LONESTAR CV UPDATEIMPLEMENTATION OF QWARN AND RSWZ

Lynne Randolph Staff Engineer

Page 2: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

AGENDA

Background

Integration with TTI’s lane closure data

BIM Geometry Challenges

Lonestar Status

2

Page 3: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

BACKGROUND

Connected work zone project implementation

Reduced speed work zone (RSWZ)

Queue warning (QWARN)

Project area within TTI’s lane closure monitoring

Lonestar incorporated FDOT SunGuide® connected vehicle module

Adding a decision support system module

Adding functionality for this project’s CV apps

3

Page 4: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

PROJECT LOCATION

I-35 between Temple and Bruceville-Eddy

Multiple lane closures planned

4

Page 5: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

INTEGRATION WITH TTILANE CLOSURE DATA

5

Page 6: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

EXISTING LANE CLOSURE DATA

• Includes road, direction,• For start and endpoints: cross street,

latitude and longitude • Lane blockage included

6

Page 7: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

ADDING: ADDITIONAL LANE DETAILS

7

Page 8: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

ADDING: SPEED LIMIT DATA

Posted speed limit

Normal speed limit on the segment if no work zone existed

Reduced speed limit

While the work zone is in effect, what is the new speed limit

8

Page 9: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

BIM GEOMETRY CHALLENGESWHAT WE CAN PROVIDE

9

Page 10: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

CAMP BIM GEOMETRY

CAMP’s Work zone map consists of three major elements:

1. Reference Point: Defines beginning of the work zone. The vehicle application uses the location of the reference point for generating appropriate alerts for the driver

2. Approach Lane(s): Defines lane(s) that lead to the work zone

3. Work Zone Lane(s): Defines lane(s) within the work zone.

10

From: WZW Guidelines 12-14-2017 v_05.docx (CAMP)A.2 Figure 10: Example of a Four-lane Work Zone with Left Lane Closed

Page 11: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

TXDOT AVAILABLE GEOMETRY DATA

Reference point for start of work zone

No lane level detail, only a single lane will be used

Distance for alerts and warnings

11

Warning for RSWZAlert for RSWZConstruction zone

Page 12: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

OUTDATED GEOMETRY DATA (SHAPE FILES)

12

I-35 at Temple, TX 2012

2017

Southbound I-35 Mainlane (centerline)Northbound I-35 Mainlane (centerline)N Frontage Road for I-35 (centerline)

S Frontage Road for I-35 (centerline)

Page 13: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

LONESTAR STATUS

13

Page 14: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

LONESTAR MAP ROADSIDE UNITS

14

• Equipment on both map and list view• Operational status• Coloring by status (as with other devices)

• View of the current messages broadcasting

Page 15: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

MULTIPLE BIMS ACTIVE

15

Multiple events may broadcast simultaneously

Page 16: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

RSWZ EVENT

16

Event is created by an operator

Managed the same as other events in Lonestar

Page 17: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

RSWZ RESPONSE PLAN MESSAGE

17

Message is created by the operator, location data is filled in from the event

Page 18: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

QWARN EVENT

18

QWARN event created

Lanes with slow speeds noted with

Managed the same as other events in Lonestar

Page 19: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

QWARN RESPONSE PLAN MESSAGE

19

Message is prefilled by the detection data, but can be edited

Page 20: Lonestar CV Update - The National Work Zone Safety ......Mar 26, 2018  · Lonestar CV Update Author: Lynne A. Randolph Created Date: 4/23/2018 9:32:45 AM

QUESTIONS?