14
TO
PROPOSED TWO-STOREY RESIDENCE
GRIBALDO ST., GRACEPARK, CALOOCAN CITY
DT FORM 002 "ANNEX A"LOG SHEETO
CANDIDATE
PROJECT TITLE/DESCRIPTION &
LOCATION
PERIOD COVERED
1
FROM
1 14 31 2 14
2
B. PLANNING AND DESIGN
CONCEPTUALIZATION15 1 14 21
A. SITE VISIT (INVETORY & CONDITION) 13 1 14 14 1 14
C. CONCEPTUAL INTERIOR LAYOUT 22 1 14 25 1 14
14
18 2 14 22 2 14
F. DRAFTED FINAL STRUCTURAL AND
ARCHITECTURAL PLAN6 2 14 17
E. CONCEPTUALIZATION OF STRUCTURAL AND
UTILITIES1 2 14 5 2 14
D. PREPARATION OF PRELIMINARYARCHITECTURAL DRAWINGS
27
I. PREPARE PROJECT COST ESTIMATE & BILL
OF MATERIALS 26 2 14 11
H. PREPARATION OF PERSPECTIVE &
INTERIORS24 2 14 25 2 14
G. DRAFTED PLUMBING AND ELECTRICAL
PLANS AND DETAILS
L. PREPARE FORMS AND DOCUMENTS FOR
BUILDING PERMIT18 3 14 25 3 14
6 14
3 14
M. CONSTRUCTION PROGRAMMING
K. PREPARE PROJECT SPECIFICATIONS 12 3 14 17 3 14
10 7 14 14
M. CONSTRUCTION SUPERVISION 22 5 14 25
26 3 14 2 4 14
7 7 14 9 7
4 7 14 5 7 14
N. PREPARE CONSTRUCTION PROGRESS
REPORT26 6 14 3 7 14
P. DRAFTED AS BUILT PLAN 14
7 14Q. PREPARED INTEIOR DETAILS AND
SPECIFICATION
O. CONDUCTED BUILDING INSPECTION AND
ASBUILT
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 2/12
DAY MO. YR. DAY MO. YR.
PROJECT TITLE/DESCRIPTION &
LOCATION
PERIOD COVERED
FROM TO
A. PREPARATION OF PRELIMINARY
ARCHITECTURAL DRAWINGS
TOTAL NO. OF HOURS
3 4 14 5 4 14
PROPOSED ONE-STOREY RESIDENCE WITH ROOF
DECK PATEROS ST.,
MAYPAJO, CALOOCAN CITY
C. DRAFTED FINAL STRUCTURAL AND
ARCHITECTURAL PLAN10 4 14 16 4 14
14B. CONCEPTUALIZATION OF STRUCTURAL AND
UTILITIES7 4 14 9 4
4 14 23 4
E. PREPARATION OF PERSPECTIVE &
INTERIORS24 4 14 25 4 14
14D. DRAFTED PLUMBING AND ELECTRICAL
PLANS AND DETAILS21
G. PREPARE BILL OF MATERIALS 30 4 14 5 5 14
14F PREPARE PROJECT COST ESTIMATE 26 4 14 29 4
14 21 5
I. PREPARE FORMS AND DOCUMENTS FOR
BUILDING PERMIT10 5 14 14 5 14
14H. PREPARE PROJECT SPECIFICATIONS 6 5 14 9 5
14J. CONSTRUCTION PROGRAMMING 15 5
14P. INTIRIOR DESIGN SUPERVISION 18
M. REVISION PLAN FOR TOILET 6 8 14 8 8
7 14 29 7
14
Q. SPACE MANAGEMENT STUDY 30 7 14 5 8 14
N. PREPARATION OFLANDSCAPE PLAN 9 8 14 12 8 14
O. PREPARED INTEIOR DETAILS AND
SPECIFICATION14 7 14 17 7 14
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 3/12
DAY MO. YR. DAY MO. YR.
O. LANDSCAPE SUPERVISION 14 3 15 16 3 15
N. PREPARATION OFLANDSCAPE PLAN 11 3 15 13 3 15
26 9 14 2 10 14
PROJECT TITLE/DESCRIPTION &
LOCATION
PERIOD COVEREDFROM TO
TOTAL NO. OF HOURS
A. PREPARATION OF PRELIMINARY
ARCHITECTURAL DRAWINGS13 8 14 26 8 14
PROPOSED TWO-STOREY RESIDENCE WITH ROOF
DECK BINANGONAN ST.,
MAYPAJO, CALOOCAN CITY
9 14
14B. CONCEPTUALIZATION OF STRUCTURAL AND
UTILITIES27 8 14 5 9
14D. DRAFTED PLUMBING AND ELECTRICAL
PLANS AND DETAILS16 9 14 22 9
C. DRAFTED FINAL STRUCTURAL AND
ARCHITECTURAL PLAN 6 9 14 15
G. PREPARE BILL OF MATERIALS 3 1O 14 8 10
F PREPARE PROJECT COST ESTIMATE
E. PREPARATION OF PERSPECTIVE &
INTERIORS23 9 14 25 9 14
M. REVISION PLAN FOR TOILET 7
14I. PREPARE FORMS AND DOCUMENTS FOR
BUILDING PERMIT16 10 14 21 10
H. PREPARE PROJECT SPECIFICATIONS 9 10 14 15 10 14
14
14J. PREPARED INTEIOR DETAILS AND
SPECIFICATION22 10 14 25 10
K. INTIRIOR DESIGN SUPERVISION 26 2 15 2 3 15
L. SPACE MANAGEMENT STUDY 3 3 15 6 3
3 15 10 3 15
15
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 4/12
DAY MO. YR. DAY MO. YR.
O. DRAFTED AS BUILT PLAN 13 2 15 18 2 15
M. CONSTRUCTION PROGRAMMING 2 2 15 10 2 15
L. PREPARE FORMS AND DOCUMENTS FOR
BUILDING PERMIT24 1 15
K. PREPARE PROJECT SPECIFICATIONS 17 1 15 23 1 15
31 1 15
5 1 15
I. PREPARE PROJECT COST ESTIMATE & BILL
OF MATERIALS6 1 15 16 1 15
H. PREPARATION OF PERSPECTIVE &
INTERIORS2 1 15
13 12 14
G. DRAFTED PLUMBING AND ELECTRICAL
PLANS AND DETAILS 15 12 14 22 12 14
F. DRAFTED FINAL STRUCTURAL AND
ARCHITECTURAL PLAN27 11 14
20 11 14
E. CONCEPTUALIZATION OF STRUCTURAL AND
UTILITIES21 11 14 26 11 14
D. PREPARATION OF PRELIMINARY
ARCHITECTURAL DRAWINGS14 11 14
B. PLANNING AND DESIGNCONCEPTUALIZATION
3 11 14 11 11 14
C. CONCEPTUAL INTERIOR LAYOUT 12 11 14 13 11 14
A. SITE VISIT (INVETORY & CONDITION) 28 10 14 31 10 14
P. PREPARED INTEIOR DETAILS AND
SPECIFICATION20 2 15
N. CONDUCTED BUILDING INSPECTION AND
ASBUILT11 2 15 12 2 15
24 2 15
PROJECT TITLE/DESCRIPTION &
LOCATION
PERIOD COVERED
FROM TO
PROPOSED THREE-STOREY RESIDENCE WITH
ROOF DECK PATEROS ST., MAYPAJO, CALOOCAN
CITY
Q. CONSTRUCTION SUPERVISION 17 3 15 16 4 15
TOTAL NO. OF HOURS
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 5/12
DAY MO. YR. DAY MO. YR.
5 15 16 5 15
Q. SPACE MANAGEMENT STUDY 18 5 15 23 5 15
P. INTIRIOR DESIGN SUPERVISION 5
15 29 4 15
O. PREPARED INTEIOR DETAILS ANDSPECIFICATION
30 4 15 4 5 15
N. DRAFTED AS BUILT PLAN 27 4
PROJECT TITLE/DESCRIPTION &
LOCATION
PERIOD COVERED
FROM TO
PROPOSED THREE-STOREY RESIDENCE WITH
ROOF DECK PATEROS ST., MAYPAJO, CALOOCAN
CITY
TOTAL NO. OF HOURS
M. CONDUCTED BUILDING INSPECTION AND
ASBUILT24 4 15 25 4 15
L. PREPARE CONSTRUCTION PROGRESS
REPORT17 4 15 23 4 15
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 6/12
TOTAL NO. OF HOURS
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 7/12
A B C D E F
240
75
32 32
16
27
16
40
48
DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION
SHEET NO.
1 OF 4
CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL
NO.HOURS
48
16
3216
40
70
40
16
16
88
70
60
88
32 32
240
40
6363
27
60
75
40
40
16 16
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 8/12
A B C D E F
54
CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL
NO.
HOURS
30
211 281 256 48 91 48 935
30
54
2424
16 16
4848
36
40
48 48
32
40
36
32
54
80
6060
30
24 24
30
32 32
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 9/12
A B C D E F
20 20
24 24
48
32
36
48
32
120 608
CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP) TOTALNO.
HOURS
170 156 0 114 48
120
72
45 45
96
60
24 24
96
72
60
72
40
45
36
40
45
72
90
120
3030
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 10/12
A B C D E F
32 32
16
60 60
96 96
54 54
84 84
24 24
120 120
180
84 84
180
66 66
25 25 50
80 80
16 16
32 32
16
CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL
NO.
HOURS
288 288
80 809303 217 20 48 141
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 11/12
A B C D E F
80 80
72 72
36 36
36 36
16
CORRESPONDING NUMBER OF HOURS OF DESCRIBED TRAINING (FOP)TOTAL
NO.
HOURS
411 318 320 128 109 72 1358
60
16
60
8/17/2019 Logbook Toby
http://slidepdf.com/reader/full/logbook-toby 12/12
72 0 0 72 0 80 224