WORK REPORT
Name of project & Milli Watershed: - IWMP-7, TOYLANKA
Name of Agency:- Krishi Vigyan Kendra, Dantewada
Name of Programme Implement Agency(PIA):- Programme Co-ordinator , KVK,Dantewada
Detail of PIA :-
S.no Name of PIA Designation Address
1 Dr. Ratna Nashine Programme-Coordinator Krishi Vigyan Kendra, opposite
Krishi upaj mandi Bijapur Road,
Geedam. Post: Geedam
District: Dantewada
Pin code:494441
Phone/fax No: 07856-244578
Email address:
Mobile no:9425263053
Team of Watershed:-
S.no Name of Member Designation Address 1 Miss. B.A.Kujur Subject Matter Specialist
(Home Science)
Krishi Vigyan Kendra, opposite
Krishi upaj mandi Bijapur Road,
Geedam. Post: Geedam
District: Dantewada
Pin code:494441
Phone/fax No: 07856-244578
Email address:
2 Er.N.H.Tayade Subject Matter
Specialist,FMP(Agril.Engg.) Krishi Vigyan Kendra,
opposite Krishi upaj mandi
Bijapur Road, Geedam. Post:
Geedam
District: Dantewada
Pin code:494441
Phone/fax No: 07856-244578
Email address: [email protected]
Mobile no:9407909941
3 Shri.S.K.Dhruw Prog.Assit.(Forestry) Krishi Vigyan Kendra,
opposite Krishi upaj mandi
Bijapur Road, Geedam. Post:
Geedam
District: Dantewada
Pin code:494441
Phone/fax No: 07856-244578
Email address: [email protected]
Mobile no:9406092607
1
Personnel Jila Panchayat:- Shri. Samir Kumar Patre
W.D.T. (Community Development)
Moble no: 9406246435
Detail of Micro Watershed:-
S.no Name of Micro Watershed Distance from KVK (Kms)
1 Gadapal 30
2 Fulnar 27
3 Muskel 32
4 Metapal 55
5 Badelakhapal 68
6 Toylanka 79
7 Surnar 85
2
Details of first phase watershed work (2014-15)
Microwise water harvesting structures
S.
n
o
Micro W/S
Name
Watershed Work No of
works
T.S.
No/Date
A.S.No/Date
Fund
Allowed
Rs.in lac
Status of
Work
1 Metapal
Block:-
Dantewada
Loose Bolder
Check
17 nos 360/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.85 Completed
Earthen Check 3 nos 361/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.32 Completed
Percolation Tank 1 nos 362/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
2.03 Completed
Contour Trenching 800
nos
363/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
1.04 Completed
2 Toylanka
Block:-
Dantewada
Loose Bolder
Check
25 nos 364/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
1.24 Completed
Earthen Check 2 nos 365/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.21 Completed
3
Gadapal
Block:-
Dantewada
Loose Bolder
Check
16 nos 366/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.80 Completed
Earthen Check 3 nos 367/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.32 Completed
4
Fulnar
Block:-
Dantewada
Loose Bolder
Check
8 nos 368/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.40 Completed
Earthen Check 4 nos 369/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.42 Completed
5
Muskel
Block:-
Dantewada
Loose Bolder
Check
12 nos 370/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.60 Completed
Earthen Check 3 nos 371/27.12.14 No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.32 Completed
6 Badelakapal
Block:-
Katekalyan
Loose Bolder
Check
15 nos 2198/08.12.1
4
No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.75 Completed
Earthen Check 4 nos 2199/08.12.1
4
No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.42 Completed
Percolation Tank 1 nos 2200/08.12.1
4
No/zp/iwmp/2015/674
2 dnt/date:12.02.15
2.03 Completed
Contour Trenching 800
nos
2201//08.12.1
4
No/zp/iwmp/2015/674
2 dnt/date:12.02.15
1.04 Completed
7 Surnar
Block:-
Katekalyan
Loose Bolder
Check
28 nos 2203/08.12.1
4
No/zp/iwmp/2015/674
2 dnt/date:12.02.15
1.39 Completed
Earthen Check 2 nos 2204/27.12.1
4
No/zp/iwmp/2015/674
2 dnt/date:12.02.15
0.21 Completed
4
Summary of work details
S.No. Watershed Structures No. of Structures Remark
1 Boulder Check 121 Completed
2 Earthen Check 21 Completed
3 Percolation Tank 02 Completed 4 Contour Trenching 1600 Completed
Details of Bank Account
PIA Level
S.no Name of Milli Watershed Name of Bank and Branch Account number 1 IWMP-7 Punjab National Bank, Geedam
7242002100000090
Micro Watershed Bank Detail
S.no Name of Micro
Watershed
Name of Bank and Branch Account number
1 Gadapal Punjab National Bank,
Dantewada
4949000100028696
2 Fulnar Punjab National Bank,
Dantewada
4949000100031797
3 Muskel Punjab National Bank,
Dantewada
4949000100032343
4 Metapal Punjab National Bank,
Dantewada
4949000100027828
5 Toylanka C.G.Gramin Bank, Katekalyan 77025249323
6 Badelakhapal C.G.Gramin Bank,Katekalyan 77023758831
7 Surnar C.G.Gramin Bank, Katekalyan 77025249129
5
Mode of Labour Payment:-
Payments are transferred to Personal Account of Labours.
Micro Gadapal: Water harvesting Structures at a Glance
6
Micro Muskel: Water harvesting Structures at a Glance
Villagers are happy. It can be seen on their faces with vibrant smile.
7
Micro Fulnar: Water harvesting Structures at a Glance
The earthen check was of 20 meters and the length after constructions is 60 meters with natural
check of natural rocks
8
Micro Metapal: Water harvesting Structures at a Glance
Participatory approach made the rights site for the work.
9
Micro Badelakhapal: Water harvesting Structures at a
Glance
Boulder Check, Earthen Check & Percolation Tank are the source of Water recharge.
10
Micro Surnar: Water harvesting Structures at a Glance
Soil erosion is basic problem ... Boulder Check, Earthen Check, taken as a measure.
11
Micro Toylanka: Water harvesting Structures at a Glance
Earthen Check & Boulder Check will improve the water recharge and help in stopping soil
erosion.
12
Conclusion
The IWMP-7 Toylanka is a most sensitive area of Dantewada District, the work was carried out by
Krishi Vigyan Kendra Dantewada. The water harvesting structures were made as they are the basic
necessity of the people of the area .
The work carried out in the area gives confidence to the tribal’s of micros & satisfaction
and vibrant smile on their faces gives boosting to the team of IWMP-7.
“The smiley faces are our success”
My sincere thanks to the Hon’ble Vice Chancellor Dr. S.K. Patil, IGKV Raipur, for the
continuous support and guidance. My heartfelt thanks to Dr. M.P. Thakur, Director Extension
IGKV, Raipur for Valuable support.
My heartfelt thanks to the District Authority, Hon’ble Collector Shri K.C. Devsenapati for
Valuable suggestions & continuous guidance, and to the CEO Dr. Shri J. Shriram for his support
& guidance.
13
INDEX
S.No. Particular Page No.
1 Work Report of IWMP-7 Toylanka 1-2
2 Location Map of Mili watershed IWMP-7
Toylanka
3-3
3 Details of first phase of watershed work 4-4
4 Summary of work details & detail of Bank
Account
5-5
5 Micro Gadapal water harvesting structure at
a glance
6-6
6 Micro Muskel water harvesting structure at
a glance
7-7
7 Micro Fulnar water harvesting structure at a
glance
8-8
8 Micro Metapal water harvesting structure at
a glance
9-9
9 Micro Badelakhapal water harvesting
structure at a glance
10-10
10 Micro Surnar water harvesting structure at
a glance
11-11
11 Micro Toylanka water harvesting structure
at a glance
12-12
12 Conclusion 13-13