  • 7/28/2019 Load Test for Rods Support

    1/11

    Elec. Test Procedure

    ELECTRICAL TEST PROCEDURE

    Insulation Testing

    Equipment Needed. Photo reference. Remarks.

    1. Megger tester. Calibratedequipment.

    2. PPE& cut resistancegloves.

    Correct PPE andgloves.

    3. Barricade. Barricadewith signage, PTP,SIPP.

    4. Walkie talkie Check walkietalkiebefore perform

    work.

    Preparation. Photo reference. Remarks.

    1. Barricade the areawhere the test will beperformed.

    Barricadewith signage, PTP,SIPP.

  • 7/28/2019 Load Test for Rods Support

    2/11

    Elec. Test Procedure

    2. Ensure the person totest is wearing properPPE.

    Correct PPEand gloves.

    3. Ensure that thesystem is isolated withonly the groundingintact. Never connect amegger tester toenergized DB orequipment. This canpotentially damage themeter.

    Cables hang outside DBexcept forgrounding cableconnected.

    Steps. Photo reference. Time.

    1. Make sure theground wire of everyindividual circuit hasbeen tied to DB beforedoing insulation testing.

    This will ensure the

    newly installed systemis properly grounded.

    10 minsper cable.

    2. Set the meggertester to 200 mega ohmrange and 500V testingvoltage. (Use the

    voltage selector switchon the megger to setthe megger to theappropriate testvoltage, usually thenext highest voltageabove the voltagerating of the piece ofequipment beingtested.)

    5 minsper receptacle..

  • 7/28/2019 Load Test for Rods Support

    3/11

    Elec. Test Procedure

    3. Press (and lock) thetest button and testbetween the terminalsPhase-Phase (3 phases),Phase- Neutral, Phase

    to Ground and Neutralto ground. Test for 1minute. If there is areading, it should behigher than 0.5 megaohm. Lower than 0.5mega ohm and it failedthe insulation test.

    2 mins.

    4. Record all values. 10 mins.

    5. Be sure to releasethe test button and turnoff the device aftertesting. Megger testeremits 500-1000VDC.

    1 min.

    Pull test Procedure

    Equipment Needed. Photo reference. Remarks.

  • 7/28/2019 Load Test for Rods Support

    4/11

    Elec. Test Procedure

    1. Torque screw driver. Calibratedequipment.

    2. PPE (HT Gloves). Correct PPE.

    3. Barricade. Barricadewith signage, PTP,SIPP.

    4. LOTO locks and tags. Refer toLOTO SWI.

    5. Radio. Check walkie

    talkiebefore performwork.

    Preparation. Photo reference. Remarks.

  • 7/28/2019 Load Test for Rods Support

    5/11

    Elec. Test Procedure

    1. LOTO individualbreaker beforeperforming any pulltest.

    One key, One padlock, One tag.

    2. Ensure the person totest is wearing properPPE.

    Leather gloves .

    3. Buddy next to himwith the safety hook,rubber mats on place.

    Safety hookand buudy.

    Steps. Photo reference. Time.

    1. Identify each of thenewly installed circuitby refering to IFC.

    1 minper cable.

  • 7/28/2019 Load Test for Rods Support

    6/11

    Elec. Test Procedure

    2. Pull by applyingenough force tomeasure thetermination of thecircuit.

    1 minper cable.

    3. Visually inspect theposition of the cable lugif it is tightened on theconductive part.

    1 minper cable.

    4. Check the torqueapplied by using a torqescrew driver.

    1 minper cable.

    5. Check the circuitlabels on the cables asper IFC with the

    corresponding circuitbreaker value.

    15 mins per tool.

    6. Check the final statusof inside DB, grommetapplications and 5S.

    2 mins.

  • 7/28/2019 Load Test for Rods Support

    7/11

    Elec. Test Procedure

    7. Take off any LOTO,remove tape and closethe dead front covers.

    15 minsper tool.

    Voltage Test Procedure.

    Equipment Needed. Photo reference. Remarks.

    1. Voltage tester. Calibratedequipment.

    2. PPE (HT Gloves). Correct PPE.

    3. Barricade. Barricadewith signage, PTP,

    SIPP.

    4. Radio. Check walkietalkiebefore performwork.

  • 7/28/2019 Load Test for Rods Support

    8/11

    Elec. Test Procedure

    Preparation. Photo reference. Remarks.

    1. Ensure propercommunication withmezzanine team and

    ATM team.

    Correct and clearcommunication.

    Steps. Photo reference. Time.

    1. Set the voltage rangeto be tested. Normallyfor VN site, 600V settingis the value.

    1 min.

    2. Test between theterminals Phase -Phase(3 phase), Phase-Neutral, Phase toGround and Neutral toground. Determine the

    polarity of the terminalsby voltage reading,refer on picture. Areading L-G determine ifthe system has properground(equal to L-N), N-G should be 0V.

    10 mins.

  • 7/28/2019 Load Test for Rods Support

    9/11

    Elec. Test Procedure

    3. Refer to IFC drawingon correspondingvoltage requirement foreach circuit. Normallymachines can handle +-

    10% tolerance. (Eg. 220Rating: Min-198, Max242).

    IFC2 mins.

    4. Record all values. 10 mins.

    Rotation Test Procedure.

    Equipment needed. Photo reference. Remarks.

    1. Phase/ RotationTester.

    Calibratedequipment.

    2. PPE (HT Gloves). Correct PPE.

  • 7/28/2019 Load Test for Rods Support

    10/11

    Elec. Test Procedure

    3. Barricade. Barricadewith signage, PTP,SIPP.

    4. Radio. Check walkietalkie

    Preparation. Photo reference. Remarks.

    1. Rotation testing canbe applied only on threephase. This determinethe correct polarity androtation of the 3 phasesystems.

    Insert correctphase(red/yellow/blue).

    2. Incorrect phase cancause MCCB to trip.

    Incorrect phasedue to installation.

    Steps. Photo reference. Time.

    1. While the power stillon, insert each of thetesting terminals of thephase tester tocorresponding locationon the receptacle. Referon photo.

    2 mins.

  • 7/28/2019 Load Test for Rods Support

    11/11

    Elec. Test Procedure

    2. Press the test button,the red dot shouldrotate clockwise.Counter clockwiserotation means wires

    are swapped and needscorrection.