Littoral Combat Ship (LCS)

Surface Navy Association National Symposium 2017

January 12, 2017 CAPT Tom Anderson PMS 501 Program Manager

Page 2: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 2

Agenda

2016– Testing– Serial Production– Performance

2017– Events

Page 3: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 3

Operational Testing

SeaRAMFiring

Swarm Raid

Page 4: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 4

Live Fire

FSST - LCS 5

FSST - LCS 6

FSST - LCS 5

FSST - LCS 6

TSST – LCS 4

Page 5: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 5

Launches

LCS 11 LCS 13LCS 11

LCS 14

Page 6: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 6

Trials

LCS 10 AT

LCS 8 AT

LCS 7 AT

Page 7: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 7

Delivery

LCS 10

LCS 7

LCS 8

Page 8: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 8

Commissioning

LCS 7

LCS 8

Page 9: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 9

LCS Post Delivery Timeline

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Construction & Test Post Sail CSSQT

DT/OTPSA

PostPSAWOO

Fleet & Life Cycle Support

In service(PMS 505)PMS 501 Production

TeamPMS 501 Post Delivery

FCTCMA

Sea Trials

New Construction (PMS 501)

CSSQT DT/OT

PrePSAWOO

SCNOWLD

(11 months after fitting-out)

2 2 5 3 12Sailaway

Commissioning

Delivery

15 months

SCN Acronyms− CMA: Crew Move Aboard− OWLD: Obligated Work Limiting Date – IPDA: Industrial Post Delivery

Availability– CMAV: Continuous Maintenance

Availability– FCT: Final Contract Trial– WOO: Window of Opportunity– CSSQT: Combat Systems Ship

Qualifications Trial

IPDA

9

Page 10: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 10

Major Improvements IncorporatedLCS 1-3-5AF

Changed to BAE FCS-57 Gun Fire Control System

Changed to LM Machinery Control System (MPCMS)

Changed to ALEX Decoy System (DLS) – Common with GD Design

SeaRAM LCS (17AF)

TRS 4D Radar LCS (17AF)

Hangar Mezzanine

Raised AnchorSplit Stern Tube Seals

10

Additional Buoyancy Tanks

Change to 7m RHIB (23AF)

Lethality UpgradeOTH Missiles

Survivability UpgradeLightweight Tow (LWT)

Replace 2 Adrick with 3 York Chiller Plants (17AF)

Survivability UpgradeMagazine Protection

Berthing Increased to 98

Renk Reduction Gear

LCS 1 to 3LCS 3 to 5AFLethality/Survivability

GT Electric StartMain Space VentilationReplaced Large Hydraulic Side Door

High Pressure Common Rail SSDGSeawater Service Redundancy (9AF)

Fin Stabilizer Removal (9AF) Reinforced Stern Ramp

Corrosion Improvement in Water-borne Mission Zone

Axial Flow Waterjets

Page 11: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 11

Major Improvements Incorporated LCS 2-4-6AF

New anchor winch &improved bow configuration

Added Impressed Current Cathodic Protection System in water jet tunnels

Upgraded MPDE exhaust material to CRES

Increase Capacity Bow Thruster

Increased berthing capacity to 98 Machinery Room

Ventilation

Waterjet Hydraulics

11

Added 4th Fire Pump

Decoupled IFF

Voice Over IP (VOIP) internal communications

New water jet hydraulic power packs

New Oil-Water Separator

Lethality UpgradeOTH Missiles

Survivability UpgradeLightweight Tow (LWT)

New TBEC Design

Upgraded Integrated Combat Management System Baseline

GRP Black and Gray Water Tank

Machinery Control System Usability

Magazine Protection

Axial Flow Waterjets

Replaced 5.1m RHIB with 7m RHIB

Upgraded AT/FP Improved Side Door Hydraulics

Amah strengthening (inline 14AF)

Upgraded multi-vehicle communications systems

Improved Load Shed

LCS 2 to 4LCS 4 to 6AFLethality/Survivability

York AC plants

Installed diesel exhaust isolation valves

Page 12: Littoral Combat Ship (LCS)

Distribution Statement A: Approved for public release 12

2017 Events Launches

– Billings (LCS 15), Tulsa (LCS 16), Indianapolis (LCS 17), Charleston (LCS 18)

Trials– Little Rock (LCS 9), Sioux City (LCS 11), Omaha (LCS 12), Wichita (LCS 13),

Manchester (LCS 14)

Commissionings– Little Rock (LCS 9), Gabrielle Giffords (LCS 10), Sioux City (LCS 11), Omaha

(LCS 12)

Post Delivery Test and Trial Period– Milwaukee (LCS 5), Jackson (LCS 6), Detroit (LCS 7), Montgomery (LCS 8),

Little Rock (LCS 9), Gabrielle Giffords (LCS 10), Omaha (LCS 12)