MRP Example TwoA master schedule calls for 250 units of A in week 6, 140 in week 8 & 200 in week 9. On-hand levels are A = 5, B = 5, C = 0, D = 0 & E = 5. Another 5 units of D are scheduled to be received in week 1 and 5 units of E in week 2. Order quantities are lot-for-lot for A and C, multiples of 10 for B & E & a minimum of 150 for D.
A
C(1)
D(2)
B(1)
D(1) E(1)E(2)
C(1)
D(1) E(1)
Low Level Coded Product Structure Tree
Part/Sub-component BeginningAvailable
ScheduledReceipts
Lead Time SafetyStock
Lot Size
A 5 0 1 week 0 L4LB 5 0 1 week 5 10'sC 0 0 2 weeks 0 L4LD 0 5 in week 1 1 week 0 150 min.E 5 5 in week 2 1 week 0 10's
![Page 2: Low Level Coded Product Structure Tree](https://reader036.vdocuments.site/reader036/viewer/2022081900/5a4d1ace7f8b9ab059970a75/html5/thumbnails/2.jpg)
LT = 1 Q = L4L 1 2 3 4 5 6 7 8 9 10 Gross Req. 250 140 200 Scheduled Rec. On-Hand 5 5 5 5 5 5 5 0 0 0 0
Net Requirements 245 140 200 Planned Ord. Rec. 245 140 200 Planned Ord. Rel. 245 140 200
Product A Solution
![Page 3: Low Level Coded Product Structure Tree](https://reader036.vdocuments.site/reader036/viewer/2022081900/5a4d1ace7f8b9ab059970a75/html5/thumbnails/3.jpg)
LT = 1 Q = multiples 10 1 2 3 4 5 6 7 8 9 10
Gross Req. 245 140 200
Scheduled Rec.
On-Hand 5 – 5 = 0
0 0 0 0 0 5 5 5 5 5
Net Requirements 245 135 195
Planned Ord. Rec. 250 140 200
Planned Ord. Rel. 250 140 200
Component B Solution
![Page 4: Low Level Coded Product Structure Tree](https://reader036.vdocuments.site/reader036/viewer/2022081900/5a4d1ace7f8b9ab059970a75/html5/thumbnails/4.jpg)
LT = 2 Q = L4L 1 2 3 4 5 6 7 8 9 10
Gross Req. 250
245 140 340 200
Scheduled Rec.
On-Hand 0 0 0 0 0 0 0 0 0 0 0
Net Requirements 250 245 140 340 200
Planned Ord. Rec. 250 245 140 340 200
Planned Ord. Rel. 250 245 140 340 200
Component C Solution
![Page 5: Low Level Coded Product Structure Tree](https://reader036.vdocuments.site/reader036/viewer/2022081900/5a4d1ace7f8b9ab059970a75/html5/thumbnails/5.jpg)
LT = 1 Q = min of 150
1 2 3 4 5 6 7 8 9 10
Gross Req. 250 245 140 830 200 280 400
Scheduled Rec. 5
On-Hand 0 0 5 0 0 10 0 0 0 0 0
Net Requirements 245 245 140 820 200 280 400
Planned Ord. Rec. 245 245 150 820 200 280 400
Planned Ord. Rel. 245 245 150 820 200 280 400
Component D Solution
![Page 6: Low Level Coded Product Structure Tree](https://reader036.vdocuments.site/reader036/viewer/2022081900/5a4d1ace7f8b9ab059970a75/html5/thumbnails/6.jpg)
LT = 1 Q = batches of 10
1 2 3 4 5 6 7 8 9 10
Gross Req. 250 245 640 340 480 400
Scheduled Rec. 5
On-Hand 5 5 5 0 5 5 5 5 5 5 5
Net Requirements 240 245 635 335 475 395
Planned Ord. Rec. 240 250 640 340 480 400
Planned Ord. Rel. 240 250 640 340 480 400