loves creek/mini-basin 20a3 ramp work zone rampi40 on dr skyline dr rd ramp east sunset rd rd dr s...

1
I40 HOLSTON DR SKYLINE DR CARTA RD RAMP EAST SUNSET RD GRATA RD SILVA DR S CHILHOWEE DR BONA RD N CHILHOWEE DR PARVA DR IROQUOIS RD MOHAWK DR COMANCHE DR SEMINOLE RD TULANE RD INDIAN RD WEST SUNSET RD MICHAEL ST ACCESS NOVA LN ALLEGHENY RD OVERHILL RD BRIDGE VIEW LN INGLEWOOD DR NOKOMIS RD SENECA RD HOLSTON CT MACEDONIA LN VEE LN DAPHNE DR CAYUGA DR PINNACLE DR DELTA RD FARMER LN CHILHOWEE CT SUNSET CT SILVA CT RELLIM RD LUNA LN RAMP I40 RAMP RAMP ASHEVILLE HWY RAMP SIOUX DRIVE Loves Creek/Mini-Basin 20A3 Wastewater Rehabilitation Project Work Zones: November 9-13, 2020 Issue Date: November 6, 2020 Map Legend Wastewater Main CHILHOWEE INTERMEDIATE SCHOOL S E W Manhole–Rehabilitation Manhole–Replacement Manhole–New Installation KFD STATION NO. 16 Current Construction Zones POCAHONTAS DR WORK ZONE Clean-up and restoration on Mohawk Drive at Seminole Road November 9-13 Temporary lane closures may be needed WORK ZONE Wastewater system rehabiliation at N. Chilhowee Drive and Asheville Higway Southbound turn lane of N. Chilhowee Drive closed daily 7 a.m. - 7 p.m. turn access maintained Westbound curbside lane of Asheville Highway closed daily 7 a.m. - 7 p.m. Adjacent road shoulder closed continuously

Upload: others

Post on 06-Feb-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

  • I40

    HOLSTO

    N DR

    SKYLINE DR

    CARTA RD

    RAMP

    EAST S

    UNSET

    RD

    GRATA RD

    SILVA DR

    S CH

    ILHO

    WEE D

    R

    BONA RD

    N CHILHOWEE DR

    PARVA DR IROQUOIS RD

    MOHAW

    K DR

    COMANC

    HE DR

    SEMINOLE RD

    TULANE RD

    INDIAN RD

    WEST SUNSET RD

    MICHAEL ST

    ACCESS

    NOVA L

    N

    ALLEGHENY RD

    OVERHILL RD

    BRIDGE VIEW

    LN

    INGLEWOOD DR

    NO

    KO

    MIS

    RD

    SENECA RD

    HOLSTON CT

    MACEDONIA LN

    VEE

    LN

    DAPH

    NE DR

    CAYUGA

    DR

    PINNACLE D

    R

    DELTA RD

    FARME

    R LN

    CHILHOW

    EE CT

    SUN

    SET CT

    SILVA CT

    RELLIM RD

    LUNA LN

    RAMP

    I40

    RAMP

    RAMP

    ASHEVI

    LLE HW

    Y

    RAM

    P

    SIOUX

    DRIVE

    Loves Creek/Mini-Basin 20A3Wastewater Rehabilitation Project

    Work Zones: November 9-13, 2020Issue Date: November 6, 2020

    Map LegendWastewater Main

    CHILHOWEEINTERMEDIATE

    SCHOOL

    S

    EW

    Manhole–RehabilitationManhole–ReplacementManhole–New Installation

    KFDSTATIONNO. 16

    CurrentConstruction Zones

    POCAHONTAS DR

    WORK ZONE

    Clean-up andrestoration

    on Mohawk Driveat Seminole Road

    November 9-13

    Temporary laneclosures may

    be needed

    WORK ZONE

    Wastewater systemrehabiliation at

    N. Chilhowee Driveand Asheville Higway

    Southbound turnlane of N. Chilhowee

    Drive closed daily7 a.m. - 7 p.m.

    turn access maintainedWestbound curbside

    lane of AshevilleHighway closed

    daily 7 a.m. - 7 p.m.Adjacent road

    shoulder closedcontinuously