Low Flow Trials –
learnings involving
innovative designs
Paul Wainwright
![Page 2: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/2.jpg)
![Page 3: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/3.jpg)
• Eleven trial sites established in
2015-16
• Marne, EMLR and WMLR
catchments
• Install and test a range of
different devices in different
settings
• Learn about construction and
management challenges
• Monitor hydrological
performance
Objectives
![Page 4: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/4.jpg)
Criteria for selecting sites
• Landowner amenable/enthusiastic
• Accessibility for construction
• Accessibility for demonstration
• Variable landscape/infrastructure settings
• Where dams could be treated in a series
• Proximate to existing hydro/eco monitoring sites
![Page 5: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/5.jpg)
Bugle Ranges
• 40ML dam on dairy farm
• TFR 0.7 L/s
• Concrete mechanical bypass
installed
![Page 6: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/6.jpg)
![Page 7: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/7.jpg)
![Page 8: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/8.jpg)
Marne Catchment - Pipe Bypass – TFR 2L/s
Bypass weir
Low flow
release point
![Page 9: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/9.jpg)
![Page 10: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/10.jpg)
![Page 11: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/11.jpg)
![Page 12: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/12.jpg)
![Page 13: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/13.jpg)
Controller, battery,
3G antenna, air pump
Dam wall
Water level
Inflows
Electric actuated fail
open vent valve
Electric actuated valve
and flow release outlet
0.1% accuracy
hydrostatic sensor
Inlet foot
valveFlow
meter
Macclesfield Trial Site –TFR 4.5L/s
![Page 14: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/14.jpg)
![Page 15: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/15.jpg)
• Today is the first step in the process of
implementing the Securing Low Flows
project
![Page 16: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/16.jpg)
![Page 17: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/17.jpg)
BYPASS DEVICES
• Non electronic
• Relatively cheap
• Robust
• Gravity based - requires minimum 2 degrees of fall
between weir and release point
• Tricky to install in wet/peaty watercourses
• Require maintenance to ensure they don’t block
Pro’s and Con’s of the different devices
![Page 18: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/18.jpg)
RELEASE DEVICES
• Electronic
• Instrumentation can be expensive
• Reliability
• Quick to install/ can be partly off-site
• Can be installed in wet/adverse conditions
• Maintenance tends to be complicated
• Generally need protection from stock etc.
Pro’s and Con’s of the different devices
![Page 19: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/19.jpg)
• Landholders generally supportive
• Understand the need to test concepts
• Open to sharing the idea with others
• Interested in the monitoring outputs
The community experience
![Page 20: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/20.jpg)
1. Is the low flow device doing what it is supposed to do?
• Measure total inflow to dam/arriving at dam• Device what is delivered through the low flow device
Hydrometric monitoring for the low flow
trial sites
2. Reliability of supply for landholder
• Change in storage in dam• Bathymetric survey + water level• Compare low flow and non-low flow scenario
![Page 21: Low Flow Trials learnings involving innovative designs · • 40ML dam on dairy farm • TFR 0.7 L/s • Concrete mechanical bypass installed. Marne Catchment - Pipe Bypass –TFR](https://reader034.vdocuments.site/reader034/viewer/2022051511/600e436057ec175ac31d491a/html5/thumbnails/21.jpg)