  • 8/11/2019 LO215 - Production Orders

    1/379

    LO215 Production Orders LO215

    Release 640 04/06/2006

  • 8/11/2019 LO215 - Production Orders

    2/379

    SAP AG 1999

    LO215 Production Orders

    SAP AG

    LO215LO215

    Production OrdersProduction Orders

    System R/3 Release 4.6C October 2000 5004 2355

  • 8/11/2019 LO215 - Production Orders

    3/379

    SAP AG 2004

    Copyright 2004 SAP AG. All rights reserved.No part of this publication may be reproduced or t ransmit ted inany form or for any purpose without the express permission ofSAP AG. The information contained herein may be changedwithout prior notice.

    Copyright

    Some software products marketed by SAP AG and its distributors contain proprietary software components ofother software vendors.

    Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400,

    iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, and Informix aretrademarks or registered trademarks of IBM Corporation in the United States and/or other countries.

    Oracle is a registered trademark of Oracle Corporation. UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or

    registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C, World Wide Web

    Consortium, Massachusetts Institute of Technology.

    Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented andimplemented by Netscape.

    MaxDB is a trademark of MySQL AB, Sweden. SAP, R/3, mySAP, mySAP.com, xApps, xApp, and other SAP products and services mentioned herein as well as

    their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several othercountries all over the world. All other product and service names mentioned are the trademarks of their respectivecompanies. Data contained in this document serves informational purposes only. National product specificationsmay vary.

    These materials are subject to change without notice. These materials are provided by SAP AG and its affiliatedcompanies ("SAP Group") for informational purposes only, without representation or warranty of any kind, andSAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP

  • 8/11/2019 LO215 - Production Orders

    4/379

    Group products and services are those that are set forth in the express warranty statements accompanying such

    products and services, if any. Nothing herein should be construed as constituting an additional warranty.

  • 8/11/2019 LO215 - Production Orders

    5/379

    SAP AG 1999

    Production Planning

    Level 2 Level 3

    ManufacturingPlanning &Execution for Discrete & Repetitive

    LO050 5 days

    EngineeringChangeManagement

    LO980 3 days

    BatchManagement

    LO955 3 days

    KANBAN

    LO235 2 days

    Classification

    LO985 3 days

    Special Features ofLIS in Production

    LO275 2 days

    Logistics InfoPlanning

    LO935 2 days

    CAP Calculation of Standard Values

    LO720 2 daysRepetitiveManufacturing

    LO225 3 days

    Capacity Planning

    LO230 5 days

    LogisticsInformationSystem (LIS)Reporting

    LO930 2 days

    Basic DataPart 2

    LO206 3 daysBasic Data forDiscreteManufacturing

    LO205 3 days

    ProductionOrders

    LO215 5 days

    ProductionPlanning

    LO210 5 days

    VariantConfiguration Part 1

    LO990 5 days

    VariantConfiguration Part 2

    LO991 3 days

  • 8/11/2019 LO215 - Production Orders

    6/379

    SAP AG 1999

    Requirements

    Necessary: Knowledge of Production Planning andControl

    LO205 Basic Data for DiscreteManufacturing

    LO206 Basic Data Part 2

    Recommended: LO050 Manufacturing Planning andExecution for Discrete and Repetitive

  • 8/11/2019 LO215 - Production Orders

    7/379

    SAP AG 1999

    Target Group

    Members of the project team who are responsiblefor the implementation of production orders(consultants and administrators)Managers and employees in production areas(production schedulers, controllers, supervisorsand operators)

    Duration: 5 days

    Information for participants The training materials are not designed to be a self-teach program. They are only complete when used in

    conjunction with the explanations of the instructor. You are given space on each page of the trainingmaterials to write down this additional information.

  • 8/11/2019 LO215 - Production Orders

    8/379

  • 8/11/2019 LO215 - Production Orders

    9/379

    (C) SAP AG LO215 1-2

    SAP AG 1999

    At the conclusion of th is course, you will beable to:

    Course Goal

    SAP AG 1999

    Use product ion orders.

    Create, release and fully implementproduction orders. You will be able tomake system settings and also understandproduction orders in context.

  • 8/11/2019 LO215 - Production Orders

    10/379

    (C) SAP AG LO215 1-3

    SAP AG 1999

    Classify production orders in the production planning andexecution environment (demand management, requirementsand materials planning, sales order processing and so on)Implement or apply production orders and their mostimportant functionsUnderstand and use the basic order management functionsin detailUse the information systems for production orders

    Take into consideration the integration relationships withinthe production order Teach yourself additional special functions

    Course Objective(s)

    At the conclusion of this course, you will be able to:

    SAP AG 1999

  • 8/11/2019 LO215 - Production Orders

    11/379

    (C) SAP AG LO215 1-4

    SAP AG 1999

    Unit 8 Order Control

    Unit 9 Confirmations

    Unit 10 Goods Receipt

    Unit 11 Settlement, Archivingand Deletion

    Unit 12 Information Systems

    Unit 13 Mass Processing and

    AutomationUnit 14 Collective Orders

    Unit 1 Introduction

    Unit 2 Overview

    Unit 3 Order Structure /Processing

    Unit 4 Order Creation /Order Change

    Unit 5 Order Release

    Unit 6 Printing Order DocumentsUnit 7 Material Staging

    Preface

    Appendix

    Course Content

  • 8/11/2019 LO215 - Production Orders

    12/379

    (C) SAP AG LO215 1-5

    SAP AG 1999

    Course Overview Diagram (1)

    Goods ReceiptGoods Receipt 1010

    ConfirmationsConfirmations 99

    Information SystemsInformation Systems

    1212

    SettlementSettlement ,, Archiv ing Archiv ingandand DeletionDeletion 1111

    CollectiveCollective OrdersOrders 1414

    Mass ProcessingMass Processingand Automationand Automation 1313

    MaterialMaterial StagingStaging 77

    111

    Order Order StructureStructure //ProcessingProcessing 33

    Order Contro lOrder Contro l 88

    PrintingPrintingOrder Order DocumentsDocuments 66

    Order ReleaseOrder Release

    55

    Order Order CreationCreation //Order ChangeOrder Change 44

    OverviewOverview 22

    Introduction

  • 8/11/2019 LO215 - Production Orders

    13/379

  • 8/11/2019 LO215 - Production Orders

    14/379

    (C) SAP AG LO215 2-1

    SAP AG 1999

    Overview: Contents

    Overview of the process chain for order-related productionThe process chain in other production planning andcontrol scenarios

    Characteristics of order-related production

    Order-related production in the organization structures ofthe R/3 System

    Master data prerequisites for production orders

  • 8/11/2019 LO215 - Production Orders

    15/379

    (C) SAP AG LO215 2-2

    SAP AG 1999

    At the conclusion of th is un it you will be ableto :

    Overview: Topic Objectives

    SAP AG 1999

    Recognize the different steps in the process chain fororder-related production

    Recognize the most important characteristics of order-related production

    Define how production orders are classified in the R/3application component PP and in the organizationstructures

  • 8/11/2019 LO215 - Production Orders

    16/379

    (C) SAP AG LO215 2-3

    SAP AG 1999

    Goods ReceiptGoods Receipt 1010

    ConfirmationsConfirmations 99

    Information SystemsInformation Systems

    1212

    SettlementSettlement ,, Archiv ing Archiv ingandand DeletionDeletion 1111

    CollectiveCollective OrdersOrders 1414

    Mass ProcessingMass Processingand Automationand Automation 1313

    MaterialMaterial StagingStaging 77

    Order Contro lOrder Contro l 88

    PrintingPrintingOrder Order DocumentsDocuments 66

    Order ReleaseOrder Release

    55

    Order Order CreationCreation //Order ChangeOrder Change 44

    Overview Diagram (2)

    IntroductionIntroduction 11

    22

    Order Order StructureStructure //ProcessingProcessing 33

    OverviewOverview

  • 8/11/2019 LO215 - Production Orders

    17/379

  • 8/11/2019 LO215 - Production Orders

    18/379

    (C) SAP AG LO215 2-5

    SAP AG 1999

    Subsystems of the PP Application

    PPPP

    PPPC

    Prod. Costing

    PPIS

    Prod. InfoSystem

    PPMRP

    Mat. RqmtsPlanning

    PPSOP

    Sales & Oper.Planning

    PPMPS

    DemandMgmt

    PPBD

    BasicData

    PPPPSFCSFC

    ShopShop Floor Floor ControlControl

    PPPI

    ProcessMfg

    PPREMRep.Mfg

    PPCRP

    CapacityPlanning

    PPKANKANBAN

    The Production Planning (PP) application incorporates a number of integrated working subsystems . Each time you use the R/3 system, you should determine precisely which components are appropriate

    to your needs. PP-Shop Floor Control is the subsystem for order-related production .

  • 8/11/2019 LO215 - Production Orders

    19/379

    (C) SAP AG LO215 2-6

    SAP AG 1999

    Order-Related Production: Characteristics (1)

    Order-related productionBased on production orders with order category '10'

    Production by order lot sizes (see Lot-Sizing Procedure)

    Integrated logistical and controlling functionality

    Production by production versions (for example,production lines)

    Detailed status management

    Full integration into capacity planningPDC - Interface (PP-PDC) for download and upload

    Material staging control led by material reservations

  • 8/11/2019 LO215 - Production Orders

    20/379

    (C) SAP AG LO215 2-7

    SAP AG 1999

    Order-Related Production: Characteristics (2)

    Availability checks for material, capacity, production resourcesand tools

    Various options for entering actual data (quantity, time)

    Order, operation, time event and progress confirmations

    Extensive order-related or product-related controlling

    Full integration in the Logistics Information System (LIS) andBusiness Information Warehouse (BW)

    Archiving and retrieval funct ionNumerous special functions

    multi-level collective orders, trigger points, serial numbers, ordersplit, external processing, rework, WIP, variance calculation,cross-plant production, batch creation and batch determination,co-products and so on

  • 8/11/2019 LO215 - Production Orders

    21/379

    (C) SAP AG LO215 2-8

    SAP AG 1999

    Cross-Application Functions

    Material forecast Sales & Distribution

    Inventory

    E A C D

    B

    C a p a c

    i t y p

    l a n n

    i n g

    C a p a c

    i t y p

    l a n n

    i n g

    C o s

    t i n g

    C o s

    t i n g

    Demand program Sales reqmtsPlanning

    Requirements planning

    Production order Production order

    Order Order processingprocessing

    Goods receiptGoods receipt

    Order Order settlementsettlement

    Goods issueGoods issue

    Purchase requisition

    Purch ase order

    Goods receipt

    Invoice receipt

    Planned order Planned o rder

    Production order management is a central component of a complex process chain that starts withindependent requirements (planned or customer requirements) and ends in the issue of a finished

    product. Production order management in the SAP System only controls the whole process of in-house

    production . Production order management uses the following system components :

    ALE, Workflow, Customizing, word processing, factory calendar, classification, communication andgraphics.

  • 8/11/2019 LO215 - Production Orders

    22/379

    (C) SAP AG LO215 2-9

    SAP AG 1999

    Production Planning and Control Data

    Confirmations

    CO object (cost col lector)

    Material movements (goods receipt / issue)

    Production orders

    Factory calendar

    Mat. master

    Work centers

    Bills of material

    Routings

    Prod. resources/tools

    CAPP formulas

    Documents

    Master Master datadata

    TransactionTransaction datadata

    Data that does not change frequently is defined as master data of the Production Planning System. Transaction data are documents that have a restricted time application. In the Production Planning

    System these are production orders. Documents for confirmations, costs (CO objects) and material movements are assigned to the production

    orders.

  • 8/11/2019 LO215 - Production Orders

    23/379

    (C) SAP AG LO215 2-10

    SAP AG 1999

    Corporate Order Management

    Order

    Assign mentto a

    material

    Order Order Order

    Overheadcost

    orders

    Capitalinvestment

    orders

    Goods for the market Internal company goods and services

    Sales-Related

    Goodssold

    Goods instock

    Company Internal

    Cannot b eactivated Can be activated

    Customer Warehouse Cost center Asset portfolio

    Logi sti c f un ctio ns (qu ant iti es and v alues) Cost ac cou nti ng fun cti ons (v alues)

    Assign mentto a

    sales order

    Corporate order management is divided into two basic forms : Sales-related orders and companyinternal orders .

    Within company internal orders, a distinction has to be made between:Orders purely for object control within cost accounting (for example, for promotional purposes orfor use in trade fairs). Productive and value-added orders that can be activated (for example, for in-house production on a production line).

    In the R/3 System, both basic order forms are assigned to SAP applications via order category . Examples: Production order (PPS) -> PP Production Planning

    Plant maintenance order -> PM Plant Maintenance Network -> PS Project SystemOverhead cost order -> CO Controlling

    Capital investment order -> CO Controlling

  • 8/11/2019 LO215 - Production Orders

    24/379

    (C) SAP AG LO215 2-11

    SAP AG 2003

    Document Type, Order Category, Order Type

    Material accounting documentsFinancial accounting documents

    Orders

    PP process order PS networkCO internal order CO production order CO model order PM plant maintenance order

    Produ ction or der (external number range)Production order (special types)

    Production order (internal number range)

    PP production order

    Document typ eDocument typ e

    Order categoryOrder category

    Order typeOrder ty pe

    The document type is used to differentiate between business transactions in the R/3 System. Orders are one category of business transaction. Orders are divided up according to order category , as it is possible to have different orders within the

    different applications. The system predefines fixed order categories for each application. You have the option of individually defining order categories for each order type within an application. An order type is used to control different processes:

    Number assignmentSetting default valuesUser-specified status managementUser-specific field control (not for production orders in Release 4.7)

    Control of special functions (activating BDE, QM, LIS,... .) You define the settings for this in Customizing.

  • 8/11/2019 LO215 - Production Orders

    25/379

    (C) SAP AG LO215 2-12

    SAP AG 1999

    Definitions in the Production Order

    WhatWhat isis being producedbeing produced ??

    WhenWhen isis it beingit beingproducedproduced ??

    How much hasHow much h as toto bebeproducedproduced ??

    For whom are we producingFor whom are we producing ??((costcost object)object)

    Which resourcesWhich resources andand methodsmethodsare being usedare being used in thein the productionproduction ??

    Which costs are incurred byWhich costs are incurred by th eth eproductionproduction ??

    Products Ac ti vi ty

    Planned ord er datesBasic order datesCalculated datesConfirmed dates

    ReleaseStartFinal

    Planned order quantityProduction order quantityConfirmed quantity

    MaterialCost center

    Order Asset

    Material usageProd. resources/toolsChecks

    Planned Ac tual

    The production order is determined by a series of definitions for manufacturing a product.

  • 8/11/2019 LO215 - Production Orders

    26/379

    (C) SAP AG LO215 2-13

    SAP AG 1999

    Production Orders and Organizational Structures

    Organizational unitsOrganizational units

    Production order

    Shop floor control

    Demand management

    Requirements planning

    Inventory management

    Company

    Controlling areas

    Sales organizations

    Company codes

    Valuation areas

    PlantsPlants

    Storage location s/batches/special stocks

    Purchasing organizations

    Production orders generally relate to the organizational unit plant . The organizational units above a plant can be structured in various ways.

  • 8/11/2019 LO215 - Production Orders

    27/379

    (C) SAP AG LO215 2-14

    SAP AG 1999

    Master Data for the Production Order

    Required quantity and usage valueControl dataRequired quantity and usage valueControl data

    BOM

    Routing

    MaterialMaterial

    BOMBOM

    Work center Work center

    RoutingRouting

    ProdProd .. resourcesresources //toolstools

    Material usage (Mat. no., item cat., quantity)Storage location (proposal for withdrawal)

    Operation default values Available capacity and formu la requ ir ements Activi ty type and for mula costs

    OperationsStandard values

    Procurement type E or XMRP, work schedule, acct. and costing data

    Material status (MARA and MARC)

    The material to be produced must have already been designated procurement type in house production(X,E).

    The material status must be released for production on both a cross-plant level (MARA) and a plantlevel (MARC) .

    At least one plant specific view (MRP and/or work scheduling) as well as financial accounting andcosting views must be maintained for the material.

    You prepare BOMs as single level BOMs . A special selection procedure chooses the correct BOM. After you have prepared a routing, a special selection procedure chooses the correct one.

  • 8/11/2019 LO215 - Production Orders

    28/379

    (C) SAP AG LO215 2-15

    SAP AG 1999

    ProductionProduction

    Production operator Production scheduler

    (supervisor)

    ProductionpreparationProductionpreparation

    Docu. &analysisDocu. &analysis

    Industrialengineer

    Salesplanning

    Salesplanning

    Designengineer

    Plantreqmts

    DetailedPlanning

    Production planner Plant manager MRP controller

    Production scheduler

    Production operator Production scheduler

    Plant manager Quality

    inspector

    Order-Related Production - Roles

    Within the development of the SAP product " mySAP.com ", computer-supported work centers have been created along the entire process chain for order-related production.

    Production order management touches on at least those roles shown on the slide. Individual roles are assigned different activities (tasks), authorizations and responsibilities that

    correspond to the actual daily work carried out in practice.

  • 8/11/2019 LO215 - Production Orders

    29/379

    (C) SAP AG LO215 2-16

    SAP AG 2003

    Production Order - Symbol Overview

    Order header

    Detail screen (operation , comp onent, PRT, ...)

    Sequence overview

    Component overview

    Operation overview

    Document overview

    Status overview

    Key

    Collective order ov erview

    Log

    Trigger point overview

    Change

    Display

    Save

    Deletion

    Schedule (order, collective order)

    Cost

    Check availabili ty (material, capacity, PRT)

    Release (order, operation)

    Print

    Enter long text (text editor)

    Generate object (for example, order)

    Execute program (function)

    Update

    The slide shows the most frequently used pushbuttons (symbols) in the production order. The symbols have been arranged on the individual production order screens in such a way that you can

    always find the relevant symbol in the same place on the screen. Order functions are arranged on the left and navigation function s on the right . In the overviews of the operations, components and production resources/tools, the relevant pushbuttons

    for the individual object have been arranged underneath the overview . Where it was considered appropriate, pushbuttons were placed directly next to a data field.

  • 8/11/2019 LO215 - Production Orders

    30/379

    (C) SAP AG LO215 2-17

    SAP AG 1999

    Order type

    LO215 - Commonly Used Abbreviations

    Table T399XSPRO + SFC + Master Data + Order-TypeDependent Parameters

    Order type parameters

    Table T003OSPRO + SFC + Master Data + Order Types

    PP-SFC

    Scheduling parameters ofthe order type

    Table TCX00_FASPRO + SFC + Operations + Scheduling + SchedulingParameters

    Production Planning - Shop Floor ControlSAP + LO + PP + Shop Floor Control

    Customizing Transaction SPROSAP + Tools + Accelerated SAP + Customizing +Edit Project

    Task menu (SAP) Transaction sess ion_manager

    During the LO215 course, the instructor may repeatedly use certain terms, tables and shortcuts . Theslide contains the most important terms and their menu paths.

    The instructor will not always repeat these menu paths.

  • 8/11/2019 LO215 - Production Orders

    31/379

  • 8/11/2019 LO215 - Production Orders

    32/379

    (C) SAP AG LO215 3-1

    SAP AG 1999

    Order data structureProduction order screens

    Overview of order processing

    Order Structure and Processing: Contents

  • 8/11/2019 LO215 - Production Orders

    33/379

    (C) SAP AG LO215 3-2

    SAP AG 1999

    Order Structure and Processing: CourseObjectives

    At the conclusion of th is un it you will be ableto :

    Describe production order data structure

    Describe the most important production orderscreens

    Summarize the main functions of order processing

  • 8/11/2019 LO215 - Production Orders

    34/379

    (C) SAP AG LO215 3-3

    SAP AG 1999

    Goods ReceiptGoods Receipt 1010

    ConfirmationsConfirmations 99

    Information SystemsInformation Systems

    1212

    SettlementSettlement ,, Archiv ing Archiv ingandand DeletionDeletion 1111

    CollectiveCollective OrdersOrders 1414

    Mass ProcessingMass Processingand Automationand Automation 1313

    MaterialMaterial StagingStaging 77

    33

    Order Contro lOrder Contro l 88

    PrintingPrintingOrder Order DocumentsDocuments 66

    Order ReleaseOrder Release

    55

    Order Order CreationCreation //Order ChangeOrder Change 44

    Overview Diagram (3)

    IntroductionIntroduction 11

    OverviewOverview 22

    Order Order StructureStructure //ProcessingProcessing

  • 8/11/2019 LO215 - Production Orders

    35/379

    (C) SAP AG LO215 3-4

    SAP AG 1999

    Elements of an Order

    Order header Order header

    OperationsOperations

    Capacity spl itsCapacity spl its

    MaterialMaterial componentscomponents

    ProdProd .. resourcesresources //toolstools

    Trigger PointsTrigger Points

    ConfirmationsConfirmations

    Order number

    PlantProduction scheduler

    Work center Control key

    Standard values

    Individual machineIndividual person

    Settlement ru leSettlement ru le

    Settlement profileSettlement receiver

    Material number QuantityReqmts date

    PRT number PRT category

    Number

    Functions

    QuantitiesTimes

    CostsCosts

    Planned Actual

    Document linksDocument links

    Doc. number Doc. category

    OperationOperation sequencessequences

    Standard sequenceOther sequences

    The order structure can be enhanced by adding certain elements. At least one operation is required. The system automatically creates this operation when missing. You have the choice of whether or not to assign material components, production resources / tools

    and trigger points to the operation. You can create several (parallel) operation sequences. You can make a selection from several alternative sequences . Suboperations are permitted within an operation. Costs are determined at operation level and submitted at order header level only in the case of order-

    related cost object controlling .

  • 8/11/2019 LO215 - Production Orders

    36/379

    (C) SAP AG LO215 3-5

    SAP AG 1999

    Production Order - Header

    1000767

    General Assignment Goods receipt Control Dates/quantities Master data

    Order typeOrder number PlantMaterial or activityQuantit ies dates

    To RoutingTo BOMTo Costing

    Entered by / Changed byPlants

    Assign men tsMRP controller

    Control of goods receipt

    Movement typeSettlement rul eSettlement receiver Percentages

    Deadline monitoringQuantity m onitoring

    Product (activity) to bemanufactured with the order

    ManualPlanned order

    Definition Origin

    Order Edit Goto Header Functions Environment

    The segment of the order header describes the product that is to be manufactured with the productionorder (finished product, assembly, individual part).

    There are a series of detail screens for the order header. The header text of a production order can either be the short text of the material master or the header

    text of the routing that has been copied into the production order (with reference to this, see the switchin table T399X ).

  • 8/11/2019 LO215 - Production Orders

    37/379

    (C) SAP AG LO215 3-6

    SAP AG 1999

    Production Order - Operation

    1000767

    Stand. values Ext. processing Interoperation times Standard value calc.

    Operation 0010

    Operation overview

    Single step inOrder

    ManualRouting

    OperationSuboperation

    Definition Origin Types General Data

    Standard values

    Ext. process ing

    Interoperation timesStandard values calc.SplittingOverlapping

    Operation dates

    User field sQuantities/activitiesConfirmed dates

    Order Edit Goto OperationFunctions Environment

    GeneralData

    This segment of the operation describes the individual work steps of the production order. There are a series of detail screens for an operation. These screens, in turn, incorporate further detail screens .

    For example, you can branch from the component overview to screens for each material component. You have the option of inserting suboperations hierarchically with reference to an operation.

    This enhances calculation and capacity planning .The operation control key of the sub-operation plays an important role in this.

    Scheduling always occurs at operation level . The standard values of the suboperations can be cumulated on the corresponding operation when the

    dimension and units of measurement are the same. It is not possible to assign material components or production resources / tools to sub-operations.

  • 8/11/2019 LO215 - Production Orders

    38/379

    (C) SAP AG LO215 3-7

    SAP AG 1999

    Production Order - Material Components

    1000767

    Purch.data VarSzeltmDta Co-product Text item

    Compon. 0010

    Material number Material descriptionRequir ements qtyReqmts date

    ReservationItem categoryBulk mat. indicator

    Availab le quant ity

    Issued quantityMissing parts quantity

    Text editor

    OriginDefinition

    Materials required for anoperation or for manufacturinga product

    Manual

    BOMPlanned order

    Order Edit Goto ComponentFunctions Environment

    General data

    In a production order, you can assign any number of material components to an operation. The segment for the material component describes the material required to carry out the individual

    operations. There are a series of single screens for a material component.

  • 8/11/2019 LO215 - Production Orders

    39/379

    (C) SAP AG LO215 3-8

    SAP AG 1999

    Production Order - Production Resources/Tools

    Definition

    1000767

    General Quantities Dates

    Item 0010

    TypesOrigin

    PRT number PRT control keyPlant

    Requirements q ty

    Usage valueFormulasUsage dates

    Document (graphics)PRT text

    Production resources/tools requiredto execute an operation Manual

    Routing

    MaterialEquipment(as of 3.0)DocumentOther Order Edit Goto PRTsFunctions Environment

    In a production order, you can assign any number of production resources/tools to an operation. The segment for production resources/tools describes the required devices, tools, test equipment and so

    on required for executing an individual operation. The production resources/tools category is essentially derived from the demands on a production

    resource/tool and its relationship to a certain object (material, equipment and so on).

  • 8/11/2019 LO215 - Production Orders

    40/379

    (C) SAP AG LO215 3-9

    SAP AG 2003

    Production Order - Documents

    P-100

    Order Processing Go to DocumentFunctions Environment

    Doc. Data Additional Data Descriptions Object Links Original

    Document

    Document no.SubdocumentDocument version

    Assignmt to oper ationOriginFormat

    Object link

    Original appl . file(s)

    Storage data

    Definition

    Production resources/tools required

    execute an o rder

    Origin

    Manual

    Material Master Bill o f MaterialProd.Version

    000 00

    Originals

    You can assign any number of documents to a production order. These are maintained in theDocument Management System (DMS).

    The documents themselves are only linked to the production order and not saved in it. You can create links from documents to a production order manually or automatically . Documents can be drawings, texts, videos and so on. Application example: Product descriptions

    Assembly instructions and diagramsInspection instructions and certificatesWork instructionsStorage and transportation regulationsSpare parts lists

    Maintenance regulations

  • 8/11/2019 LO215 - Production Orders

    41/379

    (C) SAP AG LO215 3-10

    SAP AG 1999

    1000767

    Costs arising during theexecution of a production order

    Aut omaticCosting

    Definition Origin

    Order Edit Goto Header Functions Environment

    Production Order - Costs

    OverheadOverhead costscostsCalculated in overhead structure

    Production costsProduction costsIn-house production

    Activi ty pr iceaccording to valuationvariant

    Ext. processingPrice acc. to valuationvariant

    MaterialMaterial costscostsStock materialPrice d eterminationaccording to valuationvariantNon-stock materialPrice from purch. info record

    Process costsProcess costs Ass ig ned acc. to template

    Itemization Cost categories Cost comp. structure

    If order-related cost object controlling is used, each individual production order has a cost object(CO).

    Order costs can be calculated manually or automatically .You define this by setting up the order-type dependent parameters accordingly in Customizing (tableT399X).

    The CO object enables you to display different lists of costs for a production order. By choosing Goto + Costs in an order, you can find lists for the terms

    Itemization (detailed overview of the individual costing items)Analysis (overview structured according to cost category)

    Cost component structure (overview structured according to arithmetical cost components)

  • 8/11/2019 LO215 - Production Orders

    42/379

    (C) SAP AG LO215 3-11

    SAP AG 1999

    Production Order - Settlement Rules

    OperationsOperations

    Material componentsMaterial components

    Prod. resources/toolsProd. resources/tools

    Costs PlannedTarget

    Ac tual

    Costs PlannedTarget

    Actual

    2050

    100

    Order header Order header

    Definition

    Material

    Cost center

    CO order

    Asset

    WBS element

    Sales order and so on

    Manual

    Aut omatic

    Receiver of order costs

    Account assign ment categor ies

    Origin

    You control order settlement by way of settlement rules . The order can be settled proportionally to one or more receivers . Settlement rules are created manually or automatically (during order creation).

    At the latest, they must be maintained before the goods receipts posting is carried out for the material to be produced.

    You define the settings for order settlement in Customizing. If you use product-related cost object controlling , the settlement rules are contained in the product

    cost collector and not in the production order .

  • 8/11/2019 LO215 - Production Orders

    43/379

    (C) SAP AG LO215 3-12

    SAP AG 1999

    Processing a Production Order

    11Order request

    Order creation

    Availabi litychecks

    Print o rder

    Material st aging

    Order settlement

    Archiv in g / deletin g

    Goods receiptOrder release

    Confirmations

    2050

    100Determine WIP

    Calculate variances

    Order processing

    Machinereservation

    22

    33

    44

    55

    66

    7788

    99

    1010

    1111

    1212

    1313

    1414

    Order header Order header

    Operations

    Materialcomponents

    Prod. resources/tools

    Costs PlannedTarget

    Actual

    The production order runs through a wide range of individual activities . WIP calculation, variance calculation and settlement are generally periodic operations for cost

    object controlling that are processed in the background . You must define a series of settings for each individual stage if an order is to be processed successfully. CO Configuration includes a special feature that sets the prerequisites for WIP determination, variance

    calculation and settlement.

  • 8/11/2019 LO215 - Production Orders

    44/379

    (C) SAP AG LO215 3-13

    SAP AG 1999

    Order Structure and Processing: Summary

    You have gained an overview of the data structureof a production order

    You know the most important production orderscreens

    The basic functions of production ordermanagement were shown in an example

  • 8/11/2019 LO215 - Production Orders

    45/379

    (C) SAP AG LO215 3-14

    Exercise Data

    Note:

    There will not be sufficient time to work throughall the exercises during the course. The exercisesmarked Optional should be seen as supplementaryexamples that can be used, as required and time

    permitting, during the course. Attendees can alsouse these exercises after the course, to consolidatewhat they have learned.

    Explanation of the Symbols in the Exercises and Solutions

    Exercises

    Solutions

    Course Objectives

    Business scenario

    Tips & Tricks

    Warning or caution

  • 8/11/2019 LO215 - Production Orders

    46/379

    (C) SAP AG LO215 3-15

    Data in the exercises

    Type of data Data in training system(ID3, client 400)

    Data in the IDES system (ID3, client 800)

    Group no. xx (01....20)

    User master records LO215-xx passwordFERT

    Client 400 (401, 402) as pertraining room

    Customizing project 200 200

    Company code 1000 1000

    Business area 1000 1000

    Purchasingorganization

    1000 1000

    Sales organization 1000 1000

    Distribution channel 10 Final customer sale 10 Final customer saleDivision 00 Multiple division 00 Multiple division

    Sector M Mechanicalengineering

    M Mechanicalengineering

    Personnel area 1000 1000

    Personnel subarea

    Chart of accounts INT INT

    Controlling area 1000 1000

    Cost center hierarchy H1 H1

    Cost center nodes 4200 4200

  • 8/11/2019 LO215 - Production Orders

    47/379

    (C) SAP AG LO215 3-16

    Cost centers 4210, 4220, 4230 4210, 4220, 4230

    Activity types 1410 Machine time

    1420 Setup time1430 Personnel time

    1410 Machine time

    1420 Setup time1430 Personnel time

    Factory calendar 01 01

    Plants 1000 (Normal)

    1100 (special structures)

    1000 (Normal)

    1100 (special structures)

    MRP controllers 100, 101 Demo

    001 to 002 Participants

    099 Instructor

    100, 101 Demo

    Capacity planner 100, 101 Demo

    001 to 002 Participants

    099 Instructor

    100, 101 Demo

    Production scheduler 100, 101 Demo

    001 to 002 Participants

    099 Instructor

    100, 101 Demo

    Production scheduling profile

    0000001 Normal

    0000002 automatic

    0000001 Normal

    0000002 automatic

  • 8/11/2019 LO215 - Production Orders

    48/379

  • 8/11/2019 LO215 - Production Orders

    49/379

    (C) SAP AG LO215 3-18

    Normal flow

    Collective order

    Config.var. scn. 1

    Config.var. scn. 2

    Config.var. scn. 3Changemanagement

    Normal flow

    Rework

    Automat.Procedure

    Limited no. ofVariants

    W/o BOM and plan

    Select. BOM/plan

    Op. consequences

    Co-products

    Mat. components

    Mat. staging

    Availability

    Discontinued parts

    Cross-plant

    Split valuation

    Batch production

    Ext. Proc. / proc.

    Serial numbers

    Repetitive /order- based production

    Stockdetermination

    P-100

    P-400

    P-500

    P-501

    P-502P-600

    100-300

    100-301

    T-A

    T-V1, V2

    T-MAN

    T-SEL

    T-OS

    T-COP

    T-MC

    T-MS

    T-MA

    T-MD

    T-PDP

    T-MV

    T-BCH

    T-EX

    T-SN

    T-REP

    T-STOCK

    P-100

    P-400

    P-500

    P-501

    P-502P-600

    100-300

    100-301

    T-A

    T-V1, V2

    T-MAN

    T-SEL

    T-OS

    T-COP

    T-MC

    T-MS

    T-MA

    T-MD

    T-PDP

    T-MV

    T-BCH

    T-EX

    T-SN

    T-REP

    T-STOCK

  • 8/11/2019 LO215 - Production Orders

    50/379

    (C) SAP AG LO215 3-19

    Bills of material T-F1xx

    P-100P-400

    P-500

    P-501

    P-502

    P-600

    T-A

    T-V1, V2

    T-SEL

    T-OS

    T-COP

    T-MC

    T-MS

    T-MA

    T-MD

    T-PDP

    T-MV

    T-BCH

    T-EX

    T-SN

    T-REP

    P-100P-400

    P-500

    P-501

    P-502

    P-600

    T-A

    T-V1, V2

    T-SEL

    T-OS

    T-COP

    T-MC

    T-MS

    T-MA

    T-MD

    T-PDP

    T-MV

    T-BCH

    T-EX

    T-SN

    T-REP

    Routings T-F1xx

    P-100

    P-400

    P-500

    P-100

    P-400

    P-500

  • 8/11/2019 LO215 - Production Orders

    51/379

    (C) SAP AG LO215 3-20

    P-501

    P-502

    P-600

    T-A

    T-V1, V2T-SEL

    T-OS

    T-COP

    T-MC

    T-MS

    T-MA

    T-MD

    T-PDP

    T-MV

    T-BCH

    T-EX

    T-SN

    T-REP

    50000003 standard tasklist

    P-501

    P-502

    P-600

    T-A

    T-V1, V2T-SEL

    T-OS

    T-COP

    T-MC

    T-MS

    T-MA

    T-MD

    T-PDP

    T-MV

    T-BCH

    T-EX

    T-SN

    T-REP

    50000003 standard tasklist

    WM storage bin PROD-1310 PROD-1310

    Standard trigger

    point

    T-NACHARB T-NACHARB

    Order types PP01 Demo andexercise

    PP03 Demo andexercise

    PP04 Demo and

    PP01 Demo

    PP03 Demo

    PP04 Demo

    PP06 Demo

  • 8/11/2019 LO215 - Production Orders

    52/379

  • 8/11/2019 LO215 - Production Orders

    53/379

    (C) SAP AG LO215 3-22

    SAP AG 1999

    PP Exercise Material - BOM T-F1xx

    T-F1xx (FERT, P-100)(1000, 0, _ )

    1 81

    T-T1xx(ROH, 100-110)(1000, 1000, 2 )

    T-T2xx(ROH, 100-120)(1000, 1000, 2 )

    T-T3xx(ROH, 100-130)(1000, 1000, 2 )

    1

    T-T4xx(ROH, 100-310)(1000, 1000, 2 )

    1

    T-B1xx (HALB, 100-100)(1000, 10, 2 )

    1

    T-B2xx (HALB, 100-200)(1000, 10, 2 ) (1100, 10, 2 )

    1

    T-B3xx (HALB, 100-300)(1000, 0, _ )

    1

    T-B4xx (HALB, 100-400)(1000, 10, 2 )

    T-T0xx(ROH, 100-210)(1000, 1000, 2 )

    1

    (1100, 1000, 2 )

    Key: (Material, IDES template)

    (Plant, stock qty, sec. reqmts ind.))

    Item 00 10 0020 0030 0040

    1

    T-T5xx(ROH, 100-410)(1000, 1000, 2 )

    os. 00 10 0020 0030 0010 0010 0010

    1

    Dokument T-F1xx DRW, 000, 00

    0050

  • 8/11/2019 LO215 - Production Orders

    54/379

    (C) SAP AG LO215 3-23

    SAP AG 1999 titel (author) 2

    PP Exercise Materials - Routings

    not a ssigned

    10TP-Lxx( 1310 )

    0010T-Mxx( 1310 )

    0030 T-Lxx( 1906 )

    0020T-Vxx( 1320 )

    0040 T-Exx( 1904 )

    0050T-Fxx( 1721 )

    0060 T-Pxx( 1721 )

    T-VHhierarchy:

    T-V

    Assignm ent tosta t . work center

    a nd hierarc hy

    T-EHhierarchy:

    T-E

    T-F1xx(FERT, P-100)(1000, 0, _ )

    T-F2xx(FERT, P-100)(1000, 0, _ )

  • 8/11/2019 LO215 - Production Orders

    55/379

    (C) SAP AG LO215 3-24

    Order Structure and Order Processing Exercises

    Unit: Order Structure and Order Processing

    Topic: Order Structure and Order Processing(LO215 Exercise 1)

    Structure (data and contents) of a production order

    In your capacity as production manager, production scheduler,supervisor or operator, you work with production orders all thetime. In this exercise, you will become familiar with the structureof a production order.

    1-1 Display the production order no. _______________ .

    Path: S000 LO PP SFC ORDER DISPLAY

    1-2 Display the individual data segments, screens and their data fields in the followingorder:

    Note any questions you may have about the meaning of the data fields.

    If the meaning of any of the data fields is not clear, ask the instructor.

    1-2-1 Order header screens

    Path: GOTO HEADER

  • 8/11/2019 LO215 - Production Orders

    56/379

    (C) SAP AG LO215 3-25

    Select the corresponding tab index for the respective screen.

    GeneralAssignmentGoods receipt

    ControlDates/quantitiesMaster dataLong textSettlement rule

    Path: HEADER SETTLEMENT RULE

    1-2-2 Overview of the operation sequences

    Path: GOTO OVERVIEWS SEQUENCES

    1-2-3 Operation sequence details

    Path: SEQUENCE DETAILS

    1-2-4 Operation overview

    Path: GOTO OVERVIEWS OPERATIONS

    1-2-5 Operation screens (select operation " 0010" )

    Path: OPERATION OPERATION DETAILS

  • 8/11/2019 LO215 - Production Orders

    57/379

    (C) SAP AG LO215 3-26

    Select the corresponding tab index for the respective screen.

    GeneralStandard valuesExternal processingInteroperation times

    Standard value calculationSplittingOverlapDatesUser fieldsSuboperation/datesQuantities/activitiesConfirmed datesQualificationLong text

    1-2-6 Material components - Overview

    Path: GOTO OVERVIEWS COMPONENTS

    1-2-7 Material component screens (select component " 0010" or "0070" )

    Path: COMPONENT COMPONENT DETAILS

    Select the corresponding tab index for the respective screen.

    Item 0010 General Data

    Item 0070 VarSzeltmDta

    1-2-8 Overview of production resources/tools for operation "0050"

    Path: Go to the operation overview and select operation "0050".

    In the menu bar at the bottom of the screen, select the PRT pushbutton(Production resources/tools)

    1-2-9 Screens for the production resources/tools (select production resource/tool"0020" )

  • 8/11/2019 LO215 - Production Orders

    58/379

    (C) SAP AG LO215 3-27

    Path: PRODUCTION RESOURCE/TOOL PRODUCTION RESOURCE/TOOL DETAILSHILFSMITTEL

    Select the corresponding tab index for the respective screen.

    Item 0020 GeneralQuantitiesDates

    1-2-10 Document overview

    Path: GOTO OVERVIEWS DOCUMENTS

    1-2-11 Display of the document information record (select the first document)

    Path: DOCUMENT DISPLAY DOCUMENT INFORMATION RECORD

    Select the corresponding tab index for the respective screen.

    Document data

    Additional data

    DescriptionsObject links

    Original

    1-2-12 Display of the original document (display both originals from the documentoverview for the order)

    Path: DOCUMENT DISPLAY ORIGINAL DOCUMENT

    1-2-13 Costs

    Itemization

    Analysis (Cost categories)

    Cost comp. structure (Cost component

  • 8/11/2019 LO215 - Production Orders

    59/379

  • 8/11/2019 LO215 - Production Orders

    60/379

    (C) SAP AG LO215 3-29

    Order Structure and Order Processing Solutions

    Unit: Order Structure and Order Processing

    Topic: Order Structure and Order Processing(LO215 Exercise 1)

    No answers are required for this exercise.

  • 8/11/2019 LO215 - Production Orders

    61/379

    (C) SAP AG LO215 4-1

    SAP AG 1999

    Order Creation/Order Change: Contents

    Function procedure "Creating an order" Automatic follow-on post ingsCreation variants

    NormalWith production versionNo reference to material (any activity)Copy from order Related to sales order

    With variant configuration

    Bill of material and task list selectionConverting planned ordersReading master dataOperation sequences in an order

  • 8/11/2019 LO215 - Production Orders

    62/379

    (C) SAP AG LO215 4-2

    SAP AG 1999

    At the conclusion of th is un it you will be ableto :

    Order Creation/Changing Orders: CourseObjectives

    Define the basic features and variants for creating production ordersDescribe subsequent functions in order creationDescribe the process of routing and BOMselection when creating an order Define how master data is read intoexisting ordersDescribe how to create and convertplanned orders

    SAP AG 1999

  • 8/11/2019 LO215 - Production Orders

    63/379

    (C) SAP AG LO215 4-3

    SAP AG 1999

    Goods ReceiptGoods Receipt 1010

    ConfirmationsConfirmations 99

    Information SystemsInformation Systems

    1212

    SettlementSettlement ,, Archiv ing Archiv ingandand DeletionDeletion 1111

    CollectiveCollective OrdersOrders 1414

    Mass ProcessingMass Processingand Automationand Automation 1313

    MaterialMaterial StagingStaging 77

    Order Order StructureStructure //ProcessingProcessing 33

    Order Contro lOrder Contro l 88

    PrintingPrintingOrder Order DocumentsDocuments 66

    Order ReleaseOrder Release

    55

    44

    IntroductionIntroduction 11

    Order Order CreationCreation //Order ChangeOrder Change

    OverviewOverview 22

    Overview Diagram (4)

  • 8/11/2019 LO215 - Production Orders

    64/379

    (C) SAP AG LO215 4-4

    SAP AG 1999

    Creating Production Orders

    FridayJuly

    27 1992

    TuesdayDecember

    18 1992

    ManualManual Requirements planningRequirements planning Aut omatic Aut omatic

    Specify order type

    Define order item

    Copy routing

    Copy bill of material

    Lead time scheduli ng

    Optional (Customizing)

    Availabi lity check

    Add, change

    Save producti on order

    Various functions (1)(1)

    The production order can be generated automatically (confirmation, sales order) or manually (directly) by converting it from a planned order .

    A start / finish date is entered for the order item (product) according to the scheduling type (forwards or backwards) .

    Lead time scheduling is executed automatically. It calculates the start / finish dates of the order and thedetailed dates and capacity requirements of the operations.

    You also have the option of carrying out an availability check (specifiable in Customizing). You can determine the planned costs when saving the order (specifiable in Customizing). ((11 )) Other functions that can be executed automatically are:

    Batch creation, determination, order classification, serial number assignment, document integration.

  • 8/11/2019 LO215 - Production Orders

    65/379

    (C) SAP AG LO215 4-5

    SAP AG 1999

    Automat ic Postings

    MaterialMaterial reservationsreservations

    Purchase requisitionsPurchase requisitions

    CostsCosts (CO object)(CO object)

    Capacity r equirementsCapacity r equirements

    TransportTransport requirementsrequirements

    Inspection l otsInspection l ots

    PRTPRT requirementsrequirements

    Inventory management

    Purchasing

    Controlling

    Capacity planning

    Warehouse management

    Quality management

    PRT management

    When you create a production order, a series of additional posting procedures occur at the time ofposting (the data is already formatted online).These automatically generate the required data for stored parts of the system .

    Material reservations are generated for all warehouse components. You can choose whether thesereservations are to be immediately relevant to MRP or not until the time of release (indicator in theorder-type dependent parameters T399X)

    Purchase requisitions are created for non-warehouse components and externally processed operations. Costs are determined when you save . Transport requirements are generated when the operation is released . PRT requirements are only generated internally. At the present time, however, there is no

    requirements planning for PRTs which works with these records.

    Transaction CF21 (using PRT in orders) is available for evaluating PRT requirements in productionorders.

    Missing parts records are written for missing parts.

  • 8/11/2019 LO215 - Production Orders

    66/379

    (C) SAP AG LO215 4-6

    SAP AG 1999

    Creation Variants 1

    2050

    100

    Activi ty

    Directly (manually)From planned order

    Copy from order

    For sales order

    From SD (assembly order)

    From confirmation(rework)

    As co ll ect ive order

    With variant configuration

    Order header Order header

    Operations

    Material components

    Prod. resources/tools

    PlannedTarget

    Actual

    Costs

    With reference to material

    Without reference to material

    There are numerous possibilities for creating production orders.

  • 8/11/2019 LO215 - Production Orders

    67/379

    (C) SAP AG LO215 4-7

    SAP AG 1999

    Creation Variants 2

    Order

    Order

    Planned

    Planned Order

    Material BOM

    Order Planned order

    Planned

    Create without routing andbill of material

    Create with routings

    Create with r outingand b il l of mater ial

    Create with plann ed order

    Operations, material components and production resources / tools are normally copied from the routing and BOM .

    You can also input such information manually . The BOM is not reread when you convert a planned order. If you do not specify otherwise in a routing, the system automatically assigns the BOM components to

    the first operation .

  • 8/11/2019 LO215 - Production Orders

    68/379

    (C) SAP AG LO215 4-8

    SAP AG 1999

    Own scheduling for planned ordersTo the dayCalculated basic dates Basic start date

    Basic f inish dateCreation date

    Base in-house production time or replenishment lead time Advantageous f or per forman ceNo capacity requirements are determined

    UsedTo the second

    Starts from basic dates Requirem ents planningManual

    Determined pr oduction dates (scheduled dates)Start d ateFinish dateRelease date

    Base operationsDetermined capacity requirements

    Material requirements planning

    Lead time scheduling

    Periods

    Order header Order header

    Operations

    Materialcomponents

    Prod.resources/tools

    Costs PlannedTarget

    Actual20

    50100

    for orders and routings

    Scheduling in Production Planning

    Production planning has two scheduling methods that are used differently and have different results: Scheduling of planned orders in material requirements planning (calculates the basic dates only) Lead time scheduling (starts from the basic dates and calculates the production dates)

    Only lead time scheduling calculates operation-related dates and capacity requirements. Lead time scheduling is the basis for

    Order scheduling Routing scheduling Scheduling in applications PS, PM, PI

    In addition, lead time scheduling can be activated in material requirements planning in order todetermine capacity requirements for planned orders.

  • 8/11/2019 LO215 - Production Orders

    69/379

  • 8/11/2019 LO215 - Production Orders

    70/379

    (C) SAP AG LO215 4-10

    SAP AG 1999

    Number Assignment for a Production Order

    . . . .

    1000000100000019999991999999

    2000000200000029999992999999

    3000000300000039999993999999

    PP02PP02PI02PI02..........

    XX

    PP01PP01IDESIDESPP06PP06........

    PI01PI01............

    Number rangeNumber range objectobject for for anan order order ((generalgeneral ))

    Range fromto

    Assignment in ternalexternal(x)

    Assignment of th eorder types(element)

    Number range -Group 1

    Number range -Group 2

    Number range -Group 3

    Order numbers are assigned according to order typ e. Numbers can be assigned either externally or internally . The order number can be composed of a maximum of 12 characters . Order numbers can be defined independent of company codes, plants and other organizational

    structures. A number range group must be specified for each predefined number range. You can create an

    unlimited amount of number range groups. The order categories can be assigned to any of the number range groups. The system does not allow

    multiple assignment. The current status of the internal number assignment can be changed manually provided that the

    sequences are taken into account. You maintain the number range in Customizing.

  • 8/11/2019 LO215 - Production Orders

    71/379

    (C) SAP AG LO215 4-11

    SAP AG 1999

    Task List Selection Criteria

    Selection type (T399X) " With / without routing""Routing required / optional""Manual / automatic selection""With / without ref. operation set""P" (Production)"N" (Normal) " S" (Standard)

    Task list usageTask list type

    Task list selection IDUsage

    Material no.Plant

    " Alternative selection" indicator (MRP screen 4)

    Production version

    GroupGroup counter StatusValidityLot-size rangeDeletion flag = = "X"

    "Order quantity""Basic start/finish date""Released"

    (in reference operation sets)

    CustomizingCustomizing

    Routing

    Material

    A

    "Production version" indicator (T399X)

    You define the routing selection options in Customizing . The most important tables are :

    T399X order-type dependent parameters andTCA43 automatic selection

    You can determine whether a routing is necessary or not (selection type). All criteria are always checked and a routing is only selected if all criteria are fulfilled. Determining which validity the routing should be selected with is dependent on the setting in table

    T399D ( Customizing Requirements Planning) .

  • 8/11/2019 LO215 - Production Orders

    72/379

  • 8/11/2019 LO215 - Production Orders

    73/379

  • 8/11/2019 LO215 - Production Orders

    74/379

    (C) SAP AG LO215 4-14

    SAP AG 1999

    BOM

    Stage

    0

    1

    2. . .

    . . .

    20

    50100

    HEADERHEADER

    ITEMITEM

    ITEM

    PumpP-100

    Pre-assembled casing

    100-100

    Pre-assembled shaft

    100-300

    Casing

    100-110

    Support base

    100-700

    Shaft

    100-301

    Order header Order header

    Operations

    Material components

    Prod. resources/tools

    PlannedTarget

    Actual

    Costs

    BOMs contain the material structure and required quantities of the individual components for a product. The required quantities are not dependent on the order.

    BOM data is copied to the production order . Subsequent changes you make to the BOM do not takeeffect on orders that already exist.

    When you create an order, a BOM is chosen on the basis of the corresponding selection criteria . The BOM is exploded on one level . An exception to this is multi-level BOM explosion for so-called phantom assemblies . Subitems are not copied to the order.

  • 8/11/2019 LO215 - Production Orders

    75/379

  • 8/11/2019 LO215 - Production Orders

    76/379

    (C) SAP AG LO215 4-16

    SAP AG 1999

    Bill of Material Selection - Procedure

    BOM alternativealternative (T415A)

    Addi tion alcriteria

    = Blank

    =

    No

    = 2

    =Yes

    = 1

    Sel. ID

    Mat. master Indicator " Alternative

    selection"

    PP parameters for order type (T399X)

    "BOM usage"

    BOM usage(TC04)

    BOM selection bylot size

    BOM selection bydate

    Selection b ydate permitted ?

    BOM selection byPV

    Selection b yPV permitted?= 3

    Mandatory BOMselection by PV

    Key:PV = Productionversion

    BOM usagepriorities (TCS41)

    PP parameters for order type (T399X)

    "ProdVersion" indicator

    BOMBOM

    BOM

    = Yes

    = No

    During automatic selection, the alternative selection indicator in the material master (MRP screen 4)determines the selection procedure.

    Note the following special features: IND = Blank

    The system takes the BOM usage that is defined for each order type from table T399X , enters tableTC04 with this and takes a selection ID from this table. The system uses this selection ID andsearches the sequence of priorities contained in table TCS41 for the first available BOM that fulfillsthe lot size and BOM usage criteria .

    IND = 1Selection according to date requires that an entry is maintained in Customizing for the material(T415A a lternative selection multiple BOM).

    IND = 2The system searches the material master for production versions that fit the lot size .If only one exists, then its BOM is checked against all criteria (also those contained in TCS41!). Ifthere are more than one , table T399X decides ( production version indicator) whether the user(dialog box) or the system (automatic) determines which production version is to be selected. If,despite this, no valid BOM is found, the system does not stop .The system carries on searching using the procedure for when the indicator is "blank".

    IND = 3Same as for value = 2 . If no valid BOM is found in this case, the system stops searching!The production order has no components.

  • 8/11/2019 LO215 - Production Orders

    77/379

    (C) SAP AG LO215 4-17

    Selection according to production version presupposes that valid production versions have beenmaintained in the material master.

  • 8/11/2019 LO215 - Production Orders

    78/379

    (C) SAP AG LO215 4-18

    SAP AG 1999

    Item Categories in the Production Order

    2050

    100

    Reservation

    Purchaserequisition

    Find objectfor class

    Order header Order header

    Operations

    Material components

    Prod. resources/tools

    PlannedTarget

    Actual

    Costs

    Stock item

    Variable-size item

    Non-stock item

    Text item

    Class i tem

    Item categories control the data scope and functions of a material component. Typical examples are:

    Stock item Non-stock itemVariable-size itemText itemClass item

    You cannot make alterations to item categories once they have been set. Follow-on documents are generated with the production order according to item category. Components with the item category "non-stock item" automatically generate a purchase requisition.

    This can be displayed for an item via a further screen. The class item stands for a wide variety of different materials. When you enter the command "find

    object function for class", the system can specify the class item in a particular stock item. The "document item" is transferred to the document list of the production order (document link)

  • 8/11/2019 LO215 - Production Orders

    79/379

    (C) SAP AG LO215 4-19

    SAP AG 1999

    Reservation

    1

    Material A

    Reservation

    Header

    ItemItem

    ItemItem

    ItemItem MaterialPlant / Storage location

    Reqmts dateMovement allowedCommitted qty

    Base date

    Check calendar

    Assign ment

    The system generates material reservations for all material components of a production order of the type "stock material" .

    Reservations are taken into account when determining the conditions for material requirements planning. Reservations are also taken into account when creating goods movements for components of the production order.

    A reservation item applies to a plant or a plant's storage location . A requirements date is defined by the order for each item. You can control whether goods movements

    are allowed for the reservation item by means of an indicator. The reservations for material components of the production order are assigned to this production order. You can compile lists of reservations for the material or account assignment (production order).

  • 8/11/2019 LO215 - Production Orders

    80/379

    (C) SAP AG LO215 4-20

    SAP AG 1999

    Material Assignment

    Item 20

    Item 10

    Op.30

    Op.20

    Op.10

    MaterialB

    Material A

    Routing BOM

    You can assign material components to operations both when managing BOMs and routings . The assignment of material components to operations is copied to the production order. If no assignments are maintained, then the system automatically assigns the BOM material

    components to the leading operation . When you display the material components overview , you can assign material components to

    individual operations and display material components. The material components list can be sorted andfiltered according to various criteria in order to enhance this overview.

    Other functions include:Assigning, reassigning and deleting material assignments. Navigating between operations

    You are able to reassign materials up to the point of order release .

  • 8/11/2019 LO215 - Production Orders

    81/379

    (C) SAP AG LO215 4-21

    SAP AG 1999

    Assignment of Production Resources / Tools

    Production order

    Op.10

    Op.20

    Op.30

    PRT1

    PRT2

    You can assign production resources/tools to every operation in a production order. Production resource/tool assignments are copied from the routing to the production order.

  • 8/11/2019 LO215 - Production Orders

    82/379

    (C) SAP AG LO215 4-22

    SAP AG 2003

    Document Integration in Production Orders

    Production order

    Routing

    BOM

    DMSMaterial

    B

    Master Data Document ManagementSystem (DMS)

    Material item 10

    Document item 20

    Document item 30

    Operation 10

    Operation 20

    Document 1

    Document 2

    Document 3

    Prod. res./tools Production res/tools

    Order item

    Overview of documents in PrO

    Document 4

    Document 5

    Document link 4

    Document link 5

    Document link 1

    Material item 10

    Operation 10

    Operation 20

    Document link 2

    Document 6

    Fri

    Fri

    Fri

    Fri

    You can assign any number of documents to a production order. These are maintained in theDocument Management System (DMS).

    Documents can be drawings, texts, videos and so on. The documents themselves are only linked to the production order and not saved in it. You can create links from documents to a production order manually or automatically . Automatic linking of documents takes place during order creation or release. The document items are

    copied from the BOM, the production version or from the document link to the material master ofthe product to be manufactured.(This must be activated in the production scheduling profile - Customizing for Shop Floor Control)

    Document links in the production order created in this way can be displayed, changed, deleted, printed(separate list), archived and displayed in the product structure browser .

    Original document s cannot be printed out. All document types that you use must be permitted for object PORDER (production order), work with

    status management and must be released. (See Customizing for the Document Management System). Examples, see above:

    Document 1 Link copied from material masterDocument 2 Link created manuallyDocument 3 No link to production orderDocument 4 and 5 Link created from BOM itemDocument 6 does not appear in the document overview of the production order

  • 8/11/2019 LO215 - Production Orders

    83/379

    (C) SAP AG LO215 4-23

    SAP AG 1999

    Operation Sequences in a Production Order

    Product AOrder header

    Sequence typesStandardStandard

    sequencesequence 00000000 Alternative Al ternative

    sequencesequence 00010001

    ParallelParallel sequencesequence00020002

    Op. 70

    Op. 80

    Op. 10

    Op. 20

    Op. 30

    Op. 40

    Op. 50

    Op. 60

    Op. 10

    Op. 15

    Op. 20

    Op. 70

    Op. 80

    Op. 90..

    Alternative and parallel operation sequences are possible in production orders. The alternative sequence gives you the option of choosing alternative operations for a sequence of

    operations. The parallel sequence enables you to process operations parallel to and independent of other operations. You can copy both sequence types in an order from a routing (via Customizing).

  • 8/11/2019 LO215 - Production Orders

    84/379

    (C) SAP AG LO215 4-24

    SAP AG 1999

    Alternat ive Sequences

    > 20

    25

    < 30

    Operation 10

    Operation 20

    Operation 30

    Operation 40Operation 50

    > 10

    15

    20

    25

    < 30

    Alternative Alternativesequencesequence 00020002

    StandardStandard sequencesequence00000000

    Alternative Alternativesequencesequence 00010001

    Alternative sequences are linked to the standard sequence. An alternative sequence can be created automatically when you create a production order or read the

    master data. You can use the " exchange sequences" function to replace alternative sequences with a different

    sequence . This exchange is possible as long as certain functions have not yet been executed .

    For example, material withdrawals, confirmations, purchase orders . A switch is only possible if:

    The standard sequence has branch and return operationsThe operation numbers are within the standard sequence rangeThere is no overlap with other alternative sequences.

    Application: Changed work procedures with different lot sizes and capacity bottlenecks(external processing).

  • 8/11/2019 LO215 - Production Orders

    85/379

    (C) SAP AG LO215 4-25

    SAP AG 2003

    Parallel Sequences

    20 25 30

    30

    20 30

    40 50 60

    45 55

    IIIII

    IIIIIIIII

    IIIIIIIII= Floats

    IIIIIIIII

    Parallel sequence 1

    Parallel sequence 2

    Parallel sequence 3

    Operation 10 Operation 20

    Alternative and parallel operation sequences are possible in production orders. The parallel sequence enables you to process operations parallel to and independent of other operations. You can copy both sequence types in an order from a routing (via Customizing). Parallel sequences are linked to the standard sequence through predecessor / successor

    relationships . Parallel sequences are a special form of overlapping operations. Parallel sequences create network-like structures. Order scheduling inserts operation floats according to the alignment key specifications. Applications:

    In mechanical engineering for assemblies involving the production of individual components, inspection processes, and preparatory and closing operations. In the chemical industry for analysis processes that

    are carried out in parallel to the production process.

  • 8/11/2019 LO215 - Production Orders

    86/379

    (C) SAP AG LO215 4-26

    SAP AG 1999

    Read Master Data

    2050

    100

    Routing 2

    BOM 1

    BOM 2

    Routing 1

    Material components

    Order header Order header

    Operations

    Prod. resources/tools

    PlannedTarget

    Actual

    Costs

    You can use the function "Read PP master data" to switch the originally copied routing 1 and / orBOM 1 with a different routing and / or BOM alternative 2 .

    This exchange is possible as long as certain functions have not yet been executed .For example, material withdrawals, confirmations, purchase orders .

    Assignments of components (BOMs) and production resources/tools are retained, provided that thecorresponding operation still exists.

    This function can also be used for collective orders (refer to the "Collective Orders" unit)

  • 8/11/2019 LO215 - Production Orders

    87/379

    (C) SAP AG LO215 4-27

    SAP AG 1999

    Order Change Management(OCM)

    Aims of change management for production ordersProvision of a system-supported tool for automated change of productionorders which are already being used in the production process.

    The changes concerned can be triggered by changes in sales orders and/or master data

    When are the OCM tools needed?Production orders are already being used in the production process and havebeen worked on

    Customers change their order

    Engineering or technological changes are necessaryMass orders are affected by changes (for example, collective orders)

    Who needs the OCM tools?Sales-order-related production, make-to-order production

    12

    9

    6

    3

    11 1

    7 58 4

    210

    SAP AG 1999

    If you wish to change orders already being used in production and the options provided by the "ReadPP master data" function do not suffice, you can use Order Change Management for productionorders (OCM) (as of Release 4.5).

    The R/3 change management function enables the user to make changes that are coordinatedthroughout the order process, in terms of content and dates , to one or more objects (product masterdata and documents from business transactions currently in process).

    Change management differentiates between:ECH = Engineering Change Management OCM = Order

    Change Management ECH concentrates on the preparation and execution of changes to product master data. OCM concentrates on the exection of changes to production orders that are already being used in the

    production process (and on finding planned orders or purchase orders that are affected by thesechanges).

    The changes in OCM are based on changes from the area of product master data (ECH), as well ascertain changes from sales orders (SD).

    You cannot carry out automatic unchecked changes to production orders that are currently being usedin the production process (for example, material consumption has been posted, order is partiallyconfirmed,...). This is why the R/3 system provides functions for the controlled change of orders.

    Change management for production orders (OCM) is dealt with in detail in course LO980 .

  • 8/11/2019 LO215 - Production Orders

    88/379

    (C) SAP AG LO215 4-28

    SAP AG 1999

    Order Creation with Planned Orders

    Inspection l otInspection l ot

    Planned order Planned order

    RoutingRouting

    Production order Production order

    Order item Material components

    Inspection data Operations PRT

    Material number (Product)Requirements qtyReqmts date

    Material number (component)Requirements qty

    Inspection characteristicsTest values/characteristics

    Op number Work center Control keyStandard values

    PRT number Requirements qtyControl key

    Planned orders are created via Material requirements planning (MRP ). Creating production orders from planned orders is the most important function of the whole PP

    application. When you create a production order from a planned order, the system automatically supplies the production order data .

    When an inspection lot is generated, the inspection data is copied from the routing but not written tothe production order.

  • 8/11/2019 LO215 - Production Orders

    89/379

    (C) SAP AG LO215 4-29

    SAP AG 1999

    Material Requirements Planning (MRP)

    MRP area: Plant

    Material A

    Planning unit Planning run types Processingkey

    NEUPL

    NETCH

    NETPLNet change planningin the short-termplanning horizon

    Net change planning

    Regenerative planning

    Material requirements planning is executed at the level of the MRP area (plant, warehouse, ...). Regenerative planning means that you plan all materials from the planning file. Net change planning means that you can only plan materials which are already entered in the

    planning file and have therefore undergone a change relevant to MRP. Planning file entries can be generated either automatically or manually. Net change planning in the short-term planning horizon means that you can only plan materials that

    have already undergone a change relevant to MRP within a restricted planning horizon . You can onlygenerate order proposals within the planning horizon.

    Planning can either be carried out online or in the background . Material requirements planning (MRP) is dealt with in detail in course LO210 .

  • 8/11/2019 LO215 - Production Orders

    90/379

    (C) SAP AG LO215 4-30

    SAP AG 2003

    Planned Order Structure

    1000767

    Header Assignment Master Data

    Plnd order Processing Goto Extras

    Material A

    Requir ed material- Quantity- Requirements date

    Items

    Order typeQuantityDates

    Detailed sched.Components

    Capacity r eqmts- Operation- Work center - Reqmts date

    PeriodsPeriodst

    Capacity r eq. records

    R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R /

    3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3 R / 3

    Planned receipt of the net requirements calculation for requirements coverage. Requirements transfer object for the dependent requirements. It can be used as a pegged requirement for capacity planning. It provides a data source for the production order.

  • 8/11/2019 LO215 - Production Orders

    91/379

    (C) SAP AG LO215 4-31

    SAP AG 1999

    Multi-Level Materials Planning

    PlannedPlanned --SalesSales --

    PlannedPlannedindependentindependentrequirementsrequirements

    PLANNED ORDER

    PLANNED ORDER

    PLANNED ORDER

    Dependent requirementsDependent requirements

    Dependent requirementsDependent requirements

    E1E1

    B1B1 B2

    R1R1 R2R2 R3R3

    Requirements planning covers a whole product structure. It runs in the following steps for eachmaterial. Checking the requirements coverage. Generating the planned order. Determining the dependent requirements. Entering the components into the planning file.

  • 8/11/2019 LO215 - Production Orders

    92/379

    (C) SAP AG LO215 4-32

    SAP AG 1999

    MRP List

    Header

    Net planning

    Single item planning

    Storage location planning

    Material

    MRP parameters

    - Items

    - Items

    - Items

    Planning result

    ContentsContents

    Purchase requisitions

    Planned orders

    MRP list

    An important result of material requirements planning is the MRP list . An MRP list is created for each MRP related material . Current stock and requirement situations are displayed as of the last planning run . The MRP list is subdivided according to different planning segments . Changes made between two planning runs are not displayed. Error messages are copied to a log.

  • 8/11/2019 LO215 - Production Orders

    93/379

    (C) SAP AG LO215 4-33

    SAP AG 1999

    Current Stock/Requirements list

    Production orders

    Header

    Net planning

    Single item planning

    Storage location planning

    Material

    MRP parameters

    - Items

    - Items

    - Items

    Stock/reqmts list

    Purchase requisitionsPurchase ordersPlanned ordersSales ordersReservationsWarehouse stock

    ContentsContents

    MaterialMaterial

    A further result of material requirements planning is the current stock / requirements list . This list displays the current and therefore up-to-the-minute stock / requirements situation . You can generate the list dynamically by directly reading the MRP elements. From this list, individual planned orders can be converted to production orders .

  • 8/11/2019 LO215 - Production Orders

    94/379

    (C) SAP AG LO215 4-34

    SAP AG 1999

    Collective Conversion - Time-Oriented

    Operations

    Materialcomponents

    Prod. resources/tools

    Costs PlannedTarget

    Actual

    Purchaserequisition

    Planned o rders

    PD

    PS

    PO

    PD

    PS

    PO

    t

    x Days later

    Today

    x Days earlier

    Production orders

    Opening period

    Reqmtsplanning

    Order header Order header

    2010050

    You can convert planned orders online either individually , collectively, completely or partially . You can convert planned orders in the background using the program PPBICO40 . Planned orders consist of a planned order start date (PS), a planned order finish date (PL) and a planned

    order opening date (PE). When the planned order opening date is reached, you should convert the planned order into a production order or a purchase requisition.

    When you convert a planned order into a production order, the planned order is deleted . The system reassigns the dependent requirements (material components) and any existing capacity

    requirements to the newly created production order. By changing an indicator, the dependent requirements can then be turned into a reservation . When a planned order is only partially converted , it remains intact and is fixed . You can perform a collective conversion that is dependent on the outcome of a material availability

    check (analogous to the order release).

  • 8/11/2019 LO215 - Production Orders

    95/379

    (C) SAP AG LO215 4-35

    SAP AG 1999

    Converting Planned Orders - Time Frame

    R1R1 B1

    E1E1R2R2

    R3R3

    B2

    t

    Total lead time

    Opening periodOpening period ((fromfrom -- to)to)

    CurrentCurrent datedate

    The MRP controller uses the "collective conversion" function to convert the planned orders of a product structure falling within a set time period.

    In the framework of an entire product structure , the system will only convert those planned orderswhose planned order opening dates are within a defined opening period .

    You can predefine the size of the opening period with reference to the current date in User Parameters(AEV, AEB) .

    This procedure is particularly suited to deterministic make-to-stock production.

  • 8/11/2019 LO215 - Production Orders

    96/379

    (C) SAP AG LO215 4-36

    SAP AG 1999

    Collective Conversion - Structure-Oriented

    Prod. order 2

    Prod. order 1

    Preq

    Prod. order 4

    Prod. order 3

    As an alternative to time-related collective conversion, the order progress report provides the "Convert planned orders" function for structure-related conversion .

    An order progress report is available in Release 4.5. It enables you to clearly chart the progress of all business transactions (in-house production and external procurement) that are required when carryingout a sales order or project, and to process them.

    Using this report, you can convert planned orders into production orders or purchase requisitions with the order structure in front of you.

    This procedure is particularly suited to make-to-order production. Refer also to the Information Systems unit .

  • 8/11/2019 LO215 - Production Orders

    97/379

    (C) SAP AG LO215 4-37

    SAP AG 1999

    APO as a Planning Tool

    APO APO

    Global ATP

    Global ATP

    DistributionDistribution

    SAP BW

    Historicaldata

    Keyfigures

    ExternalData

    (for example,ITEM)

    SAP BW

    Historicaldata

    Keyfigures

    ExternalData

    (for example,ITEM)

    Demand planningDemand planning

    Productionplanning anddetailedscheduling

    SupplyNetworkPlanning

    SupplyNetworkPlanning

    Supply Chain CockpitR/3R/3

    Sales anddistribution(sales orders)

    Shop floor control

    (prod. orders)

    Inventorymanagement

    Instead of R/3 requirements planning (MRP), you can use the new SAP product: Advanced Plannerand Optimizer (APO) . This product is one of the SAP New Dimension products.

    APO enables a general, comprehensive portrayal, planning and monitoring of all processes in thelogistics chain, right down to a detailed level .

    Open standard interfaces permit seamless integration of SAP Systems (highly-integrated solution forR/3), old systems and systems from external providers.

    LiveCache , an SAP technology for processing data in the memory , gives APO its high performancelevel.

    APO is an absolute planning machine . Inventory management, sales order creation and order execution and control (Manufacturing Execution)

    are carried out outside of APO, for example in the R/3 System. Orders (planned, production or process) can be created and changed as the result of planning with APO. APO and R/3 are connected by the APO Core Interface (CIF) Data is kept consistent on both sides (APO and R/3). Planning with APO is dealt with in detail in courses AP010 to AP230 .

  • 8/11/2019 LO215 - Production Orders

    98/379

  • 8/11/2019 LO215 - Production Orders

    99/379

    (C) SAP AG LO215 4-39

    Order Creation/Order Change Exercises

    Unit: Order Creation /Order Change

    Topic: Creating an order without basic data(LO215 Exercise 2)

    Learn about the dialog for creating and changing a productionorder.

    As production manager, production scheduler or supervisor, fromtime to time you must create production orders for which there isno master data (routing, BOM).This is particularly the case if production has to carry outunplanned work, special requests and other tasks.In this exercise, you will become familiar with the dialog forcreating or changing a production order.

    1-1 Create an order using the following data:

    Material T-MAN

    Production plant 1000 Order type PP01

    Total amount 10 piece

    Basic finish date Any

    Scheduling type Backwards

    Path: S000 LO PP SFC ORDER CREATE

    WITH MATERIAL

    A dialog box appears: Routing Selection T-MAN

    React to the system message: "No routing found" with

    GENERATE OPERATION

  • 8/11/2019 LO215 - Production Orders

    100/379

  • 8/11/2019 LO215 - Production Orders

    101/379

    (C) SAP AG LO215 4-41

    Machine time 10 pieces per 30 mins

    Labor time 10 pieces per 60 mins

    Path: S000 LO PP SFC ORDER CHANGE

    1-6 Add material components "T-T1##" and "T-T2##" to operation "0010" in any quantity .

    Use item category "L" for both.

    Path: Go to the operation overview and select

    operation "0010". In the menu bar at the bottom of the screen, select the COMPONENTS pushbutton

    1-7 To operation "0020" , add the production resource/tool "PP-FHMM" . with anyquantity .

    Path: Go to the operation overview and select

    operation "0020".

    In the menu bar at the bottom of the screen, select the PRT pushbutton

    (production resources/tools)

    A dialog box appears: PRT New Entries

    Note that this production/resource tool has a materialmaster .

    The window is set up accordingly. If you want to add otherPRT categories, you must select the pushbutton at the

    bottom.

    1-8 Execute a document link, by linking the order with document T-D##.

    Document no. T-D##

    Document type DRW

    Subdocument 000

  • 8/11/2019 LO215 - Production Orders

    102/379

    (C) SAP AG LO215 4-42

    Document version 00

    Assign the document to operation 0010 .

    Path: Go to the document overviewGOTO OVERVIEWS DOCUMENTS

    1 -9 Check the operation overview.

    1-10 Carry out order costing (determine costs).

    Path: FUNCTIONS COST

    1-11 Display the costing result.

    Path: GOTO -> COSTS -> ITEMIZATION

    1-12 Save the order.

    Path: ORDER SAVE

  • 8/11/2019 LO215 - Production Orders

    103/379

    (C) SAP AG LO215 4-43

    Order Creation/Order Change Exercises

    Unit: Order Creation /

    Order ChangeTopic: Creating an Order with Basic Data

    (LO215 Exercise 3)

    Routing and BOM selection

    Production versions in a production order

    Reading master data

    As production manager, production scheduler or supervisor, as arule, you create production orders on the basis of master data(routings, BOMs), which has been created and is maintained inthe areas of engineering and work scheduling in your company.This is particularly the case when the production of materials andactivities is of a repetitive nature.In this exercise you become acquainted with the way in which theSAP System searches for and selects the master data that is validfor a production order.

    2-1 Create an order using the following data:

    Material T-F1##

    Production plant 1000

    Order type PP01

    Total amount 1 piece

    Basic finish date Any

    Scheduling type Backwards

    Path: S000 LO PP SHOP FLOOR CONTROL ORDERCREATE WITH MATERIAL

    2-2 What is the validity date of the BOM and the routing in the production order?

  • 8/11/2019 LO215 - Production Orders

    104/379