.jpg)
Low-Pressure Membrane Contactors for Carbon Dioxide Capture
DE-FE0007553
−Richard Baker, Ken Chan, Brice Freeman, Don Fulton,
Pingjiao Hao, Jay Kniep, Vincent Nguyen (MTR)
−Glenn Lipscomb, Terry Lou (University of Toledo)
NETL CO2 Capture Technology Meeting Wednesday, July 10, 2013
![Page 2: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/2.jpg)
Membrane Technology and Research
MTR designs, manufactures, and sells membrane systems for industrial gas separations
2
-70 Employees -2012 Sales: $25 million
![Page 3: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/3.jpg)
Project Overview
• Award name: Low-pressure Membrane Contactors for CO2 Capture • Project period: 10/1/11 to 9/30/14 • Funding: $ 3.0 million DOE; $1.0 million MTR • DOE program manager: Mike Mosser • Participants: MTR, University of Toledo • Project scope: Develop compact large membrane area (> 500 m2), low
pressure drop plate-frame sweep module for CO2 capture application • Project plan: The key project work organized by budget period is as follows:
– BP1 : Construct prototype laboratory modules (20m2), select components, develop fabrication technology.
– BP2: Scale up production to 1m x 1m pilot scale modules (100m2), demonstrate with lab test system that modules meet CO2 separation performance and pressure drop targets.
– BP3: Scale up to full scale module (> 500 m2), show modules meet all performance targets. Be ready to test at NCCC.
3
![Page 4: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/4.jpg)
4
A separation is performed at a minimal energy cost
The MTR Membrane Contactor
A Way of Generating an Affordable (Partial) Pressure Difference
![Page 5: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/5.jpg)
A Coal Power Plant
5
![Page 6: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/6.jpg)
A Membrane CO2 Pre-Concentrator
6
![Page 7: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/7.jpg)
MTR’s Membrane Solution
7
500 MWe plant requires one million m2 of membrane
![Page 8: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/8.jpg)
The Issues and Solutions
8
Membrane module area and cost are not an issue – Skid packing density – Manifolding – Footprint – A sweep process – Needs low pressure drop
Large area modules, compact skids
Needs wide, straight channels on both sides of the membrane
![Page 9: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/9.jpg)
Membrane Module Designs in Current Use
9
Capillary Fibers Hollow Fine Fibers
Spiral-Wound Modules Plate-and-Frame Modules
![Page 10: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/10.jpg)
100
1,000
10,000
10 100 1,000 10,000
Membrane Area
Packing Density (m2/m3)
Average Channel Dimension (micron)
Hollow Fiber
Spiral Wound
Packing Density for Different Membrane Module Configurations
Plate and Frame
CO2 Capture Application Range
![Page 11: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/11.jpg)
Two Membrane Contactor Designs
11
Countercurrent
Cross-flow
– Most efficient – Difficult to make
– Uses 40% more membrane area – Easier to make
![Page 12: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/12.jpg)
Progress to Date
12
• Year 1 – Footprint:
1ft x 2 ft – Modules:
20 m2
• Year 2 – Footprint:
1m x 1m – Modules:
100 m2
![Page 13: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/13.jpg)
Our Concept
13
A single 100 m2
module element
50 Module elements connected to make a 5000 m2 module
![Page 14: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/14.jpg)
14
Feed Direction Sweep Direction
Membrane Contactor with Vessel
Test System
Membrane Module and Test System
![Page 15: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/15.jpg)
Module Pressure Drop within Target Range
15
0
0.5
1
1.5
2
2.5
3
3.5
4
0 20 40 60 80 100
Pressure drop (psi)
Gas flow rate (scfm)
Sweep side
Feed side
Year 2Pressure drop target
Current Polaris membrane flow range
![Page 16: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/16.jpg)
Partial Countercurrent Design
16
Symmetrical sweep spacer
Needs 30% more membrane compared to countercurrent
Stagnant
Stagnant
![Page 17: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/17.jpg)
Partial Countercurrent Design
17
Needs 18% more membrane compared to countercurrent
Asymmetrical sweep spacer
Stagnant
![Page 18: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/18.jpg)
Our Plans
18
– Refine module fabrication techniques
– Improve module flow design
– Develop multi-element modules (3~5 elements)
– Test modules at NCCC (2014)
![Page 19: Low-Pressure Membrane Contactors for Carbon …...Membrane Module and Test System Module Pressure Drop within Target Range 15 0 0.5 1 1.5 2 2.5 3 3.5 4 0 20 40 60 80 100 Pressure drop](https://reader036.vdocuments.site/reader036/viewer/2022081614/5fcdaeb7af91d36d272143f1/html5/thumbnails/19.jpg)
Combination Process May Be the Way to Go
19
– Double the CO2 concentration
– 50% removal required
Series Hybrid Case
Parallel Hybrid Case
– Double the CO2 concentration – Half the flow – 95% removal required