local problems - ridley & partners · post office box 197 ... however, this system relied upon...

14
Post Office Box 197 Chelsea, Alabama 35043 Phone: 205.746.7567 Email: [email protected] RIDLEY & PARTNERS is a self ‐cerƟfied woman owned small business head‐ quartered in the state of Alabama. We are acƟve in the engineering, pro‐ curement, and construcƟon market sectors. We hold mulƟple United States (US) licenses and cerƟficaƟons for the services that we offer. AddiƟonally, we are proud to have a branch office in Baghdad, Iraq and have extensive experience throughout Iraq. Let us know what your problems are and we will be glad to discuss the so‐ luƟons that we can provide. Local Problems Global SoluƟons for Eighteen (18) story concrete framed apartment build- ings. Private development located in the Old Muthana Airport Complex, Baghdad, Iraq. Our staff lead the effort to re-design the tower to work with the exisƟng en-situ soils as well as to accommodate a modular form work system that was imported to facilitate construc- Ɵon. The form work system allowed for pouring one floor every two (2) weeks. RIDLEY & PARTNERS, INC. www.ridleypartners.com www.rapidppe.com www.rapidpsd.com

Upload: truongnhi

Post on 16-Jun-2019

212 views

Category:

Documents


0 download

TRANSCRIPT

 

 

Post Office Box 197 Chelsea, Alabama 35043 Phone: 205.746.7567 Email: [email protected] 

 

RIDLEY & PARTNERS is a  self ‐cer fied woman owned small business head‐quartered in the state of  Alabama.  

We are ac ve in the engineering, pro‐curement, and construc on market 

sectors. We hold mul ple United States (US) licenses and cer fica ons 

for the services that we offer. 

 Addi onally, we are proud to have a branch office in Baghdad, Iraq and 

have extensive experience throughout Iraq.  

Let us know what your problems are and we will be glad to discuss the so‐

lu ons that we can provide.   

 

Local Problems Global Solu ons for 

 

Eighteen (18) story concrete framed apartment build-ings. Private development located in the Old Muthana Airport Complex, Baghdad, Iraq. Our staff lead the effort to re-design the tower to work with the exis ng en-situ soils as well as to accommodate a modular form work system that was imported to facilitate construc-on. The form work system allowed for pouring one 

floor every two (2) weeks.  

RIDLEY & PARTNERS, INC. 

www.ridleypartners.com 

www.rapidppe.com 

www.rapidpsd.com 

 

 

For your business needs 

 

Our staff has provided full design package engineering services on mul ple design-build building facility projects u lizing both in-house staff as well as the management of tradi onal USA based A&E firms.   

These services have included up to shop level design in accordance with all applicable interna onal codes and best industry prac-ces.  

 

Our staff has provided full procurement services on mul ple design-build building facility projects requiring sourcing and logis-cs on a global scale. Addi onally, we cur-

rently hold US based distributor accounts for a wide range of products and goods.  

We are fully conversant in rela on to all import regula ons as they pertain to the country of Iraq.   

If you are new to the Iraq market and would like to partner with an established compa-ny who understands the nuances of this market, please reach out to us to discuss your needs. We believe the depth of our Iraq based exper se and par cularly the wide geo-graphic area in which we have gained this exper se can afford a leg up to new entrants into this market. We welcome the opportunity to assist you with market penetra on of your goods and services.   

RIDLEY & PARTNERS, INC. is a self-cer fied woman 

owned small business concern  incorporated  in  the 

United States of America (USA) State of Alabama.  

We hold mul ple US  licenses and cer fica ons for 

the  services  that  we  offer.  Addi onally,  we  are 

proud  to  have  a  fully  registered  and  func oning 

branch office located in Baghdad, Iraq.  

Our  experience  and  exper se  associated  with  de-

sign-build building facility projects throughout Iraq  

is  unparalleled.  Our  principals  begun  working 

throughout Iraq circa 2005 in support of US Feder-

ally  funded  re-construc on  projects  and  then  be-

gun  suppor ng  the  Oil  &  Gas  communi es  re-

mobiliza on efforts circa 2009.   

We are adept at working with both a global supply 

chain as well as with local communi es, in rela on 

to execu ng project work throughout Iraq.   

About Us 

About Us & What We Do  1 

Engineering  3 

Engineering Organiza on Chart  5 

Procurement  7 

Construc on  9 

Construc on Organiza on Chart  11 

Example—Camp Honor  13 

Example—Forth Iraqi Division  17 

Example—Al Anbar Judicial Complex  15 

Example—Schlumberger Base Camp  19 

Example—Shell (Basra Gas) Base Camp  21 

Example—LukOil CPF  23 

Example—Gazprom CPF  25 

Table of Contents

Schlumberger Opera ons Base locat-ed in North Rumelia, Basra, Iraq. Our staff worked on the ini al green-field base build as well as several expan-sions.  

 

(TOP) - Typical onsite pre-engineered building (PEB).  

(BOTTOM) - 6 mva Onsite diesel fired prime power plant with under-ground 11 kv and 0.4 kv looped dis-tribu on networks. 

 

Our staff has provided full construc on services on mul ple-design build building facility projects throughout Iraq.  

These services range from temporary facili es to full-scale green field self-contained building facility projects.  

Addi onally, our staff is conversant with local construc on prac ces, interna onal construc on prac ces, as well as Oil & Gas construc on prac ces.  

 

 

 

For your business needs 

 

Our staff can review your design needs based on your conceptual requirements, your ini al Front End Engineering and Design (FEED) work, or other preliminary infor-ma on.  

From your inputs we will tailor a design package that suits your requirements.  

 

Our staff can offer complete Architectural and Engineering (A&E) services where re-quired. These services are generally offered in connec on with design-build projects.  

We offer these services with both in-house staff as well as retained A&E consultants on a case by case basis.  

If you require onsite assistance in Iraq pertaining to architectural, engineering, or relat-ed construc on management services, we have staff to support your needs. Our staff have the required exper se to provide a full range of onsite services and we can offer both Iraqi Na onal Staff as well as Foreign Na onal Staff.  

RIDLEY & PARTNERS,  INC.  is  licensed under Cer fi-

cate of Authoriza on (COA) number 5137-E to pro-

vide engineering services to the public in The State 

of Alabama.    

In addi on to this our staff has provided engineer-

ing  services  on  numerous  design-build  projects 

throughout  Iraq. These services have been provid-

ed  to various en es associated with  the US Gov-

ernment as well  as  to mul ple  Interna onal Oil & 

Gas Companies (IOCs).  

Where  required  our  staff  has  also  rou nely  part-

nered with  local  Iraq  based  geotechnical  and  sur-

veying firms to complete preliminary field work as 

well as ongoing project related quality control (QC) 

and quality assurance (QA) requirements.  

In  addi on  to  this  and where  required  to  comply 

with  local ordinances our  staff has partnered with 

local  universi es  as  well  as  third  (3rd)  party  A&E 

firms to review and cer fy our design work.  

We prefer u lizing the following so ware as a part 

of our building facility design approach: 

AUTODESK REVIT (and related products) 

AUTODESK CIVIL 3D (and related plugins) 

ETAP (short circuit analysis and related design) 

Visual (ligh ng design) 

Various other applica ons on an as needed basis.  

Engineering 

 

If you are not certain what services you may need or are looking for an un-biased third (3rd) party to support your require-ments our staff and exper se can be made available.  

 

Local Stakeholder           Involvement  

Local Third Party                   Involvement 

Onsite Material Tes ng Services 

Geotechnical Site            Inves ga ons and              Reports 

Topographical X, Y, and Z Surveys 

Front End Engineering and Design (FEED) 

Comprehensive Shop Level Design 

Circa 2009  the  Interna onal Oil & Gas Community begun  their  remobiliza on efforts  in Southern,  Iraq. 

Most western companies were encouraged by their security consultants to provide facili es planned for 

larger concentrated occupancies with some means to provide resistance to rocket propelled muni ons. 

 A majority of western companies specified the use of the system u lized by The US Department of State 

(DoS) throughout Iraq. However, this system relied upon the u liza on of E-Glass protec ve panels which 

at the  me were an export controlled item of US origin.  

As a solu on to this problem our staff developed a pre-engineered metal building (PEB) concept which 

u lized a welded mesh grate  roof  for a pre-detona on  layer and a  reinforced concrete  roof deck  for a 

detona on  layer.  This  design was  analyzed  u lizing  a  specialized  ballis c  Finite  Element Analysis  (FEA) 

so ware package and was constructed u lizing locally and regionally procured goods. The system was so 

effec ve that it was u lized by Schlumberger (1st-Genera on), Exxon-Mobile (2nd-Genera on), as well as 

Shell (3rd-Genera on) in their Southern, Iraq base camp facili es.  

 

 

 

US ENGINEERING TEAM 

Arnold Lee Ridley, PE, PMP 

President—Principal 

Andy Schmieder, PE 

VP of Engineering 

Roman Ramos, AIA 

VP of Architecture 

Mazin Al Bazaz 

VP of Construc on—Principal 

Iraq Branch Director 

Dan Rossiter, PE 

Transporta on and Land     Development 

Office & Field Resources 

Dan McDonald, PLS 

Land Surveying 

Dennis Roote, PE 

Environmental 

Sara Gilbert, PE, LEED AP 

Water Resources 

Michael R. McEntree, PE, LEED AP 

Mechanical 

David Lee, PhD 

Industrial Design 

Steven Thomsen, PE 

Electrical 

Garry Myers, PE, SE 

Anit‐Terrorism & Force Protec on (Blast Protec on) 

Christopher Casanzio, PE 

Power Distribu on 

Henry Mac                                   ICT, Security, and                       Entertainment 

Brian Pierce, PE 

Structural 

Amy Brothers, PE 

Geotechnical 

Caleb Griffin, EIT 

BIM Dra ing & Modeling 

Donald Middleton, PE, LEED AP, CFPS Fire Protec on 

Mike Vo, PE 

HVAC 

James Feely, PE 

Plumbing 

Gino Repe o, AIA, LEED Green Associate 

Interior/Exterior 

Andrew Cartley,         LEED AP 

Interior/Exterior 

William Langston, RLA 

Landscape 

Addi onally we have long term rela onships with mul ple A&E firms across the US which have supported our staff on design build projects for over a decade. We regularly u lized the resources of the following firms on an as needed basis for our project work: 

HALFF  Cummins  PACT  MVP 

TYLIN  Mammut  Henrikson Owen  MKC Global Protec on 

 

 

For your business needs 

 

CoreTex—Manufacturer of a range of skin care protec on products packaged for construc on, commercial, as well as industrial uses.  

Atlanco—Parent company for the Tru Spec brand. Manufacturer of a full range of tac cal, military, and outdoor ware as well as associated accessories.  

Rothco - Manufacturer of a full range of tac cal, military, and outdoor ware as well as associated accessories.  

US Armor—Manufacturer of a full range of custom fit (tailored) conven-onal and concealable body armor.  

 

ORS Nasco—B2B wholesale distributor for Personal Protec ve Equipment (PEP), Tools, and Industrial Goods. 

Logis cs Supply—B2B wholesale dis-tributor for Personal Protec ve Equip-ment (PEP), Tools, and building facility fire protec on equipment.  

Mo on Industries - B2B wholesale distributor for industrial goods. 

ADI—B2B wholesale distributor for access control, CCTV, Fire, and related products.  

Wynit—B2B wholesale distributor for drones, cameras, and an array of con-sumer electronics.  

Tac cal Gear Distributors—B2B wholesale distributor for tac cal gear including Safari Land, 5.11, APS, etc.  

RIDLEY & PARTNERS,  INC.  is well  versed  in provid-

ing  procurement  solu ons  domes cally,  globally, 

and specifically in Iraq.   

At  the present  me we rou nely par cipate  in US 

Federal  Solicita ons  associated with  the  supply  of 

tangible goods. As such we have provided procure-

ment services to the US Department of State (DoS), 

the US Army, as well as the US Navy.  

We  presently  maintain  US  based  distributor  ac-

counts  with  a  wide  array  of  Original  Equipment 

Manufacturers  (OEMs)  as well  as  regional  and na-

onal  business  two  (2)  business  (B2B)  wholesale 

distributors.  As  such  we  can  provide  access  to  a 

vast  array  of  US  goods  and  brands  on  both  a  do-

mes c and export basis.   

Addi onally,  we  are  well  versed  in  the  most  cur-

rent Government of  Iraq  (GOI)  importa on proce-

dures.  This  includes  the  u liza on  of  all  common 

ports  of  entry  and  con nual  evalua on  of  those 

ports of entry  in-light of  the evolving  security and 

regulatory environment.  

All exports and imports are in full compliance with 

both  domes c  and  interna onal  regula ons. 

Where required for qualified clients and pertaining 

to US origin exported goods we shall ensure com-

plete compliance with the US Department of Com-

merce, the US Department of State, The GOI’s Pre-

Import  Inspec on, Tes ng & Cer fica on Program 

(ICIGI),  The  GOI’s  import  permit  program,  and  all 

required  formali es  for  customs  clearance  and 

door to door transport.  

When  required  for  compliance  purposes  we  also 

have working rela onships with third (3) party Iraq 

based  customs  clearance  agents,  Iraq  based  Full 

Load and Less Than Full Load (LTL) carriers.  

Procurement 

 

Camfil—OEM for HVAC related air filtra on products.  

Control Southern—B2B distributor for process and automa on equip-ment and accessories.  

Cummins Middle East, Philips Ligh ng, First Source Ligh ng (Induc on Fixtures), Cat Power Gen-era on, Schneider, ABB, Carrier, Mammut (PEBs), Mabani  Steel (PEBs), PACT, NAFCO, CommScope, Blackbox, RAK Ceramics, Jotun, MVP, FLIR, Motorola, Gatekeeper, Axis, Lenel, Rapiscan, Federal Signal, and many others.  

 

Extensive knowledge of the United Arab Emir-ates (UAE) market as a regional/global hub for imports/exports    

Extensive knowledge of the Iraq market in terms of locally available products 

Extensive knowledge of Iraq regula ons pertain-ing to importa on of goods 

Extensive US based line card with OEM direct accounts and B2B ac-counts 

 

 

 

For your business needs  

Our staff’s core capabili es are associated with self-contained campus style building facility projects. Regardless of the loca on or the size we can execute this style of project on an interna onal basis at any general loca-on in Iraq and to what ever quality or speci-

fica on level that may be required.  

 

As a result of our core capabili es, our staff is fully conversant on a design-build basis with all manner of u lity infrastructure systems.  

Electrical—Our staff has worked on diesel fired power plants in the range of 15 mva with all required distribu on and systems. 

 

As a result of our core capabili es, our staff is fully conversant on a design-build basis with all manner of Internet, Communica ons, Telecom-munica ons, Security, and Entertainment systems. We have been involved with highly complex building-facility requirements, including such technologies as u lizing microwave antennas to provide converged network support to building facili es that were remotely located from the core project. Through our system integrator partners we can provide any level of ICT support in Iraq. This service can include advanced securi-ty systems as well as connec vity and integra on with global corporate access control systems.  

RIDLEY & PARTNERS, INC. has a full office and field 

staff  in  Iraq.  Our  staff  has  been  engaged  almost 

con nually  with  design-build  building  facility  pro-

jects  as  well  as  heavy  civil  construc on  projects 

since  2005.  Their  exper se  has  generally  been 

gained  in  the  fixed-price  self-performed  design-

build  building  facility  environment.  Their  ini al 

experience was gained working for various US Gov-

ernmental en es and  their  la er experience was 

gained working  for various  Interna onal Oil & Gas 

Companies (IOC), Oil Service Firms, as well as Inter-

na onal  Engineering,  Procurement,  and  Construc-

on (EPC) firms. Our staff has been exposed to an 

excess of one  (1) billion US dollars of design build 

projects in Iraq.  

In  rela on  to  site  civil  or  building  facility  projects 

our  staff  can work  from  client  design  packages  or 

we  can  fully  execute  design-build  projects  to  all 

applicable  local  and  interna onal  standards.  This 

includes  being  fully  conversant  with  mul ple  IOC 

design  and  construc on  standards  and  specifica-

ons.  

Construc on 

 

Sewer—Our staff has worked on both packaged as well as site con-structed WWTPs. In addi on we are conversant with most piping technol-ogies.  

Water—Our staff has worked on both packaged as well as site con-structed WTPs. In addi on we are conversant with most piping technol-ogies including large diameter HDPE.  

Extensive Knowledge Associated With Steel Stud and Drywall Construc on 

Extensive Knowledge Associated With Com-prehensive ICT, Security, and Entertainment  Net-working and Systems  

Extensive Knowledge Associated with HDPE Pipe Infrastructure from 50mm to 400mm 

Extensive Knowledge Associated with Pile Founda ons 

 

While RIDLEY & PARTNERS is a rela vely new corporate en ty, our principals as well as our key personnel 

have extensive experience opera ng in Iraq. This experience has generally been acquired on a vast array 

of design-build projects beginning circa 2005 and con nuing today.  

Ini ally our  staff executed small design build construc on projects generally associated with greenfield 

Iraq Army Brigade Level sites. These projects were generally executed on behalf of USA based Prime Con-

tactors. As  the market  sector  changed and USA based Contractors begun  to demobilize  from  Iraq, our 

staff begun execu ng the same style of projects as a Prime Contractor. 

As a result of the USA GOV drawdown and the mobiliza on of the Interna onal Oil & Gas community, our 

staff was engaged in the construc on of greenfield base construc on projects. Once the ini al mobiliza-

on was completed our staff’s work transi oned into heavy civil process based greenfield construc on. 

These la er ac vi es have generally been performed for larger interna onal EPC Prime Contractors; but, 

in some cases on a design-build basis.  

 

TOP—11kv overhead distribu on line construc on Numaniyah (Iraqi Army Base Adjacent to Tallil Air Base) 

 

 

IRAQ CONSTRUCTION TEAM 

Mazin Al Bazaz 

VP of Construc on—Principal 

Iraq Branch Director 

Andy Schmieder, PE 

VP of Engineering 

Mohammed Jamal 

Mechanical Engineer 

Qasim Almosawi 

Office Manager & Accoun ng 

Duraid Albaya  

Lead Project Manager 

Kumar Rajendra 

Health, Safety, &                 Environmental Manager 

Ahmed Munahi 

Quality Control Manager 

Ahmed Shehab 

Security Manager 

Ahmed Sami 

Civil Engineer 

Ahmed Owaid 

Surveyor 

Salam Ali 

Electrical Engineer 

Mahir Yassen 

Architect 

Walaa Aldeen Jabbar 

Field Office Admin. 

Firas Al Ghanimey 

Field Engineering  

HSE Tecs 

1:25 

QC Tecs 

1:25 

Lead Forman 

Logis cs Team 

Visas, Permits, & Transport 

Office/Site Security Team 

Arrivals, Departures, & Guard Teams 

For staff security reasons our full in-country team is not depicted within this organiza on chart. For specific and verifiable inquiries we can provide our full organiza on chart with suppor ng curriculum vita. In addi on to our own internal staff with have working rela-onships with an extensive network of specialty subcontractors, material suppliers, and 

technical service firms throughout Iraq.  

 

 

SAMPLE CONSTRUCTION  PROJECTS 

Circa 2006 to 2007 

46 Million USD 

25,000 SM of new con-struc on 

Self-contained u lity system 

All required site civil in-frastructure 

Modern code compliant retail and bulk fuel sta-on with state of the art  

equipment imported from the US 

Onsite produc on of all required ready mix con-crete 

 

 

UPPER—All new construc on was composed of strip founda on footers based on local customary building prac ces. This design approach was cho-sen to maximum available labor resources as well as to expedite construc on at a job site which rou-nely encountered indirect fire (IDF).  

 

MIDDLE—A comprehensive modern commercial fuel sta on was provided for both MOGAS as well as Diesel. All mechanical equipment and valves were imported from the US. The facility included a bulk offload stand, bulk top-loading fuel truck arms, bulk retail fuel pumps, and all required safety accessories.   

 

BOTTOM RIGHT—Given the urban nature of the project all new construc on was two (2) story load bearing brick walls with cast in place floors and roof decks.  

 

BOTTOM LEFT—All ready mix concrete u lized for the project site was produced on-site with a mobile batch plant. Concrete pours were begun near day-break and were con nued un l sunrise as a majori-ty of pours occurred during the summer months.  

Camp Honor was a Brigade level design-build building facility project for the Iraq Army. The project consisted of three (3) each Infantry Ba alions and one (1) each Motor Regiment Ba alion.  

The project was planned and executed in a high density urban environment u lizing con ngency construc on principals to compress the schedule and maximum the use of locally available personnel, labor, and material resources.     

Each Ba alion had a design troop level of approximately seven-hundred and fi y (750) personnel. As such the total design popula on of the facility was three-thousand (3,000) personnel.  

All new construc on was composed of two (2) story load bearing brick walls with cast in place floor and roof decks.  

Addi onally, all new construc on was supported with accompanying site civil infrastructure. Electrical power was provided with an on-site self-contained 12 mva diesel fired power plant, the water and sewer networks were connected to the exis ng municipal systems.  

This facility represented the second (2nd) and last Bri-gade Level base constructed in the approximate center of Baghdad, Iraq with final Brigade du es being associ-ated with protec on of the area formally known as the Green or Interna onal Zone.  

BELOW—Overview of one (1) of the four (4) ba alion complexes consis ng of four (4) barrack structures in the background and (1) each Company and Ba alion office building in the foreground.   

TOP—All interiors were finished with gypsum plaster work and terraz-zo  led floors.  

 

 

SAMPLE CONSTRUCTION  PROJECTS 

Circa 2008 to 2009 

27 million USD  

Restora on of exis ng decora ve plaster work 

Self-contained u lity system 

All required site civil in-frastructure 

New Construc on: 10 luxury townhouses, de-ten on facili es for 250 detainees, and detainee receiving and discharge building 

Onsite produc on of all required ready mix con-crete 

 

UPPER—Restored decora ve plaster work inside of exis ng courthouse . Restora on work involved retaining specialty subcontractor from Baghdad to repair exis ng decora ons as well as to fabricate new decora ons to match exis ng.  

 

MIDDLE—Exterior view of townhouses for in-resident judges. All townhouses were new con-struc on. Addi onally, each townhouse was fully furnished with both local procured goods as well as imported goods.   

 

BOTTOM RIGHT—Interior view of townhouses for in-resident judges. All furnishings as well as case-work were imported. Each unit was fi ed with a custom chandler to illuminate the entry/receiving area.  

 

BOTTOM LEFT—Interior view of on-site open offic-es. All furnishings were imported. 

The Al Anbar Providence Judicial Complex located in Ramadi Iraq was a high priority rule of law project. The project consisted of renova ng and expanding and ex-is ng courthouse complex. The project included new courthouses, administra ve buildings, judicial housing, security measures, u li es, and deten on facili es. In addi on all material, furniture, supplies, and mainte-nance equipment were provided as a part of the project scope.  

The following summarizes the buildings which were constructed or renovated: 

Renova on/Conversion—Three courthouses 

Renova on/Conversion—Training Building  

Renova on/Conversion—A orney Offices 

Renova on/Conversion—Cafe 

Renova on/Conversion—Student Housing 

Renova on/Conversion—Public Restrooms 

Renova on/Conversion—Security Screening Build-ing (with metal and X-ray equipment) 

Renova on/Conversion—Security Barracks, DFAC, Officers Quarters, Laundry, and MWR Facili es 

New Construc on—Ten (10) each luxury town-houses 

New Construc on—100 person deten on facility 

New Construc on—150 person deten on facility 

New Construc on—Receiving and discharge build-ing 

New Construc on—Force protec on facili es 

In addi on to the renova on/conversion and new con-struc on the complex was fi ed with all required site civil infrastructure and suppor ng self-contained u lity systems.  

A unique feature of this project included the restora on of architectural plaster details throughout the exis ng courthouse. In order to complete this work a specialist plaster sub-contractor was retained from Baghdad.  

BELOW—Night view of renovated primary courthouse  

TOP—Night view of renovated courthouse  

 

 

SAMPLE CONSTRUCTION  PROJECTS 

Circa 2009 to 2010 

33 million USD  

43,330 SM of New Con-struc on 

32,120 SM of Vehicle Sun Shades 

Green Field Project 

All required site civil in-frastructure 

Force Protec on system including CCTV 

Onsite produc on of all required ready mix con-crete 

 

 

UPPER—Modern commercial kitchen with equip-ment as required to support the 1,748 SM Dinning Facility (DFAC). The equipment was procured from Fargor located in Spain.    

 

MIDDLE—Modern vehicle maintenance shop with pneuma c fluid dispensing system for oil, grease, and related maintenance fluids.   

 

BOTTOM RIGHT—Site wide fire hydrant/hose sys-tem combined with the potable water system.  

 

BOTTOM LEFT—Interior view of NCO barracks. All new finished construc on was generally based on local building prac ces to expedite construc on as well as to maximize the use of locally alliable mate-rial and labor. All exterior sun-shades were com-posed of pre-engineered metal buildings (PEBs) imported from a  PEB firm located in Dubai, UAE.  

The Forth (4th) Iraqi Army Division Headquarters Com-plex was a design-build project located near Tikrit. This facility encompassed and area of approximately 100,000 SM, and was designed to be a self-contained base serv-ing as the headquarters for the 4th Iraqi Army Division.  

The total area of facili es constructed was approximate-ly 43,440 SM, with and addi onal 32,120 SM of sun-shade space required for vehicles.  

The following summarizes the buildings which were constructed: 

3,550 SM Division Headquarters Building 

(4 ea) 1,171 SM Regimental Headquarters Building 

(2 ea) 659 SM Company Headquarters Building 

504 SM Vehicle Maintenance Building 

105 SM Maintenance Building 

907 SM Officer’s Quarters 

1,357 SM NCO Barracks 

841 SM Enlisted Barracks  

874 SM Dining Facility (Enlisted) 

874 SM Dining Facility (NCO) 

863 SM Medical Facility 

59 SM Laundry Facility 

469 SM Vehicle Wash Rack 

100 M Weapons Range 

691 SM Arms Storage Building 

 

As this was a green field site, a complete u lity infra-structure was designed and constructed. This consisted of new water/wastewater distribu on and treatment. Extension of new electric transmission and service ex-tensions. Back-up power genera on, and integrated communica ons network.  

All roadwork and parking areas were constructed of cast-in place concrete. Force protec on measures consisted or perimeter fencing, guard towers, sally ports and a CCTV surveillance system. 

BELOW—Site view of completed building facili es. Sunshades were composed of pre-engineering metal buildings (PEBs) and masonry construc on was u lized for all finished space.  

TOP—Night view of car sunshade.  

 

 

SAMPLE CONSTRUCTION  PROJECTS 

Circa 2009 to 2010 

35 million USD  

1st Genera on Over-head Protec ve Cover 

Protec ve Blast Wall and ECP 

Comprehensive CCTV and Access Control Sys-tem 

Comprehensive land-scaping and irriga on system u lizing treated waste water effluent 

Greenfield site 

 

 

UPPER—Modern workshop facili es composed of pre-engineered metal buildings (PEBs) with the ini al three (3) meters of wall composed of Con-crete Masonry Unit (CMU) plastered and painted block work.   

 

MIDDLE—Typical interior view of workshop space fi ed with cranes. The main workshop was fi ed with seven (7) overhead cranes. The cranes were sourced from Kone Crane in Dubai, UAE and load tested a er installa on.   

 

BOTTOM RIGHT—Finished and furnished office space on the second floor of the main workshop.  The office space consisted of glass fronted execu-ve offices on one site.  

 

BOTTOM LEFT—On-site accommoda ons provided with by u lizing Red-Sea containers protected with standard T-walls.  All Red-Sea containers were fab-ricated at their Dubai, UAE facility.  

Schlumberger was the first interna onal oil and gas service firm to mobilize back to Iraq and break ground of permanent facili es. All facili es within this campus complex were design and constructed to all applicable interna onal codes and Schlumberger specifica ons.  

The following summarizes the buildings which were constructed: 

Main Workshop 

Mechanical workshop with pressure test bay 

Truck-wash with industrial waste water treatment plant 

Cement / Chemical Warehouse 

Nuclear Storage Building 

Calibra on Pad and Building 

Explosives Building 

841 SM Enlisted Barracks  

Wireline Facility 

Acid tank pad complete with HDPE liner under the pad and protec ve fiberglass acid resistant exterior contac ng system 

DFAC, Medical Clinic, MWR facili es, and Security Office 

 

This was a greenfield site and as such all required sup-por ng site civil  infrastructure and suppor ng u lity systems were provided.  

As a result of the loca on of this site, a salt-water re-verse osmosis water treatment system was required with an onsite reject injec on well. Addi onally, all treated waste water was reu lized through a secondary treatment system and automated site wide landscape irriga on system. In addi on to this an industrial waste water treatment system was installed for recycling waste water from the truck wash.   

BELOW—Comprehensive main workshop for all on-base tenants. Air-condi oned laboratory space and second story office space.   

TOP—Remote fuel offload stand with pri-mary filtra on and wa-ter separa on. 

 

 

SAMPLE CONSTRUCTION  PROJECTS 

Circa 2011 to 2012 

35 million USD  

3rd Genera on Over-head Protec ve Cover 

Comprehensive ICT, Se-curity, PAGA, Fire Detec-on, H2S Detec on, and 

Entertainment System 

Comprehensive land-scaping and irriga on system  

Greenfield construc on on a Brownfield site 

 

 

UPPER—This facility included two (2) third (3rd) genera on overhead protec ve structures. These structures were composed of a pre-engineered building (PEB), concrete detona on layer, and welded grate pre-detona on layer. The  PEB was then finished with masonry exterior walls and standard western interior finishes.  

 

MIDDLE—Comprehensive onsite self-contained u lity system with remote load/offload systems. On-site diesel fired power plant with future provi-sions for u lity grid connec on, redundant emer-gency backup generators for all cri cal building facili es, secondary UPS backup system for all serv-er racks.  

Power was distributed at 11kv with provisions pro-vided at the power plant to accept a 33kv u lity grid feed. 

 

BOTTOM RIGHT—Olympic size in-ground masonry and fully  led swimming pool. Construc on includ-ed and underground equipment room/filtra on system. 

 

BOTTOM LEFT—On-site modern fitness gym u liz-ing commercial quality gym equipment imported from the USA  

Shell has a majority foreign stake in the Basra Gas Com-pany. Their main opera ons base is located adjacent to the KAZ Gas Plant in Khor-Al Zubair. This facility was designed and constructed with one-hundred and fi y-six (156) execu ve ensuite private accommoda on rooms and all required suppor ng features.   

The following summarizes the buildings which were constructed: 

Accommoda on block 

Main Office with central server room 

Kitchen and Dining Facility 

Mul -purpose recrea on room 

Swimming pool and sports field 

Security Building 

Converged fiber op c network u lizing Commscope and Cisco equipment providing sup-port to Public Internet, Company, Internet, CCTV, Access Control, and Private Hotel Style TV Enter-tainment System.  

Hardwired analog Fire and Gas Detec on/Alarm System 

Hardwired PAGA system cross connected to the Fire and Gas Detec on Alarm System and the En-tertainment System 

100 meter tall telecommunica ons tower sup-por ng mul -rack server room u lized by Shell for opera ons as well as four (4) full racks to support project site core connec vity needs.  

This site was adjacent to an ac ve gas processing plant and as such required comprehensive HSE work proce-dures. The site was essen ally constructed on a brown-field and required extensive site civil prepara on work to remove exis ng abandoned u lity and infrastructure systems to allow for the new development.  

Addi onally, all facili es were finished with steel stud / drywall construc on in order to conceal u lity systems and meet applicable fire and sound ra ng requirements.  

BELOW—View of accommoda on block consis ng of thirteen single story buildings with twelve rooms per building.   

TOP—100 meter high freestanding telecom-munica ons tower. Connec ng to main onsite server room.   

 

 

SAMPLE CONSTRUCTION  PROJECTS 

Circa 2012 to 2013 

27 million USD  

Single concrete pours up to 2,200 CM 

7,000 pre-cast concrete piles installed 

300 man work crew for pile and concrete work 

Greenfield construc on 

 

 

UPPER—As a result of in-situ soil condi ons all heavy structures and par cularly all bulk tank foun-da ons rested on driven concrete piles. As a part of the projects local content plan and socio-economic plan, local area laborers were hired to manually cut the pile tops in prepara on for con nued founda-on works.  

 

MIDDLE—The largest bulk storage tanks in the facility had diameters of thirty-five (35) meters and also relied on pile founda ons.   

 

BOTTOM RIGHT—The largest bulk storage tanks required con nuous thirty-six (36) hour pour  mes and required up to 2,200 CM of concrete.  

 

BOTTOM LEFT—Local area labor manually cu ng pile in prepara on for con nued founda on work. Over 7,000 pre-cast concrete piles were installed and prepared for con nued founda ons work.   

The West Qurna Central Processing Facility (CPF) is lo-cated, in Southern Iraq, in the West Qurna Oilfield. For this project our staff ini ally performed the Phase 1 scope of work, which consisted of site grading, perime-ter fencing, and security infrastructure.  

Following comple on of Phase 1 or staff worked on Phase 2 which consisted of finalizing site work, installing founda ons, concrete tanks and u li es.  

U li es constructed in this phase consisted of water-lines, electrical duct banks, and storm water manage-ment infrastructure.  

Founda ons were constructed for all primary equip-ment. All founda ons were supported by pre-cast con-crete piles. Over 7,000 piles were installed and cut to the design eleva on.  

A total of fi een (15) circular tanks were constructed, with dimeters ranging from 7.2 M to 33 M. For the larg-er tanks, up to 2,200 CM of concrete was used for the bo om slab and placed in a con nuous pours generally las ng up to thirty-six (36) hours.   

Founda ons for the pipe racks had to be precisely placed as the pipe racks were pre-assembled on the ground while the founda ons were being installed. A er founda on work was completed, the pipe racks were moved into place and set as single assemblies. 

Over 300 workers were mobilized for the founda on and pile cu ng work.   

BELOW—Central Produc on Facility (CPF) nearing comple on. Our staff worked on all site civil works within the CPF with raw materials generally being provided by the Prime EPC contractor.   

TOP—Steel erec on work for pipe racks inside of the CPF.  

 

 

SAMPLE CONSTRUCTION  PROJECTS 

Circa 2011 to 2013 

30 million USD  

Ini al Site Prepara on Construc on on behalf of Oil Major 

Site Civil Construc on on behalf of Prime EPC Contractor 

Greenfield Construc on 

 

 

UPPER—Our staff constructed all substa ons with-in the Phase 1 CPF. This construc on was based on Prime EPC Contractor designs as well as Prime EPC Contractor provided major equipment. Our staff coordinated and supplied all required ancillary equipment and finishing materials for each substa-on. The general configura on of each substa on 

consisted of exterior packaged transformers, interi-or switchgear and controls, with adequate space underneath the switchgear room for all applicable raceways and cables.  

 

MIDDLE—Our staff was responsible for the erec-on of all steel pipe rack structures. These struc-

tures were pre-fabricated by the Prime EPC Con-tractor offshore and erected on founda ons in-stalled by our staff.   

 

BOTTOM RIGHT—Our staff was responsible for all final site clean up and associated gravel landscap-ing throughout the CPF facility.   

 

BOTTOM LEFT—Our staff completed all internal road asphalt pavement in the CPF as well as all concrete road crossings.   

The Badra Oil Field project Central Processing Facility Phase I (CPF) was constructed in the Badra oilfield situ-ated in Wasit governorate, approximately 160 km southeast of Baghdad, Iraq. 

For this project our staff  performed the Early Civil Works, which consisted of site grading, perimeter fenc-ing and security infrastructure. This work was per-formed on a design-build basis and specifically our staff completed the ini al grading design and grading for the CPF facility.  

A er the Early Civil Works phase was completed the Phase I por on of the project was begun.  For this phase our staff performed site excava ons for founda ons and u li es, concrete work for pipe supports, equipment and tanks as well as blast pressure resistant reinforced concrete buildings constructed for the CPF substa ons, control center, and various support facili es.  

Containment dykes were constructed for bulk oil tanks, which incorporated HDPE liners. 

All concrete was prepared with on-site batch plants and all reinforcing was fabricated on-site. 

U lity installa ons included water, wastewater, pre-cast and cast in place electrical duct work and manholes.  A site wide stormwater system was constructed as well as storrmwater reten on ponds.  

Sleepers to support transmission pipe were pre-cast on-site u lizing fabricated formwork, and then installed at loca ons as shown on plans. 

All roadways were paved or received gravel surfacing with concrete road crossings. 

Cast in place piles were installed to support larger struc-tures. 

 

BELOW—Our staff completed all on-site structures.  Below is the interior view of one of the instrument control rooms in the CPF. All finishing materials were provided by our staff with major equipment provid-ed by the Prime EPC Contractor.  

TOP—Site Civil Road-work. Concrete pave-ment for roadway em bankment.