Page 1: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Local Transport Plan 4 Oxford Transport Strategy

Page 2: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

LTP4

OTS

Other area

strategies

Mode based

strategies

Policy

Science Transit

Strategy

Strategic Environmental

Assessment

Page 3: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

OTS areas

City centre

Eastern Arc

North Oxford

Citywide & beyond Oxford

Page 4: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

The scale of the challenge for LTP4 and OTS

Page 5: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Local Plan 2011 growth vs SEP growth

0

20000

40000

60000

80000

100000

120000

Households Jobs

Local Plan 2011

2014 SHMAhouseholds andCambridgeEconometrics jobsforecasts

Page 6: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

The network cannot accommodate this,

even with improvements, so…

Implications for Oxford’s network

26,000 additional journeys (by all modes)

within the city by 2031 – a 25% increase from

2011.

Without intervention, this could mean 13,000

more commuter car trips each day.

Page 7: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Mode shift is required to avoid major traffic growth and congestion

Page 8: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Central challenge

Improve access

Move more people

Improve place

A better city vs

Page 10: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Components of the OTS

Mass transit Walking & cycling Managing traffic and

travel demand

Page 11: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Three elements: one vision

Mass transit

Walking & cycling

Traffic management

A better place, with better access

Page 12: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Mass transit

Rail Bus rapid transit (BRT)

Bus & coach

Page 13: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Rail

BRT Line 1

BRT Line 2

BRT Line 3

New P&R

Redeveloped P&R

Page 14: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Zero emissions

High capacity

No tracks or wires

Fast boarding

Page 15: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

City centre More mass transit vehicles + more cyclists + more

pedestrians = need for increased segregation of mass transit

Stage 1

Routeing and stop changes

Stage 2

New & expanded off-street terminals

Stage 3

Transit tunnels

Zero emission zone to expand throughout stages

Page 16: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Cycle routes

Super cycle routes Premium cycle routes

Connector cycle routes

Page 17: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Proposed cycle super route and premium route network

Page 18: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Cycle parking

Page 19: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Walking and public realm

Routes Crossings Pedestrianisation &

public realm

Page 20: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Managing traffic and travel demand

Challenge: tackling induced demand for travel

Interstate 80, Berkeley, California

Page 21: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Managing demand for car travel

Public parking charges

Limit parking supply Traffic restrictions

or charging

Workplace parking levy

Page 22: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Traffic routeing

Add capacity Introduce restraint

• Mass transit, walking and cycling prioritised

• Less noise and pollution

• Safer roads

Page 23: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Planning

Reduce the need to travel

Prioritise and enable mass transit, walking and cycling

Page 24: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Costs over 20 years

With transit tunnels

Without transit tunnels

£600m

£1.2bn

Page 25: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Funding

Developer contributions – from Oxford and Oxfordshire

Private sector Transport operators

Bus stop departure charges

Road user charges

Share of land value uplift resulting from infrastructure

investment

Transport users

Public parking charges

Workplace parking charges

Park & Ride departure charges

Bus tunnel use charges

Freight fees

Local, National and European funding

Third party investment Tourist levy

Business improvements districts

Investment in infrastructure

Page 26: Local Transport Plan 4 Oxford Transport Strategy...OTS areas City centre Eastern Arc North Oxford Citywide & beyond Oxford The scale of the challenge for LTP4 and OTS Local Plan 2011

Next steps

Consultation 5 February to 2 April

Cabinet approval June

Council approval July