list of cases to be submitted before 2nd consent appraisal …€¦ · list of cases to be...
TRANSCRIPT
Sr. No. Name & Address Capital
Investment Applied For Section Page No. Remarks
1 M/s. EON Hinjewadi Infrastructure Pvt. Ltd., Hotel Courty Yard, S. No. 19/2 and 20/1-9, Rajiv Gandhi Infotech Park, Hinjewadi, Tal. Mulshi, Dist. Pune
102.08 Crs. 1st Operate AS(T)
1 to 23
2 Hotel Leela Kempiniski Sahar Mumbai--59, Andheri Kural Road , Andheri Sahar Mumbai
541.90 Crs. Renewal AS(T) 24-47
3 M/s. Wardha Power Ltd., Phase-II of 270 MW, MIDC warora, Chandrapur
1339.0 Crs Renewal JD(APC) 48-62
4 Thyssenkrupp Engine Components India Pvt. Ltd., G No.392, A/p- Gondhe, Vill- Wadivarhe, Tal- Igatpuri, Dist - Nashik
155.52 Crs 1st operate JD(APC) 63-79
5 M/s. Western Coal Fields Ltd., Umred Open Cast Project, Tal- Umred, Dist - Nagpur
168.43 Crs Renewal JD(APC) 80-104
6 WCL Mungoli Opencast Mine, Po. Sakhara (Kolgaon), Mungoli Sub Area, Dist. Yavatmal
110.81 Crs. Renewal (Expansion)
JD(APC) 105-133
7 Mahanidra and Mahindra Ltd., F-1 & 7 MIDC Hingna, Nagpur
114.00 Crs 1st Operate (Expansion)
JD(APC) 134-142
8 Gupta Energy Ltd., Kh No.89, Usgaon, Chandrapur
520.87 Crs 1st Operate JD(APC) 143-156
9 M/s.Posco Maharashtra Steel Pvt. Ltd., Plot No. C-1, MIDC Bhagad, Tal- Mangaon, Dist - Raigad
894.16 Crs 1st operate JD(APC) 157-173
10 M/s.Posco Maharashtra Steel Pvt. Ltd., Plot No. C-1, MIDC Bhagad, Tal- Mangaon, Dist - Raigad
949.58 Crs Amendment JD(APC) 174-194
11 Tata Steel Ltd., (Cold Rolling Coils & Sheets) Plot No.S-76, MIDC Tarapur, DistThane
103.76 Crs Establish (Expansion)
JD(APC) 195-206
12 M/s. Maharashtra State Power Generation Co. Ltd., Nashik Thermal Power Station, P.O. Eklahare, Dist. Nashik
700.89 Crs. Renewal JD(APC) 207-226
13 M/s.Balaji Amines(power plant) Tamalwadi, Osmanabad®
118.11 Crs Renewal JD(PAMS) 227-244
14 M/s. Mumbai International Airport Pvt Ltd, Chhatrapati Shivaji International Airport , Terminal 1B, 1st floor , Santacruz (E), Mumbai- 400099
447.13 crs 1st Operate RO(HQ) 245-264
15 M/s. Neptune Venture & Developers Pvt Ltd ( Magnet Mall),Plot beraing CTS no: 372,372/1 to 65, LBS Marag, Village: Kanjur, Tal: Kurla , Mumbai
455.66 crs 1st Operate RO(HQ) 265-275
16 Cadbury India Ltd A/p. Induri, Tal- Maval, Dist- Pune
270.1 Crs Establish (Expansion)
JD(WPC)
List of Cases to be submitted before 2nd Consent Appraisal Committee Meeting Scheduled on 15.05.2012 at 11:00 Hrs.
Resubmitted Agenda
276-305
17 Cadbury India Ltd A/p. Induri, Tal- Maval, Dist- Pune
270.1 Crs Establish (Expansion)
JD(WPC)
18 Ballarpur Industries ltd, ( Asthi) Tq- Charmorshi, Dist- Gadchiroli.
310.2 Crs Renewal JD(WPC) 306-323
19 Brinton Carpet Asia Pvt. Ltd, Vill- Urvade, Tq- Mulshi, Dist- Pune.
110.7 Crs Establish (Expansion)
JD(WPC) 324-346
20 Bombay Rayon FashionLtd. Plot No. G-95,MIDC Tarapur, Tq- Palghar, Dist- Thane
263.8 Crs 1st Operate JD(WPC) 347-366
21 Ruchi Soya industries Ltd. Patalganga. Sarvoli- Kharpada Road, Isambe, Khalapur, Raigad
223.81 Crs 1st Operate (Expansion)
with Amalgamati
on
JD(WPC) 367-384
22 M/s. Bhima SSK Ltd., Madhukarnagar, Patas, Tal. Daund, Dist. Pune
147.48 Crs. Renewal JD(WPC) 385-406
23 M/s. B S Ispat ( Sprong Iron Plant) 101 & 190, Vill- Salori Yenasa, Chandrapur
158.50 Crs 1st Operate JD(APC) 407-415
24 M/s. Wockhardt Hospitals Ltd., Plot No.1877, Dr. Anand Rao Nair Marg, NearPolice Stn. Byculla, Mumbai-
208.00 Crs. Establish AS(T) 416-443
25 Classic Citi Investments Pvt. Ltd. 36/3B, Vill. Ghorpadi, Tal. Havelli, Koregaon, Park, Pune -
271.05 Crs. Renewal AS(T) 444-456
26 Nirmal Lifestyles Ltd., (Hotel & Shopping Mall), Vill. Nahur, Mulund-W, Mumbai-
652.25 Crs Establish (Expansion)
AS(T) 457-472
27 M/s. Raddisson Blu ( 5 Star Hotel), Unit Of Bestech Hospitalities Pvt. Ltd., KH. No. 32/2-3, 37/1-C, Mauza-Somalwada. Tal. Dist. Nagpur -
146.08 Crs. Renewal AS(T) 473-480
28 M/s. Western Coal Fields Ltd., Ukni Deep Open Cast Mine, Vill- Ukho, Po- Bhallar, Tal- Wani Dist - Yavatmal
319.96 Crs Establish (Expansion)
JD(APC) 481-489
29 M/s. Bridgestone India Pvt. Ltd., (Phase-II), Plot No. A-43, MIDC Chakan Phase-II, Tal- Khed, Dist -Pune
525.56 Crs Establish JD(APC) 490-497
30 M/s. Precision Automation & Robotics (I) Ltd., G No.463 A, 463 B, 464, A/p- Dhangarwadi. Tal- Khandala, Dist - Satara
133.8 Crs Establish (Expansion)
JD(APC) 498-505
31 AAM India Mfg Coproration Pvt. Ltd., Gat No. 787 & 788, Hingan, Tal- Parner, Ahmednagar
14072 Crs Establish (Expansion)
JD(APC) 506-513
32 M/s. JSW Steel Ltd., Plot no. B-6, MIDC Tarapur, Navapur Road, Boisar, Tal-Palghar, Thane
672.61 Crs Renewal JD(APC) 514-524
33 M/s. Force Motors Ltd., Mumbai-Pune Road, Akurdi, Pune
670.14 Crs Renewal JD(APC) 525-533
34 M/s. Bajaj Auto Ltd., Plot No. A-1, MIDC Chakan, Mahalunge, Tal- Khed, Dist Pune
431.16 Crs Renewal JD(APC) 534-544
Fresh Agenda
35 M/s. Apple Sponge and Power Ltd., C-4, Five Star MIDC Indl. Area, Kagal, Kolhapur
130.54 Crs Renewal JD(APC) 545-554
36 M/s. Can Pack India Pvt. Ltd., H-14/1, MIDC Waluj, Dist - Aurangabad
425.0 Crs Establish JD(APC) 555-561
37 Lloyds Metals & Energy Ltd., Plot No. A-1&2, MIDC Ghugus, Dist. Chandrapur
498.55 Crs. Renewal with
Amalgamation
JD(APC) 562-586
38 Cummins Technologies India Ltd., B-3/1, Phaltan SEZ Ind. Area, Tal. Phaltan, Dist. Satara
500.00 Crs. Establish JD(APC) 587-594
39 M/s. Mazgaon Dock Ltd, Dock Yard Road, Mazgaon Mumbai -10
169.18 Crs Renewal RO(HQ) 595-603
40 M/s. Reliance Infocomm Infrastructure Pvt Ltd, TTC Industrial Area DAKC Koparakharine , Navi Mumbai
1886.5035 Crs
Renewal RO(HQ) 604-619
41 M/s. Adhiraj Construction Pvt Ltd ,MMRDA ( Rental Housing Scheme) residential township project – Adhiraj Upscale , Plot Survey no: 64,67,68,69,70,71,72,76,77,86,88,89,90,91&99, vill: Rohinan , Tal Panvel Dist : Raigad
900.00 Crs Establish RO(HQ) 620-632
42 M/s. Kanhan river Project ( Kochi Barrage ), Vill: Kochi, Tal: Saoner , Dist: Nagpur
262.25.Crs Establish RO(HQ) 633-640
43 Reliance Industries Ltd, Vill- Dahali, Ta- Mouda, Dist- Nagpur.
225.47 Cr 1st Operate (Expansion)
JD(WPC) 641-647
44 Lokmangal Mauli Industries Ltd. Gat No.67,68,69,70,80,Vill- L0hara ( Khurd), Tq- Lohara, Dist- Osmanabad
282.16 Cr Establish JD(WPC) 648-654
45 Dr. Babasaheb Ambedkar SSK Ltd. Arvindnagar, Post- Keshgaon, Dist- Osmanabad.
157.75 Cr Establish (Expansion)
JD(WPC) 655-661
46 Urjankur Shree Tatyasaheb Kore Warana Power Co. Ltd. Gat No. 630, A/p. Warananagar, Kolhapur.
281 Cr 1st Operate JD(WPC) 662-669
47 Eurotex Industries And Exports Limited, Plot No. E-23,M.I.D.C Gokul Shirgaon, Dist- Kolhapur.
176.14 Cr Renewal JD(WPC) 670-676
48 Tessitura Monti India(P) Ltd ,Gat No. -147, Vill - Tamgaon, Karveer, Dist- Kolhapur.
239.97 Cr Renewal with
amalgamation
JD(WPC) 677-684
49 Raymond Zambaiti Pvit LtdPlot No-T-1,Five Star M.I.D.C Kagal-Hatkanangale
187.93 Cr Renewal with 1st
consent to operate
(Expansion)
JD(WPC) 685-691
50 M/s.Shri Dudhganga Vedganga SSK Ltd, Bidri(Mouninagar),Tal-Kagal, Dist- Kolhapur
184.08 Cr Renewal JD(WPC) 692-698
51 M/s. Lenzing Modi fibres, Plot No-M-1 & M-2 Additional MIDC Patalganga,Raigad.
827 Cr Amendment (Establish)
JD(PAMS) 699-715
52 M/s. Sandoz Pvt Ltd , Plot No-L-1 MIDC Mahad dist-Raigad.
120.0 Cr Establish (Expansion)
JD(PAMS) 716-725
53 M/s.Jublient Life Sciences,Vill- Nimbhut Nira,Tal- Baramati,Dist-Pune
307.8 Cr Renewal with
amalgamation
JD(PAMS) 726-739 Resubmission
1 Chevrolet Sales India Pvt. Ltd., Plot No. A-16, MIDC Talegaon, Nr Floriculture Park, Tal- Maval, Dist - Pune
76.00 Cr 1st Operate Discussed in
CC
JD(APC) 740-746
2 JSW Steel Ltd., B-7/1, MIDC Tarapur, Tal. Palghar, Dist. Thane
91.64 Crs. Renewal Discussed in
CC
JD(APC) 747-756
3 M/s. Mukund Ltd., Thane Belapur Road, Post office Kalwa, Thane
521.53 Cr Amendement
JD(APC) 757-772
4 M/s. Bilt Graphics Paper Products Ltd., Po-Ballarpur, Dist - Chandrapur
- Forfeiture of BG
JD(APC) 773-780
5 M/s. Lloyds Steel Industries Ltd., (Steel Division), Bhugaon road, Dist - Wardha
211.59 Cr Forfeiture of BG
JD(APC) 781-799
6 M/s. Avantha Power & Infrastructure Ltd., Ballarpur , Tal- Ballarpur, Dist - Chandrapur
256.61 Cr Forfeiture of BG
JD(APC) 800-809
7 M/s. Neeljay OCM, WCL, Wani Area, Po- Bellora, Tal- Wani, Dist - Yavatmal
195.91 Cr Non submission
of Board Resolution
JD(APC) 810-828
8 Status of revocation of consent as on 26.04.2012 - 6 cases
- - JD(APC) 829-833
9 Status of Consent granted under Auto Renewal Scheme - 2 cases
- - JD(APC) 834
Review Items
Sr No Regional Office
Industry Name Address Directions
1 Nagpur Abhijeet MADC Nagpur Energy Pvt. Ltd.
S. No. 22(P) & 23(P), SEZ at MIHAN area, Tal and Dist. Nagpur.
Interim Direction dtd. 19.07.2011
2 Nagpur Dinshaws Dairy Foods Ltd.
K-41,42, MIDC, Butibori, Dist. Nagpur
Proposed Direction dtd. 03.08.2011
3 Nagpur Mahalaxmi TMT Pvt. Ltd.
Chikni, Dist. Wardha Closure Direction dtd. 18.03.2012
4 Nagpur ERA BUILDSYS LTD.,
D-3 MIDC UMRED NAGPUR
Proposed Direction dtd. 13.11.2011
5 Nagpur Hindalco Industries Ltd. (Formerly known Pennar Alu. Co. Lt)
Hindalco Industries Ltd., Vill. Dahali, Tq. Mauda, Dist. Nagpur
Closure Direction dtd. 19.02.2012
6 Nagpur Indo Rama Synthetics (I) Ltd.
Indo Rama Synthetics (I) Ltd., A-
Restart Direction dtd. 01.02.2011
List of Direction issued in respect of CAC cases by respective Regional Officers as on 21.05.2012
CAC Review item No. -10
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
y ( )power plant
y ( ) ,31,A-31P,A-31P/1, A-40 to A-45, MIDC Butibori Nagpur
7 Nagpur Indrajit Infrastructure Pvt. Ltd. (Phase- I & II),
Barbadi, Tq. Dist. Wardha
Proposed Direction dtd. 15.03.2011
8 Nagpur Ispat Industries Ltd. Ispat Industries Ltd.,plot no.A-10/1,MIDC Indl. area,kalmeshwar,dist-Nagpur
Proposed Direction dtd. 25.08.2012
9 Nagpur Mahalaxmi TMT Private Ltd
C-2, Deoli MIDC, Wardha,
Closure Direction dtd. 18.03.2012
10 Nagpur Morarjee Textiles Industries Ltd.
Plot No. G-2, MIDC, Butibori, Dist. Nagpur
Interim Direction dtd. 11.02.2010
11 Nagpur Reliance Industries Ltd.
Dahali, Tq. Mouda, Dist. Nagpur
Interim Direction dtd. 19.12.2011
12 Nagpur Shree Virangana Steel Ltd.,
Ukerwahi, Tq.Umred, Dist. Nagpur
Interim Direction dtd. 12.03.2010
13 Nagpur Sunflag Iron and Steel, Tal- Mohadi
Dist - Bhandara Interim Direction dtd. 07.03.2012
14 Nagpur Uttam Galva Metallics Ltd.
Barbadi, Tq. Dist. Wardha
Interim Direction dtd. 16.09.2011
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
15 Nagpur Western Coalfields Ltd.(WCL)
Umred Open Cast Project, Tal.Umred, Dist.Nagpur
Closure Direction dtd. 19.04.2012
16 Chandrapur ACC Ltd P.O-Cement Nagar,Tq-Ghugus,Distt-Chandrapur
Closure Direction dtd. 04.12.2010
17 Chandrapur CSTPS Chandrapur Proposed Direction dtd. 23.08.2010
18 Chandrapur Murli Industries Village Naranda,Tq-Korpana,Distt-Chandrapur
Interim Direction dtd. 22.11.2011
19 Chandrapur SHREE SIDHBALI ISPAT LTD
C-2 & 3 MIDC TADALI,CHANDRAPUR
Interim Direction dtd. 15.11.2010
20 Chandrapur Bilt Graphics Paper Product Ltd.
Ballarpur,Distt-Chandrapur
Interim Direction dtd. 03.01.2012
21 Chandrapur Wardha Power Company Ltd.
Tq. Warora, Distt. Chandrapur
Interim Direction dtd. 20.05.2011
22 Mumbai Hindustan UniLever Ltd.
Research Centre Chakala, Andheri(E), Mumbai.
Restart Direction dated 22.2.2012
23 Mumbai India Bulls Real Estate pvt.Ltd.
612,613,India Bulls Lower Parel Divisin
Closure Direction dated 6.6.2011
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
Estate pvt.Ltd. Lower Parel Divisin Elphsiton Mill Senapati Bapat Road marg., Mumbai-13
dated 6.6.2011
24 Mumbai Mumbai Port Trust Port House,Shoorji Vallabhdas Marg, Ballard Estate
Interim Direction dated 1.2.2011
25 Mumbai Magus Estates & Hotels Pvt. Ltd.,
114, Dr. E Moses Road, Worli, Mumbai-018
Interim Direction dated 27.1.2012
26 Mumbai Mumbai International Airport Pvt. Ltd. Chhatrapati shivaji international airport
1st floor, terminal 1B, santa Cruz, Mumbai
Interim Direction dated 06.1.2012
27 Mumbai CEAT Ltd Off. LBS Marg Bhandup (W)
Proposed Directions dated 19.4.2010
28 Nashik Jindal Saw Ltd, A-50 ,60 MIDC Malegaon Tal-Sinner, Dist-Nasik
Interm Direction dtd-30/4/2010
29 Pune Kisanveer SSK , A/p-Kisanveernagar, Bhuinj, Wai, Dist-Satara
Interm Direction dtd-31/3/2011
30 Pune Lokmangal Agro industries
A/p- Bibi Darphal, Tal. N.Solapur, Dist. Solapur
Interm Direction dtd-19/3/2012
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
31 Pune Privilege Industries Limited(Distillery Division
Plot No.B-1,MIDC Lonand,Tal-Khandala,Dist-Satara
Interm Direction dtd-30/11/2011
32 Pune Sona Alloys Pvt. Ltd.
Plot No. C-1, MIDC Area, A/p. Lonand, Tal. Khandala, Dist. Satara
Interm Direction dtd-30/11/2011
33 Pune Atlas Copco (i) Ltd Mumbai Pune Road, Dapodi, Dist-Pune
Proposed Direction 13/03/2012
34 Pune Cipla Ltd;D-7, MIDC Ind.Area,Kurkumbh, Tal.Daund,Dist.Pune
Proposed Direction 15/11/2011
35 Pune Emcure Pharmaceutical Ltd,
Plot No.P-2,IT-BT Park,Phase-II,MIDC Hinjewadi, Tal.Mulshi,Dist.Pune
Proposed Direction 15/11/2011
36 Pune Exide Industries Ltd.
D-2,MIDC Chinchwad.
Proposed Direction 14/03/2012
37 Pune Sahakar Maharshi Shankarrao Mohite Patil SSK Ltd.
At.Shankarnagar, Akluj, Tal-Malshiras.
Proposed Direction 24/06/2011
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
38 Pune Sahakar Maharshi Shankarrao Mohite Patil SSK Ltd.
At.Shankarnagar, Akluj, Tal-Malshiras.
Proposed Direction 24/06/2011
39 Pune Sahakar Maharshi Shankarrao Mohite Patil SSK Ltd(Distillery).
At.Shankarnagar, Akluj, Tal-Malshiras.
Proposed Direction 29/02/2012
40 Pune Shree Pandurang SSK Ltd. (Distillery)
A/P Shreepur, Tal- Malshiras Dist-- Solapur
Proposed Direction 29/02/2012
41 Pune Shree Pandurang SSK Ltd. (Distillery)
A/P Shreepur, Tal- Malshiras Dist-- Solapur
Proposed Direction 29/02/2012
42 Pune Sidhnath Sugar Mills Ltd. (Sugar & Co- Gen Plant)
A/p – Tirhe, Tal. N.Solapur, Dist. Solapur
Proposed Direction 29/02/2012
43 Pune SKF India Ltd. S. No. 159 to 162, 169,188, Chinchawad, Dist. Pune
Proposed Direction 14/03/2012
44 Pune Yashwantrao Mohite Krishna SSKRethare (Bk),
Tal. Karad, Dist.: Satara
Proposed Direction 29/02/2012
45 Pune Kirloskar oil Engines Ltd,
Laxmanrao Kirloskar Road Pune
Proposed Direction 13/03/2012
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
46 Kolhapur Gharda Chemicals Ltd
Plot No-D-1/2,B-1/7,MIDC Lote Parshuram,Tal-Khed
Closer Direction 28/03/2012
47 Kolhapur JSW Jaigad Port Ltd
A/p--Jaigad,Dhamankhol Bay,Tal-Dust-Ratnagiri
Proposed Direction 19/04/2012
48 Kolhapur USV Limited B-1/8,M.I.D.C Lote Parshuram,Tal-Khed
Proposed Direction 07/01/2010
49 Kolhapur Oswal F.M. Hammerle Textiles Ltd
Kagal -Hatkanangale Five Star M.I.D.C,Kagale
Interim Direction dtd-07/05/2010
50 Kolhapur Raymond Zambaiti pvt Ltd,
T-1 Five star MIDC Kagal Kolhapur
Interim Direction dtd-30/05/2010
51 Kolhapur Hemarus Technologies ltd.
gut no. 76, Chenati, Tal-Chandgad, Dist-Kolhapur
Restart Order dtd-19/01/2011
52 Aurangabad Bajaj Auto Limited Plot No. A-1, MIDC Waluj
Interim Direction dtd. 18.10.2010
53 Aurangabad Balkrishna Industries Ltd.
B-66, MIDC, Waluj, Aurangabad
Interim Direction dtd. 19.10.2010
54 Aurangabad Terna SSK Ltd., Vill:- Dhoki, Tal. & Dist. Osmanabad
Interim Direction dtd. 09.02.2011
55 Aurangabad Varroc Engineering Pvt. Ltd.
Waluj, Dist - Aurangabad
Interim Direction dtd. 18.10.2010
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
56 Aurangabad Videocon Industries Ltd..
14 K.M. Stone, Paithan Road, Chitegaon, Tq. Paithan, Dist: Aurangabad
Closure Direction dtd. 07.10.2010
57 Kalyan Gharda Chemicals,
B-28,29 ,MIDC Dombivali, Dist. Thane
Restart Directions issued on 06/02/2010
58 Kalyan ASB internations, Plot No. E-9, MIDC Ambarnath
Interim Directions issued on 08/12/2011
59 Thane Viraj Profile, Plot No. G-2, MIDC Tarapur
Interim Directions issued on 07/02/2012
60 Thane Dicitex Exports, Plot No G7/1 ,MIDC Tarapur
Interim Directions issued on 24/01/2012
61 Thane Mandhana Weaving House,
Plot No.C-2 MIDC,Tarapur
Interim Directions issued on 24/01/2012
62 Thane Mukand Ltd. Kalwa, Thane Interim Directions issued on 17/04/2010
Sr. No.
12
Abstract of Outstanding Directions of CAC List as on 21.05.2012Regional Office
NagpurChandrapur
156
No. of Directions
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
34
56
7
8
9
10
KolhapurKalyanThane
Aurangabad
NashikPune
117
62
62
4
5
0
6
Amravati
Mumbai
Total
Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012
Resubmitted Agenda
CAC Item No. 01 Name of the Industry: M/s. Court Yard Hotel, (EON Hinjewadi Infrastructure Pvt. Ltd.),
S. No. 19/2 and 20/1-9, Rajiv Gandhi Infotech Park, Hinjewadi, Tal-Mulshi, Dist. Pune. HOD Remarks:
1. Applied for grant of Consent to Operate on 19/10/2010 at Regional Office, Pune.
2. R.O. (Pune) has issued show cause notice on 12/07/2011 for operating hotel without obtaining Consent to Operate from the Board, for not providing ozonisation / UV Treatment in place of chlorination for the treatment of sewage, and for not submitting B.G. of Rs. 5.0 Lakhs as per Consent to Establish condition No. (13).
3. RO, Pune forwarded the application to A.S. (T) Section on 7/10/2011 and recommended to grant Consent to Operate.
4. Application received at A.S. (Tech.) Section on 18/10/2011. 5. Member Secretary has ordered to call explanation on 3/02/2012 from R.O.
(Pune) for wrongly processing and forwarding consent application to HQ. 6. R.O. (Pune) was instructed on 29/02/2012 to submit their explanation for non
taking action against Hotel authority for submitting wrong information in the Board and for wrongly processing and forwarding consent application to HQ.
7. R.O. (Pune) has submitted explanation that Hotel Authority has informed vide letter dtd. 23/01/2012 that they have converted water body meant for beautification purpose into swimming pool. Also, he has issued proposed directions on 2/03/2012 for operating hotel without obtaining Consent to Operate from the Board and for submitting wrong information in the Board.
8. RO, Pune has recommended to initiate stringent action against the Hotel Authority.
9. Case was discussed in the CAC meeting on 20/03/2012 and it was decided to issue SCN for refusal of Consent as the Industry has not submitted B.G. of Rs. 5.0 Lakhs within stipulated time and not mentioning swimming pool activity in the application for Consent to 1st Operate.
10. Show cause notice was issued on 29/03/2012 to which hotel authority has replied vide letter dtd. 11/04/2012 and submitted B.G. of Rs. 5.0 Lakhs on 28/04/2012.
11. Consent to 1st Operate may be granted for the period upto 31/10/2013 after the receipt of additional payment of Rs. 4,08,320/- as per Env. Dept’s revised Consent Fee G.R. dtd. 25/08/2011.
CAC Item No. 02 Name of the Industry: M/s. The Leela Kempinski Sahar,
Plot No. 1407(pt), 1405(pt), 1404(pt),
Sahar, Andheri(E), Mumbai. HOD Remarks:
a. Applied for grant of Renewal of consent for hotel activity including 395 rooms
including lodging activity.
b. Application received at SRO on 21.10.2011 and at HQ on 07.01.2012.
c. Previous consent was valid upto 31.08.2011.
d. The case was discussed during CAC meeting held on 23.01.2012 and during
the meeting, it was decided to issue SCN for refusal of consent as industry has
not replied to letter issued by the SRO on 11.11.2011. SCN issued on
06.02.2012 and industry has submitted the reply on 27.02.2012 & 03.04.2012,
wherein mentioned that C.I. mentioned is found reduced to previous year is due
to fluctuation of the foreign exchange rate of the assets purchased under foreign
loans. They are ready to pay the requisite consent fees. Current year C.I. is Rs.
318.34 Crs. Therefore, File was referred to CAO for verification of point no. (a)
& (b) and he remarked that C.I. shown in schedule of fixed assets of balance
sheet do not match with total gross block of fixed asset shown in CA-certificate.
e. Further, it was discussed during CAC meeting held on 16.04.2012 and decided
to grant consent after CI verification by CAO. f. Accordingly, file was again referred to CAO on 20.04.2012 and he asked to call
Balance Sheet from industry to verify Gross Block of Fixed Assets. After
verification of CA certificate of Multiple unit, it is reflect that C.I. in fixed assets in
particularly building, land and furniture fixture got reduced. Gross block of fixed
assets never reduce in value in normal course of business. Hence, said details
were called from industry on 27.04.2012 and 03.05.2012, but they have not
submitted the reply till date.
g. Consent may be refused due to non-submission of Balance Sheet details.
CAC Item No. 03 Name of the Industry: M/s. Wardha Power Company Ltd.,
Phase II of 270 MW, MIDC Warora, Dist-Chandrapur.
HOD Remarks:
• Applied for renewal of consent for phase II of 270 MW capacities (i.e 2 x 135 MW) with no increase in capacity.
• Gross block investment is increased from Rs 1211.15 crore to Rs 1339 crore &
submitted additional consent of Rs 255700/- as consent to establish fee and renewal
fees of Rs. 26,78,000/- as per new GR dated 25.8.2011 for the consent period up to
31.1.2013.
• Domestic effluent generation is 48 m3/day. STP provided. Industrial effluent generation
is 1800 m3/day. ETP consists of neutralization tank, aeration tank, RO system, guard
point. This treated effluent is used for cooling makeup. RO reject taken in evaporation
pond for further use in dust suppression.
• Coal consumption -3600 MT/day. ESP Followed by bag house provided to boiler. Bag
house provided to coal crusher and transfer point.
• Regional Officer, Chandrapur has issued interim direction on dtd 25/05/2011
• Analysis results of ambient air quality monitoring and stack monitoring are exceeding the standards.
Earlier the case was discussed in CAC meeting held on 20.03.2012 and it was decided
to issue Show cause notice for refusal of consent. Accordingly Board has issued SCN vide letter
dated 2.4.2012. R.O. Chandrapur has submitted the compliance report vide letter dated
17.04.2012.
In view of the above we may grant renewal of Consent up to 31.1.2013 with condition of
Encashment of Bank Guarantee of Rs.10/- Lakhs against exceeding norms and fresh Bank
Guarantee of Rs.20/-Lakhs to achieve the standards.
CAC Item No. 04 Name of the Industry: M/s. Thyssenkrupp Engine Components India Pvt. Ltd., G.No.392, A/p Gonde, Vill: Wadivarhe, Tal: Igatpuri, Dist: Nashik. HOD Remarks:
1. Applied for 1st consent to operate Consent to established obtained for production of
crank shafts – 1,00,000 Nos./Year.
2. Gross block investment is increased from Rs 102.78 crores to Rs 155.52 crore. Consent
fee paid by the industry Rs.2,08,251 & required to submit difference in Consent fee of
Rs.2,02,789/- as per new GR dated 25.8.2011 for the consent period up to 31.1.2013
3. SRO, Nashik reported that industry has not provided STP, ETP and coolant treatment
plant and industry has started production activity since November, 2011 without valid
consent to operate.
4. Warning notice issued by SRO, Nashik. Show cause notice issued by R.O. Nashik vide
letter dated 22.02.2012 .
Earlier the case was discussed in CAC held on 20.03.2012 and it was decided to issue
show cause notice for refusal of consent. Accordingly Board has issued Show Case Notice vide
letter dated 02.04.2012. Industry has submitted the reply of SCN vide letter dated 10.04.2012.
R.O. Nashik submitted the compliance report vide letter dated 24.04.2012.
We may grant 1st Consent to operate for the period up to 30.09.2012 with the operation
Bank Guarantee of Rs.5/- Lakhs each for ETP operation and STP operation.
CAC Item No. 05 Name of the Industry: M/s. Western Coalfields Ltd.,
Umred Open Cast Project, Tal: Umred, Dist: Nagpur.
HOD Remarks:
1. Applied for plain renewal of Consent.
2. Earlier consent for mining of coal 3.5 MTPA was valid up to 31.12.2011.
3. Capital Investment of the Industry is Rs.168.43. The investment was in earlier consent
was 201.44 cores. Justification required for decrease in capital investment. Capital
investment Certificate of C.A. is not furnished.
4. Industry required to submit difference in Consent Fee of Rs.8,26,266/- for the consent
validity period up to 31.12.2012 as per new GR dated 25.08.2011.
5. Mobile Water tanker provided for water sprinkling on road. 7 Nos. rain guns provided at
CHP.
6. Analysis results of AAQM are not submitted.
7. Analysis results of effluent sample from ETP outlet collected on 5.10.2010 and
22.2.2011 shows all the parameters are within the limit.
Earlier the case was discussed in CAC meeting held on 23.01.2012 and it was decided
to issue refusal order. Accordingly refusal order was issued on 08.02.2012. The unit vide letter
dated 29.02.2012 has requested for revocation of refusal order. The work of STP require two
years. Strengthening of water sprinkler by June, 13, 2012.
In view of above work, we may consider the proposal for withdrawal of refusal order and forfeit the Bank Guarantee of Rs.10 Lakhs. Also grant conditional consent to complete all the works related to pollution control within 1 year.
CAC Item No. 06 Name of the Industry: M/s. WCL Mungoli Opencast Mine, Po-Sakhara(Kolgaon),Mungoli Sub Area, Dist-Yavatmal. HOD Remarks: 1. Applied for renewal of consent with expansion from 1.5 Million ton per year to 4.0 Million ton per year. 2. Obtained Environmental Clearance for coal production 2.5 MTPA to 4.0 MTPA from
MoEF GOI vide letter dated 30th March 2011, copy is enclosed. 3. Earlier consent was valid up to 31/12/2010, for coal production of 1.55 Million ton
per year. 4. Regional Office Chandrapur vide letter dated 21/01/2012 demanded additional consent
fee of Rs. 34,80,938/- including delay charges and balanced consent fee. Mine authority vide their letter dated 03/02/2012 has submitted that they are in process of depositing additional fee.
5. Coal Production for last three years is enclosed herewith. The Production for the year 2010-11 was 3.058 Million Ton.
6. The Board vide letterMPC/CRO/1366/2010 dated 05/08/2010 has issued interim directions to the mine. But said mine authority is non-complied with respect to these points.
a. Active O.B is about 50 meter away from notified Wardha river. The OB was slide in part and spread up to bank of river.
b. Operation & maintenance of existing air pollution control system, sewage treatment plant is very poor and thus affecting surrounding environment.
8. From the Ambient Air Monitoring Results carried in Jan/March/Oct, 2011 observed that results are exceeding.
9. Mine Lease boundary is adjacent to notified A-II class Wardha river ( 0.2 Km) and within two km from Notified A-II Class Penganga river. RRZ not satisfied for expansion of mine near the notified A-II class river.
10. Earlier the case was discussed in CAC meeting dt 16/04/2012 decided to refuse the consent for expansion and SCN for refusal of renewal of consent of existing unit. Accordingly, Board has issued SCN for refusal on dt 23/04/2012 and refusal order for expansion is issued on 25/04/2012. Industry has submitted the reply of SCN vide letter dt 30/04/2012 received on 05/05/2012.
We may grant the renewal of consent for 2.5 Million Ton/Yr capacity by forfeting the existing BG of Rs.5 Lakhs due to non compliance of consent conditions and by taking operation BG of Rs.5 Lakhs towards pollution control system.
CAC Item No. 07 Name of the Industry: Mahindra and Mahindra Ltd., F-1 & 7, MIDC Hingna, Nagpur. HOD Remarks :
• Applied for first consent to operate for expansion. • Consent to establish for expansion obtained vide letter dated 26.8.2011. • Consent of existing unit is valid up to 28.2.2014. • Total Gross block investment of the industry is Rs 274 crore (CI of existing unit is Rs.
160/- crore and CI of expansion is Rs. 114/- crore). Consent fee of Rs.5, 60,000/- paid for the period up to 31.01.2014 as per new GR.
• Domestic effluent generation is 4.34 m3/day. STP provided. Industrial effluent 130 CMD. Existing ETP of 300 m3 capacity will be utilized & addl. 150m3 proposed. Treated effluent will be recycled partly and remaining disposed on land for gardening.
• Paint booth with water scrubbing provided. • Industry has installed plant and machinery for phosphate and spray painting and also
provided air pollution control system i.e water scrubbing system with exhaust stack for the same.
• Industry has provided stack for hot water generator and backing oven. • Industry has provided pipeline for carrying effluent from new plant to existing effluent
treatment plant having capacity 300m3. • Installation of machineries in transmission line section found in progress and factory
representative reported that, they have completed work within the month. • Earlier the case was discussed in CAC meeting held on 20.03.2012 and it was decided
to keep the case in abeyance till the completion of the work and compliance of consent conditions.
• R.O. Nagpur vide letter dated 21.04.2012 has submitted the compliance report of the industry. As reported by R.O. Nagpur, now the unit has completed the remaining works of
pollution control system and is ready for use. In view of the above, we may grant consent to
operate amalgamating to the existing one for period up to 31.01.2014.
CAC Item No. 08 Name of the Industry: M/s. Gupta Energy Ltd., (Formerly known as M/s Gupta Thermal Power Plant) Khasara No.89, Usgaon-Shengaon, Chandrapur
HOD Remarks :
1. RED/LSI Unit, Applied for first consent to operate for the power plant coal based 2 x 60
MW.
2. Consent to establish granted by Board vide letter dated 29.2.2008 up to COU and
amendment in consent for change in name from M/s Gupta Thermal Power Plant to
M/s Gupta Energy Ltd., granted vide letter dated 27.3.2008. 3. Environment Clearance granted by MoEF,GoI vide letter dated 4.9.2008 under the name
M/s Gupta Coalfields & Washeries Ltd.,. Change in the name in EC required. 4. Capital Investment of the industry is Rs.520.87 Crore. Since project cost shown during
the consent to establish was Rs. 364 crore and now shown as Rs.520.67 crore,
Difference in consent fee of Rs.3,13,740 /- for increased in capital investment of Rs.156.87 crore shall be submitted by the industry.
5. I/c SRO Chandrapur recommended consent to operate subject to following compliances
• Industry is located in CEPI
• Standard for TPM shall be 50 mg/Nm3
• Bottom ash shall be disposed as per consent condition.
• Permission to carry out bottom ash in container & dump at ash pond may
be reviewed.
• Industry shall achieve zero discharge
• Industry shall install three CAAQMS & on line stack monitoring system.
• Industry shall provide conveyor belts for transportation of raw material
/waste so as to minimize internal truck movement
• Industry shall complete all the balance environmental works before
commission of the power plant.
6. Earlier the case was discussed in CAC meeting held on 23.1.2012 & decided to issue
SCN Accordingly SCN issued to industry vide letter dated 3.2.2012
7. Industry has submitted the reply of SCN received on 6.2.2012 & verification report
received from RO/SRO on 14.2.2012.
Earlier the case was discussed in CAC held on 20.03.2012 and it was decided to keep the case in abeyance. Regional Officer, Chandrapur has submitted the compliance report dated 03.05.2012 and stated that the unit has completed the work of requisite pollution control
system. In view of above, we may grant Consent up to 31.03.2013 with conditional operational Bank guarantee of Rs.5/- Lakhs.
CAC Item No. 09 Name of the Industry : M/s. POSCO Maharashtra Steel Pvt. Ltd.,
Plot No. C-1, MIDC Bhagad, Tal: Mangaon, Dist –Raigad.
. HOD Remarks :
1. Applied for grant of 1st consent to operate.
2. This case was discussed in the CAC meeting held on 16.04.2012.
3. Industry has submitted reply to the SCN on 26.04.2012.
4. SRO-Mahad has submitted report 03.05.2012.
5. Industry has obtained Environmental Clearance from GoM for the same
Product.
6. Industry has paid consent fees Rs. 35, 76,738 /-as per revised
G.R.25.08.2011.
7. RO- Raigad has recommended case for grant of consent to operate subject to,
industry shall provide full-fledged ETP and STP for treatment of industrial and
domestic effluent.
8. Industry has provided ETP to treat the domestic and industrial effluent.
9. Recommended case for grant of consent to operate for the period up to
28.02.2014 subject to following conditions
I. Industry shall install STP of adequate capacity for domestic
effluent.
II. Industry shall achieve BOD- 5 mg/l standard for treated industrial
effluent .
III. Industry shall provide 3 CAQMS within next 4 months with the B.G.
of Rs.5 Lacs.
CAC Item No. 10
Name of the Industry : M/s. POSCO Maharashtra Steel Pvt. Ltd., CRC plant, Plot No. C-1, MIDC Vile Bhagad,
Tal: Mangaon, Dist –Raigad.
HOD Remarks:
1. Applied for amendment in Consent to Establish for manufacturing of Full Hard Coil
and Cold Rolled Coils.
2. This case was discussed in the CAC meeting held on 16.04.2012.
3. Industry has submitted reply letter on 26.04.2012 requested for consideration of BOD
limit -30 mg/l
4. Industry has obtained consent to establish for the production of Galvanized coils in
the same premises.
5. They have obtained Environmental Clearance for manufacturing Galvanizing coils.
6. Industry has informed that they have applied for environmental clearance to GoM
[SEAC] on 27.06.2011.
7. Industry has paid consent fees Rs.9,49,580/-.+ Rs.9, 49,580/- as per new GR dated
25.8.2011. 8. Consent to establish may amend with the condition that industry shall achieve
BOD- 30 mg/l with the incorporation of other parameters like Arsenic, Mercury, Lead, Cadmium etc.
CAC Item No. 11
Name of the industry : M/s. Tata Steel Limited (Cold Rolling Coils & sheets) Plot No. S-76,MIDC. Tarapur Industrial Area,
Tarapur Dist Thane 401 506
HOD Remarks:
• Applied for f consent to establish for expansion
• Application received at SRO-Tarapur on dtd 30/11/2011 and at HQ on 03/03/2012.
• Existing plant consent was valid up to 31/12/2011
• Industrial Effluent Generation will be NIL (Existing 200 CMD) for which industry has provided effluent treatment plant .
• Domestic effluent generation will be Nil (existing 11 CMD)
• Industry has provided scrubber to pickling section
• Industry has provided air pollution control system to pickling section, galvanizing section, steam boiler & patenting line
• SRO Tarapur-I has recommended for grant of consent to establish after assessment of pollution load by education institute IIT/ICT (UDCT)/BATU
• The case was discussed in CAC held on 20/03/2012. it was decided to resubmit the case before CAC after assessment of no increase in pollution Load
• The unit has submitted the certificate from IIT Mumbai regarding No Increase in pollution load due to establish of above plant.
• We may grant consent to establish for expansion
• We may place the consent application before CAC for further consideration
CAC Item No. 12
Name of the Industry : M/s. Maharashtra State Power Generation Co. Ltd., Nashik Thermal Power Station, P.O. Eklahare, Dist: Nashik.
HOD Remarks : 1. Applied for renewal of consent for electricity generation (125 MW x 2 & 210 MW x 3). SRO,
Nashik reported that Unit No.1 & 2 of 125 MW each are decommissioned and only unit
no.3,4,5 of 210 Mw each are in operation .
2. Earlier consent for electricity generation- 880 MW was valid up to 31.12.2011.
3. Capital investment of the industry is increased from Rs.613.09 Crores to Rs.700.89 Crores
(i.e. Rs.87.80 Crores.). Industry has paid Consent fee of Rs.28,03,575/- along with
application. However, industry required to submit Consent to Establish fee of
Rs.1,25,000/- for increase in capital investment of Rs.87.80 crores.
4. Domestic Effluent – 2500 CMD. Industry has provided STP. Industrial Effluent – 37285
CMD. ETP provided. 20% effluent is used for gardening & 80% effluent is used for ash
slurry.
5. ESP provided to Unit no.3,4,5. The unit No.1 & 2 are closed.
6. Augmentation of ESP is completed for unit no.3 and augmentation of ESTP for unit no.4 & 5
is not done.
7. CAAQM Station is not yet installed.
8. Analysis results of Stack monitoring are exceeding the standards. 9. Regional Officer, Nashik reported that Board had issued directions vide letter No.
MPCB/APAE/TB-2/B-1884 dated 29.03.2011 and directed the industry to comply with these
directions in stipulated period and submit the Bank Guarantee of Rs.1.0 Crore towards
compliance of these directions (detail report is enclosed herewith). But Industry has failed to
submit the said Bank Guarantee. In view of above the application is submitted herewith for
the consideration and further disposal, please.
10. Earlier the case was discussed in 16/04/2012 and it was decided to issue SCN for refusal
of consent. Accordingly Board has issued SCN dt 23/04/2012. The industry has submitted
the reply of SCN vide letter dated 30/04/2012 received on 10/05/2012.
The unit has not completed most of the pollution control works also CAAQMS also not yet installed.
In view of above as decided in interim direction we may grant renewal for one year i.e 31/12/2012 with BG of Rs.1/- Cr for compliance of above directions dated 29/03/2011.
CAC Item No. 13
Name of Industry: M/s. Balaji Amines Ltd (Chemical & Captive power plant), Gat No-194 to 197 Vill:Tamalwadi, Tq-Tuljapur Dist- Osmanabad HOD Remarks :
1) Application for renewal of Consent.(Amalgamation of Two Consents) 2) This is Chemical industry with captive power plant. 3) Application received for renewal of Captive power plant & Chemical plant. 4) Application received at SRO on 14/01/2011, 16/04/2012 and at HQ on
24/05/2011, 03/05/2012 for Captive power plant & Chemical Plant respectively. 5) Total Industrial effluent generation- 182.43 CMD. 6) Parent Industry is engaged in manufacturing of 20 different chemicals for which
the consent is valid upto 30/04/2012 7) The captive power plant consent was valid upto -31/01/2011. 8) The application received from APC section on 06/03/2012. 9) The case was placed in CAC meeting dtd-20/03/2012 and decided to resubmit the case
in next CAC after obtaining report from RO/SRO and required consent fee from industry. 10) Report received from SRO Latur with details of fee paid by the industry. 11) Meanwhile the application of Chemical plant received from RO for renewal of
Consent. 12) Hence it was decided to pace the case before CAC for Combine Renewal of
Consent with amalgamation of two consents (i.e-Chemical plant and Captive plant).
13) RO Aurangabad had issued direction dtd-07/10/2012 and its Compliance is reported (Attached). Combine renewal of Consent may be approved.
CAC Item No. 14 Name of Industry : M/s. Mumbai International Air Port Pvt. (Phase-I) Ltd. Chhatrapati Shivaji International Airport Terminal 1B, 1st floor, Santacruz (E), Mumbai HOD Remarks:
• Renewal with Resubmission case, was discussed in CAC of 30/04/2011 and 31/01/2012.
• Application of resubmission case received at SRO on 12/08/2010, and at HQ on
10/01/2011.The application for renewal of consent received at SRO on 26/04/2012 and HQ on 09/05/2012.
• Water requirement is 4.570MLD
Sewage generation is 4.0 MLD STP provided - 4 MLD
• Solid waste generation(MSW) is 15 Tons/day Biodegradable Disposed to MCGM Non Biodegradable sold to M/s Janata Scrap Merchant
• The project proponent has obtained EC from MoEF vide No. 10- 5/2007-IA-III dt. 03/04/2007
• RO has recommended the case for grant of consent to operate • Renewal of consent with amalgamation of the consent with 1st operate, may be granted
with Bank guarantee of Rs. 5.0 lacs for operation and maintenance of STP.
CAC Item No. 15
Name of Industry: M/s. Neptune Venture & Developers Pvt. Ltd. (Magnet Mall), Plot bearing CTS No. 372,372/1 to 65, LBS Marg, Village Kanjur, Tal. Kurla, Mumbai - 400078 HOD Remarks:
1. Applications for renewal of consent with expansion
2. Application Received at SRO on 02/01/2012 and at HQ on 22/03/2012.
3. Industry has provided STP of capacity 600+350 CMD.
4. The firm has submitted the details of solid waste management, as per MCGM Certificate firm has provided 3 bins of 1.1 MT capacity each for vermi composting of solid waste.
5. Environment Statement for year 2010-2011 submitted.
6. Industry has submitted voluntary payment of Rs. 5000/- for Cess payment , Cess assessment order not received
7. RO has recommended the case for grant of consent to operate.
8. Consent may be granted by obtaining lapse period fees and with BG of Rs. 10 lacs
for operation of STP, MSW plant within 30 days period.
CAC Item No. 16
Name of industry : M/s. Cadbury India Ltd., G. No. -532, 533, A/p – Induri, Tal. Maval, Dist. – Pune.
HOD Remarks:
• Applied for the C to E for expansion for increase in production of Milk Crumb, Chocolate and confectionary by 717 MT/M and by 2163 MT/M separately.
• Application for expansion by 717 MT/M received at SRO on dt.02/08/2010 and at HQ on dt. 01/03/2012 and Application for expansion by 2163 MT/M received at SRO on dt. 18/01/2012 and at HQ on dt.01/03/2012.
• Industry type is food additives, nutrients and flavors. • ETP – ETP of capacity 660 CMD consisting of primary, secondary and tertiary treatment
provided. • Unit is located at @ 2.0 Km from river Indrayani. • Industry was called to submit the river distance certificate of Executive Engg. Irrigation
Department and combined Pollution Load Assessment Report for all the three expansions vide letter dt. 16/03/2011.
• The application was discussed in CAC dt.20.03.2012 and it was decided to keep the case in abeyance till obtaining No Increase in Pollution Load report of the plant and put up the case in next CAC.
• Industries reply received to this office on dt. 16.04.2012 along with following points. • Industry has proposed to use Sweetened Milk Condensate instead of the starting
material as a Milk, due to which the water consumption will be reduced. • The total trade effluent Exiting (500 CMD) and increased due to all three expansions is
(69 CMD) i.e Total - 569 CMD. • The Domestic effluent is (Existing + Expansion) is 32 CMD. • Industry has proposed to install Ultra Filtration / Reverse Osmosis System. • Performa of No Increase in Pollution Load prepared by professor UICT recommends that
due to expansion there will be no increase in Pollution Load. • We may consider the certificate of UICT and Grant C to E. • Board has received two applications, now we may amalgamate & issue one C to E.
CAC Item No. 18
Name of the Industry : M/s. Ballarpur Industries Ltd., (Ashti), Tal. Charmorshi, Dist.- Gadchiroli
HOD Remarks:
• Applied for the Renewal of Consent for production of Writing and printing paper (White) – 5000 T/M. (based on readymade pulp & without bleaching) • Application received at SRO office on dt.09/12/2011 and at HQ on dt. 07/04/2012. • Capital Investment of the Industry is Rs. 310.20 Crs. • Industrial effluent generation shown is reduced to the tune of 5500 CMD against
the previous consented quantity of 6500 CMD. • Domestic effluent is 500 CMD towards the previous consented quantity of 300
CMD. • ETP of capacity 6000 CMD with secondary treatment is provided. • JVS results are provided which are within the consented limits. • ESP is provided as an APCS boiler. • As per the decision of the CAC meeting dt.16.04.2012, SCN was issued vide letter
dt. 27.04.2012 to the Industry for Non Submission of BG, not providing adequate APC system and non compliance of consent conditions.
• Regional Officer Chandrapur vide letter dt.03.05.2012 reported that a) The said unit was visited on 26.04.2012. b) Water sprinklers are provided at coal stock yard. c) The work of Installation of dust collector at crushing unit, ash siloes were in
progress. d) Industry has submitted BG of Rs. 50,000/- valid upto 31/03/2013.
• Now Industry has paid / submitted BG of Rs. 50000 as per the directions issued. • The dust collector installation is in progress as per RO report. • We may grant Renewal with BG of Rs. 5.0 Lakhs as per the matrix.
CAC Item No. 19
Name of the Industry : M/s. Brintons Carpets Asia Pvt. Ltd., Gat No.- 414/415/416, Vill.- Urawade, Tal. Mulshi, Dist.- Pune.
HOD Remarks:
• Applied for C to E for expansion for Dyed Yarn by 25 MT/M and Carpet production by 25000 Sq. mtrs.
• Application received at SRO on Dt.20.10.2011 and at HQ on 02.03.2012. • C.I of the proposed expansion is Rs. 8.57 Cr. (C.I of existing unit is Rs. 102.13 Cr; Total
C.I of the Industry is Rs.110.7 Cr.) • Existing consent for Dyed yarn-150 MT/M, Carpet production -95000 Sq. mtrs. and
spinning of yarn 261 MT/M is valid upto 31/12/2013. • Located at 3.00 Km away from Mula river (A-2). • Industrial effluent generation is to the tune of 25 CMD and D.E is 5CMD in addition to
exiting I.E -152 CMD. • Industry has provided ETP with secondary & Tertiary treatment. • For the treatment of D.E provided 3 packaged STP’s. • Disposal of the treated effluent is on land for gardening, land available is @ 12 Acres. • Obtained membership of CHWTSDF, M/s. MEPL, Ranjangaon. • JVS results are not confirming to the consented standards w.r.t BOD. • RO Pune has recommended for grant of C to E by imposing appropriate Bank
Guarantee towards O & M of ETP. • As per the decision of the CAC dt. 16.04.2012, SCN for refusal of consent was issued
vide letter dt. 27.04.2012 as industry has already started the operations and taking trial runs.
• Industry has submitted reply to SCN and stated that no commercial production started, only the machines / operational conditions are checked with British Experts.
• Industry has expressed apology for carrying trial run without C to O. • We may Grant C to E subject to provide augmentation of existing ETP or recycle
effluent.
CAC Item No. 20
Plot No. - G-95, MIDC Tarapur, Tal. – Palghar, Dist. – Thane.
HOD Remarks :- 1. Applied for Consent to Ist Consent to Operate.
2. Consent was refused in CAC dated 02.03.2012 and refusal was issued on 13.03.2012.
3. The Case was disused in CAC meeting for reconsideration of Refusal dated 16.04.2012
4. It was decided to obtain report from RO (Thane) along with the justification to achieve Zero
discharge & revert back to CAC
5. As per Regional Officer, Thane report Industry has made arrangement for utilizing treated
effluent (250 CMD) for toilet flushing, humidification process and cooling tower, which will
resulting Zero discharge. 6. MIDC has not provided any connection to the industry for any kind of disposal drainage
system. 7. Industry is still engaged in weaving process without Boards permission.
Name of Industry : M/s. Bombay Rayon Fashion Ltd.,
CAC Item No. 21
Patalganaga,
Savroli- Kharpada, Road Isambe, Khalapur, Dist. – Raigad.
HOD Remarks :- 1. Applied for C to O for expansion and amalgamation with existing Consent. 2. Based on details submitted and decision of CAC dated 02.03.2012, SCN for refusal was
issued.
3. The industry has submitted their representation to Board on 21.03.2012 and justified that
from expansion no effluent generated except occasional washings of floor
4. Case was placed in CAC dated 16.04.2012 and decided to call report of RO, Raigad in
person on 17.04.201
5. RO, Raigad submitted report on 17.04.2012and finding are as below:- a. The ETP of existing production was upgraded b. Seepage from storage tank of ETP finding is way to Patalganga River. c. The upgraded ETP is not yet commissioned. d. The results of treated effluent are exceeding the prescribed standards. e. The production in C to E was equal to C to O valid consent (i.e. doubled) f. H.W. quantities are increased g. Air Pollution / Emission also increased.
6. Grant C to O with amalgamation and obtain B.G. of Rs. 10 lakh for Nill effluent generation.
Also we may obtain assurance / put condition in C to O that there should not be increase in effluent quantity from expansion.
7. We may also obtain B.G. of Rs. 5 lakh for O & M of ETP (as per matrix)
Name of Industry : M/s. Ruchi Soya Industries Ltd.,
CAC Item No. 22
Name of the Industry : M/s. Bhima SSK Ltd., (Sugar Unit), Madhukarnagar, -Patas, Tal. Daund, Dist. Pune
HOD Remarks :
• Applied for Consent to Operate (Renewal). • Application received at SRO on 20.03.2012 and at HQ on 02.04.2012. • Industrial effluent generation is 580 CMD and D.E is 80 CMD. • ETP provided with secondary treatment and SDB. • Dust collector is provided to 5 nos. of Boilers. • The application was discussed in the CAC meeting dt. 16.04.2012. • As per the decision of the CAC meeting SCN for the refusal of the consent was issued
vide letter dt. 27.04.2012 for discharging the effluent into Bhima River, JVS results are exceeding the norms and non compliance of the directions issued by the Board
• Industry has replied vide letter dt. 06.05.2012 that Industries sugar ETP was old and aeration tank drain valve failed and hence the effluent went out side the factory premises, Stopped the discharge of the effluent immediately and replaced the drain valve, Industry has stopped the production on 04.04.2012, The proposal of the up gradation of ETP is received from Vasantdada Sugar Institute, Upgradation of the ETP will be done in this off-season.
• Closure was issued on 26.03.2012 and Industry has stopped production on 04.04.2012. • Sugar ETP was too old and valve was failed and untreated effluent went outside the
premises. • Industry is regular defaulter. • We may refuse the Consent.
CAC Item No. 23
Name of the industry : M/s. B.S. ISPAT LTD.,(sponge Iron Plant) Vill-Salori Yensa,Tal-Warora, Dist.- Chandrapur.
HOD Remarks : 1. M/s B.S.Ispat Ltd,Salori Yensa, Ta warora, dist Chandrapur, is engaged in
manufacturing of sponge iron. 2. Earlier application for first consent to operate was refused by the Head
office vide letter dated 01/02/2012 due to non compliance of consent to establish conditions and accordingly Regional Office vide letter dated 29/02/2012 has issued directions not to operate industry unless obtaining valid consent to operate from the Board.
3. Now, the said industry has made fresh application for first consent to operate for sponge iron plant for production of 60,000 TPA (Phase-I).
4. Capital Investment of the Sponge iron plant is Rs. 65.24 crore. Total Capital Investment of integrated project including sponge iron plant as per the consent to establish granted earlier is Rs.158.5/- crore.
5. Consent Fees of Rs.2,00,000/- had been submitted with earlier consent application which was refused. Hence we may forfeit one term consent fees of Rs.1,00,000/- and consider Rs.1,00,000/- for this consent to operate.
6. Obtained Environmental Clearance from the MoEF, GOI, vide letter dated 5th May 2009 for sponge iron unit with captive power plant , for sponge iron of production of 64000 TPA & further obtained EC vide letter dated 23 rd November 2010 for production of sponge iron of 64000 TPA to 184000 TPA, copy is enclosed.
Now unit has installed necessary pollution control system including installation of CAAQMS & Opacity meter. The compliance is submitted by RO /SRO. We may grant consent to operate up to 30.4.2013 with operational bank guarantee of Rs.5/- Lakhs towards pollution control system.
CAC Item No. 24
Name of the Industry: M/s. Wokhardt Hospitals Pvt. Ltd.,
Dr. Anand Rao Nair Marg,
Byculla, Mumbai. HOD Remarks:
a. Applied for grant of consent to Establish for construction of Hospital (320 No. of Beds and Cafeteria/canteen).
b. Application received at SRO on 3.11.2011 and at HQ on 17.03.2012. c. The total built-up area 25,015.26 sq.m. and total plot area is 3586.98 sq.m.
d. Applicant requires to obtain Environmental Clearance as per EIA Notification,
2006 and obtained the same.
e. Applicant have started construction activity without obtaining consent as
previously they had approved plan for 7,868.06 sq.m. BUA and said does not
require Environmental Clearance. SRO reported that they have completed 21
storey building of hospital with partly plumbing/ flooring. And SRO recommended
to issue SCN for the same.
f. The effluent generated from the said activity will be sewage – 242 CMD and
proposed to provide STP (capacity-325 CMD) and treated effluent will be reused
for flushing, cooling purpose and remaining treated effluent is disposed off into
the sewer line.
g. The bio-degradable waste generated will be segregated and disposed to MCGM.
And non-biodegradable waste will be send to authorized vendor. They have
proposed to provide vermin-composting pits for biodegradable waste.
h. RO reported that applicant have proposed rain water harvesting.
i. The C.I. of project mentioned in EC is Rs. 100 Crs. and in the application it is
mentioned as Rs. 208 Crs. Applicant have submitted the clarification as earlier
medical equipment cost did not included in C.I. and escalation in project cost is
due to the time lapsed between 2008 and now and paid consent fees
accordingly.
j. As this is the construction of Hospital with canteen, category of consent and
consent granting authority needs to be defined. As per CPCB revised product
category, Hospital comes under RED category. There are similar activities in
Hospital & Hotel such as laundry activity, canteen, sewage waste, biodegradable
waste. So, we may consider hospital in Red category and Hotel.
k. The case was discussed in CAC dtd. 16.04.2012 and it was decided to keep the
case in abeyance. It was decided to cover the Hospital activity under purview of
Water Act, Air Act, etc. to grant consent, a separate note shall be moved for
discussion in CAC and then a decision be taken in this case.
l. Consent may be granted upto commissioning of the unit.
Fresh Agenda
CAC Item No. 25
Name of the Industry: M/s. Classic City Investments Pvt. Ltd.,
36/3B, Vill. Ghorpadi,
Tal. Haveli, Dist. Pune HOD Remarks:
a. Applied for grant of Renewal of consent for hotel activity (Five Star) includes
Lodging & Boarding, Restaurants, Banquates Halls, Club, Lounge Bar Rooms &
Suites, etc.(270 Rooms).
b. Application received at SRO on 21.03.2012 and at HQ on 19.04.2012.
c. The effluent generated (388.5 CMD) is treated in combine STP and the treated
effluent is used for flushing, cooling purpose. JVS Results of dtd. 21.02.2012 and
20.03.2012 are within the norms.
d. RO/SRO reported that industry has provided ozonation treatment to one of the
swimming pool and remaining work of the same is in progress, which need
further period of three months for completion.
e. The bio-degradable waste generated is being sent to PMC site for treatment and
disposal.
f. RO-Pune recommended the case for grant of consent upto 31.03.2017 with the
condition of obtaining BG towards the installation of ozonation treatment within
next three month period.
g. Consent may be granted with the condition of obtaining BG for providing
ozonation treatment within three months period.
CAC Item No. 26
Name of the Industry: M/s. Nirmal Lifestyle Ltd., (Hotel & Shopping Mall)
CTS No. 706, 709, 710(pt), 711 to 714, 716 to 720, 722, 724 &
724/1 to 10, 730/A to E, 762 & 762 (pt), Vill. Nahur,
Mulund-W, Mumbai HOD Remarks:
1. Applied for grant of consent to Establish for Commercial project of Hotel (450 rooms) and shopping mall.
2. Application received at SRO on 21.03.2012 and at HQ on 19.04.2012. 3. The total built-up area 94,475.74 sq.m. and total plot area is 81,692.15 sq.m.
4. Applicant requires to obtain Environmental Clearance as per EIA Notification, 2006
and obtained the same. 5. Applicant have started construction work and completed the RCC work of
Commercial building upto 4th floor and foundation work of three service core area is
under progress.
6. Applicant have obtained CC on 03.01.2007 and IOD on 10.08.2006 for commercial
mall.
7. Applicant have handed over the building no. 1 & 2 to society as per the approved
plan (CC).
8. The effluent generated from the said activity will be sewage – 681 CMD and
proposed to provided STP (capacity-600 CMD) for Hotel and STP (Capacity-450
CMD) for commercial building. Treated effluent will be reused for flushing, cooling
purpose, etc.
9. The bio-degradable waste generated will be segregated and disposed to MCGM.
And non-biodegradable waste will be send to authorized vendor.
10. RO-Mumbai issued SCN to the applicant on 09.03.2012 for starting construction
without obtaining consent, reply not received.
11. Consent may be granted in RED category after receipt of reply to SCN issued.
CAC Item No. 27
Name of the Industry: M/s Radisson Blu (5 Star Hotel), Unit of Bestech Hospitalities Pvt. Ltd., KH. No. 32/2-3, 37/1-C of Mauja-Somalwada, Nagpur.
HOD Remarks:
1. Applied for grant of Consent to 1st Operate for 5 star hotel having 214 nos. of rooms on 10/04/2012 at Sub-Regional Office, Nagpur-I.
2. SRO, Nagpur-I forwarded the application to A.S. (Tech.) Section on
21.04.2012.
3. Board has granted Consent to Establish to the Hotel vide Consent No. BO/AS(T)/EIC-NG-6312-12/AMND/CAC-365 dtd. 29/03/2012 for 214 Nos. of Rooms with Swimming Pool & Laundry having total built-up area is 27,667.16 sq. mtrs.
4. Applicant has obtained Environmental Clearance for construction of the Hotel
Building from the Env. Dept., GoM vide Letter No. SEAC-2011/CR.892/TC.2 dtd. 13/03/2012.
5. SRO, Nagpur-I has recommended grant of Consent to 1st Operate.
6. Consent to 1st Operate may be granted after receipt of additional Consent
Fee of Rs. 13,400 /- as per Env. Dept., GoM’s revised Consent Fee G.R. dtd. 25/08/2011.
CAC Item No. 28
Name of the Industry : M/s. Western Coalfields Ltd., Ukni (Deep) Opencast Mine, Village: Ukni, PO: Bhallar,
Tal: Wani, Dist: Yavatmal. HOD Remarks: 1. Applied for consent to Establish for expansion in coal production from 2.20 Million
Ton/Annum to 3.50 Million Ton/Annum.
2. Board has granted consent for Existing Coal Mine for production of 2.20 Million
Ton/Annum which is valid up to 31.10.2014.
3. Sub-Regional Officer, Chandrapur reported that mine lease boundary is about 0.544 km
from notified river Wardha (A-II Class), thus not satisfying RRZ Policy.
4. Public hearing for expansion for 2.20 MTPA to 3.5 MTPA was conducted on 10.08.2011.
5. Capital Investment of the proposed expansion unit is Rs.319.96 Crores. Consent fee of
Rs.6,39,940/- is paid by the industry. However, industry required to submit the Consent to
Establish fee for increase in production of mineral 1.3 MTPA Rs. 5,2,000/- as per new GR
dated 25.08.2011.
6. Domestic Effluent-489.67 CMD. STP proposed to be provided. Treated effluent will be
disposed in river. Industrial Effluent-17186 CMD. Mine water will be discharged in to river.
7. Fixed water sprinklers will be provided to coal handling plant and haul roads.
Notified Wardha river (A-II Class) is about 0.544 km away from the proposed expansion
unit, hence is not satisfying the RRZ Policy. Consent to Establish for expansion of coal mine
may be refused.
CAC Item No. 29
Name of the industry : M/s. Bridgestone India Private Limited (Phase-II), Plot No. A-43, MIDC Chakan, Phase-II, Tal. Khed, Dist. Pune 410 501
HOD Remarks:
• Applied for consent to establish
• Application received at SRO- Pune-II on dtd 13/02/2012 and at HQ on 19/04/2012.
• Industry has obtained consent to establish for phase I on dated 04/01/2011
• Industry located @ 3.0 KM away from A-II River Indrayani. Satisfy the distance criteria.
• Generation of industrial effluent will be 660 CMD from Cooling, DM softening & boiler blow down for which proposed to provide Effluent treatment plant
• Domestic effluent generation will be 105 CMD for which proposed to provide Sewage treatment plant
• Total land available for the use of treated effluent is 48366 Sq.Mts
• Industry has proposed to provide dust collector to carbon handling/charging section.
• Hazardous will sent to CHWTSDF
• RO Pune has recommended the case for grant of consent to establish by stipulating stringent condition Viz BOD-20 Mg/lit SS-10 Mg/lit and continuous ambient monitoring system and at major source emission points
• We may grant the consent to Establish for Phase-II with amalgamation of Consent to Establish of Phase-I with condition to achieve BOD 30 mg/Ltr., 3 CAAQMS and 50 % effluent reused in the process.
• We may place the consent application before CAC for further consideration.
CAC Item No. 30
Name of the industry : M/s. Precision Automation & Robotics (I) Ltd., Gat No. 463 A, 463 B, 464, A/p. Dhangarwadi, Tal. Khandala, Dist. Satara.
HOD Remarks:
• Applied for consent to establish for expansion
• Application received at SRO- Satara on dtd 05/12/2011 and at HQ on 02/04/2012.
• Existing plant consent is valid up to 31/07/2012
• Industry located @ 2.5 KM from AII River Nira. Satisfy the distance criteria.
• Generation of industrial effluent will be 8 CMD (Existing 3.5 CMD). Industry proposed to provide ETP.
• SRO Satara reported that industry has discontinued the industrial effluent till expansion in completed
• Generation of industrial effluent will be 4 CMD (existing 28 CMD ) for which industry has provided 80 CMD capacity STP in the existing unit
• JVS result of not submitted by the industry of existing plant
• Industry has proposed to provide dust collecting system with bag filter and a stack of 11 mtr height to the powder coating booth, Stack of 4 meter height to the heat treatment section & stack to the D.G. Sets (4 Nos)
• RO Pune recommended the case for grant of consent to establish for expansion by imposing condition towards provision of VOC control System for paint booth section
• We may grant consent to establish for expansion with condition of company Board Resolution as they have completed activity before C to E
• We may place the consent application before CAC for further consideration.
CAC Item No. 31
Name of the Industry: M/s. AAM India Manufacturing Corporation Pvt. Ltd., Gat No. 787 & 788 Hanga, Tal: Parner, Dist: Ahmednagar. HOD Remarks: 1. Existing unit having consent for production of Drive Heads 1901 Nos./Month & Gears-1088
Nos./Month which was valid up to 31.03.2012.
2. Now applied for consent to establish for expansion for the production of Drive Heads – 1100
Nos./Month, Gears – 9900 Nos./Month, Axle – 8000 Nos./Month & Banjo – 8000
Nos/Month.
3. Total Capital investment of the industry is Rs.203.03 Crores (Existing Unit Capital
Investment is Rs.63.11 Crores & Capital Investment of proposed expansion is Rs.140.72
Crore). Industry has paid Consent to Establish fee of Rs.2,81,540/- as per new Consent fee
GR dated 25.08.2012.
4. Domestic Effluent – 6.0 CMD. Industry has Soak pit and Septic Tank Provided. Disposal on
land for gardening. Industrial Effluent – 1.0 CMD, After primary treatment disposed on land
for gardening.
5. The proposed expansion unit in existing plant is located at 2.0 km from river Hanga.
The Honga river is not notified. Consent to Establish for expansion to the said unit.
CAC Item No. 32
Name of the industry : M/s. JSW Steel Ltd. Plot No. B-6, MIDC Tarapur, Navapur Road Boisar, Tal. Palghar, Dist. Thane
HOD Remarks:
• Applied for renewal of consent
• Application received at SRO- Tarapur on dtd 29/02/2012 and at HQ on 26/04/2012.
• Previous consent was valid up to 30/04/2012
• Industry generating 450 M3/d of effluent for which Industry has provided effluent treatment plant with RO system
• Sewage treatment Plant provided by industry for 92.0 CMD domestic effluent.
• Fume extraction system followed by 2 nos of scrubbers provided at pickling section
• Fume extraction system followed by dust collector system attached to adequate height of stack provided to the furnace
• Industry has submitted JVS analysis report dated 09/08/2011, 07/12/2011 & 15/03/2012. Which is under consented limit
• Industry submitted the letter on dated 23/04/2012 & reported that they have commissioned operation of MEE on 22/04/2012
• SRO-Tarapur-I recommended the case for renewal of consent.
• The unit has installed MEE & commissioned on 23/04/2012. The JVS results are within consented limits. We may grant renewal of consent upto 30/04/2015.
• We may place the consent application before CAC for further consideration.
CAC Item No. 33
Name of the industry : M/s. Force Motors Ltd., Mumbai-Pune Road, Akurdi, Pune 35
HOD Remarks:
• Applied for renewal of consent
• Application received at SRO- Pune on dtd 31/01/2012 and at HQ on 12/04/2012
• Previous consent was valid up to 31/03/2012
• Industrial Effluent Generation is 200 CMD for which industry has provided 2 Nos effluent treatment plant
• Domestic effluent generation is 720 CMD for which provided sewage treatment plant.
• JVS analysis result on dated 24/01/2011,22/02/2012,23/03/2011, & 30/09/2011is under prescribed limit
• Total Land available for disposal of treated effluent is 9.65 hectares
• Industry has provided double chambered captive incinerator, Wet scrubber followed by stack of height 30 mtrs.
• RO Pune reported that incinerator provided for disposal of paint sludge need to be stopped being proximately to residential area.
• SRO- PC issued letter to industry on dated 09/02/2012 for various non compliances observed.
• RO Pune has recommended the case for grant of renewal of consent after receipt of the satisfactory reply of the letter issued by SRO
• Industry not submitted the reply of the same
• The industry has provided APC for paint booth. The land available for disposal of effluent 920 M3/D is totally inadequate. The incinerator is not as per CPCB guidelines. We may issued SCN for refusal for non compliance.
• We may place the consent application before CAC for further consideration.
CAC Item No. 34
Name of the industry : M/s. Bajaj Auto Ltd., Plot No. A-1, MIDC Chakan, Mahalunge,Gaon, Tal. Khed, Dist. Pune
HOD Remarks:
• Applied for renewal of consent
• Application received at SRO- Pune on dtd 04/02/2012 and at HQ on 02/04/2012
• Previous consent was valid up to 31/03/2012
• Industrial Effluent Generation is 440 CMD for which industry has provided 2 Nos effluent treatment plant
• Domestic effluent generation is 480 CMD for which provided sewage treatment plant.
• JVS analysis result on dated 16/06/2011,16/09/2011,20/10/2011,11/11/2011 is generally under prescribed limit
• Industry has provided air pollution control system to Boiler & PTCED Boiler & furnace
• Industry provided 35 Stack to D.G. Set (Capacity 3187 KVAx2 Nos)
• Scrubber provided to paint Booth
• Industry submitted B.G. of 5 Lakhs towards operation & maintenance of ETP valid up to 23/01/2013.
• RO Pune has recommended the case for grant of renewal of consent for period up to 31/03/2015 by Stipulating condition towards provision of online monitoring system at major source emission points and including CAQMS being located proximity to residential area
• We may grant the consent upto 31/013/2015 with condition of encashing Bank Guarantee as ETP standards are not achieved consistently and also take fresh BG of Rs.5/- Lakhs.
• We may place the consent application before CAC for further consideration.
CAC Item No. 35
Name of the industry: M/s. Apple Sponge And Power Ltd., C-4, Five Star MIDC Industrial Area,
Kagal, Kolhapur.
HOD Remarks :
• Applied for Renewal of consent for Sponge iron plant (existing)and Consent to first operate for Rolling Mill & Captive Power Plant.
• Total C. I. is Rs. 130.54 crores. (Existing Sponge Iron plant Rs. 43.08 cr and Rolling mill & CPP Rs.87.46 cr).
• Manufacturing :- I} Existing Plant • 1) Sponge Iron:- 6000 MT/M.
2) MS Billets :- 3600 MT/M. II} First Operate
1) Rolling Mill :- 6000 MT/M 2) Captive Power Plant: 10 MW (WHRB- 4 MW & AFBC- 6 MW)
• Obtained the Environmental Clearance for additional qty of Sponge iron plant, Induction furnace /Arc furnace, Rolling Mill and captive power plant-10 MW.
• Provided ESP to rotary klin of sponge iron plant, Wet scrubber to induction furnace and bag filters to stock house, collar discharge, iron ore crusher, coal crusher, product separation house.
• Water sprinkling system near production area and internal roads. • Provided Continuous online monitoring system for stack . • Provided CAAQMS in the factory premises. • JVS results of AAQM for the parameter SPM are exceeding the prescribed limits.
And JVS results of Stack air monitoring are within limit except parameter TPM in the month of July.
• Submitted Environment Audit Statement for the year 2010-2011and cess returns are submitted Feb-2012.
• Have submitted the BG of Rs. 3.0 lac as per last consent condition, which is valid upto 31/5/2012.
• Rolling mill furnace is provided with dust collector. • Captive Power Plant is of 10 MW capacity,( from WHRB :- 4 MW & AFBC:- 6 MW). • Provided ESP to the AFBC with stack height of 60 mtrs. • D. M. plant waste water & cooling waste water, treated in collection cum
neutralization tank & same recycled back. • SRO recommended the grant of Renewal of consent and first consent to operate. • We may place the case before CAC for approval.
CAC Item No. 36
Name of the industry : M/s. Can Pack India Pvt. Ltd. H 14/1, MIDC,Waluj, Dist –Aurangabad. HOD Remarks :
• Applied for consent to Establish. • Will manufacture glass bottles of various size for beverage industries. • Capital Investment is Rs.425.00 crores. • Industrial effluent will be 46 CMD, ETP will be provided. Proposal submitted. Further
will be dispose to CETP. • Domestic effluent will be 48 CMD, STP will be provided, proposal submitted. • Will provide Furnace oil fired Furnaces 2 Nos. • 5 no of D. G. sets will amount to 1 MW generation. • Paid fees of Rs. 850000/- as per the new fees schedule. • RO Aurangabad has recommended the grant of consent to Establish. • We may place the consent application before CAC for further consideration.
CAC Item No. 37
Name of the Industry: M/s. Lloyds Metals & Energy Ltd., Plot No.A 1 & 2, MIDC Ghugus,,
Dist: Chandrapur. HOD Remarks: 1. Industry is having two consent in the same premises. First is for 4 x 100 TPD Kiln which is
valid up to 18.10.2011. Second one is for 500 TPD Kiln, Coal Washery and 25 MW Power
generation which is valid u to 28.2.2012. Plain renewal with amalgamation of both consents.
2. Total Capital investment of the industry is Rs.498.55 Crores. Consent fee of Rs.9,97,109/-
is paid for one year period as per new G.R. dated 25.08.2011.
3. Regional Officer, Chandrapur reported that the industry has complied majority of directions
except point no.4 & 7 i.e. installation of Ash Silo and disposal of solid waste. Hence, R.O.
has forfeited the bank guarantee of Rs.5.0 Lakhs in the month of December, 2011.
4. Regional Officer, Chandrapur reported that;
i) Industry has installation one CAAQM station within premises in January, 2008.
ii) Continuous Monitoring Station (CMS) is also provided Sponge Iron stack and 25 MW
Power Plant.
iii) Construction of new ash silo is expected to complete by March, 2012.
iv) Industry has improved housekeeping since previous visit.
v) Industry has paid Cess payment of Rs.22,856/- on 17.1.2012 and Cess Return filed up
to 31.1.2012.
vi) Online environment statement for the year 2010-11 submitted by the industry.
vii) From the analysis reports stack emission and ambient air quality levels are fluctuating
and some time on higher side and hence industry shall improve operation and
maintenance of pollution control system.
viii) Char beneficiation plant is commissioned on January, 2011 and it is used as
secondary fuel in AFBC boiler and hence conditions regarding use of char as fule may
be incorporated.
ix) Industry shall submit proposal for one additional CAAQMS as per consent condition.
5. Legal Action: Writ Petition No.3501/2006 in Mumbai High Court, Nagpur Bench. The writ
petition is pending for hearing.
We may consider renewal of consent to operate with amalgamation of both consent for
the period upto 31/10/2012.
CAC Item No. 38
Name of the industry : M/s. Cummins Technologies India Ltd., Plot No. B-3/1, Phaltan SEZ Industrial Area, Tal. Phaltan, Dist Satara
HOD Remarks :
• Applied for consent to establish
• Application received at SRO- Satara on dtd 22/02/2012 and at HQ on 26/04/2012.
• Industry located @ 4.0 KM away from A-II River Nira. Satisfy the distance criteria.
• Generation of industrial effluent will be 15 CMD for which proposed to provide 30 CMD capacity Effluent treatment plant
• Domestic effluent generation will be 130 CMD for which proposed to provide 210 CMD Capacity Sewage treatment plant
• Total land available for the use of treated effluent is 52800 Sq.Mts
• Industry has proposed to provide chimney of height 3.5 mtr each to 4 nos. of test cell & 18 mtr chimney to paint boot & adequate height of chimney to D.G. sets with acoustic enclosures
• Industry obtained Membership of CHWTSDF Ranjangaon
• RO Pune has recommended the case for grant of consent to establish by imposing the condition towards provision of APC to the test cells, Voc control system for paint booth & required modification in STP & ETP design due to over design capacity by imposing appropriate Bank guarantee
• We may grant of consent to establish
• We may place the consent application before CAC for further consideration.
CAC Item No. 39 Name of industry: M/s. Mazgaon Dock Ltd. , Dock Yard Road, Mazgaon Mumbai. HOD Remarks :
• Applied for renewal of Consent to operate with expansion.
• Application received at SRO on 27/02/2012 and at HQ on 07/05/2012
• Capital investment of the industry is 169.18 Crs.
• Industry has provided ETP consisting of primary treatment followed by tertiary treatment, which is inadequate considering physical segregation of high COD & metal bearing system, which requires up gradation of existing of ETP.
• Industry has provided Air Pollution Control System in form of suction hood.
• JVS analysis results dated 28/06/2011, & 22/09/2011 are exceeding consent limit.
• RO Mumbai, recommended renewal of consent to operate with Bank Guarantee for up gradation of ETP, STP & Air Pollution Control System.
• ETP is not operated regularly.
• Dry & wet Dock construction started without CRZ clearance & C to E from MPC Board. • More than 10% increase in investment made without permission i.e C.I. Increased from
143.27 Crs to 169.18 Crs.
• Recommended for SCN for refusal of consent application.
CAC Item No. 40
Name of industry : M/s. Reliance Infocomm Infrastructure Pvt. Ltd., TTC Industrial Area DAKC Koparakharine HOD Remarks:
• Applied for renewal of Consent to operate.
• Application received at SRO on 30/01/2012 and at HQ on 08/05/2012
• submitted application for renewal of consent for IT Project, on plot area 5,39,349 sq mtrs & total built up area of 2,36,195 sq. mtrs including utilities of residential project & services as occupancy certificate of local body.
• Capital investment of the industry is 1886.5035646 Crs. Earlier capital of investment
of industry was 1836.038 Crs. Industry has increased its capital investment by 50 Crs.
• Industry has applied for change in domestic effluent quantity from 744 CMD to 930 CMD, RO Navi Mumbai reported to update /amend the figure of Domestic effluent quantity 930 CMD.
• As reported by RO Navi Mumbai, industry has provided STP of the Capacity 2000 CMD for treatment of domestic effluent qty 930 CMD.
• SRO NM-I has collected JVS samples of STP outlet, as per analysis reports of STP
samples all parameters are within consented limits.
• Industry has submitted Environmental Statement in Form V to MPC Board.
• Industry has submitted Water Cess paid up to April 2011 & return filed up to Sep 2011.
• RO , Navi Mumbai recommended case for grant of renewal of consent with correction in domestic effluent quantity to 930 CMD, up to period 31/03/2014
• Recommended for renewal of consent after confirmation on Capital investment.
CAC Item No. 41
Name of industry : M/s. Adhiraj Construction Pvt. Ltd., MMRDA ( Rental Housing Scheme) residential township project – Adhiraj Upscale , Plot Survey no: 64,67,68,69,70,71,72,76,77,86, 88,89,90,91&99, vill: Rohinan , Tal Panvel Dist : Raigad
HOD Remarks:
• Applied for consent to establish
• Application received at SRO on 13/02/2012 and at HQ on 24/04/2012
• submitted application for C to E for residential township project
• Capital investment of the industry is Rs. 900 Crs
• Plot Area : 11,47,700 M2 & Total Construction Area : 7,21,399 M2
• Project proponent has obtained EC vide No: SEAC 2010/CR.698/TC.2 date: 28/06/2011 & amended EC dt 03/04/2012 for :- Plot Area : 11,47,700 M2 & Total Construction Area : 7,21,399 M2
• RO Raigad recommended case for grant for C to E .
• Recommended for grant of Consent to Establish up to commissioning of project.
CAC Item No. 42 Name of the industry: M/s. Kanhan River Project (Kochi Barrage), Viil: Kochi, Tal: Saoner, Dist. Nagpur
HOD Remarks:
• Applied for consent to establish
• Submitted application for C to E for construction of Conreate Barrgae, across Kanhan River.
• Capital investment of the industry is Rs. 26225.3 lacs • Waste water generation: 4.5 m3/day, septic tank soak pit proposed. • Solid waste generation: Nil
• Project proponent has obtained Environmental Clearance from MoEF vide no: J-
1201/15/2008-iA-I dt: 09/02/2012
• The project does not attract Provisions of the RRZ Policy 2009.
• SRO Nagpur recommended case for grant for C to E.
• Recommended for grant of Consent to Establish up to commissioning of project or 5 five years Period with BG of 10 lakhs for compliance of consent conditions.
CAC Item No. 43
Village Dahali, Tal. – Mouda, Dist. Nagpur
HOD Remarks :- 1. Applied 1st Consent to Operate for Expansion.
2. Drawing of Textured Yarn from POY Intermediate
3. Existing consent tis valid up to 31.05.2013 & Consent to Establish for expansion was
granted on 13.03.2012.
4. Total C.I. is 225.45 Cr. (Existing – 218 Cr. + Proposed – 7.45 Cr.)
5. We may grant consent to 1st Operate for Expansion.
Name of Industry : M/s. Reliance Industries Ltd. (Expansion),
CAC Item No. 44 Name of Industry : M/s. Lokmangal Mauli SSK Ltd.,
Village Lihara (Khurd), Tq. Lohara, Dist. Osmanabad.
HOD Remarks : 1. Applied for Consent to Establish Sugar and Co-gen.
2. Sugar industry of 6000 TCD and Co-Gen 30 MW.
3. Environmental clearance is required.
4. SCN was issued to industry as the project proponent had started work of development
activity before obtaining Consent to Establish.
5. RO reported that industry have stopped the development activity.
6. RO Recommended for grant of consent to Establish with subject to obtain Environmental
Clearance from MoEF.
7. We may Grant Consent to Establish.
CAC Item No. 45
Arvind nagar, Post Keshgaon, Dist. Osmanabad.
HOD Remarks : 1. Applied for Consent to Establish Sugar and Co-gen.
2. Sugar industry of 2500 TCD and Co-Gen 16 MW.
3. Environmental clearance is required for Expansion.
4. Total C.I. including expansion is 157.75 Cr. ( Sugar - 43.18 Cr. +Co-gen- 30.03 & Distillery
– 21.44 Cr. & Proposed – 63.10 Cr. )
5. Effluent generation is 120 CMD including cooling tower blow down for expansion.
6. Proposed Secondary & Tertiary treatment to effluent generated. Treated effluent is used for
gardening. Land available 223 acres.
7. Recommended for grant of consent to Establish with Expansion, subject to obtain
Environmental Clearance from MoEF.
8. We may Grant Consent to Establish.
Name of Industry : M/s. Dr. Babasaheb Ambedkar SSK Ltd.,
CAC Item No. 46
Name of industry : M/s. Urjankur Shree Tatyasaheb Kore Warana Power Co. Ltd.
Gat No. 630, A/p. Warananagar, Tal: Panhala, Dist: Kolhapur.
HOD Remarks :
• Applied for Consent to operate.
• It is power generating Plants.
• Application received at SRO on 14.03.2012 and at HQ on 19.04.2012.
• Industry has applied for C to O for electricity- 44 MW.
• Domestic effluent generation is 7 CMD. I.E. generation is 640 CMD
• Industry has provided ETP comprising primary & Secondary treatment treated effluent
use on land for gardening
• Industry has provided 02 Nos. ESP to Boiler as a APC
• Industry has obtained Environmental Clearance from Govt. of Maharashtra dated
10.06.2009 for Electricity- 44 MW
• The industry has not installed continuous online stack monitoring system
• SRO recommended the case for grant of consent to operate with Bank Guarantee
• Recommended for grant of consent to operate with Bank Guarantee of Rs. 5 Lakh for
providing continuous online monitoring system in 4 month.
CAC Item No. 47 Name of industry : M/s. Eurotex Industries & Exports Ltd
Plot No. E-23, MIDC Gokul Shirgaon, Dist- Kolhapur
HOD Remarks :
• Applied for Renewal of consent
• Application received at SRO on 26.3.2012 and at HQ on 21.4.2012.
• Domestic effluent generation is 70 CMD. I.E. generation is 50 CMD
• Industry has provided upflow anaerobic filter unit
• The treated industrial effluent Partly recycle & remaining used on land for gardening/irrigation.
• Industry has provided dust collection system to the carding & combing section
• For domestic effluent industry has provided STP
• Previous consent granted with industrial effluent 320 CMD. Industry has submitted revised water budget. As per this the industrial effluent is reduce i.e. 50 CMD
• SRO Kolhapur has recommended for renewal of consent upto 31.03.2014
• Recommended for renewal of consent.
CAC Item No. 48 Name of industry : M/s. Tessitura Monti India (P) Ltd.,
Gat No-147, Vill- Tamgaon, Karveer, Dist- Kolhapur
HOD Remarks :
• Applied for Renewal of two consent with amalgamation for 6 MW Electricity.
• It is power generating Plants.
• Application received at SRO on 02.03.2012 and at HQ on 12.04.2012.
• Industry has applied for C to R for electricity- 06 MW.
• Domestic effluent generation is Nil CMD. I.E. generation is 68 CMD
• Industry has provided Primary ,Secondary & tertiary treatment ETP ( Existing textile unit ETP)
• The treated industrial effluent is use for gardening/Irrigation. Total land available is 126 Acre.
• Industry has obtained Environmental Clearance for 3 MW & 5 MW Electricity
• Industry is a member of CHWTSDF for disposal of Hazardous waste
• SRO Kolhapur has recommended for renewal of consent to operate with amalgamation
• Recommended for consent to renewal with amalgamation with earlier textile consent which is valid upto 31.12.2012.
CAC Item No. 49 Name of industry : M/s. Raymond Zambaiti Ltd., Plot No. T-1, Five Star Indl. Estate,
Kagal, Dist- Kolhapur
HOD Remarks :
• Applied for Renewal of consent with 1st consent to operate ( Expansion)
• It is Yarn & Textile Processing Unir
• Application received at SRO on 26.03.2012 and at HQ on 21.04.2012.
• Domestic effluent generation is 130 CMD. I.E. generation is 2800 CMD
• Industry has provided Primary ,Secondary treatment ETP
• The treated industrial effluent is send to CETP for further treatment.
• The JVS results dated 20.09.2011except TDS, 20.10.2011 are within limit & 30.11.2011 & 30.12.2011 are marginally exceeding in respect of BOD & COD
• Industry has provided mechanical dust collector & Bag Filter to Boiler & Thermopack as a APC.
• Industry is member of CHWTSDF for disposal of Hazardous waste
• Industry has submitted Environment Statement for Year 2010-2011
• Industry has change name fro. Raymond Zambaiti Pvt Ltd to Raymond Zambaiti Ltd for which industry has submitted certificate of Registrar of Companies. Mumbai
• Industry has submitted Bank Guarantee of Rs. 05 Lakh towards O & M of ETP valid upto April-2011.
• Industry has paid Cess return upto Feb -2012
• SRO, Kolhapur has recommended for grant of consent upto 31.03.2015
• Recommended for grant of consent with expansion with encash the previous Bank Guarantee of Rs. 05 Lakh & taking fresh Bank Guarantee of RS. 10 Lakh.
CAC Item No. 50
Name of industry : M/s.Shri Dudhganga Vedganga SSK Ltd, Bidri(Mouninagar),Tal-Kagal, Dist- Kolhapur HOD Remarks :
• Applied for Renewal of consent
• It is Sugar Unit
• Application received at SRO on 11.4.2012 and at HQ on 04.05.2012.
• Domestic effluent generation is 60 CMD. I.E. generation is 450 CMD
• Industry has provided Primary ,Secondary treatment ETP
• The treated industrial effluent is used on land for irrigation. Land available for disposal of treated effluent is 88 Acres.
• Industry has provided 5 Nos. of boiler with Multi Cyclone type of fly ash arrestor with 2 Nos. of common stack of height 32 Mtrs
• The industry has not provided 30 days storage tank as per CREP guidelines
• Industry has not dismantled the Kachha lagoons
• JVS results dated 12.1.2012 are exceeding the limit as per consented parameter
• SRO has recommended for grant of renewal of consent to operate upto 31.12.2011 obtaining appropriate Bank Guarantee
• Recommended for SCN for refusal as industry does not comply with CREP norms
CAC Item No. 51 Name of Industry : M/s. Lenzing Modi Fibers India Pvt Ltd.
Plot No M-1 & M-2, Additional MIDC , Patalganga, Dist – Raigad
HOD Remarks :
1. Application received at RO Raigad 07/04/2012 2. Industry representation made on dated 17/04/2012 before Hon’ble
Chairman of the Board. 3. Application recd at HQ 07/05/2012 4. Product- Viscose Staple fiber, Qty- 6667 MT/M 5. C to E given in Oct 2005, exempting EC as earlier NOC was given prior to 1994
notification. 6. Subsequently, C to E was given in June 2009 & Oct 2011 for change in name /
plot addition. 7. There was no expiry clause in C To E or Amendment. Industry has now applied
for EC. 8. SRO has issued notice to the industry for fresh application as 5 yrs of validity of
first C to E i.e. 2005 is over. 9. Industry has represented against that and mentioned that, this 5 yrs conditions
has not been mentioned in C To E or amendment granted to them. 10. Now industry has submitted a fresh application for C to E & also requested to
withdrawal and return of fees. 11. SRO has reported only leveling and compound wall work is in progress. 12. SRO has remarked that suitable decision may be taken at HQ.
This may be placed before CAC for policy decision regarding refund of consent
fees and validity of C to E.
CAC Item No. 52 Name of the Industry : M/s. Sandoz Pvt. Ltd.,
Plot No L-1, Addl.MIDC, Mahad Dist Raigad.
HOD Remarks : • Application recd to RO Raigad 12/03/2012. • Application recd at HQ on 07/04/2012. • Existing unit, Mfg of Bulk drugs. Valid consent upto 30/06/2015. • Now applied for additional four products with reduction in existing products quantity &
maintaining no increase in total production quantity & effluent quantity. • Existing I.E. – 877 CMD, proposed Nil. D.E. – 50 CMD. Primary, secondary & Tertitary
treatment provided. Disposal – Reuse/ CETP. • Industry has not submitted, “No increase in pollution load” certificate from reputed
institute. • Capital investment certificate is not certified by C.A. Envt statement,HW return in Form
IV, latest JVS reports are not submitted. • RO Raigad has recommended for grant of consent for addl four products subject to pay
consent fee on total investment & nil discharge to CETP.
We may call “no increase in pollution load” certificate/ self assessment proforma & C.A certificate, Envt statement, JVS reports.
CAC Item No. 53
Name of the Industry: M/s. Jubilant Life Science Ltd., Village Nimbut-Nira, Tal-Baramati, Dist-Pune HOD Remarks : • Application recd to RO Pune 02/01/2012. • Application recd at HQ on 03/03/2012. • Mfg of chemicals. • The industry location is in RRZ restricted area (Nira river A-IV Zone) • In the same premises industry has holding 5 consents for various products Existing I.E.
– 1804 CMD, proposed IE-163. Total I.E. 1967 CMD. • Earlier board has granted consent to establish in 22/08/2008 and accordingly industry
has obtained EC from MoEF. Now Industry has applied Phase-wise consent to 1st Operate only for the mfg of acetic anhydride 125 MT/Day with IE 163 CMD.
• RO Pune has reported compliance of existing industries and recommended for 1st Operate with amalgamation of existing consent.
• Board has already granted C to E and now the application is for consent to 1st operate. • Case was discussed in CAC meeting held on 16/04/2012 and it was decided to verify the
pollution load, applicability of RRZ policy reverts back to CAC. • Accordingly, industry has submitted details about effluent treatment and its disposal
method for achieving ZERO discharge for proposed products, which seems to be in order.
We may consider the case for short period for verification of industry say about
achieving ZERO discharge with amalgamation of existing consent issued for chemical plant.