Page 1: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

Low Impact Development Training

Module 1: Background

Part 3: D.C. Stormwater Regulations

Page 2: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

2

Sponsors

District Department of Transportation

U.S. Department of Transportation Federal Highway Administration

The Low Impact Development Center, Inc.

University of the District of Columbia

Funding for this project was provided through a grant from the Federal Highway Administration, U.S. Department of Transportation

Page 3: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

3

Contributors

The Low Impact Development Center, Inc.

John Shorb Landscaping, Inc.Logo

Groundwork Anacostia River, D.C.

Page 4: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

4

Copyright

Unless otherwise noted, Low Impact Development Training, funded by DDOT & DDOE, is licensed under a Creative Commons Attribution-NonCommerical-ShareAlike 3.0 Unported License.

Content provided by cited entities remains the property of those entities and may not be used without their explicit permission.

Page 5: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

5

Overview

• Development projects in the District are required to take steps to limit the amount of stormwater runoff discharged to city storm sewers and receiving waters.

• This module will provide an overview of DDOE stormwater regulations

Page 6: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

6

Expected Outcomes

• Know what stormwater requirements are triggered by construction

• Be able to navigate the process of preparing and submitting a stormwater management plan for a construction project

Page 7: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

7

Outline

• Design requirements• Permitting process• Construction and maintenance inspections• Fines and corrective actions

Page 8: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

8

Supplemental Information

• Note that slides with orange backgrounds contain supplemental details that are provided for informational purposes, but which are not required content for this course

Page 9: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

9

Principal Players

• Owner• DDOE – District Department of the

Environment– Responsible for stormwater regulation– Set rules, issue permits, conduct inspections

• DDOT – District Department of Transportation– Own many bioretention installations in the

right-of-way

Page 10: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

10

Green Area Ratio

• Proposed change to District zoning codes• Sets standards for landscape design • Required Green Area Ratio (GAR) score

varies by zone• Encourages green space and promotes

infiltration

Page 11: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

11

D.C. Stormwater Regulations

• Stormwater is regulated by the District Department of the Environment (DDOE)

• A revised Stormwater Guidebook was adopted in July 2013

• Increased focus on retention for stormwater quality and quantity control

Neil Weinstein
how about ddots commitment
Page 12: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

12

DDOE Stormwater Requirements

• Retention requirements• Detention requirements• Extreme flood requirements• Water quality requirements

Page 13: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

13

What activities trigger these requirements?

• Major Land Disturbing Activities:– Soil disturbance is greater than 5,000 square

feet

• Major Substantial Improvement Projects:– Combined footprint of building improvements and

land disturbance is greater than 5,000 square feet

• All land disturbing activities requiring a building permit also require an erosion and sediment control plan, regardless of size

Page 14: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

14

Retention requirements

• Require that a certain volume of stormwater runoff be captured and not discharged

• Retention requirements target small, every day rainstorms, which are responsible for most stormwater pollution

• Required retention volume is calculated using a Compliance Spreadsheet

Page 15: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

15

Retention requirements

Photo Courtesy of Emily Ayers

Page 16: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

16

Retention requirements

• For Major Land Disturbing Activities:• Retain a volume equal to post-development

rainfall from 90th percentile event (1.2 inches)

• For Major Substantial Improvement Activities:• Retain a volume equal to post-development

rainfall from 80th percentile event (0.8 inches)

Page 17: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

17

Retention requirements

• Retention requirements apply to each drainage area on site

• Excess retention in one area may be credited toward other areas up to the 1.7 inch storm

Graphic Courtesy of the Low Impact Development Center, Inc.

Page 18: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

18

Off-site retention

• Off-site retention may be used for up to 50% of retention requirement

Page 19: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

19

Projects in the Right-of-Way

• Must meet retention requirements only to the Maximum Extent Practicable

• Details in Guidebook Appendix B

Photo Courtesy of DDOT

Page 20: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

20

Stormwater Retention Credits

• If a project achieves retention in excess of what is required, the excess can be awarded Stormwater Retention Credits (SRCs)

• SRCs can then be sold for use as offsite retention for other projects

Page 21: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

21

Detention Requirements

• Apply to larger, infrequent storm events• Require that a certain quantity of

stormwater runoff be held back temporarily, so that stormwater flow rates do not reach damaging levels

Page 22: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

22

Flood control requirements

• Apply to very large, very infrequent storms (once in 100 years)

• Triggered when proposed development is likely to increase flooding

• This can happen when development involves filling in a floodplain, or dramatically increasing imperviousness of a watershed

Page 23: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

23

Water quality requirements

• Treated effluent concentration of oil and grease must be less than 10 mg/L

• 60% of Total Suspended Solids (TSS) must be removed

Page 24: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

24

Accepted BMPs

• Green roofs• Rainwater harvesting• Impervious surface disconnection• Permeable pavement systems• Bioretention• Filtering systems• Infiltration• Open channel systems• Ponds• Wetlands• Storage practices• Proprietary practices• Tree planting and preservation

Page 25: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

25

Green roofs

Two types:

• Extensive (3-6” media)

• Intensive (6”-4’ media)

R Retention

Detention

R Water Quality

ASLA Headquarters Green Roof, Washington DCPhoto Courtesy of the Low Impact Development Center, Inc.

Page 26: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

26

Rainwater harvesting

• Rain barrels or cisterns

• Captured rainfall can be used for irrigation and non-potable applications

• Consult District Construction Codes (DCMR, Title 12) for allowable indoor uses

R Retention

Detention

R Water Quality

Photo Courtesy of Robb Lukes

Page 27: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

27

Impervious surface disconnection

• Disconnect downspouts or impervious surfaces to drain toward pervious areas

R Retention

Detention

R Water Quality

Infiltration Planter, Navy Yard, Washington DCPhoto Courtesy of the Low Impact Development Center, Inc.

Page 28: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

28

Permeable pavement systems

• Porous asphalt• Pervious concrete• Permeable interlocking

concrete pavers / concrete grid pavers

• Plastic grid pavers

R Retention

Detention

R Water Quality

Navy Yard, Washington DCPhoto Courtesy of the Low Impact Development Center, Inc.

Page 29: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

29

Bioretention

Several different variations:• Traditional

bioretention• Streetscape

bioretention• Engineered tree pits• Stormwater planters• Residential rain

gardens

R Retention

Detention

R Water Quality

Edmonston, MDPhoto Courtesy of the Low Impact Development Center, Inc.

Page 30: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

30

Filtering systems

• Use sand or other media to filter stormwater

Retention

Detention

R Water Quality

Photo Courtesy of DDOE

Page 31: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

31

Infiltration

• Infiltration trench• Infiltration basin• Must be located in

areas with high infiltration rates

• Must be set back from foundations and pavement

R Retention

Detention

R Water Quality

Photo Courtesy of the Low Impact Development Center, Inc.

Page 32: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

32

Open channel systems

• Grass channels• Dry swales• Wet swales• Used to convey runoff

from drainage area to other BMPs

• Provide limited water quality and retention benefits

R (Dry swales) Retention

Detention

R Water Quality

Photo Courtesy of the Low Impact Development Center, Inc.

Page 33: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

33

Ponds

• Used to provide detention for large events

• Included if necessary at end of treatment train

Retention

R Detention

R Water Quality

Photo Courtesy of the Low Impact Development Center, Inc.

Page 34: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

34

Wetlands

• Used to provide detention for large events

• Included if necessary at end of treatment train

• Drainage area must be large enough to sustain a permanent water level

Retention

R Detention

R Water Quality

Photo Courtesy of Emily Ayers

Page 35: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

35

Storage practices

• Underground vault• Dry pond• Rooftop storage• Stone storage under

permeable pavement or other BMPs

• Used for detention of stormwater from large events

Retention

R Detention

Water Quality

Photo Courtesy of the Low Impact Development Center, Inc.

Page 36: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

36

Proprietary practices

• Must be approved by DDOE

• Provide water quality treatment

Retention

Detention

R Water Quality

Photo Courtesy of Larry Coffman.

Page 37: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

37

Tree planting and preservation

• Preserve existing trees

• Plant and maintain new trees

• Reduce runoff volume• Improve infiltration• Use tree canopy to

intercept rainfall over paved areas

R Retention

Detention

R Water Quality

Photo Courtesy of the Low Impact Development Center, Inc.

Page 38: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

38

BMP Selection

• BMPs are selected based on a 5-step screening process:1. Stormwater management suitability

2. Land use factors

3. Physical feasibility factors

4. Community and environmental factors

5. Location and permitting considerations

Page 39: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

39

1. Stormwater management suitability

• Select BMPs or combinations of BMPs that will meet retention, detention, and water quality requirements

Page 40: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

40

2. Land use factors

• Select BMPs most suitable for the land use:– Residential– Commercial

development– Roads and highways– Hotspot land uses

Page 41: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

41

3. Physical feasibility factors

• Select BMPs that are feasible given the physical conditions onsite:– Underlying soils– Water table depth– Contributing drainage

area– Practice surface slope– Head

Page 42: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

42

4. Community and environmental factors

• Consider community and environmental factors:– Maintenance burden– Cost– Safety risk– Space required– Environmental factors– Habitat value

Page 43: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

43

5. Location and permitting considerations

• Prohibitions• Regulated areas• Setbacks

Page 44: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

44

Permitting Process

Page 45: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

45

Permitting Process (cont’d)

Page 46: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

46

1. Submit application package

• Submitted to DCRA Permit Service Center• Includes:

– Stormwater Management Plan (SWMP)• Requests for:

– Public Right-of-Way MEP– Exemption for extraordinarily difficult site conditions– Use of proprietary practice

– Soil Erosion and Sediment Control Plan (SESCP)

Page 47: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

47

SWMP

• A Stormwater Management Plan (SWMP) contains: – supporting computations– drawings– sufficient information to evaluate the environmental

characteristics of the affected areas– the potential impacts of the proposed development on water

resources – the effectiveness and acceptability of Stormwater Best

Management Practices (BMPs) for managing stormwater runoff

– maintenance and construction schedules– number of gallons the applicant shall retain off-site (where

applicable)

Page 48: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

48

Site Plan

Graphic Courtesy of the Low Impact Development Center, Inc.

Page 49: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

49

Stormwater Hotspots

• H-1 Vehicle Maintenance and Repair• H-2 Vehicle Fueling• H-3 Vehicle Washing• H-4 Vehicle Storage• H-5 Loading and Unloading• H-6 Outdoor or Bulk Material Storage• If any of the above operations are expected to occur on a

planned development site, the• Stormwater Hotspot Cover Sheet should be completed.

Further, a stormwater pollution• prevention plan (SWPPP) or the Stormwater Hotspot

Checklist

Page 50: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

50

Required supporting documents

(1) Site Development Submittal Information Form

(2) DC Water Storm Sewer Verification Form

(3) DCRA Application for Construction Permit on Private Property

(4) Environmental Intake Screening Form (EISF)

(5) Environmental Questionnaire

(6) DC Green Building Act Permit Application Intact Form

(7) Contract Agreement

(8) Lead Permit Screening Form

(9) Zoning Data Summary Form

(10) Reasonable Accommodations and Modifications for Persons with Disabilities Form

 

Forms 1 and 2 are found in Section 5.7 of the Guidebook. Forms 3 through 10 are available at the DCRA intake counter or can be downloaded at: http://dcra.dc.gov/DC/DCRA/Permits/Building+Permit+Application+Supplemental+Documents

Page 51: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

51

Current fees (as of 2013)SWMP Review Land disturbance

≥5,000sf & ≤10,000sf

Land disturbance ≥10,000sf

Initial plan review due upon filing $3,300.00 $6,100.00

Final plan review due before issuance of building permit

$1,500.00 $2,400.00

Supplemental review fee due before issuance of building permit

$1,000.00 $2,000.00

Page 52: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

52

Current fees (as of 2013)Additional fees Land disturbance

≤10,000sfLand disturbance ≥10,000sf

Field visit for soil percolation test $300 for ≤ 10 borings; $600 for > 10

Review of soil percolation test report $150.00

Soil characteristics inquiry $150.00

Review of geotechnical report $70.00/hour

After-hours inspection fee $50.00/hour

Stormwater pollution plan review $1,100.00

Dewatering pollution reduction plan review $1,100.00 $2,100.00

Application for relief from extraordinarily difficult site conditions

$500.00 $1,000.00

Page 53: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

53

Current fees (as of 2013)SWMP Review to create retention capacity for Department certification of stormwater retention credits

Land disturbance ≤10,000sf

Land disturbance ≥10,000sf

Initial plan review due upon filing $575.00 $850.00

Final plan review due before issuance of building permit

$125.00 $200.00

Supplemental review fee due before issuance of building permit

$500.00

Review of Green Area Ratio plan Land disturbance ≤10,000sf

Land disturbance ≥10,000sf

Initial plan review due upon filing $575.00 $850.00

Final plan review due before issuance of building permit

$125.00 $200.00

Supplemental review fee (for reviews after first re-submission)

$500.00

Page 54: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

54

EPA filings

• Filing a Notice of Intent Form with US EPA is required if the project will disturb 1 or more acres of land, or part of a common plan of development or sale that will ultimately disturb 1 or more acres of land must file.

• Consult US EPA’s web site for details, http://cfpub.epa.gov/npdes/stormwater/application_coverage.cfm

Page 55: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

55

Inspection Requirements

• Prior to SWMP approval, applicant must submit a proposed construction and inspection control schedule

• Stages:– Pre-construction meeting with DDOE– Inspections during construction– Final inspection after construction– Maintenance inspections

Page 56: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

56

Pre-construction meeting

• Required before beginning land disturbance or installing any BMPs

• Contact DDOE 3 days prior to starting construction

• Submit material certifications for aggregate, soil media, and geotextiles

• Site visit to confirm drainage area, inlet elevations

Page 57: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

57

Construction inspections

• Contact DDOE 3 days before starting construction of BMPs

• Certifying PE must accompany inspectors at on-site inspections

• The following detail construction inspection schedule for bioretention

• See the Guidebook for inspection schedules for other BMPs

Page 58: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

58

Bioretention Construction Inspection Checklist

Page 59: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

59

Construction inspections

• During percolation/infiltration tests

Page 60: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

60

Construction Inspections

• Upon completion of stripping, stockpiling, and construction of temporary sediment control and drainage facilities

Photo Courtesy of DDOT.

Page 61: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

61

Construction inspections

• Upon completion of excavation to subgrade

Photo Courtesy of Rasma Plato

Page 62: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

62

Construction inspections

• During the placement of: – perforated PVC/HDPE standpipes (for

observation wells) including bypass pipes (where applicable)

– geotextile materials– gravel, or crushed stone course– backfill

Page 63: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

63

Construction inspection

• Upon completion of final grading and establishment of permanent stabilization

Photo Courtesy of DDOT

Page 64: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

64

Final Inspection

• A final inspection must be conducted by the DDOE upon completion of the BMP to determine if the completed work is constructed in accordance with approved plans

• Contact DDOE to schedule a final inspection 1 week prior to the completion of a BMP construction to schedule inspection

• PE is required to certify “As-Built" plans that the BMP has been constructed in accordance with the approved plans and specifications

Page 65: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

65

Maintenance inspections

• Performed by DDOE• Twice per year for the first five years• Once every three years thereafter• Maintenance inspection forms are

provided in the Guidebook

Page 66: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

66

Review

• Construction activities disturbing more than 5,000 square feet of built or landscaped space require submission of a Stormwater Management Plan (SWMP) when applying for a building permit

• New rules require retention of runoff from small storms

• SWMPs must include construction and maintenance schedules

• Certification requires multiple inspections during construction and ongoing maintenance inspections

Page 67: Low Impact Development Training Module 1: Background Part 3: D.C. Stormwater Regulations

67

Resources

• 2013 District of Columbia Stormwater Management Guidebook (http://ddoe.dc.gov/swregs)

• District of Columbia Soil Erosion and Sediment Control Handbook (http://ddoe.dc.gov/soil-erosion-and-sediment-control-handbook)