  • 7/29/2019 List of Dist Roads

    1/95

    Length to

    be treated

    Works

    category/

    sub-

    category

    Planned Exp

    UGX '000

    Implement

    ation

    strategy

    Q1 Q2 Q

    3088 Mufudu - Webuta 1.40 1.40 RMM/1.1,1.2,1.3,1.4

    1,089

    3090 Nanyunza - Makosi 3.70 3.70 RMM/1.1,1.2,1.3,1.5

    2,878

    3092 Bulweta - Bumalunda 4.60 4.60 RMM/1.1,1.2,1.3,1.6

    3,577

    3079 Namagumba - Nankusi 3.00 3.00 RMM/1.1,1.2,1.3,1.7

    2,333

    3063 Border - Bukingala 6.00 6.00 RMM/1.1,1.2,1.3,1.8

    4,666

    3089 Busano Passa - Bukhabusi 1.50 1.50 RMM/1.1,1.2,1.3,1.9

    1,167

    3064 Busano - Buwangwa 6.00 6.00 RMM/1.1,1.2,1.3,1.10

    4,666

    3095 Busano - Khatwelatwela 3.30 3.30 RMM/1.1,1.2,1.3,1.11

    2,566

    3091 Bukatsa - Nabiri 2.00 2.00 RMM/1.1,1.2,1.3,1.12

    1,555

    3014 Bunywaka-Nyondo 3.00 3.00 RMM/1.1,1.2,1.3,1.13

    2,333

    3015 Burukuru-Bumamali 3.20 3.20 RMM/1.1,1.2,1.3,1.14

    2,489

    3093 Nabweye - Bukikali 5.30 5.30 RMM/1.1,1.2,1.3,1.15

    4,122

    3097 Kilayi - Imam Hussein 7.60 7.60 RMM/1.1,1.2,1.3,1.16

    5,911

    3061 Jewa - Kaama 6.75 6.75 RMM/1.1,1.2,1.3,1.17

    5,249

    3017 Bumagira - Wambewo 3.20 3.20 RMM/1.1,1.2,1.3,1.18 2,489

    3002 Kimwanga - Musese 7.60 7.60 RMM/1.1,1.2,1.3,1.19

    5,911

    3099 Lwaboba - Busiu TC 8.00 8.00 RMM/1.1,1.2,1.3,1.20

    6,222

    3053 Lwaboba - Kangole 6.80 6.80 RMM/1.1,1.2,1.3,1.21

    5,288

    3094 Busano - Buyago 6.00 6.00 RMM/1.1,1.2,1.3,1.22

    4,666

    3003 Buwalula - Nabumali 5.50 5.50 RMM/1.1,1.2,1.3,1.23

    4,277

    3034 Nabumali - Busano 6.30 6.30 RMM/1.1,1.2,1.3,1.24

    4,900

    3020 Bumbobi - Kachonga 1.00 1.00 RMM/1.1,1.2,1.

    3,1.25

    778

    3058 Busiu - Wangale 5.50 5.50 RMM/1.1,1.2,1.3,1.26

    4,277

    3004 Shikoye - Watakhuna 1.70 1.70 RMM/1.1,1.2,1.3,1.27

    1,322

    3007 Railway Station - Bunanimi 4.30 4.30 RMM/1.1,1.2,1.3,1.28

    3,344

    Road

    length, Km

    Annual Work Plan Quarterly Physical wor

    DISTRICT ROADS

    Routine Manual Maintenance

    Item

    No.Road Name

    Surface

    Type

  • 7/29/2019 List of Dist Roads

    2/95

    3013 Korani - Manafa 6.20 6.20 RMM/1.1,1.2,1.3,1.29

    4,822

    3012 Shisala - Makhonje 3.00 3.00 RMM/1.1,1.2,1.3,1.30

    2,333

    3045 Doko - Kolonyi 7.00 7.00 RMM/1.1,1.2,1.3,1.31

    5,444

    3065 Kabwangasi - Doko 6.00 6.00 RMM/1.1,1.2,1.3,1.32

    4,666

    3008 Nakaloke - Namunsi 2.50 2.50 RMM/1.1,1.2,1.3,1.33

    1,944

    3005 Bugema - Doko 5.6 5.6 RMM/1.1,1.2,1.3,1.34

    4,355

    3072 Mukaga - Marale 3.50 3.50 RMM/1.1,1.2,1.3,1.35

    2,722

    3054 Sirra - Musoto 6.80 6.80 RMM/1.1,1.2,1.3,1.36

    5,288

    3010 Buzalangizo - Kaama 2.70 2.70 RMM/1.1,1.2,1.3,1.37

    2,100

    3011 Bunawunzu - Madenge 4.80 4.80 RMM/1.1,1.2,1.3,1.38

    3,733

    3096 Tooma - Buwalasi 3.20 3.20 RMM/1.1,1.2,1.3,1.39

    2,489

    3098 Lwaboba - Nagirima 6.00 6.00 RMM/1.1,1.2,1.3,1.40

    4,666

    3071 Busiu - Namawanga 6.30 6.30 RMM/1.1,1.2,1.3,1.41

    4,900

    3006 Namwenula - Nabweya 5.1 5.1 RMM/1.1,1.2,1.3,1.42

    3,966

    3048 Mutoto - Busimba 6.00 6.00 RMM/1.1,1.2,1.3,1.43

    4,666

    3060 Mutoto - Bulujele 3.85 3.85 RMM/1.1,1.2,1.3,1.44

    2,994

    3009 Busamaga - Bumuluya 8.00 8.00 RMM/1.1,1.2,1.3,1.45

    6,222

    3084 Buwalula - Namatsale 4.00 4.00 RMM/1.1,1.2,1.3,1.46

    3,111

    3057 Mulatsi- Busoba 4.85 4.85 RMM/1.1,1.2,1.3,1.47

    3,772

    3056 Busoba - Makhai 6.90 6.90 RMM/1.1,1.2,1.3,1.48

    5,366

    3016 Mulatsi - Bukiende 7.10 7.10 RMM/1.1,1.2,1.3,1.49

    5,522

    3080 Nkoma - Makuduyi 6.70 6.70 RMM/1.1,1.2,1.3,1.50

    5,211

    3049 Namanyonyi - Buwalasi 7.70 7.70 RMM/1.1,1.2,1.3,1.51

    5,988

    Burukuru-Namutembi 6.30 6.30 RMM/1.1,1.2,1.3,1.52

    4,900

    Buwalasi - Namwalye 8.70 8.70 RMM/1.1,1.2,1.3,1.53

    6,766

    252.05 252.05 196,020SUBTOTAL - DISTRICT

  • 7/29/2019 List of Dist Roads

    3/95

    Road Name Border - Bukingala

    Sub County BudwaleRoad Link 7601Chainage 00 - 6+600

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova oobstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,200 0.50 24,400 80 488,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 4,000 0.50 8,000 157 314,000

    6 Cleaning mitre drains, fully silted m 100 0.50 200 80 4,000- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 120 0.50 240 90.00 5,400

    - -

    10 Clearing stream channels m 0.50 - 90.00 -- -

    11 Cleaning catch-water drains, fully

    silted m3 - -- -

    12 Cleaning catch-water drains, half

    silted m2 - -

    - -

    13 Filling potholes - -- -

    14 Filling minor gullies m2 0.50 - 200.00 -m2 - -

    - -

    15Grubbing to reinstate road camber m2 6,000 0.50 12,000 30.00 79,600

    - -

    16 Repairing shoulder slope erosion m2 3,000 0.50 6,000 45.00 67,500- -

    17 Weeding shoulders m2 - -- -

    18 Grass cutting m2 8,000 0.50 16,000 16.00 64,000- -

    19 Bush/shrub clearing m2 - -

    - -

    20 Grass planting (Pass-puram) m2 - -

    - -21 Tree planting No - -- -

    22 Tree Nursing m2 - -- -

    23 Removal of debris and silt m2 - -- -

    24 Sweeping the road m2 - -

    - -

    25 Maintaining footpaths m2 - -- -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -67,640 1,166,500

    MBALE DISTRICT LOCAL GOVERNMENT

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    4/95

    Road Name Bugema - DokoSub County BudwaleRoad Link 7602Chainage 00 -5+600

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,200 0.50 24,400 80 488,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 2,000 0.50 4,000 157 157,000

    6 Cleaning mitre drains, fully silted m 480 0.50 960 80 19,200- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 120 0.50 240 90.00 29,550

    - -10 Clearing stream channels m 400 0.50 800 90.00 18,000

    - -

    11 C eaning catc -water rains, u y

    silted m3 - -- -

    12 C eaning catc -water rains, a

    silted m2 - -

    - -

    13 Filling potholes - -- -

    14 Filling minor gullies m2 500 0.50 1,000 200.00 50,000m2 - -

    - -15Grubbing to reinstate road camber m2 6,000 0.50 12,000 30.00 90,000

    - -

    16 Repairing shoulder slope erosion m2 2,000 0.50 4,000 45.00 45,000

    - -

    17 Weeding shoulders m2 - -- -

    18 Grass cutting m2 24,000 0.50 48,000 16.00 192,000- -

    19 Bush/shrub clearing m2 - -- -

    20 Grass planting (Pass-puram) m2 - -

    - -

    21 Tree planting No - -

    - -

    22 Tree Nursing m2 - -- -

    23 Removal of debris and silt m2 - -- -

    24 Sweeping the road m2 - -- -

    25 Maintaining footpaths m2 - -

    - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,088,750

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    5/95

    Road Name Bukatsa - NabiriSub County Nyondo

    Road Link 7603Chainage 00 - 2+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 4,000 0.50 8,000 80 160,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 1,000 0.50 2,000 157 78,500

    6 Cleaning mitre drains, fully silted m 0.50 - 80 -- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 60 0.50 120 90.00 2,700

    - -

    10 Clearing stream channels m 0.50 - 90.00 -

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 50 0.50 100 200.00 5,000

    m2 - -

    15Grubbing to reinstate road camber m2 800 0.50 1,600 30.00 12,000

    - -

    16 Repairing shoulder slope erosion m2 2,900 0.50 5,800 45.00 65,750

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 8,100 0.50 16,200 16.00 64,800

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    388,750

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    6/95

    Road Name Bulweta - BumalundaSub County LwassoRoad Link 7604Chainage 00 - 4+600

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 4,000 0.50 8,000 80 160,000

    4Reinstating/Repairing scour checks No 300 0.50 600 720 108,000

    5 Reinstating eroded ditches m 2,000 0.50 4,000 157 157,000

    6 Cleaning mitre drains, fully silted m 240 0.50 480 80 9,600

    - -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 60 0.50 120 90.00 2,700

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 1,000 0.50 2,000 200.00 100,000

    m2 - -

    15Grubbing to reinstate road camber m2 9,000 0.50 18,000 30.00 134,450

    - -

    16 Repairing shoulder slope erosion m2 4,000 0.50 8,000 45.00 90,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 16,000 0.50 32,000 16.00 128,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -894,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    7/95

    Road Name Bumagira - WambewoSub County BubyanguRoad Link 7605Chainage 00 - 3+200

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 6,400 0.50 12,800 80 255,950

    4Reinstating/Repairing scour checks No 20 0.50 40 720 7,200

    5 Reinstating eroded ditches m 1,500 0.50 3,000 157 117,750

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 50 0.50 100 90.00 2,250

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000

    m2 - -

    15Grubbing to reinstate road camber m2 6,400 0.50 12,800 30.00 96,000

    - -

    16 Repairing shoulder slope erosion m2 100 0.50 200 45.00 2,250

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,300 0.50 24,600 16.00 98,400

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -622,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    8/95

    Road Name Bumbobi - KachongaSub County Busoba

    Road Link 7606Chainage 00 - 1+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 100 0.50 200 80 4,000

    4Reinstating/Repairing scour checks No 30 0.50 60 720 10,800

    5 Reinstating eroded ditches m 510 0.50 1,020 157 40,217

    6 Cleaning mitre drains, fully silted m 180 0.50 360 80 7,200

    - -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 6 0.50 12 90.00 270

    - -10 Clearing stream channels m 0.50 - 90.00 -

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 300 0.50 600 200.00 30,000

    m2 - -

    15Grubbing to reinstate road camber m2 4,000 0.50 8,000 30.00 60,000

    - -

    16 Repairing shoulder slope erosion m2 445 0.50 890 45.00 10,013

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 4,000 0.50 8,000 16.00 32,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -194,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    9/95

    Road Name Bunawunzu - Madenge

    Sub County BubyanguRoad Link 7607Chainage 00 - 4+800

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 3,500 0.50 7,000 80 140,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 670 0.50 1,340 80 26,800- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 360 0.50 720 200.00 36,000m2 - -

    15Grubbing to reinstate road camber m2 9,600 0.50 19,200 30.00 141,900

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 11,000 0.50 22,000 16.00 88,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -933,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    10/95

    Road Name Bunywaka-Nyondo

    Sub County

    Nyondo

    Road Link 7608Chainage 00 - 3+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,fallen trees, debris, etc)

    Man-hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 340 0.50 680 80 13,600

    4Reinstating/Repairing scour checks No 200 0.50 400 720 72,000

    5 Reinstating eroded ditches m 1,500 0.50 3,000 157 117,100

    6 Cleaning mitre drains, fully silted m 300 0.50 600 80 12,000

    - -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -

    10 Clearing stream channels m 50 0.50 100 90.00 2,250

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 1,000 0.50 2,000 200.00 100,000

    m2 - -

    15Grubbing to reinstate road camber m2 6,000 0.50 12,000 30.00 90,000

    - -

    16 Repairing shoulder slope erosion m2 4,100 0.50 8,200 45.00 92,250

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 10,000 0.50 20,000 16.00 80,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -583,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    11/95

    Road Name Burukuru-Bumamali

    Sub County BusanoRoad Link 7609Chainage 00 - 3+200

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 6,400 0.50 12,800 80 254,550

    4Reinstating/Repairing scour checks No 50 0.50 100 720 18,000

    5 Reinstating eroded ditches m 500 0.50 1,000 157 39,250

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000m2 - -

    15Grubbing to reinstate road camber m2 6,400 0.50 12,800 30.00 96,000

    - -

    16 Repairing shoulder slope erosion m2 3,000 0.50 6,000 45.00 67,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,500 0.50 25,000 16.00 100,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -622,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    12/95

    Road Name Burukuru-Namutembi

    Sub County BusanoRoad Link 7610Chainage 00 - 6+300

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,600 0.50 25,200 80 504,000

    4Reinstating/Repairing scour checks No 250 0.50 500 720 90,000

    5 Reinstating eroded ditches m 4,000 0.50 8,000 157 314,000

    6 Cleaning mitre drains, fully silted m 120 0.50 240 80 4,800- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 120 0.50 240 90.00 5,400- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 290 0.50 580 200.00 29,000m2 - -

    15Grubbing to reinstate road camber m2 0.50 - 30.00 -

    - -

    16 Repairing shoulder slope erosion m2 4,000 0.50 8,000 45.00 90,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 23,000 0.50 46,000 16.00 183,300

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,225,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    13/95

    Road Name Busamaga - Bumuluya

    Sub County LwassoRoad Link 7611Chainage 00 - 8+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 16,000 0.50 32,000 80 639,300

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 0.50 - 80 -

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 160 0.50 320 90.00 7,200

    - -10 Clearing stream channels m 0.50 - 90.00 -

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 650 0.50 1,300 200.00 65,000m2 - -

    15Grubbing to reinstate road camber m2 16,000 0.50 32,000 30.00 240,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 32,000 0.50 64,000 16.00 256,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,555,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    14/95

    Road Name Busano - Buwangwa

    Sub County BusanoRoad Link 7612Chainage 00 -6+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,000 0.50 24,000 80 478,400

    4Reinstating/Repairing scour checks No 300 0.50 600 720 108,000

    5 Reinstating eroded ditches m 1,900 0.50 3,800 157 149,150

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 200 0.50 400 90.00 9,000

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 600 0.50 1,200 200.00 60,000m2 - -

    15Grubbing to reinstate road camber m2 12,000 0.50 24,000 30.00 180,000

    - -

    16 Repairing shoulder slope erosion m2 3,000 0.50 6,000 45.00 67,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,000 0.50 24,000 16.00 96,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,166,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    15/95

    Road Name Busano - Buyago

    Sub County BusanoRoad Link 7613Chainage 00 -6+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,000 0.50 24,000 80 478,400

    4Reinstating/Repairing scour checks No 300 0.50 600 720 108,000

    5 Reinstating eroded ditches m 1,900 0.50 3,800 157 149,150

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 200 0.50 400 90.00 9,000

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 600 0.50 1,200 200.00 60,000

    m2 - -

    15Grubbing to reinstate road camber m2 12,000 0.50 24,000 30.00 180,000

    - -

    16 Repairing shoulder slope erosion m2 3,000 0.50 6,000 45.00 67,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,000 0.50 24,000 16.00 96,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,166,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    16/95

    Road Name Busano - Khatwelatwela

    Sub County BusanoRoad Link 7614Chainage 00 -3+300

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 6,600 0.50 13,200 80 264,000

    4Reinstating/Repairing scour checks No 70 0.50 140 720 25,200

    5 Reinstating eroded ditches m 950 0.50 1,900 157 74,575

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 160 0.50 320 200.00 16,000m2 - -

    15Grubbing to reinstate road camber m2 6,400 0.50 12,800 30.00 96,000

    - -

    16 Repairing shoulder slope erosion m2 4,000 0.50 8,000 45.00 90,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 6,600 0.50 13,200 16.00 52,775

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -641,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    17/95

    Road Name Busano Passa - Bukhabusi

    Sub County BusanoRoad Link 7615Chainage 00-1+500

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 2,000 0.50 4,000 80 80,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 500 0.50 1,000 157 37,000

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 30 0.50 60 90.00 1,350- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000m2 - -

    15Grubbing to reinstate road camber m2 2,500 0.50 5,000 30.00 37,500

    - -

    16 Repairing shoulder slope erosion m2 2,000 0.50 4,000 45.00 45,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 6,000 0.50 12,000 16.00 48,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -291,750

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    18/95

    Road Name Busiu - Namawanga

    Sub County BusiuRoad Link 7616Chainage 00 -6+300

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,600 0.50 25,200 80 504,000

    4Reinstating/Repairing scour checks No 100 0.50 200 720 36,000

    5 Reinstating eroded ditches m 4,000 0.50 8,000 157 312,200

    6 Cleaning mitre drains, fully silted m 120 0.50 240 80 4,800- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -

    9 Cleaning culverts, half silted m 120 0.50 240 90.00 5,400- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 440 0.50 880 200.00 44,000m2 - -

    15Grubbing to reinstate road camber m2 0.50 - 30.00 -

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 25,200 0.50 50,400 16.00 201,600

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,225,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    19/95

    Road Name Busiu - Wangale

    Sub County BusiuRoad Link 7617Chainage 00 -5+500

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 11,000 0.50 22,000 80 440,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 840 0.50 1,680 80 33,600

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 180 0.50 360 90.00 8,100

    - -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 360 0.50 720 200.00 36,000m2 - -

    15Grubbing to reinstate road camber m2 990 0.50 1,980 30.00 14,850

    - -

    16 Repairing shoulder slope erosion m2 6,000 0.50 12,000 45.00 135,000

    -

    17 Weeding shoulders m2 - --

    18 Grass cutting m2 20,200 0.50 40,400 16.00 161,700

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,069,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    20/95

    Road Name Busoba - Makhai

    Sub County BusobaRoad Link 7618Chainage 00 -6+900

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 13,800 0.50 27,600 80 552,000

    4Reinstating/Repairing scour checks No 200 0.50 400 720 72,000

    5 Reinstating eroded ditches m 4,000 0.50 8,000 157 314,000

    6 Cleaning mitre drains, fully silted m 600 0.50 1,200 80 24,000

    7 Cleaning mitre drains, half silted m

    8 Cleaning culverts, fully silted m

    9 Cleaning culverts, half silted m 110 0.50 220 90.00 5,000- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000m2 - -

    15Grubbing to reinstate road camber m2 7,800 0.50 15,600 30.00 117,000

    - -

    16 Repairing shoulder slope erosion m2 2,000 0.50 4,000 45.00 45,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 23,000 0.50 46,000 16.00 184,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,341,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    21/95

    Road Name Buwalasi - Namwalye

    Sub County BusobaRoad Link 7619Chainage 00 -8+700

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 17,400 0.50 34,800 80 696,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 3,500 0.50 7,000 157 274,750

    6 Cleaning mitre drains, fully silted m 560 0.50 1,120 80 22,400

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 126 0.50 252 90.00 5,670

    - -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 360 0.50 720 200.00 36,000

    m2 - -

    15Grubbing to reinstate road camber m2 17,400 0.50 34,800 30.00 261,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 34,800 0.50 69,600 16.00 278,680

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,691,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    22/95

    Road Name Buwalula - Nabumali

    Sub County BungokhoRoad Link 7620Chainage 00 -5+500

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 11,000 0.50 22,000 80 440,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 2,000 0.50 4,000 157 157,000

    6 Cleaning mitre drains, fully silted m 840 0.50 1,680 80 33,600- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 180 0.50 360 90.00 8,100- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 400 0.50 800 200.00 40,000m2 - -

    15Grubbing to reinstate road camber m2 11,000 0.50 22,000 30.00 165,000

    - -

    16 Repairing shoulder slope erosion m2 2,000 0.50 4,000 45.00 45,050

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 22,000 0.50 44,000 16.00 176,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,069,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    23/95

    Road Name Buwalula - Namatsale

    Sub County BungokhoRoad Link 7621Chainage 00 -4+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 8,000 0.50 16,000 80 320,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 1,500 0.50 3,000 157 117,750

    6 Cleaning mitre drains, fully silted m 340 0.50 680 80 13,600- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 170 0.50 340 200.00 17,000m2 - -

    15Grubbing to reinstate road camber m2 7,000 0.50 14,000 30.00 105,000

    - -

    16 Repairing shoulder slope erosion m2 3,000 0.50 6,000 45.00 67,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 16,000 0.50 32,000 16.00 128,350

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -777,750

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    24/95

    Road Name Buzalangizo - Kaama

    Sub County BufumboRoad Link 7622Chainage 00 -2+700

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 5,400 0.50 10,800 80 216,000

    4Reinstating/Repairing scour checks No 100 0.50 200 720 36,000

    5 Reinstating eroded ditches m 1,200 0.50 2,400 157 94,200

    6 Cleaning mitre drains, fully silted m 220 0.50 440 80 8,800

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 66 0.50 132 90.00 2,970

    - -10 Clearing stream channels m 80 0.50 160 90.00 3,600

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 270 0.50 540 200.00 27,000m2 - -

    15Grubbing to reinstate road camber m2 4,000 0.50 8,000 30.00 59,750

    - -

    16 Repairing shoulder slope erosion m2 1,500 0.50 3,000 45.00 33,480

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 5,400 0.50 10,800 16.00 43,200

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -525,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    25/95

    Road Name Doko - Kolonyi

    Sub County NakalokeRoad Link 7623Chainage 00 -7+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 14,000 0.50 28,000 80 560,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 630 0.50 1,260 80 25,200- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -

    9 Cleaning culverts, half silted m 126 0.50 252 90.00 5,670- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 400 0.50 800 200.00 40,000m2 - -

    15Grubbing to reinstate road camber m2 14,000 0.50 28,000 30.00 210,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,130

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 21,000 0.50 42,000 16.00 168,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,361,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    26/95

    Road Name Jewa - Kaama

    Sub County BufumboRoad Link 7624Chainage 00 -6+750

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 13,500 0.50 27,000 80 540,000

    4Reinstating/Repairing scour checks No 300 0.50 600 720 108,000

    5 Reinstating eroded ditches m 2,000 0.50 4,000 157 157,000

    6 Cleaning mitre drains, fully silted m 460 0.50 920 80 18,400

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 126 0.50 252 90.00 5,670- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 390 0.50 780 200.00 39,000m2 - -

    15Grubbing to reinstate road camber m2 11,000 0.50 22,000 30.00 165,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 20,250 0.50 40,500 16.00 162,180

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,312,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    27/95

    Road Name Kabwangasi - Doko

    Sub County NakalokeRoad Link 7625Chainage 00 -6+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,000 0.50 24,000 80 480,000

    4Reinstating/Repairing scour checks No 200 0.50 400 720 72,000

    5 Reinstating eroded ditches m 2,100 0.50 4,200 157 164,850

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 385 0.50 770 200.00 38,500

    m2 - -

    15Grubbing to reinstate road camber m2 12,000 0.50 24,000 30.00 180,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,200

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,000 0.50 24,000 16.00 96,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,166,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    28/95

    Road Name Kilayi - Imam Hussein

    Sub County BubyanguRoad Link 7626Chainage 00 -7+600

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 15,200 0.50 30,400 80 608,000

    4Reinstating/Repairing scour checks No 785 0.50 1,570 720 282,600

    5 Reinstating eroded ditches m 2,200 0.50 4,400 157 172,700

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 160 0.50 320 90.00 7,200

    - -10 Clearing stream channels m 300 0.50 600 90.00 13,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 825 0.50 1,650 200.00 82,350

    m2 - -

    15Grubbing to reinstate road camber m2 9,000 0.50 18,000 30.00 135,000

    - -

    16 Repairing shoulder slope erosion m2 4,000 0.50 8,000 45.00 90,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 9,000 0.50 18,000 16.00 72,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,477,750

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    29/95

    Road Name Kimwanga - Musese

    Sub County BumasikyeRoad Link 7627Chainage 00 -7+600

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 15,200 0.50 30,400 80 608,000

    4Reinstating/Repairing scour checks No 785 0.50 1,570 720 282,600

    5 Reinstating eroded ditches m 2,200 0.50 4,400 157 172,700

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 160 0.50 320 90.00 7,200

    - -10 Clearing stream channels m 300 0.50 600 90.00 13,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 825 0.50 1,650 200.00 82,500m2 - -

    15Grubbing to reinstate road camber m2 9,000 0.50 18,000 30.00 134,850

    - -

    16 Repairing shoulder slope erosion m2 4,000 0.50 8,000 45.00 90,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 9,000 0.50 18,000 16.00 72,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,477,750

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    30/95

    Road Name Korani - Manafa

    Sub County BusiuRoad Link 7628Chainage 00 -6+200

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,400 0.50 24,800 80 496,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 2,000 0.50 4,000 157 157,000

    6 Cleaning mitre drains, fully silted m 380 0.50 760 80 15,200

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 140 0.50 280 90.00 6,300

    - -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 520 0.50 1,040 200.00 52,000m2 - -

    15Grubbing to reinstate road camber m2 12,400 0.50 24,800 30.00 186,000

    - -

    16 Repairing shoulder slope erosion m2 4,000 0.50 8,000 45.00 90,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 24,800 0.50 49,600 16.00 198,500

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,205,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    31/95

    Road Name Lwaboba - Busiu TC

    Sub County BusiuRoad Link 7629Chainage 00 -8+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 16,000 0.50 32,000 80 640,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 2,800 0.50 5,600 157 219,800

    6 Cleaning mitre drains, fully silted m 540 0.50 1,080 80 21,600- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 180 0.50 360 90.00 8,100

    - -10 Clearing stream channels m 200 0.50 400 90.00 9,000

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 480 0.50 960 200.00 48,500m2 - -

    15Grubbing to reinstate road camber m2 16,000 0.50 32,000 30.00 240,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 32,000 0.50 64,000 16.00 256,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,555,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    32/95

    Road Name Lwaboba - Kangole

    Sub County BumasikyeRoad Link 7630Chainage 00 -6+800

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 13,600 0.50 27,200 80 544,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 3,800 0.50 7,600 157 298,300

    6 Cleaning mitre drains, fully silted m 480 0.50 960 80 19,200

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 120 0.50 240 90.00 5,400

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 260 0.50 520 200.00 26,000m2 - -

    15Grubbing to reinstate road camber m2 13,600 0.50 27,200 30.00 204,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 13,600 0.50 27,200 16.00 108,100

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,322,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    33/95

    Road Name Lwaboba - Nagirima

    Sub County BumasikyeRoad Link 7631Chainage 00 -6+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,000 0.50 24,000 80 480,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000m2 - -

    15Grubbing to reinstate road camber m2 12,000 0.50 24,000 30.00 180,000

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,050

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 14,000 0.50 28,000 16.00 112,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,166,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    34/95

    Road Name Mufudu - Webuta

    Sub County BukondeRoad Link 7632Chainage 00 -1+400

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 2,800 0.50 5,600 80 112,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 500 0.50 1,000 157 39,250

    6 Cleaning mitre drains, fully silted m 140 0.50 280 80 5,600- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -

    9 Cleaning culverts, half silted m 60 0.50 120 90.00 2,700- -

    10 Clearing stream channels m 0.50 - 90.00 -

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 247 0.50 494 200.00 24,700m2 - -

    15Grubbing to reinstate road camber m2 1,800 0.50 3,600 30.00 27,000

    - -

    16 Repairing shoulder slope erosion m2 2,000 0.50 4,000 45.00 45,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 2,000 0.50 4,000 16.00 16,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    272,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    35/95

    Road Name Mukaga - Marale

    Sub County BukasakyaRoad Link 7633Chainage 00 -3+500

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 7,000 0.50 14,000 80 280,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 2,600 0.50 5,200 157 204,100

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 116 0.50 232 90.00 5,220- -

    10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 229 0.50 458 200.00 22,900m2 - -

    15Grubbing to reinstate road camber m2 6,300 0.50 12,600 30.00 94,500

    - -

    16 Repairing shoulder slope erosion m2 1,017 0.50 2,034 45.00 22,880

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 4,000 0.50 8,000 16.00 32,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    680,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    36/95

    Road Name Mulatsi - Bukiende

    Sub County BukiendeRoad Link 7634Chainage 00 -7+100

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 14,200 0.50 28,400 80 568,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 242 0.50 484 200.00 24,200m2 - -

    15Grubbing to reinstate road camber m2 14,000 0.50 28,000 30.00 210,000

    - -

    16 Repairing shoulder slope erosion m2 3,548 0.50 7,096 45.00 79,850

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,000 0.50 24,000 16.00 96,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,380,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    37/95

    Road Name Mulatsi- Busoba

    Sub County BusobaRoad Link 7635Chainage 00 -4+850

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 9,700 0.50 19,400 80 388,000

    4Reinstating/Repairing scour checks No 0.50 - 720 -

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 260 0.50 520 200.00 26,000

    m2 - -

    15Grubbing to reinstate road camber m2 9,700 0.50 19,400 30.00 145,500

    - -

    16 Repairing shoulder slope erosion m2 3,070 0.50 6,140 45.00 69,050

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 7,000 0.50 14,000 16.00 56,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -943,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    38/95

    Road Name Mutoto - Bulujele

    Sub County Bungokho - MutotoRoad Link 7636Chainage 00 -3+850

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a uarter

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 7,700 0.50 15,400 80 308,000

    4Reinstating/Repairing scour checks No 200 0.50 400 720 72,000

    5 Reinstating eroded ditches m 2,285 0.50 4,570 157 179,360

    6 Cleaning mitre drains, fully silted m 356 0.50 712 80 14,240- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 0.50 - 90.00 -

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000m2 - -

    15Grubbing to reinstate road camber m2 3,000 0.50 6,000 30.00 45,000

    - -

    16 Repairing shoulder slope erosion m2 2,500 0.50 5,000 45.00 56,250

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 5,700 0.50 11,400 16.00 45,600

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -748,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    39/95

    Road Name Mutoto - Busimba

    Sub County Bungokho - MutotoRoad Link 7637Chainage 00 -6+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a uarter

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,000 0.50 24,000 80 480,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 80 0.50 160 90.00 3,600- -

    10 Clearing stream channels m 90 0.50 180 90.00 4,050

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 245 0.50 490 200.00 24,450m2 - -

    15Grubbing to reinstate road camber m2 6,200 0.50 12,400 30.00 93,000

    - -

    16 Repairing shoulder slope erosion m2 3,000 0.50 6,000 45.00 67,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,500 0.50 25,000 16.00 100,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,166,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    40/95

    Road Name Nabumali - Busano

    Sub County NyondoRoad Link 7638Chainage 00 -6+300

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 12,600 0.50 25,200 80 504,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 0.50 - 90.00 -

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000m2 - -

    15Grubbing to reinstate road camber m2 2,800 0.50 5,600 30.00 42,000

    - -

    16 Repairing shoulder slope erosion m2 1,200 0.50 2,400 45.00 27,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 9,288 0.50 18,576 16.00 74,300

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -1,069,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    41/95

    Road Name Nabweye - Bukikali

    Sub County LwassoRoad Link 7639Chainage 00 -5+300

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 10,600 0.50 21,200 80 424,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 3,000 0.50 6,000 157 235,500

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -- -

    9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 240 0.50 480 200.00 24,000m2 - -

    15Grubbing to reinstate road camber m2 4,000 0.50 8,000 30.00 60,000

    - -

    16 Repairing shoulder slope erosion m2 2,500 0.50 5,000 45.00 56,050

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 8,000 0.50 16,000 16.00 64,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,030,500

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    42/95

    Road Name Nakaloke - Namunsi

    Sub County NakalokeRoad Link 7640Chainage 00 -2+500

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 2,000 0.50 4,000 80 80,000

    4Reinstating/Repairing scour checks No 100 0.50 200 720 36,000

    5 Reinstating eroded ditches m 1,000 0.50 2,000 157 78,500

    6 Cleaning mitre drains, fully silted m 390 0.50 780 80 15,600

    - -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 Cleaning catch-water drains, half

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 230 0.50 460 200.00 23,000m2 - -

    15Grubbing to reinstate road camber m2 6,400 0.50 12,800 30.00 96,000

    - -

    16 Repairing shoulder slope erosion m2 2,050 0.50 4,100 45.00 46,125

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,800 0.50 25,600 16.00 102,225

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 Ot er misce aneous activities t at

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -486,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    43/95

    Road Name Namagumba - Nankusi

    Sub County NamanyonyiRoad Link 7641Chainage 00 -3+000

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a Quarter)

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 2,000 0.50 4,000 80 80,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 1,000 0.50 2,000 157 78,500

    6 Cleaning mitre drains, fully silted m 360 0.50 720 80 14,400- -

    7 Cleaning mitre drains, half silted m - -

    - -8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 90 0.50 180 90.00 4,050

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 Cleaning catch-water drains, fully

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 235 0.50 470 200.00 23,500

    m2 - -

    15Grubbing to reinstate road camber m2 6,400 0.50 12,800 30.00 96,000

    - -

    16 Repairing shoulder slope erosion m2 1,600 0.50 3,200 45.00 36,000

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 12,800 0.50 25,600 16.00 102,300

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    583,250

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    44/95

    Road Name Namanyonyi - Buwalasi

    Sub County NamanyonyiRoad Link 7642Chainage 00 -7+700

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times

    in a uarter

    Annual

    Quantity

    Unit

    Rate

    Ushs

    Quarterly

    Amount

    Ushs

    Remarks

    1 Inspection an re-mova o

    obstructions (e.g. dead animals,

    fallen trees, debris, etc)

    Man-

    hour

    2 Cleaning side drains, fully silted m

    3 Cleaning side drains, half silted m 2,000 0.50 4,000 80 80,000

    4Reinstating/Repairing scour checks No 400 0.50 800 720 144,000

    5 Reinstating eroded ditches m 9,300 0.50 18,600 157 730,050

    6 Cleaning mitre drains, fully silted m 410 0.50 820 80 16,400- -

    7 Cleaning mitre drains, half silted m - -- -

    8 Cleaning culverts, fully silted m - -

    - -9 Cleaning culverts, half silted m 100 0.50 200 90.00 4,500

    - -10 Clearing stream channels m 100 0.50 200 90.00 4,500

    11 C eaning catc -water rains, u y

    silted m3 - -

    12 C eaning catc -water rains, a

    silted m2 - -

    13 Filling potholes - -

    14 Filling minor gullies m2 1,500 0.50 3,000 200.00 150,000m2 - -

    15Grubbing to reinstate road camber m2 8,500 0.50 17,000 30.00 127,050

    - -

    16 Repairing shoulder slope erosion m2 5,000 0.50 10,000 45.00 112,500

    17 Weeding shoulders m2 - -

    18 Grass cutting m2 16,000 0.50 32,000 16.00 128,000

    19 Bush/shrub clearing m2 - -

    20 Grass planting (Pass-puram) m2 - -

    21 Tree planting No - -

    22 Tree Nursing m2 - -

    23 Removal of debris and silt m2 - -

    24 Sweeping the road m2 - -

    25 Maintaining footpaths m2 - -

    26 er m sce aneous ac v es a

    include removal of big stones,

    anthills, disposal fal-len trees

    within road reserves, etc

    Man-

    hour - -

    1,497,000

    ROUTINE MAINTENANCE WORKPLAN FY 2013/14

  • 7/29/2019 List of Dist Roads

    45/95

    Road Name Namwenula - Nabweya

    Sub County LukhonjeRoad Link 7643Chainage 00 -5+100

    Item

    No.

    Description Unit Quantity Frequency

    (No. of Times