local gad planning and budgeting_jmc 2013

Upload: rheajoy1189

Post on 13-Oct-2015

76 views

Category:

Documents


0 download

DESCRIPTION

none

TRANSCRIPT

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    1/72Philippine Commission on WomenOffice of the President

    C. GAD PLANNING AND BUDGETING

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    2/72Philippine Commission on WomenOffice of the President

    THE LGU GAD PLAN & BUDGET (GPB) shall be:

    C.1 GENERAL GUIDELINES

    1. Formulated within the context of the LGU mandateto ensure gender mainstreaming in PPAs.

    2. Synchronized with the planning and budgetingcalendar (DILG-NEDA-DBM-DOF JMC 2007-01)

    3.Incorporated in the CLUP, CDP, AIP, ELA, PDPFP and insector plans (e.g. DRRM plans) guided by the desiredoutcomes and goals in GAD related plans & laws

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    3/72Philippine Commission on WomenOffice of the President

    a. Provision of basic services and facilities to protect and fulfill

    womens human rights including right to protection fromall forms of violence

    b. Womens economic empowermentincluding womensparticipation in economic governance

    c.Participation in local governance and decision-making

    d. Other provisions of the MCW (Refer to Annex C: Roles and Responsibilities of LGUsin Implementing the Magna Carta of Women).

    C.1 GENERAL GUIDELINES

    5.In identifying GAD PPAs, priority is given to emergingand/or continuing issues and concerns on:

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    4/72Philippine Commission on WomenOffice of the President

    .

    C.1 GENERAL GUIDELINES

    If these are not present or need to be strengthenedin the LGU, LGUs shall include them in their GPBs.

    For effective planning and implementation of GAD PPAs, essentialelements in GAD planning and budgeting should be in place:

    (a) creation and strengthening of the LGU GFPS;

    (b) capacity development on gender mainstreaming,gender-responsive planning and budgeting,gender analysis and gender assessment;

    (c) institutionalization of the GAD database

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    5/72Philippine Commission on Women

    Office of the President

    C.1 GENERAL GUIDELINES

    6) Provision of adequate resources by the LCE; GPBimplementation should not be affected by austeritymeasures.

    7. The GAD budget, which is the cost of implementing the GAD

    plan shall form part of and is not in addition to the LGUsAnnual Budget.

    8. Consultation with employees and constituencies throughaccredited women or people/civil society organizations,among others to ensure the relevance of their GPBs.

    9) GAD planning and budgeting shall adhere to Executive Order43 s. 2011 (Social Contract) [bottom-up Budgeting]

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    6/72Philippine Commission on Women

    Office of the President

    C.2 STEPS IN FORMULATING

    THE LGU GAD PLANAND BUDGET (GPB)

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    7/72Philippine Commission on Women

    Office of the President

    1. LGU GFPS to set GAD AGENDA or IDENTIFY GENDER PRIORITY

    ISSUES to be addressed inthree-year term in consultation with local functionaries & stakeholders GAD agenda as basis for annual formulation of PPAs to be included in

    the LGU GPB.

    GAD AGENDA OR ISSUES can be generated from:i. Review of GAD-related laws and policies relevant to the LGU

    (Section 2.0 and item C.1.4 of JMC);

    ii. Results of gender analysis and/or gender assessment using

    sex-disaggregated data(LGU GAD database, Ecological

    Profile, CBMS and/or LGPMS/NHTS-PR, LGUs major programs and

    services of the LGU reflecting gender gaps/issuesiii. Results of program and project evaluation in terms of benefits to

    target beneficiaries; and

    iv. Review of COA audit findings and GAD ARs to surface remaining

    gender issues not addressed in previous GPBs.

    C.2 STEPS IN FORMULATING THELGU GAD PLAN AND BUDGET (GPB)

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    8/72Philippine Commission on Women

    Office of the President

    4. FILL OUT theGPB Form

    3. GADBUDGET isPREPAREDBASED ON

    ESTIMATEDCOST OFFUNCTIONS& PPAstranslated fromthedemands/commitments identified

    in the GADPlan.

    C.2 STEPS IN FORMULATING THELGU GAD PLAN AND BUDGET (GPB)

    2. IDENTIFYAPPROPRIATE

    PPAs to

    address

    priority gender

    issues includedin the GPB.

    client-focusedaddressing gendermainstreaming inregular/flagshipPPAs); and

    organization-focused(addressing genderissues of the LGUand its personnel)

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    9/72Philippine Commission on Women

    Office of the President

    2. The five percent (5%) GAD budget shall endeavor toinfluence the remaining 95% of the LGU budget towardgender-responsiveness.

    1) At least five percent (5%) of the total LGU budgetappropriations authorized under the Annual Budgetshallcorrespond to activities supporting GAD PPAs.

    The GAD budgetshall be drawn from the LGUs maintenance and

    other operating expenses (MOOE), capital outlay (CO), andpersonal services (PS).

    The GAD budgetshall not constitute an additional budgetover anLGUs total budget appropriations.

    C.3 COSTING AND ALLOCATIONOF THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    10/72Philippine Commission on Women

    Office of the President

    3. GFPS to annually monitor and evaluate the utilization &outcome of the GAD budget in influencing the genderresponsive implementation of PPAs funded by the remaining95% of the LGU budget

    (MCW Chapter VI, Sec. 36); the results of which shall be reflected in theforms prescribed in Section 5.0 of this JMC)

    4. Five (5) to thirty (30) percent of ODA funds shall beallocated to support gender-responsive PPAs, provided

    that the same are aligned with the purpose of the foreigngrant and/or the grant agreements between the LGU andthe Grantor.

    C.3 COSTING AND ALLOCATIONOF THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    11/72

    Philippine Commission on WomenOffice of the President

    a. To gradually increase the gender-responsivenessofLGU programs and projects, the LGU may attribute aportion or whole of their budgets supporting gender-responsive PPAsto the GAD budget.

    To facilitate this, the LGU shall conduct a genderanalysis of their programs and projects through theadministration of the HGDG.

    C.4 ATTRIBUTION TO THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    12/72

    Philippine Commission on WomenOffice of the President

    b. If the LGU is not trained on the HGDG, it may propose

    a training program on the HGDG in its GPB for the

    incoming year or seek assistance of a gender analysis

    specialist/expert on the HGDG.

    c. HGDG yields a maximum score of 20 points for eachprogram or project.

    Based on the HGDG score, a percentage of the budgetof the LGUs existing and proposed regular or flagshipprogram/project may be attributed to the GADbudget.

    C.4 ATTRIBUTION TO THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    13/72

    Philippine Commission on WomenOffice of the President

    SCHEDULE TO BE OBSERVED IN GAD PLANNING & BUDGETING

    Jan

    LCEs issuance ofMemo for the

    preparation of annual

    GAD PLAN & BUDGET

    (GPB) & GAD

    ANNUAL REPORT(AR) of every

    office/department

    Jan-Feb

    Preparation ofannual GPB and GAD

    ANNUAL REPORT of

    all LGU Offices/depts

    including brgys for

    submission to GFPS(LGUs shall submit consolidatedGAD AR to DILG Provl, to Regl

    Office then to CO & to PCW)

    March

    LGU GFPS TWGof comp, cities and

    municipalitiesshall review&

    consolidate theGPBs & AR

    March

    Consolidated GPBsshall be submitted

    to M/PPDO toensure alignment of

    GAD PPAs to mun/provlgovt priorities

    GFPS to review

    March

    SubmissIon of GPBto the

    MLGOO/DILGProvl /DILG Reg;Offices for review

    and approval

    (endorsement)

    April-May

    DILG-approved LGUGPBs shall be

    returned to theconcerned LGUs for

    integration of theGAD PPAs in the

    AIP.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    14/72

    Philippine Commission on WomenOffice of the President

    SCHEDULE TO BE OBSERVED IN GAD PLANNING & BUDGETING

    JuneJuly

    Integration of

    identified gender

    issues and

    concerns & GAD

    goals, strategies,objectives,

    targets & PPAs of

    the GPB in the

    i.CLUP/CDP/PDPFP/ELA

    ii LDIP) before its

    approval.

    iii. Issuance of the

    Budget Call by the

    LCE to all LGU

    depts/offices

    July-Augusti. Integration of

    the approved

    GPB in the

    annual budget

    proposals of LGUdepartments/

    offices;

    ii. LFC shall

    ensure the

    integration of the

    GPB in the LGUbudget proposals

    during the

    technical budget

    hearings.

    SeptemberLFC shall

    ensure that

    the identified

    GAD PPAs are

    reflected inthe Local

    Expenditure

    Program

    (LEP) and the

    Budget

    Expenditureand Sources of

    Financing

    (BESF).

    OctoberNLT October 16,

    the LCE ensure

    that GAD PPAs are

    included in the

    Budget Messageand in the

    Executive Budget

    for submission to

    the Local

    Sanggunian for its

    enactment

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    15/72

    Philippine Commission on WomenOffice of the President

    C.6 SUBMISSION, REVIEW AND APPROVAL OF

    LGU GAD PLANS AND BUDGETS

    Component cities and municipalities outside Metro Manilashall submit their GPBs to the PPDO of the ProvincialGovernment to ensure the alignment of the municipal/city

    GAD PPAs with the priorities of the province and

    then from the PPDO to the (DILG Provincial Office)DILGRegional Officesfor its review and(endorsement)and

    approval. DILG-approved(endorsed)GPBs shall be returnedto the LGUs concerned, for incorporation in their annualbudgets to be enacted by their Local Sanggunian.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    16/72

    Philippine Commission on WomenOffice of the President

    C.6 SUBMISSION, REVIEW AND APPROVAL OF

    LGU GAD PLANS AND BUDGETS

    Barangays shall prepare and submit their GPBs to the

    City/Municipal PDO to ensure the alignment of the barangay

    GAD PPAS with the priorities of the city/municipalityand

    then from the City/Municipal PDO, submit the same to theDILG city/municipal LGOO for review and approval

    ENDORSEMENT.

    Reviewed and approvedENDORSEDGPBs shall be returned tothe concerned barangays, for incorporation in their Annual

    Budgets.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    17/72

    Philippine Commission on WomenOffice of the President

    C.6 SUBMISSION, REVIEW AND APPROVAL OF

    LGU GAD PLANS AND BUDGETS

    The LGU GFPS shall ensure that the GPBs of their respectiveLGUs,including the GPBs of barangays within the city/municipal jurisdiction arecarried out according to synchronized local planning and budgetingcalendar.

    For enhancement:The MUNICIPAL GFPS TWG SHALL REVIEWSUBMITTED BARANGAY GPBs. LIKEWISE THE PROVINCIAL GFPS

    TWG SHALL REVIEW SUBMITTED GPBs OF MUNICIPALITIES ANDCOMPONENT CITIES (FOR ENHANCEMENT) shall review all submittedGPBsand as needed, provide comments or recommendations for revision.(E.G. BARANGAY GPBs WILL BE REVIEWED BY MUNICIPAL GFPSTWG)

    The review of GPBs shall focus on the 1) alignment of the GAD plan with the

    GAD agenda and 2) the correctness and alignment of the entries in each columnof the GPB form, e.g. if the proposed activities respond to the identified genderissue or cause of the issue, the issues are correctly identified or formulated, ifthere are clear indicators and targets, if the proposed budget is realistic, if thenumber of proposed activities are doable within the year, among others.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    18/72

    Philippine Commission on WomenOffice of the President

    C.6 SUBMISSION, REVIEW AND APPROVAL OF

    LGU GAD PLANS AND BUDGETS

    The DILG Regional Offices shall issue review and approve

    endorsedthe LGU GPBs based on the gender-

    responsiveness of their content, e.g. relevance of the GAD

    PPAs to the identified gender issues and their causes as

    well as the correctness and alignment of the entries in the

    GPB form.

    DILG-approvedendorsedGPBs shall include a certificate of approval

    from the DILG Regional Offices which will be returned to the

    concerned LGUs for incorporation in their Annual Budgets to be

    enacted by their Sanggunian.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    19/72

    Philippine Commission on WomenOffice of the President

    C.7 IMPLEMENTATION AND MONITORING OFTHE LGU GAD PLAN AND BUDGET

    1) Upon receipt of the enacted GPB which includes acertificate of approval endorsementfrom the concernedDILG Regional or Provincial Office, the LCE shall issue anappropriate policy directive, copy furnished the DILGRegional or Provincial Office, to disseminate and implementthe GPB.

    The directive shall also mandate the LGU GFPS to: a) providetechnical assistance in the implementation of the GPB; b)monitor its implementation; c) ensure the preparation andsubmission of GAD AR; and d) consolidate reports on theimplementation of the GPB.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    20/72

    Philippine Commission on WomenOffice of the President

    C.7 IMPLEMENTATION AND MONITORING OFTHE LGU GAD PLAN AND BUDGET

    2) The LGUs through their LCEs shall inform the DILG Regionalor ProvincialOffice in writing if there are changes in theDILG-approvedendorsed GPB and/or if there is a need toimplement additional PPAs relevant to current gender issues

    or GAD-related undertakings.

    The DILG Regional or Provincial Office, in turn, shallacknowledge receipt of adjusted GPB and shall inform theLGUs if the GAD PPAs or activities in the adjusted GPB are in

    accordance with this JMC.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    21/72

    Philippine Commission on WomenOffice of the President

    C.7 IMPLEMENTATION AND MONITORING OFTHE LGU GAD PLAN AND BUDGET

    3) As needed, LGUs may seek the assistance of DILG, PCW,

    DBM, NEDA, other oversight agencies, civil society

    organizations (CSOs), gender specialists/experts and

    other stakeholders in monitoring the results of their GAD

    PPAs.

    4) The GFPS shall regularly monitor if the GAD budget is

    being spent for what it was intended for and check on the

    actual cost of implementing the GAD activities.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    22/72

    Philippine Commission on WomenOffice of the President

    ANNEX D:

    GUIDE IN COMPLETING THE LGUGAD PLAN AND BUDGET FORM

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    23/72

    Philippine Commission on WomenOffice of the President

    OLD GPB FORM (JMC 2001-01)

    LGU:

    Department/Office

    Calendar Year

    GAD

    PPAs

    Gender-

    relatedissuesaddressed

    Expected

    Output/TargetBeneficiaries

    Implementat

    ion Period

    Performa

    nceIndicators

    OPR Budget

    Allocation

    Grand Total

    Prepared By: Approved By: Date

    NEW GPB FORM (JMC

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    24/72

    Philippine Commission on WomenOffice of the President

    ANNUAL GENDER AND DEVELOPMENT (GAD) PLAN AND BUDGETFY ______

    Region: __________________Province: __________________City/Municipality: __________________Total Budget of LGU: __________________Total GAD Budget: __________________

    GenderIssue/GAD

    Mandate(1)

    Causeof the

    GenderIssue

    (2)

    GADObjecti

    ve(3)

    Relevant LGUPPA(4)

    GADActivity

    (5)

    Performance

    Target(6)

    Performance

    Indicator(7)

    GAD Budget(8)

    Officeof

    Primary

    Responsibility

    (9)

    MOOE

    PS

    CO

    Client-focused/GAD

    Mandate

    Organization-focused

    SUB-TOTAL

    GRAND TOTAL (MOOE+CO+PS)

    Prepared by:Chairperson, GFPS-TWG

    Approved by:Local Chief Executive

    Date:DAY/MM/YEAR

    NEW GPB FORM (JMC

    &

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    25/72

    Philippine Commission on WomenOffice of the President

    Gender Issue(1)

    Relevant

    LGU

    PPA

    (4)

    GADActivity

    (5)

    Performance

    Indicat

    or

    (6)

    Performance

    Target

    (7)

    GAD Budget(8)

    Officeof

    Prima

    ry

    Respon

    sibility(9)

    MOOE PS CO

    GAD PLAN & BUDGET

    List priority gender issues identified through theLGUs review of its flagship or regular programsand analysis of sex-disaggregated data or relevantinformation surfacing the unequal situation ofwomen and men. The gender issue could be client-

    or organization-focused.

    A client-focused gender issue refers to concerns arisingfrom the unequal status of women and men stakeholders,clients, and or constituents of LGUs including the extent oftheir disparity over benefits from and contribution to a

    policy/program and/or project of the LGU.

    An organization-focused gender issuepoints to thegap/s in the capacity of the LGU to integrate a genderdimension in its programs, systems or structure.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    26/72

    Philippine Commission on WomenOffice of the President

    Cause of the Gender

    Issue

    (2)

    GAD

    Obje

    ctive

    (3)

    Relevant

    LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Performance

    Indicat

    or

    (6)

    Perfor

    mance

    Target

    (7)

    GAD Budget(8)

    Officeof

    Prima

    ry

    Respon

    sibility(9)

    MOOE PS CO

    GAD PLAN & BUDGET

    Establish the cause or causes of the issue toensure that the GAD PPA will directly addressthe gender issue leading to its gradual orcomplete elimination.

    Some gender issues may take longer than a year

    to address.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    27/72

    Philippine Commission on WomenOffice of the President

    GAD Objective(3)

    Relev

    ant

    LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    mance

    Indicat

    or

    (6)

    Perfor

    mance

    Target

    (7)

    GAD Budget

    (8)

    Office

    of

    Prima

    ry

    Respon

    sibility

    (9)

    MOOE PS CO

    GAD PLAN & BUDGET

    This column responds to the gender issue

    including its cause or implement thespecific GAD mandates relevant to theLGU.

    It spells out the result that the LGU intendsto achieve. It may also be the intended

    result of the GAD mandate the LGU intendsto implement.

    The GAD objective must be SMART.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    28/72

    Philippine Commission on WomenOffice of the President

    Relevant LGU PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    mance

    Indicat

    or

    (6)

    Perfor

    mance

    Target

    (7)

    GAD Budget

    (8)

    Office

    of

    Prima

    ry

    Respon

    sibility

    (9)

    MOOE PS CO

    GAD PLAN & BUDGET

    This column indicates the relevant PPAs ofthe LGU that can be integrated withgender perspective to respond to thegender issues and/or implement thespecific GAD mandate/s identified inColumn 1.

    Similar to the GAD objective, the proposedGAD activities should respond to thegender issue including its cause/s orimplement the specific GAD mandatesrelevant to the LGU.

    The proposed GAD activity, which caneither be client- or organization-focused,should be stated as clearly as possible tofacilitate budgeting.

    (confusing)

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    29/72

    Philippine Commission on WomenOffice of the President

    GAD Activity

    (5)

    Perfor

    mance

    Indicat

    or

    (6)

    Perfor

    mance

    Target

    (7)

    GAD Budget

    (8)

    Office

    of

    Prima

    ry

    Responsibility

    (9)

    MOOE PS CO

    GAD PLAN & BUDGET

    Similar to the GAD objective, the

    proposed GAD activities should

    respond to the gender issue

    including its cause/s or implement

    the specific GAD mandates relevantto the LGU.

    The proposed GAD activity, which

    can either be client- or

    organization-focused, should bestated as clearly as possible to

    facilitate budgeting.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    30/72

    Philippine Commission on WomenOffice of the President

    GAD Activity

    (5)

    Perfor

    mance

    Indicat

    or

    (6)

    Perfor

    mance

    Target

    (7)

    GAD Budget

    (8)

    Office

    of

    Prima

    ry

    Respon

    sibility

    (9)

    MOOE PS CO

    GAD PLAN & BUDGET

    Organization-focused activitiesmay seek to:

    a) create the organizationalenvironment for implementinggender-responsive policies,programs, projects and services;

    b) address the gap inknowledge, skills and attitudesof key personnel on gendermainstreaming; and

    c) address the gender issues of

    employees in the workplacesubject to the mandate of theorganization.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    31/72

    Philippine Commission on WomenOffice of the President

    GenderIssue

    (1)

    Cause ofthe

    Gender

    Issue

    (2)

    GADObjective

    (3)

    Relevant

    LGU

    PPA

    (4)

    GADActivity

    (5)Performance Indicator

    (6)

    GAD PLAN & BUDGET

    Quantitative or qualitative means tomeasure achievement of the results of theproposed activity and how theycontribute to the realization of the GADobjective.

    Quantitative indicators are measures orevidence that can be counted such as, butnot limited to, number, frequency,percentile, and ratio.

    Qualitative indicators are measures of an

    individual or groups judgment and/ orperception of established standards, thepresence or absence of specificconditions, the quality of something, orthe opinion about something

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    32/72

    Philippine Commission on WomenOffice of the President

    Gende

    r Issue

    (1)

    Cause

    of the

    Gender

    Issue

    (2)

    GAD

    Objective

    (3)

    Rele

    vant

    LGU

    PPA

    (4)

    GAD

    Activity

    (5)Performance Target

    (7)

    GAD PLAN & BUDGET

    The target is an important consideration inbudgeting for it specifies what the LGUsGPB intends to achieve within one year inrelation to the GAD objective.

    The target should be realistic and attainablewithin the implementation period andshould be set against a baseline data.

    Monitoring and evaluating the GPB willlargely be based on attainment of targets

    and performance indicators.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    33/72

    Philippine Commission on WomenOffice of the President

    Gender

    Issue

    (1)

    Cause of

    the

    Gender

    Issue

    (2)

    GAD

    Objective

    (3)

    Relev

    ant

    LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    mance

    Indicat

    or

    (6)

    GAD Budget

    (8)

    MOOE PS CO

    GAD PLAN & BUDGET

    The GAD budget is the cost of implementing theGAD plan. For more realistic budgeting, the costof implementing each activity should be estimatedby object of expenditure.

    The GAD budget may be drawn from the LGUsMOOE, CO, and/or PS based on the LGUsapproved budget.All LGUs shall allocate at leastfive percent (5%) of their annual budgetappropriations to support their respective GADPPAs.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    34/72

    Philippine Commission on WomenOffice of the President

    GenderIssue

    (1)

    Cause ofthe

    Gender

    Issue

    (2)

    GADObjective

    (3)

    Relevant

    LGU

    PPA

    (4)

    GADActivity

    (5)

    Performance

    Indicat

    or

    (6)

    Performance

    Target

    (7)

    GADBudg

    et

    (8)

    Office ofPrimary

    Responsibility

    (9)M

    O

    O

    E

    P

    S

    C

    O

    GAD PLAN & BUDGET

    This column specifies the unit or office within the LGUtasked to implement a particular GAD activity.

    The responsible unit shall have direct knowledge or

    involvement in GAD PPAs and shall periodically reporton the progress of implementing its assigned tasks to

    the LGUs LCE and/ or GFPS.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    35/72

    Philippine Commission on WomenOffice of the President

    (e.g. gender sensitivity, gender audit,gender analysis, gender-responsiveplanning and budgeting, gender-responsive project design,implementation and institutionalstrengthening, among others)

    Give priority toclient-focusedGAD activities

    Give premium tocapacity development

    for LGUs that are

    in early stages ofgender mainstreaming

    For the GAD Activity column

    Gender Cause of the GAD Relevant GAD Activity Performance Performance

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    36/72

    Philippine Commission on WomenOffice of the President

    Issue/

    GADMandate (1)

    GenderIssue

    (2)

    Objective(3)

    LGU PPA(4)

    (5) Indicator

    (6)

    Target

    (7)

    Client-Focused

    1) lack ofaccess ofmarginalizedand indigentwomen tosocialprotection

    programsand servicesof the LGUon health

    Women arenot aware of

    socialprotectionprograms

    Lack ofIECcampaigns

    on socialprotectionprograms

    To increaseand sustain

    access ofindigent/

    marginalized womento socialprotectionprograms

    Welfareand

    DevelopmentProgram

    conductmassive

    informationeducationcampaign onthe socialprotectionprogram/scheme;

    assist in theenrollment ofthemarginalizedand indigentwomen toPhilhealth;

    promulgateand implementan ordinanceon access ofwomen to theLGUs social

    protectionprogram

    Number ofmarginalized

    and indigentwomenenrolled inthe Philhealth(quantitativeindicator)

    Presence of anordinancesupportingmarginalizedand indigentwomens

    access to the

    socialprotectionprograms ofthe LGU(qualitative)

    a) x number ofIEC campaigns on

    the socialprotectionprogram orscheme conductedby end of theyear;

    b) x number of

    marginalized andindigent womenassisted in theenrollment toPhilhealth by 1stquarter; and

    c) ordinance on

    the access ofwomen to socialprotectionprogram of theLGUs issued byend of the year.

    Gender Cause of the GAD Relevant GAD Activity Performance Performance

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    37/72

    Philippine Commission on WomenOffice of the President

    Issue/

    GADMandate

    (1)

    Gender Issue

    (2)

    Objective(3)

    LGU PPA(4)

    (5) Indicator

    (6)

    Target

    (7)

    Org-focused

    Slowprogress ofgendermainstreaming in theLGU

    Absence of aGFPS orsimilarmechanism tolead gendermainstreaming in the LGU

    Lack of

    support onGADinitiativesfrom LGUofficials

    To facilitateand sustaingendermainstrea-ming in theLGU

    To addressthe gap ofthe LGU inintegratinggenderdimensionin itsprogramsand or

    services

    CapacityDevelopment Program

    a) issuance ofan executiveorder for thecreationand/orstrengtheningof the GFPS orsimilarmechanism;

    b) creationand/orstrengtheningof the GFPS inthe LGU; and

    c)institutionaliz

    ation ofgender-responsivePPAs in the

    LGU.

    Number ofGFPS memberstrained on GADover totalnumber ofGFPS members(quantitative)

    Level ofknowledge,skills andattitudes (KSAs)of GFPSmembers onGAD(qualitative)

    X number ofGFPSmembers andLGUemployeestrained onGST++ by 1stquarter of theyear

    Oneexecutiveorder onreconstitution/strengtheningof the LGUGFPS issued

    by end of theyear

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    38/72

    Philippine Commission on WomenOffice of the President

    1)Programs, projects, activities (PPAs) included in the DILG-approved LGU GADplan, includingrelevant expenses such as supplies, travel, food, board andlodging, professional fees, among others;

    2) Capacity development on GAD (e.g. Gender Sensitivity Training; Gender

    Analysis, Gender-responsive Planning and Budgeting, among others

    3) Activities related to the establishment and/strengthening of enablingmechanisms that support the GAD efforts of LGUs (e.g. GAD Focal Point System,VAW desks, among others);

    4)Salaries of LGU personnel assigned to plan, implement and monitor GAD PPAson a full-time basis, following government rules in hiring and creating positions;

    EXPENSES THAT CAN BE CHARGED TO THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    39/72

    Philippine Commission on WomenOffice of the President

    5) Time spent by LGU GAD Focal Point System members or LGU employees

    doing GAD related work. Overtime work rendered in doing GAD relatedPPAs may be compensated through a compensatory time off (CTO),following government accounting and auditing rules and regulations;

    6) Salaries of police women and men assigned to womens desks

    7) Salaries of personnel hired to manage/operate the GAD Office,if established;

    8) LGU programs that address womens practical and strategic needs(e.g. day care center, breastfeeding rooms, crisis or counseling roomsfor abused women and children, halfway houses for trafficked womenand children, gender-responsive family planning program, among others);

    EXPENSES THAT CAN BE CHARGED TO THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    40/72

    Philippine Commission on WomenOffice of the President

    9) Construction expenses for the following : a) Day care center; b) VAWCCenter; c) Halfway Houses for trafficked women and girls; andd) Women crisis center

    10) Consultations conducted by LGUs to gather inputs for and/orto disseminate the GAD plan and budget;

    11) Payment of professional fees, honoraria and other services for genderexperts or gender specialists engaged by LGUs for GAD-relatedtrainings and activities; and

    12) IEC activities (development, printing and dissemination) thatsupport the GAD PPAs and objectives of the LGUs.

    EXPENSES THAT CAN BE CHARGED TO THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    41/72

    Philippine Commission on WomenOffice of the President

    The expenditures although allowed, muststill follow government accounting rulesand regulations.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    42/72

    Philippine Commission on WomenOffice of the President

    EXPENSES THAT CANNOT BE CHARGED TO THE GAD BUDGET

    Programs, projects, activities (PPAs) that are not in the LGUs

    DILGapproved GAD plan;

    Personal services of women employees unless they are workingfull time or part time on GAD PPAs;

    Honoraria for LGUs GFPS members or other employees

    working on their LGU GAD programs;

    Salaries of casual or emergency employees UNLESS they arehired to assist in GAD-related PPAs;

    Provision of contingency funds or other services of PPAs; and

    Purchase of supplies, materials, equipment and vehicles for thegeneral use of the LGU.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    43/72

    Philippine Commission on WomenOffice of the President

    The following expenses CAN NOT be charged to the GADbudget UNLESS they are justified as clearly addressing aspecific gender issue:

    Physical, mental and health fitness including purchaseof supplies, materials, equipment and informationdissemination materials;

    Social, rest and recreation activities; and Religious activities and implementation of cultural

    projects;

    ATTRIBUTION TO THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    44/72

    Philippine Commission on WomenOffice of the President

    HGDGScore

    Description Corresponding Budget for the Year of theProgram that may be Attributed to the

    LGU GAD Budget

    Below 4.0 GAD is invisible 0% or no amount of the program/projectbudget for the year may be attributedto the GAD budget

    4.0 7.9 Promising GADprospects

    (conditional pass)

    25% of the budget for the year of theprogram/project may be attributed to

    the GAD budget

    8.0 14.9 Gender sensitive 50% of the budget for the year of theprogram/project, may be attributed tothe GAD budget

    15.0 19.9 Gender-responsive 75% of the budget for the year of the

    program/project may be attributed tothe GAD budget

    20.0 Fully gender- responsive 100% of the budget for the year of theprogram may be attributed to the GADbudget

    ATTRIBUTION TO THE GAD BUDGET

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    45/72

    Philippine Commission on WomenOffice of the President

    PARAMETERS FOR REVIEWING

    GAD PLANS AND BUDGETS

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    46/72

    Philippine Commission on WomenOffice of the President

    Did it follow the prescribed format in thePCW-DILG-DBM-NEDA Joint MemorandumCircular No. 2013-01: Guidelines on theLocalization of the Magna Carta of Women

    Did it completely satisfy the elementsprescribed in the GPB template?

    GAD Plan and Budget Format

    Rule: If the answers are negative,suggest that the prescribed GPB template be met.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    47/72

    Philippine Commission on WomenOffice of the President

    General Rules:

    If answer to the question is YES, then it satisfies therequirements of the PCW-DILG-DBM-NEDA JMC 2013-01;

    If answer to the question is NO, then it does not satisfy

    the requirement of the JMC; Recommend enhancement to ensure that the GPB is in

    accordance with the guidelines.

    Conduct horizontal review to check whether the

    elements are aligned.

    When in doubt, probe before agreeing/disagreeing toany of the proposed item in the LGU GAD plan and budget.

    Content of the GAD Plan and Budget

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    48/72

    Philippine Commission on WomenOffice of the President

    Did the LGU prioritize client-focused gender issues?

    Did it articulate the disparity or the gender gaps betweenwomen and men clients within the LGU?

    Did it consider the GAD mandates relevant to the LGU(e.g. MCW, CEDAW, LGC among others)

    Are the gender issues, causes of the gender issues and/orGAD mandates relevant to the LGU mandate? Are the

    gender issues valid and relevant based onstatistics/situation?

    Did it consider the organization-focused issues?

    Column 1: Gender Issue/s and or GAD Mandate

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    49/72

    Philippine Commission on WomenOffice of the President

    The LGU should prioritize client-focused genderissues/GAD mandates relevant to their mandate.Prioritize organization-focused gender issues if LGU isnew or still in the early stages of gender-

    mainstreaming.

    The reviewer should be knowledgeable of the LGUmandate to check the relevance and alignment of the

    gender issues/GAD mandates. If these are not alignedwith the LGU mandate, recommend enhancements oridentify relevant gender issue/GAD mandate.

    RULES

    RULES

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    50/72

    Philippine Commission on WomenOffice of the President

    In reviewing the gender issue/s or GAD mandates,

    refer to the LGU mandate, its sectoral priorities,national/term plans e.g. PDP; OPIF and other relevantpolicies. The reviewer should probe whether the identifiedgender issue/s were based on gender analysis.

    Check with previous GPBs and GAD ARs:1) ensure that previous gender issue/s have beenresponded to

    2) to check if gender issue/s have always been includedin past and current GPBs.

    RULES

    If so, probe the reason why it is recurring;recommend gender issues that he/she

    deems more pressing and

    what the LGU needs to prioritize

    C l 2 C / f th G d I

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    51/72

    Philippine Commission on WomenOffice of the President

    Did the LGU undergo gender analysis to identify the

    what and the why of the gender issue?

    Is the cause/s of the gender issue/s related to the genderissue? Is this related to the mandate of the LGU?

    Column 2: Cause/s of the Gender Issue

    Use this column for probing gender issuesProbing causes of the gender issue ensures that GADactivities/programs will directly address gender issues

    leading to its gradual or complete eliminationIf cause of the gender issue is not aligned, recommendpossible cause/s that he/she deems relevant/related

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    52/72

    Philippine Commission on WomenOffice of the President

    Does it respond to the gender issueand its cause/s or implement GAD

    mandates relevant to the LGU? Did this column spell out the result

    that the LGU intends to achieve?

    Does it clearly state the result and

    not the intended activities?

    Column 3: GAD Objective

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    53/72

    Philippine Commission on WomenOffice of the President

    The LGU may also include a long-term objectiverelevant to their mandate and gender issue/s of itssector.

    Check past GAD plans and GAD ARs and probe if GADobjective is repeated over time. If so, ask LGU why therepetition over time.

    The objective maybe repeated over time if it cannot berealized within the period of the GPB.

    If there is lack of progress in their GAD efforts,recommend LGU to address priority genderissues/GAD mandates that have not been addressed orpriority gender issues identified in their term plans.

    RULES

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    54/72

    Philippine Commission on WomenOffice of the President

    Is the LGU PPA identified part of the LGU mandate?Is it relevant to the identified gender issue/s or GADmandate?

    Is the PPA part of the regular and budgeted program

    of the LGU?

    Column 4: Relevant LGU PPA

    Use the LGU mandate as referenceReviewer should be familiar with the LGU to be able to

    recommend or identify relevant LGU PPAs that can beintegrated with gender concerns to address gender issuesor implement GAD mandates.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    55/72

    Philippine Commission on WomenOffice of the President

    Will the proposed GAD activity address thegender issue/s and its causes? Or will it respondto the GAD mandate relevant to the LGU?

    Is it within the LGU mandate?

    Will it contribute in responding to the genderissue/s of the sector where the LGU may becategorized?

    Column 5: GAD Activity

    RULES

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    56/72

    Philippine Commission on WomenOffice of the President

    GAD activities must be related to the LGU mandate.

    The LGU should prioritize client-focused activities.

    There are also organization-focused activities that canrespond to the gender issue/s and GAD mandates ofclients. e.g. advocacy activities of the LGU may respond to

    issue of LGUs clients, e.g. access to the LGU programsand services.

    If the LGU is new or in the early stages of starting its GMefforts, it may prioritize org-focused activities, e.g. GFPS,capacity development.

    However, the reviewer should be able to monitor theoutputs of these activities through the GAD AR.

    RULES

    RULES

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    57/72

    Philippine Commission on WomenOffice of the President

    The LGU may plan related GAD activities to achieve the same

    objective over several planning periods until the GADobjective or targeted result is achieved.

    Programs on womens practical gender needs (e.g. daycarecenter, breastfeeding rooms) are acceptable GAD activities.However, probe and assess if LGU employees really needthem before allowing/agreeing to such activities.Implementation of such programs must follow governmentaccounting and auditing rules and regulations.

    For economic- and/or health-related activities of LGU

    employees (e.g. livelihood training/capital, cervical cancervaccination) inform LGU to work with its HRMD/HRMO toconsider these as productivity concerns and to engage otherservice providers. These may NOT necessarily be reflected aspart of the LGU GPB.

    RULES

    FILTERS FOR

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    58/72

    Philippine Commission on WomenOffice of the President

    Budget CANNOT be used for the following:

    Individual purpose i.e. payment of fees for

    livelihood training of individual LGU staff

    Livelihood activity will benefit the LGUorganization, e.g. LGUs cooperative

    Livelihood options for retiring employees

    FILTERS FORLIVELIHOOD ACTIVITIES

    FILTERS FOR

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    59/72

    Philippine Commission on WomenOffice of the President

    Budget CANNOT be used for the following:

    Cervical cancer vaccination, mammography

    among others

    provision of health cards

    purchase of physical fitness equipment

    FILTERS FORHEALTH-RELATED ACTIVITIES

    Columns 6 and 7: Performance Indicators

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    60/72

    Philippine Commission on WomenOffice of the President

    Does it show clear measure or evidence of progressmade based on the identified GAD activity andtarget? Does it show clear relation how it contributesto the realization of the GAD objective?

    Does it clearly indicate the outputs of the GADActivity?

    Does it specify what the LGU intends to achievewithin one year in relation to the GAD result?

    Does it clearly identify the target beneficiaries of theactivity (e.g. how many), the target date ofimplementation among others?

    Columns 6 and 7: Performance Indicators

    and Targets

    RULES

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    61/72

    Philippine Commission on WomenOffice of the President

    The targets and indicators should beattainable within the implementation

    period. The monitoring and assessment the

    GPB will largely be based on theindicators and targets.

    The target is also the basis for theallocation of the GAD budget.

    RULES

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    62/72

    Philippine Commission on WomenOffice of the President

    Is there a budget allocated for theproposed GAD activity?

    Is it reasonable given the proposedGAD activity and target?

    Columns 8: GAD Budget

    For mainstream PPAs integrated with GAD perspective

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    63/72

    Philippine Commission on WomenOffice of the President

    To the extent possible, reflect the cost of GAD effort/s

    done in mainstream PPA and not the entire cost of saidPPA.

    If the LGU is not able to do so, reflect total cost ofmainstream PPA but indicate the GAD efforts done inthe GAD activity column.

    If the LGU used the HGDG to assess how much toattribute to the GAD budget, it should be able to showthe evidence by submitting the HGDG results.

    It is possible that certain activities do not have direct

    cost implications. In determining what can be or cannot be charged to the

    GAD budget, the primary consideration is the genderissue relevant to the LGU mandate being addressed bythe expense or activity.

    For mainstream PPAs integrated with GAD perspective

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    64/72

    Philippine Commission on WomenOffice of the President

    Is there a specified office /unit tasked to implement aparticular GAD activity?

    Is the unit the relevant office to implement theidentified GAD activity?

    RULE

    The reviewer must be familiar with the offices andunits within the LGU and its functions to be able to

    verify the relevance of the assigned office/unit in theimplementation of the GAD activity.

    Column 9: Office of Primary Responsibility

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    65/72

    Philippine Commission on WomenOffice of the President

    ANNEX E:GUIDE IN COMPLETING THE LGU GAD

    ACCOMPLISHMENT REPORT FORM

    ANNUAL GENDER AND DEVELOPMENT (GAD) ACCOMPLISHMENT REPORTFY _____

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    66/72

    Philippine Commission on WomenOffice of the President

    Region: __________________________Province: __________________________City/Municipality: __________________________Total Budget of LGU: __________________________

    Gender

    Issue/

    GAD

    Mandate

    (1)

    Cause

    of the

    Gender

    Issue

    (2)

    GAD

    Objecti

    ve

    (3)

    Relevant

    LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    mance

    Indica

    tor

    (6)

    Target

    (7)

    Actual

    Result

    s

    (8)

    Total

    Appro

    ved

    GAD

    Budge

    t

    (9)

    Actual

    Cost or

    Expendi

    ture

    (10)

    Varian

    ce

    /Rema

    rks

    (11)

    Client-

    focused/

    GAD

    Mandate

    Org-

    focused

    TOTAL

    Prepared by:

    Chairperson, GFPS-TWG

    Approved by:

    Local Chief Executive

    Date:

    DAY/MM/YEAR

    ANNUAL GENDER AND DEVELOPMENT (GAD) ACCOMPLISHMENT REPORTFY _____

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    67/72

    Philippine Commission on WomenOffice of the President

    Region: __________________________Province: __________________________City/Municipality: __________________________Total Budget of LGU: __________________________

    Gender

    Issue/

    GAD

    Mandat

    e

    (1)

    Cause

    of the

    Gende

    r Issue

    (2)

    GAD

    Object

    ive

    (3)

    Relevan

    t LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    manc

    e

    Indica

    tor

    (6)

    Targe

    t

    (7)

    Actual

    Result

    s

    (8)

    Total

    Appr

    oved

    GAD

    Budg

    et(9)

    Actual

    Cost or

    Expend

    iture

    (10)

    Varian

    ce

    /Rem

    arks

    (11)

    Client-

    focused/

    GAD

    Mandate

    Org-

    focused

    TOTAL

    Prepared by:

    Chairperson, GFPS-TWG

    Approved by:

    Local Chief Executive

    Date:

    DAY/MM/YEAR

    Columns 1-7 may be copied from the previous years GAD Plan and

    Budget

    ANNUAL GENDER AND DEVELOPMENT (GAD) ACCOMPLISHMENT REPORTFY _____

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    68/72

    Philippine Commission on WomenOffice of the President

    Region: __________________________Province: __________________________City/Municipality: __________________________Total Budget of LGU: __________________________

    Gender

    Issue/

    GAD

    Mandat

    e

    (1)

    Cause

    of the

    Gende

    r Issue

    (2)

    GAD

    Object

    ive

    (3)

    Relevan

    t LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    manc

    e

    Indica

    tor

    (6)

    Targe

    t

    (7)

    Actual

    Result

    s

    (8)

    Total

    Appr

    oved

    GAD

    Budg

    et(9)

    Actual

    Cost or

    Expend

    iture

    (10)

    Varian

    ce

    /Rem

    arks

    (11)

    Client-

    focused/

    GAD

    Mandate

    Org-

    focused

    TOTAL

    Prepared by:

    Chairperson, GFPS-TWG

    Approved by:

    Local Chief Executive

    Date:

    DAY/MM/YEAR

    This column reflects all the results/outputs of the GADactivities that were conducted and or implemented. It

    shall provide a description of the change that has occurredafter implementing a particular GAD activity. The LGUmust also indicate the accomplishment of previouslyidentified targets.

    ANNUAL GENDER AND DEVELOPMENT (GAD) ACCOMPLISHMENT REPORTFY _____

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    69/72

    Philippine Commission on WomenOffice of the President

    Region: __________________________Province: __________________________City/Municipality: __________________________Total Budget of LGU: __________________________

    Gender

    Issue/

    GAD

    Mandat

    e

    (1)

    Cause

    of the

    Gende

    r Issue

    (2)

    GAD

    Obje

    ctive

    (3)

    Relevant

    LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    manc

    e

    Indica

    tor

    (6)

    Targe

    t

    (7)

    Actual

    Result

    s

    (8)

    Total

    Appr

    oved

    GAD

    Budg

    et(9)

    Actual

    Cost or

    Expend

    iture

    (10)

    Varian

    ce

    /Rem

    arks

    (11)

    Client-

    focused/

    GAD

    Mandate

    Org-

    focused

    TOTAL

    Prepared by:

    Chairperson, GFPS-TWG

    Approved by:

    Local Chief Executive

    Date:

    DAY/MM/YEAR

    This column reflects the approved totalGAD budget

    ANNUAL GENDER AND DEVELOPMENT (GAD) ACCOMPLISHMENT REPORTFY _____

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    70/72

    Philippine Commission on WomenOffice of the President

    Region: __________________________Province: __________________________City/Municipality: __________________________Total Budget of LGU: __________________________

    Gender

    Issue/

    GAD

    Mandat

    e

    (1)

    Cause

    of the

    Gende

    r Issue

    (2)

    GAD

    Obje

    ctive

    (3)

    Releva

    nt LGU

    PPA

    (4)

    GAD

    Activity

    (5)

    Perfor

    manc

    e

    Indica

    tor

    (6)

    Targe

    t

    (7)

    Actual

    Result

    s

    (8)

    Total

    Appr

    oved

    GAD

    Budg

    et(9)

    Actual

    Cost or

    Expend

    iture

    (10)

    Varian

    ce

    /Rem

    arks

    (11)

    Client-

    focused/

    GAD

    Mandate

    Org-focused

    TOTAL

    Prepared by:

    Chairperson, GFPS-TWG

    Approved by:

    Local Chief Executive

    Date:

    DAY/MM/YEAR

    This column shows the actual cost orexpenditure in implementing the

    identified GAD activities of theprevious GPB. To avoid doublecounting and attribution, the LGU shallprovide a breakdown of theexpenditure, if necessary.

    ANNUAL GENDER AND DEVELOPMENT (GAD) ACCOMPLISHMENT REPORTFY _____

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    71/72

    Philippine Commission on WomenOffice of the President

    Region: __________________________Province: __________________________City/Municipality: __________________________Total Budget of LGU: __________________________

    Gender

    Issue/

    GAD

    Mandat

    e

    (1)

    Cause

    of the

    Gende

    r Issue

    (2)

    GAD

    Obje

    ctive

    (3)

    Releva

    nt LGU

    PPA

    (4)

    GAD

    Activi

    ty

    (5)

    Perform

    ance

    Indicator

    (6)

    Targe

    t

    (7)

    Actual

    Result

    s

    (8)

    Total

    Appr

    oved

    GAD

    Budg

    et(9)

    Actual

    Cost or

    Expend

    iture

    (10)

    Varian

    ce

    /Rem

    arks

    (11)

    Client-

    focused/

    GAD

    Mandate

    Org-

    focused

    TOTAL

    Prepared by:

    Chairperson, GFPS-TWG

    Approved by:

    Local Chief Executive

    Date:

    DAY/MM/YEAR

    This column shall indicate anydeviation from the identifiedresults, activities and targets. The

    reasons for the deviation as wellas the factors that have facilitatedor hindered the implementationof the LGU-approved GPB shallalso be cited.

  • 5/22/2018 Local GAD Planning and Budgeting_JMC 2013

    72/72