list general construction projects ranked by construction ... · 9/28/2020 · w.e. o'neil...
TRANSCRIPT
SEPTEMBER 28, 2020 LOS ANGELES BUSINESS JOURNAL 15
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
1Lucas Museum of Narrative Art inExposition ParkExposition ParkLos Angeles 90007
$1,200.01 four-story exhibition space for George Lucas March 20182021300,000
George LucasMAD Architects
Hathaway DinwiddieConstruction Co.(213) 236-0500
2Century Plaza Development2025 Avenue of the Stars, Suite 2100Century City 90067
1,102.0 Century Plaza Hotel renovation; two new 46-storytowers with 363 condominiums
December 2016July 20211,937,712
Next Century PartnersGensler/Harley Ellis Deveraux/MarmolRadziner & Associates
Webcor(213) 239-2800
3Jordan Downs Redevelopment9901 S. Alameda St.Los Angeles 90002
1,000.02 new mixed-use development that will include1,400 residential units, a 50,000-square-footcommunity center and 115,000 square feet ofretail space
June 20172022415,000
Housing Authority of the City of LosAngelesSVA Architects
Cannon Constructors Inc.(818) 906-6200
4The Grand100 S. Grand Ave.Los Angeles 90012
950.02 39-story apartment tower with 436 units: 323luxury apartments and 113 ultra premiumapartments, connected hotel tower on a three-acre site
February 20192022NA
SBE Entertainment Group/DakotaDevelopmentFrank Gehry
AECOM(213) 593-8000
5Oceanwide Plaza11th Street and Figueroa StreetLos Angeles 90015
814.0 mixed-use project comprised of high-riseresidential towers, hotel, retail, LED signage,parking
March 201520212,600,000
Oceanwide Holdings Co. Ltd.CallisonRTKL
Lendlease (US) ConstructionInc.(213) 430-4660
6LACMA Renovations5905 Wilshire Blvd.Los Angeles 90036
650.0 renovations include a large gallery that will stretchacross Wilshire Boulevard
April 20202023NA
NAPeter Zumthor
NANA
7Second Century Burbank Project2901 Warner Blvd.Burbank 91523
600.0 project comprised of a 1-million-square-footgarage and 800,000 square feet in two officebuildings
August 2019June 20231,800,000
Worthe and Stockbridge Real Estate FundGehry Partners
Krismar Construction Co.(310) 393-9653
8Vista CanyonSouthwest intersection of Sand CanyonRoad and State Route 14Santa Clarita 91310
500.02 mixed-use development including 1,100 single-family and multifamily homes, commercial/officespace, hotel, water reclamation plant, parkinggarage, Metrolink station
December 2017Late 2022250,000
JSB DevelopmentJohnson Fain/Gensler
JPI/TDI and KB Home JV(858) 369-5670/(310) 231-4000
9Academy Museum of Motion Pictures6067 Wilshire Blvd.Los Angeles 90670
482.0 1,000-seat Geffen Theater and renovation ofhistoric May Co. building
April 2017Spring 2021290,000
Academy of Motion Picture Arts andSciencesRenzo Piano Building Workshop/Gensler
Matt Construction Corp.(562) 903-2277
10Academy on Vine1341 Vine St.Los Angeles 90028
450.01 20-story apartment building with 200 units;commercial buildings
June 20182021545,000
Kilroy RealtyHouse and Robertson/Shimoda DesignGroup
Hathaway DinwiddieConstruction Co./Webcor(213) 694-3630/(213) 239-2800
11Providence Tarzana Medical CenterReimagined Project18321 Clark St.Tarzana 91356
440.0 redevelopment of medical center, including newpatient care wing and emergency department
Summer 20182024328,000
Providence Health & ServicesPerkins + Will
McCarthy Building Cos. Inc.(949) 851-8383
12960 W. 7th StreetNALos Angeles 90017
390.0 mixed-use project with 785 apartment units, retailspace, rooftop deck and podium-level pool deck
June 2019June 20221,364,436
Maguire Properties - 775 South FigueroaLARGE Architecture
Webcor(213) 239-2800
13UCLA Warren Residence Hall900 Weyburn PlaceLos Angeles 90024
303.02 construction of three mid-rise buildings with2,279 beds
July 2019August 2022NA
UCLAMithun Partners Inc.
PCL Construction Services Inc.(818) 246-3481
14Hollywood Presbyterian MedicalCenter Acute Care Replacement1300 N. Vermont Ave.Los Angeles 90027
291.02 51-bed replacement acute care services building April 20182021174,954
Hollywood Presbyterian Medical CenterKMD Architects
Skanska USA Inc.(213) 694-3630
1 Business Journal estimate.2 Information from BuildCentral Inc.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2020. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2020 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Ranked by construction costGENERAL CONSTRUCTION PROJECTS NEXT WEEK
Chambers of CommerceTHE LIST
Since 1919, Rosendin has created a reputation for building quality electrical installations, building value for clients, and building people. Get inspired at rosendin.com.
CA License #142881
LEAD. INSPIRE. BUILD.
Continued on page 16
015-20_Gen Constr_LIST.indd 15015-20_Gen Constr_LIST.indd 15 9/24/20 6:00 PM9/24/20 6:00 PM
16 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 28, 2020
Continued on page 18
Continued from page 15GENERAL CONSTRUCTION PROJECTS
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
15Vermont Corridor LA County DMHHeadquarters510-532 S. Vermont Ave.Los Angeles 90020
$270.01 21-story building including 1,900-car parkinggarage and ground floor retail space
October 2018Late 2021468,000
Los Angeles CountyY&M Architects/Steinberg Architects
Hathaway DinwiddieConstruction Co.(213) 236-0500
16Ferrante1000 W. Temple St.Los Angeles 90012
255.01 seven-story building with 1,437 apartments,commercial space and parking for 2,606 cars and1,680 bicycles
February 2019Winter 20201,286,091
G.H. Palmer AssociatesNelson/Boivin Architecture and Planning
G.H. Palmer Associates(310) 207-3100
178th & Figueroa744 Figueroa St.Los Angeles 90017
250.0 42-story high rise with 438 rental unit July 20202023850,000
Mitsui Fudosan AmericaJohnson Fain
Lendlease (US) ConstructionInc.(213) 430-4660
18LAX Intermodal TransportationFacility West Parking Structure &Mobility Hub6101 W. 98th St.Los Angeles 90045
248.0 four-level parking structure with 4,500 stalls 201820211,700,000
Los Angeles World AirportsWatry Design Inc./Gensler
Swinerton Builders(213) 896-3400
19Martin Luther King Jr. BehavioralHealth Center1670 E. 120th St.Los Angeles 90059
245.0 rehabilitation of existing MLK hospital September 2019June 2021487,000
County of Los AngelesHOK
Bernards(818) 898-1521
20Ivy Station8824 National Blvd.Culver City 90232
240.0 mixed-use complex featuring 148-room hotel,office space and 200 apartments
June 20172021500,000
Lowe EnterprisesEhrlich Yanai Rhee Chaney Architects
Bernards(818) 898-1521
21Fig+Pico1248 S. Figueroa St.Los Angeles 90015
235.0 two towers; a 42-story tower with 820 rooms splitbetween the Marriott brands Moxy and AC Hotels;25-story tower with 300 rooms for the HiltonGarden Inn
January 2020June 2022505,000
Lightstone GroupGensler
Suffolk Construction(213) 861-6100
22Kaiser Permanente Downey MedicalCenter Tower Expansion9333 Imperial HighwayDowney 90242
226.0 six-story 96-bed tower expansion June 1, 2016Dec. 30, 2020141,000
Kaiser PermanenteHMC Architects
Hensel Phelps ConstructionCo.(949) 852-0111
23Dignity Health Hospital MedicalCenter Emergency Department &Women's Services Building1401 S. Grand Ave.Los Angeles 90015
215.01 four-story 345-bed tower addition andrenovations to the California Hospital MedicalCenter
January 2019Late 2020150,460
CommonSpirit HealthDevenney Group/Stantec Inc.
Swinerton Builders(213) 896-3400
Kurve on Wilshire2900 Wilshire Blvd.Los Angeles 90010
215.0 23-story residential towers with 648 units with a1-acre amenity deck, 1,000 parking spaces and15,000 square feet of ground level retail
March 2019May 20211,250,000
Hankey Investment Company LPJamisonPropertiesLARGE Architecture
AECOM-Hunt/WilshireConstruction(213) 593-8100/(213) 788-3339
25Perla on Broadway359 S. BroadwayLos Angeles 90013
208.0 38-story luxury condo tower with 450 units February 2017Winter 2020709,677
Shanghai Construction Group AmericaCallisonRTKL
Swinerton Builders(213) 568-6666
26Landmark II11750 Wilshire Blvd.Los Angeles 90670
203.0 34-story building totaling 376 apartments March 2018April 2021415,000
Douglas Emmett Inc.Gensler
Matt Construction Corp.(562) 903-2277
27NoHo West6150 Laurel Canyon Blvd.North Hollywood 91606
200.02 mixed-use complex with 742 apartments April 2017Fall 2020570,000
Merlone Geier Partners/GPI Cos.STIR Architecture
W.E. O'Neil Construction Co.of California(310) 643-7900
28Caltech Chen Neuroscience ResearchBuilding1200 E. California Blvd.Pasadena 91125
194.0 three-story neuroscience research and classroombuilding with 15 research labs
April 13, 2017Oct. 5, 2020144,780
CaltechSmithGroup
Hensel Phelps ConstructionCo.(949) 852-0111
1 Information from BuildCentral Inc.2 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2020. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2020 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
015-20_Gen Constr_LIST.indd 16015-20_Gen Constr_LIST.indd 16 9/24/2020 1:29:32 PM9/24/2020 1:29:32 PM
18 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 28, 2020
Continued on page 20
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
29Hollywood Presbyterian MedicalCenter1300 N. Vermont Ave.Los Angeles 90027
$188.31 acute care services replacement hospital building September 2017Late 2020174,954
Hollywood Presbyterian Medical CenterKMD Architects
Skanska USA Inc.(213) 694-3630
30UCLA Lot 15 Residence HallWest of De Neve Drive and south of theHitch SuitesLos Angeles 90024
181.02 residence hall featuring two mid-rise buildingshousing up to 1,800 undergraduate beds
July 2019Fall 2021353,000
UCLAMithun Partners Inc.
PCL Construction Services Inc.(818) 246-3481
31Four Seasons Private Residences atLos Angeles9000 W. 3rd St.Los Angeles 90048
180.0 58 luxury condominiums June 2017October 2020372,000
Genton Property GroupRTKL Associates Inc. / CallisonRTKL Inc.
Webcor(213) 239-2800
The Park Santa Monica500 Broadway Blvd.Santa Monica 90401
180.0 249-unit mixed-used apartment complex Aug. 9, 2019Nov. 21, 2020630,000
DK BroadwayKoning Eizenberg / Large Architecture
Charles Pankow Builders(626) 304-1190
LAX - Airport Police Facility9150 S. Loyola Blvd.Los Angeles 90045
180.0 consolidating multiple departments in this onebuilding, which includes a training facility andparking structure
June 20, 2018June 18, 2021165,000
Los Angeles World AirportsSOM, Skidmore, Owings, & Merrill
Hensel Phelps(949) 852-0111
Manhattan Village Expansion3200 Sepulveda Ave.Manhattan Beach 90266
180.02 Phase I construction of two parking decks,additional stores and restaurants; Phase IIdemolishing an adjacent movie theater and retailstores; Phase III two-story parking garage, retailand restaurant space
June 20182021200,000
RREEF Real EstateCallisonRTKL
W.E. O'Neil Construction Co.of California(310) 643-7900
35Cal State Los Angeles StudentHousing East5151 State University DriveLos Angeles 90032
165.3 new student housing facility June 2018September 2021380,000
Cal State Los AngelesHarley Ellis Devereaux
McCarthy Building Cos. Inc.(949) 851-8383
36John H. Francis Polytechnic HighSchool12431 Roscoe Blvd.Sun Valley 91352
159.7 modernization and new construction of 20buildings
June 2019October 2023200,000
LAUSDCO Architects
Bernards(818) 898-1521
37Cumulus Apartment Tower3311-3321 La CienegaLos Angeles 90016
157.02 30-story apartment tower with 300 units and retailand restaurant space
May 20182021NA
Carmel PartnersTCA Architects
Carmel Partners(424) 291-8604
38Rise Koreatown750 S. Oxford Ave.Los Angeles 90005
153.72 seven-story mixed-use development will include367 residential units above commercial space
Fall 20192021NA
Rescore Property Corp./Cal CoastDevelopmentNadel Architects Inc.
Bernards(818) 898-1521
39Lincoln Boulevard Collection1601, 1613, 1637 and 1641 LincolnBlvd.Santa Monica 90404
150.02 four buildings on Lincoln Boulevard with a total of421 apartment units with retail and restaurantspace on the ground floor
February 2018Summer 2021NA
Century West PartnersMichael W. Folonis Architects
Milender White Construction(949) 724-9531
40LAUSD Belvedere Middle School312 N. Record Ave.Los Angeles 90063
148.0 renovation, demolition and construction ofmultiple new buildings on campus, including newshade structures and outdoor eating areas.
April 1, 2020May 1, 2024160,500
Los Angeles Unified School DistrictNAC
Hensel Phelps(949) 852-0111
41LAUSD Roosevelt High School456 S. Mathews St.Los Angeles 90033
147.0 three-story 78-classroom building; two-storyadministration building; two-story gymnasium;one-story performing arts center
20172022226,773
Los Angeles Unified School DistrictLPA Inc.
Swinerton Builders(213) 896-3400
42Dignity California Hospital andMedical Center Expansion1401 S. Grand Ave.Los Angeles 90015
142.0 new four-story acute care tower addition toexisting hospital
20172021145,000
CommonSpirit HealthDevenney Group
Swinerton Builders(213) 896-3400
43Entrada6181 Centinela Ave.Culver City 90230
135.0 creative and mixed-use office October 2019April 2021300,000
LPC WestGensler
KPRS Construction(714) 672-0800
1 Business Journal estimate.2 Information from BuildCentral Inc.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2020. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2020 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Continued from page 16GENERAL CONSTRUCTION PROJECTS
015-20_Gen Constr_LIST.indd 18015-20_Gen Constr_LIST.indd 18 9/24/2020 1:29:53 PM9/24/2020 1:29:53 PM
20 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 28, 2020
BUILD BETTERBUILD SAFERBUILD w
ith
Jon P. PreciadoSouthern California
District Council(626) 350-6900
www.SCDCL.org
SAFE | ON-TIME | UNDER BUDGET
Sergio RasconLIUNA Local 300
- Los Angeles -(213) 385-3550
www.Local300.com
Mario SualesLIUNA Local 1309
- Long Beach -(562) 421-9346
www.Local1309.com
Build Better with LIUNA and its contractors, who create industry-specific agreements and are committed to the skills and safety training of craftspeople that the industry demands.
Build Safer with LIUNA and its contractors, who establish safe work environments for employees and the public during uncertain times brought on by the current COVID-19 crisis.
Build with LIUNA and its contractors, who raise industry standards, promote quality, and most importantly, protect the bottom line. So on your next project, build with
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
44Catherine Santa Monica1601 Lincoln Blvd.Santa Monica 90404
$124.0 four-story mixed-use rental building with 282units
January 2018March 2021300,000
Century West PartnersMichael Folonis Architects and KilleferFlammang Architects
Milender White Construction(949) 724-9531
LAUSD Venice High School13000 Venice Blvd.Los Angeles 90066
124.0 renovation, demolition and new construction ofmultiple buildings on campus including a newfootball field, track and gymnasium
July 31, 2017May 7, 2022113,318
Los Angeles Unified School DistrictNAC
Hensel Phelps(949) 852-0111
46Hollywood Park Residential2988 & 2998 E. Hardy St.Inglewood 90303
121.6 two, 5-story residential buildings at HollywoodPark consisting of 314 residential units
February 2020February 2022683,535
Wilson MeanyTCA Architects
Bernards(818) 898-1521
47Hollywood Park1213 S. District DriveInglewood 90305
117.0 retail project Jan. 7, 2020April 29, 2022351,000
Hollywood Park Retail/CommercialInvestorsBCV; Architects Orange
Webcor(213) 239-2800
48Santa Monica High School DiscoveryBuilding601 Pico Blvd.Santa Monica 90405
115.0 new building, construction of a pool, andlandscape and hardscape constituting
June 2019August 2021265,000
Santa Monica-Malibu Unified SchoolDistrictHED Design
McCarthy Building Cos. Inc.(949) 851-8383
49Skechers World Headquarters330 S. Sepulveda Blvd.Manhattan Beach 90266
114.0 new headquarters consisting of a 180,000-squarefoot building with 3 levels above ground and 3levels of parking below ground.
October 2018April 2021180,000
SkechersDavid Forbes Hibbert
McCarthy Building Cos. Inc.(949) 851-8383
50Wilshire & La Jolla Apartments6401 Wilshire Blvd.Los Angeles 90048
112.4 17-story multi-family apartment tower with 112units
March 2020March 2022298,000
WS Communities Inc.Steinberg Hart
Gilbane(213) 440-0870
NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractors,architects and BuildCentral Inc. Projects must be under construction as of August 2020. To the best of our knowledge,this information is accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the
list, omissions and typographical errors sometimes occur. Please send corrections or additions on company letterheadto the Research Department, Los Angeles Business Journal, 11150 Santa Monica Blvd., Suite 350, Los Angeles 90025.©2020 Los Angeles Business Journal. This list may not be reprinted in whole or in part without prior written permissionfrom the editor. Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Continued from page 18GENERAL CONSTRUCTION PROJECTS
015-20_Gen Constr_LIST.indd 20015-20_Gen Constr_LIST.indd 20 9/24/2020 1:30:31 PM9/24/2020 1:30:31 PM